Penetrating type deep-layer post-grouting reserved pipeline structure of basement bottom plate

Through the two-stage assembly-deep deep grouting reserved pipeline structure of basement floor bottom plate, the construction difficulty of grouting pipelines and the waterproofing of the bottom plate are solved, and more efficient construction and stronger waterproofing performance are achieved.

CN222275495UActive Publication Date: 2024-12-31SHEN ZHEN SHI JIN ZHONG JI TUAN GU FEN YOU XIAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420880291.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-12-31
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

In basement construction, the construction of grouting pipelines is difficult, the grouting quality is difficult to ensure, and the waterproofing treatment of the bottom plate is complicated and easy to seep water, which affects the usability and aesthetics of the building.

Method used

The basement floor bottom plate penetrating deep grouting reserved pipeline structure adopts two-stage assembly design, including the first grouting pipe and the second grouting pipe, the second grouting pipe is higher than the bottom plate, and the sand and gravel layer is filled inside. The grouting pipe is sealed with an asphalt paste layer, and a powerful waterproof system is formed through water-stop steel plates and asphalt layers, reducing construction complexity and improving waterproof performance.

Benefits of technology

The construction process is simplified, the stability and waterproof performance of the grouting pipe are improved, the bottom plate is effectively prevented, and the waterproof performance and structural stability of the building are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222275495U_ABST
    Figure CN222275495U_ABST
Patent Text Reader

Abstract

The basement bottom plate penetrating type deep layer post-grouting reserved pipeline structure comprises a basement bottom plate, a first grouting pipe and a second grouting pipe are arranged on the basement bottom plate in a penetrating mode, one end of the second grouting pipe communicates with the first grouting pipe, and the other end of the second grouting pipe communicates with the first grouting pipe. One end of the first grouting pipe is connected with the second grouting pipe, the other end of the second grouting pipe is located at a water collecting well, communicated with the outside and higher than the top face of the basement bottom plate, the first grouting pipe and the second grouting pipe are connected through a connector connecting piece, the second grouting pipe is filled with a gravel layer, and the first grouting pipe is filled with an asphalt factice layer. Different from a traditional single-section grouting pipe, the grouting pipe adopts the two-section assembly design, due to the segmented assembly mode, installation is more convenient, the construction difficulty is reduced, meanwhile, the overall stability is improved, the grouting pipe is firmer and more reliable, the construction efficiency of the grouting pipe is effectively improved, the construction complexity is reduced, and the construction cost is reduced. And the problem of water seepage of the bottom plate is effectively prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of basement construction, and in particular to a basement floor penetrating deep post-grouting reserved pipeline structure. Background Art

[0002] The grouting pipe opening refers to the pipe or hole used to inject grouting materials in the construction of underground structures. It is a key component in the grouting process and is used to guide the grouting materials to the places that need to be reinforced or repaired. Grouting can be divided into two types according to the construction sequence. One is to bury the conduit by drilling after the base plate construction is completed. This method has a complicated construction process, the grouting is prone to leakage, and the construction quality is difficult to guarantee. The other is to complete the construction of the conduit and then the grouting by reserving and pre-buried during the base plate construction. This method is difficult to waterproof the base plate and is prone to water seepage, which affects the usability and aesthetics of the building. Utility Model Content

[0003] In order to solve the above-mentioned technical problems, the present application provides a basement floor penetrating deep post-grouting reserved pipe structure that reduces construction difficulty and solves the problems of grouting quality and floor seepage.

[0004] A basement floor penetrating deep post-grouting reserved pipeline structure comprises a basement floor, wherein a first grouting pipe and a second grouting pipe are penetrated on the basement floor, one end of the second grouting pipe is connected to the first grouting pipe, and the other end is located at a water collection well and connected to the outside and is higher than the top surface of the basement floor, the first grouting pipe and the second grouting pipe are connected by a joint connector, the second grouting pipe is filled with a sand and gravel layer, and the first grouting pipe is filled with an asphalt paste layer.

[0005] As described above, in the basement floor penetrating deep post-grouting reserved pipe structure, the second grouting pipe is 200 mm higher than the basement floor, and one end of the second grouting pipe away from the first grouting pipe is also covered with a conduit cover.

[0006] As described above, in the basement floor penetrating deep post-grouting reserved pipe structure, the second grouting pipe is wrapped with an asphalt layer around one end away from the first grouting pipe, and the length of the asphalt layer is 400 mm.

[0007] As described above, in the basement floor penetrating deep post-grouting reserved pipe structure, an end of the first grouting pipe away from the second grouting pipe is provided with an asphalt cap for sealing the asphalt paste layer.

[0008] As described above, in the basement floor penetrating deep post-grouting reserved pipe structure, the middle parts of the first grouting pipe and the second grouting pipe are both provided with water-stop steel plates.

[0009] In the basement floor penetrating deep post-grouting reserved pipe structure as described above, the length of the asphalt paste layer is 700 mm.

[0010] As described above, the basement floor penetrating deep post-grouting reserved pipeline structure, the basement floor includes a concrete base and a water collection well, and the lower end of the first grouting pipe is penetrated under the concrete base and passes through the concrete base.

