Filtering silt inspection well

By designing a filtered sludge inspection well in the sludge well, using the grid to filter the debris and perform secondary precipitation, the problem that the sludge well cannot settle floating objects is solved, avoiding pump station failures and improving sewage treatment stability.

CN222275716UActive Publication Date: 2024-12-31BEIJING NORTH DRAINAGE DESIGN & RES INST CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420105324.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-16
Publication Date
2024-12-31
Estimated Expiration
2034-01-16

AI Technical Summary

Technical Problem

The existing sludge wells cannot effectively precipitate floating objects such as plastic and paper towels in the sewage, resulting in the fan blades of the lift pump being wrapped and the water inlet is blocked, causing the pump station to fail.

Method used

A filtered sedimentation sludge inspection well is designed, including a well chamber, a sedimentation chamber, a water inlet, a water outlet and a filtering mechanism. The debris is filtered through the grid, and secondary precipitation is carried out during the flow process to store the fallen sludge. Avoid debris wrapping the lift pump fan blades.

Benefits of technology

Effectively block debris, prevent pump station failure, and perform secondary sedimentation and storage of sludge, solving the problem that existing sludge wells cannot effectively precipitate floating objects, and improving the stability and efficiency of sewage treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222275716U_ABST
    Figure CN222275716U_ABST
Patent Text Reader

Abstract

The utility model discloses a silt filtering inspection well which comprises a well chamber, a manhole is arranged at the upper end of the well chamber, a settling chamber is arranged at the lower end of the well chamber, the settling chamber is provided with a water inlet and a water outlet, a filtering mechanism is arranged at the water outlet, and sewage can overflow the filtering mechanism to enter the water outlet. The silt filtering inspection well can be independently used as a silt well according to the volume of the settling chamber, can also be arranged on a water outlet pipeline of an original silt well and is connected with the silt chamber and a water outlet of the silt well through a water inlet, so that sundries can be blocked and prevented from being discharged out of the settling chamber, and the silt filtering inspection well is convenient to use. Failure of the lifting pump of the pump station caused by the fact that the sundries wind the fan blades of the lifting pump and block a water inlet is prevented, secondary sedimentation can be carried out, and sludge which falls off and is attached to the impurities in the flowing process can be stored.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of sewage discharge, and more specifically relates to a filtering sludge inspection well. Background Art

[0002] At present, the sedimentation well only has the function of sedimentation. When it is connected to the sewage lift pump station downstream, floating objects such as plastics and paper towels in the sewage often fail to settle effectively, entangle the lift pump blades, block the water inlet, and cause the pump station lift pump to malfunction. Utility Model Content

[0003] The purpose of the utility model is to provide a filtering sludge inspection well to address the deficiencies in the prior art and to solve the problem that floating objects such as plastics and paper towels in the existing sewage fail to settle effectively, entangle the lift pump blades, block the water inlet and cause the pump station lift pump to malfunction.

[0004] In order to achieve the above object, the utility model provides a filtering sludge inspection well, comprising:

[0005] A well chamber, wherein a manhole is arranged at the upper end of the well chamber, a sedimentation chamber is arranged at the lower end of the well chamber, the sedimentation chamber is arranged with a water inlet and a water outlet, a filtering mechanism is arranged at the water outlet, and sewage can overflow the filtering mechanism and enter the water outlet.

[0006] Optionally, the inner wall of the well chamber is provided with a ladder or steps.

[0007] Optionally, the water inlet and the water outlet are cylindrical with the same diameter, and the water inlet and the water outlet are coaxially arranged relative to each other.

[0008] Optionally, the filtering mechanism comprises a grille, and connecting parts are respectively provided on both sides of the water outlet, and both ends of the grille are respectively connected to the two connecting parts.

[0009] Optionally, the upper end of the grille is not lower than the water outlet, and the lower end of the grille is connected to the bottom of the well.

[0010] Optionally, the plane where the grille is located is perpendicular to the axis of the water outlet, and a gap is provided between the grille and the water outlet.

[0011] Optionally, a water outlet pipe is connected to the water outlet, and an inclined brace is provided on the periphery of the well chamber, and the inclined brace is used to support the water outlet pipe to be horizontal.

[0012] Optionally, a gap is provided between the inlet end of the water outlet pipe and the grille.

[0013] Optionally, the well chamber is in a vertical cylindrical shape, and the diameter of the water inlet is not greater than the radius of the well chamber.

[0014] Optionally, a water inlet pipe is connected to the water inlet, and a gap between the water inlet pipe and the water outlet pipe is not less than the radius of the well chamber.

[0015] The utility model provides a filtering sludge inspection well, which has the following beneficial effects:

[0016] The filtered sludge inspection well can be used as an independent sludge well according to the volume of the sedimentation chamber, and can also be set on the outlet pipe of the original sludge well. It is connected with the sludge chamber and the drain outlet of the sludge well through the water inlet. It can block the debris and prevent it from being discharged from the sedimentation chamber, and prevent the debris from entangled in the lift pump blades and blocking the water inlet, causing the pump station lift pump failure. It can also carry out secondary sedimentation and store the sludge attached to the impurities that falls off during the flow process.

[0017] Other features and advantages of the present invention will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The above and other objects, features and advantages of the present invention will become more apparent through a more detailed description of exemplary embodiments of the present invention in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present invention.

[0019] Figure 1 A schematic diagram of the main structure of a filtering sludge inspection well according to an embodiment of the utility model is shown.

[0020] Figure 2 A schematic diagram of the top view of a filtering sludge inspection well according to an embodiment of the utility model is shown.

[0021] Figure 3 A side structural schematic diagram of a filtering sludge inspection well according to an embodiment of the utility model is shown.

[0022] Description of reference numerals:

[0023] 1. Well chamber; 2. Grille; 3. Water inlet pipe; 4. Water outlet pipe; 5. Step; 6. Manhole; 7. Diagonal brace. DETAILED DESCRIPTION

[0024] The preferred embodiments of the present invention will be described in more detail below. Although the preferred embodiments of the present invention are described below, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to fully convey the scope of the present invention to those skilled in the art.

[0025] like Figure 1-3As shown, a filtering sludge inspection well comprises:

[0026] The well chamber 1 has a manhole 6 at its upper end, a sedimentation chamber at its lower end, a water inlet and a water outlet, a filtering mechanism at the water outlet, and sewage can flow over the filtering mechanism and enter the water outlet.

[0027] Specifically, the filtering mechanism is used to prevent debris from being discharged from the sedimentation chamber, and to prevent debris from entangled in the lift pump blades and blocking the water inlet, causing the pump station lift pump to fail. When sludge and debris accumulate and block the filtering mechanism, the accumulated sewage overflows the filtering mechanism and directly enters the water outlet, preventing the accumulated sewage from overflowing through the manhole 6.

[0028] Furthermore, the inspection well can be used independently as a sludge well according to the volume of the sedimentation chamber, or it can be set on the outlet pipe of the original sludge well and connected to the sludge chamber and the drain outlet of the sludge well through the water inlet. It can not only block debris, but also carry out secondary sedimentation, and store the sludge attached to impurities that falls off during the flow process.

[0029] In this embodiment, a ladder or steps 5 are provided on the inner wall of the well chamber 1 .

[0030] Specifically, the bottom of the well is entered through a ladder or steps 5, and the steps 5 are arranged in a staggered manner.

[0031] In this embodiment, the water inlet and the water outlet are cylindrical with the same diameter, and the water inlet and the water outlet are coaxially arranged opposite to each other.

[0032] In this embodiment, the filtering mechanism includes a grille 2, and connecting parts are respectively provided on both sides of the water outlet, and both ends of the grille 2 are respectively connected to the two connecting parts.

[0033] Specifically, filtering is performed through the grille 2, and the stability of the support of the grille 2 is ensured by the connection part.