[0011] As described above, in the basement floor penetrating deep post-grouting reserved pipe structure, the length a of the first grouting pipe passing through the concrete base is 100 mm.

[0012] As described above, in the basement floor penetrating deep post-grouting reserved pipe structure, a waterproof membrane is also provided on the periphery of the first grouting pipe located on the upper side of the concrete base.

[0013] As described above, in the basement floor penetrating deep post-grouting reserved pipe structure, the length of the waterproof membrane is 200 mm.

[0014] Compared with the prior art, the present invention has the following beneficial effects:

[0015] The present application provides a basement floor penetrating deep post-grouting reserved pipe structure. By setting a first grouting pipe and a second grouting pipe, unlike the traditional single-section grouting pipe, the grouting pipe of the present application adopts a two-section assembly design. This segmented assembly method is more convenient during installation, reduces the difficulty of construction, and improves the overall stability, making the grouting pipe more sturdy and reliable. It not only effectively improves the construction efficiency of the grouting pipe and reduces the construction complexity, but also effectively prevents water seepage in the floor and improves the waterproof performance of the floor. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for describing the embodiments.

[0017] Figure 1 This is a schematic diagram of a basement floor penetrating deep post-grouting reserved pipeline structure of the present application;

[0018] Figure 2 This is an enlarged view of point A of a basement floor penetrating deep post-grouting reserved pipe structure of the present application. DETAILED DESCRIPTION

[0019] The utility model is further described below in conjunction with the accompanying drawings:

[0020] like Figure 1-2As shown, a basement floor penetrating deep post-grouting reserved pipeline structure includes a basement floor 1, a first grouting pipe 2, a second grouting pipe 3, a water collection well 11, a water steel plate 4, a sand and gravel layer 5, an asphalt grease layer 6, a joint connector 8 and an asphalt layer 9.

[0021] A basement floor penetrating deep post-grouting reserved pipeline structure comprises a basement floor 1, wherein a first grouting pipe 2 and a second grouting pipe 3 are penetrated on the basement floor 1, wherein one end of the second grouting pipe 3 is connected to the first grouting pipe 2, and the other end is located at a water collection well 11 and is connected to the outside and is higher than the top surface of the basement floor 1, wherein the first grouting pipe 2 and the second grouting pipe 3 are connected via a joint connector 8, wherein a sandstone layer 5 is filled in the second grouting pipe 3, and an asphalt paste layer 6 is sealed in the first grouting pipe 2, wherein the first grouting pipe and the second grouting pipe are arranged, and the second grouting pipe and the second grouting pipe are connected to the first grouting pipe 2 and the second grouting pipe are connected to the first grouting pipe 2 and the second grouting pipe 3, wherein the first grouting pipe 2 ... are connected to the first grouting pipe 2 and the second grouting pipe are connected to the first grouting pipe 2 and the second grouting pipe are connected to the first grouting pipe 2 and the second grouting pipe are connected to the first Unlike the traditional single-section grouting pipe, the grouting pipe of the present application adopts a two-section assembly design. This segmented assembly method is more convenient during installation, reduces the difficulty of construction, and improves the overall stability, making the grouting pipe more sturdy and reliable. It not only effectively improves the construction efficiency of the grouting pipe and reduces the complexity of construction, but also effectively prevents water seepage from occurring in the base plate and improves the waterproof performance of the base plate. The present application sets the grouting pipe inside the water collection well (original layout or newly added), which can better guide groundwater flow, avoid water retention under the base plate, and further reduce the occurrence of water seepage problems in the base plate.

[0022] Preferably, the second grouting pipe 3 is 200 mm higher than the top surface of the basement floor 1, and the end of the second grouting pipe 3 away from the first grouting pipe 2 is also covered with a conduit cover 30. By setting the conduit cover, top sealing measures are taken, and by adopting a special segmented assembly and waterproof design, the connection between the floor and the grouting pipe is made firmer. Through grouting, the bearing capacity of the deep soil layer and the side friction resistance and end resistance of the pile foundation can be effectively improved, thereby ensuring the stability of the overall structure.

[0023] Preferably, the end of the second grouting pipe 3 away from the first grouting pipe 2 is wrapped with an asphalt layer 9, the length of the asphalt layer 9 is 400 mm, and the asphalt layer is formed by wrapping asphalt + fiber mesh cloth. The inner wall of the pipe is coated with asphalt and filled with sand and gravel, which effectively improves the bearing capacity of the deep soil layer or pile foundation and ensures the waterproof performance and structural stability of the base plate.

[0024] Preferably, an end of the first grouting pipe 2 away from the second grouting pipe 3 is provided with an asphalt cover 20 for sealing the asphalt jelly layer 6, the asphalt cover is formed by wrapping asphalt + fiber mesh cloth, and the bottom of the grouting pipe is sealed with asphalt jelly.