[0034] In this embodiment, the upper end of the grille 2 is not lower than the water outlet, and the lower end of the grille 2 is connected to the bottom of the well.

[0035] Specifically, the upper end of the grille 2 is not lower than the water outlet to ensure the filtering effect of the grille 2, and the lower end of the grille 2 is connected to the bottom of the well to prevent debris from being impacted by the water flow and passing through the grille 2 from the bottom, thereby improving the stability of the grille 2.

[0036] In this embodiment, the plane where the grille 2 is located is perpendicular to the axis of the water outlet, and a gap is provided between the grille 2 and the water outlet.

[0037] Specifically, the filtering area of ​​the grille 2 is larger than the cross-sectional area of ​​the water outlet, and a gap is left to prevent debris from being sucked out of the water outlet and blocking the grille 2 near the water outlet.

[0038] In this embodiment, a water outlet pipe 4 is connected to the water outlet, and an oblique support 7 is provided on the outer periphery of the well chamber 1 , and the oblique support 7 is used to support the water outlet pipe 4 horizontally.

[0039] Specifically, the oblique braces 7 are used to improve the support stability of the mud outlet and the mud inlet to the mud outlet pipe and the mud inlet pipe respectively.

[0040] In this embodiment, a gap is provided between the inlet end of the water outlet pipe 4 and the grille 2 .

[0041] In this embodiment, the well chamber 1 is in a vertical cylindrical shape, and the diameter of the water inlet is not greater than the radius of the well chamber 1 .

[0042] Specifically, there is a gap between the water inlet pipe 3 and the water outlet pipe 4, and the gap allows the sewage to be depressurized and dispersed, which is conducive to dispersing debris.

[0043] In this embodiment, a water inlet pipe 3 is connected to the water inlet, and a gap between the water inlet pipe 3 and the water outlet pipe 4 is not less than the radius of the well chamber 1 .

[0044] Specifically, it is ensured that the water outflowing from the water inlet pipe 3 will not directly enter the water outlet pipe 4 due to the water pressure.

[0045] When a filtering sludge inspection well of the present embodiment is used, taking sludge use as an example, sewage enters the sedimentation chamber through the water inlet pipe 3, and floating debris is blocked in the sedimentation chamber by the filtering mechanism to prevent the debris from entangled in the lift pump blades and blocking the water inlet.

[0046] The above description of various embodiments of the utility model is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments.

Claims

1. A filtering sludge inspection well, characterized in that: include: A well chamber, wherein a manhole is arranged at the upper end of the well chamber, a sedimentation chamber is arranged at the lower end of the well chamber, the sedimentation chamber is arranged with a water inlet and a water outlet, a filtering mechanism is arranged at the water outlet, and sewage can flow through the filtering mechanism and enter the water outlet; The inner wall of the well chamber is provided with a ladder or steps; The water inlet and the water outlet are cylindrical in shape with the same diameter, and the water inlet and the water outlet are coaxially arranged opposite to each other; The filtering mechanism comprises a grille, and connecting parts are respectively provided on both sides of the water outlet, and the two ends of the grille are respectively connected to the two connecting parts; The upper end of the grille is not lower than the water outlet, and the lower end of the grille is connected to the bottom of the well; The plane where the grille is located is perpendicular to the axis of the water outlet, and a gap is provided between the grille and the water outlet; A water outlet is connected to the water outlet, and an inclined brace is arranged on the periphery of the well chamber, and the inclined brace is used to support the water outlet to be horizontal; A gap is arranged between the inlet end of the water outlet pipe and the grille.

2. The filtering sludge inspection well according to claim 1 is characterized in that: The well chamber is in a vertical cylindrical shape, and the diameter of the water inlet is not greater than the radius of the well chamber.

3. The filtering sludge inspection well according to claim 2 is characterized in that: The water inlet is connected to a water inlet pipe, and the gap between the water inlet pipe and the water outlet pipe is not less than the radius of the well chamber.

Citation Information

Cited By

  • Filtering silt inspection well

    CN117966866A