[0025] Preferably, the middle of the first grouting pipe 2 and the second grouting pipe 3 are both provided with a water-stopping steel plate 4, which effectively isolates the penetration of external moisture and improves the sealing performance inside the grouting pipe. These measures together constitute a powerful external waterproof system.

[0026] Preferably, the length of the asphalt grease layer 6 is 700 mm. Insufficient bearing capacity of the deep soil layer and pile foundation may cause serious structural problems. The present application adopts a special segmented assembly and waterproof design to make the connection between the base plate and the grouting pipe more secure. Through grouting, the bearing capacity of the deep soil layer and the side friction and end resistance of the pile foundation can be effectively improved, thereby ensuring the stability of the overall structure.

[0027] Preferably, the basement floor 1 includes a concrete base 10 and a water collection well 11, and the lower end of the first grouting pipe 2 is penetrated through the lower side of the concrete base 10 and passes through the concrete base 10. By arranging the first grouting pipe to pass through the concrete base, the bearing capacity of the deep soil layer or the pile foundation is effectively improved, and the waterproof performance and structural stability of the floor are ensured. After grouting, the bearing capacity of the deep soil layer and the side friction resistance and end resistance of the pile foundation can be effectively improved, thereby ensuring the stability of the overall structure.

[0028] Preferably, the length a of the first grouting pipe 2 passing through the concrete base 10 is 100 mm.

[0029] Preferably, a waterproof membrane 7 is also provided on the upper side of the concrete base layer 10 around the first grouting pipe 2. The present application adopts multiple waterproof measures on the outside of the first grouting pipe. First, the setting of two water-stopping steel plates effectively isolates the penetration of external moisture; secondly, the water-swellable waterstop strip (not marked in the figure) at the bottom of the first grouting pipe can expand rapidly when encountering water to prevent moisture from penetrating. On the inner side of the first grouting pipe, the upper and lower ends are sealed with asphalt paste, which effectively isolates the entry of moisture and improves the sealing performance of the inside of the grouting pipe. These measures together constitute a powerful external waterproof system.

[0030] Preferably, the length of the waterproof coiled material 7 is 200 mm.

[0031] Specific construction technology:

[0032] Set the second grouting pipe at the water collection well. Seal the bottom of the first grouting pipe with asphalt jelly and wrap it with asphalt + fiber mesh cloth. While constructing the concrete cushion layer, insert the first grouting pipe according to the predetermined position, and the bottom of the first grouting pipe penetrates 100mm below the concrete base. After the cushion layer construction is completed, start the waterproof layer construction. On the side of the conduit, the waterproof layer is turned up by no less than 200mm. At the turned-up node, the waterproof membrane is reinforced, sealed with asphalt jelly and tied tightly.

[0033] Prepare the second grouting pipe. After applying asphalt, install the second grouting pipe on the top of the first grouting pipe through the joint connector, then fill in sand and gravel, and take top sealing measures. Install two waterstop steel plates in the middle of the first grouting pipe and the second grouting pipe respectively, then complete the bottom plate reinforcement binding and concrete pouring, and the construction is completed.

[0034] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A basement floor penetrating deep post-grouting reserved pipeline structure, characterized by: The invention comprises a basement floor (1), wherein a first grouting pipe (2) and a second grouting pipe (3) are provided on the basement floor (1), one end of the second grouting pipe (3) is connected to the first grouting pipe (2), and the other end is located at a water collection well (11) and is connected to the outside and is higher than the top surface of the basement floor (1), the first grouting pipe (2) and the second grouting pipe (3) are connected via a joint connector (8), the second grouting pipe (3) is filled with a sand and gravel layer (5), and the first grouting pipe (2) is filled with an asphalt paste layer (6).

2. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 1 is characterized by: The second grouting pipe (3) is 200 mm higher than the basement floor (1), and one end of the second grouting pipe (3) away from the first grouting pipe (2) is also covered with a conduit cover (30).

3. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 1 is characterized by: The circumference of one end of the second grouting pipe (3) away from the first grouting pipe (2) is wrapped with an asphalt layer (9), and the length b of the asphalt layer (9) is 400 mm.

4. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 1 is characterized by: An asphalt cover (20) for sealing the asphalt paste layer (6) is provided at one end of the first grouting pipe (2) away from the second grouting pipe (3).

5. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 1 is characterized by: A water-stop steel plate (4) is provided in the middle of each of the first grouting pipe (2) and the second grouting pipe (3).

6. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 1 is characterized by: The length c of the asphalt grease layer (6) is 700 mm.

7. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 1 is characterized by: The basement floor (1) comprises a concrete base (10) and a water collection well (11), and the lower end of the first grouting pipe (2) is arranged on the lower side of the concrete base (10) and passes through the concrete base (10).

8. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 7 is characterized by: The length a of the first grouting pipe (2) passing through the concrete base (10) is 100 mm.

9. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 7 is characterized by: A waterproof coiled material (7) is also provided on the circumferential side of the first grouting pipe (2) and located on the upper side of the concrete base (10).

10. The basement floor penetrating deep post-grouting reserved pipeline structure according to claim 9 is characterized by: The length d of the waterproof coiled material (7) is 200 mm.