Adsorption and desorption system for macroporous resin
By achieving synchronous operation and recycling of dual adsorbers in the macroporous resin adsorption and desorption system, the problem of low adsorption efficiency is solved, the utilization rate of adsorbent and the safety of the system are improved, and acidic exhaust emissions are reduced.
Patent Information
- Application Number
- CN202421468749.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-06-26
AI Technical Summary
The existing macroporous resin adsorbents are inefficient during the desorption process, resulting in incomplete desorption of the desorption tower, affecting production continuity and causing economic losses.
A large-pore resin adsorption and desorption system is designed, including a series adsorption module, a steam desorption module, a separation module and an electrical control module. By controlling the operating status of the adsorber and the steam desorption status of the adsorber, the synchronous operation of the dual adsorbers is achieved. and recycling to avoid desorption speed too fast or too slow, and set up alarm systems and sensors to ensure system safety.
It improves the utilization rate of adsorbent, extends the service life of adsorbent, reduces the emission of acidic waste gas, and ensures the safe operation and production continuity of the system.
Smart Images

Figure CN222286852U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of adsorption and desorption equipment, in particular to an adsorption and desorption system of a macroporous resin. Background Art
[0002] At present, adsorption and desorption use macroporous resin as adsorbent. In the production process, it is mainly aimed at acidic gases in waste gas with low water solubility, poor biodegradability, strong corrosiveness, and secondary pollution easily generated during oxidation and incineration. After the existing macroporous resin adsorption is completed, due to the different rates of adsorption and desorption, the working time of the adsorption tower and the desorption tower is also different, which is not convenient for complete desorption of the adsorbate in the desorption tower. The utilization rate of the adsorbent is low, and it is easy to re-enter the adsorption process before desorption is completed, resulting in incomplete desorption of the desorption tower. If the two towers desorb at the same time, it will cause production shutdown, resulting in serious economic losses. Utility Model Content
[0003] In order to facilitate the complete desorption of the desorption container and improve the utilization rate of the adsorbent, the utility model provides a macroporous resin adsorption and desorption system (this should be the same as the name of the utility model and no other words should be added).
[0004] The macroporous resin adsorption and desorption system provided by the utility model adopts the following technical scheme:
[0005] The adsorption and desorption system of macroporous resin comprises a raw material input module, a series adsorption module, a steam desorption module, a separation module, an electrical control module, a plurality of pipelines and a plurality of solenoid valves, wherein the series adsorption module, the steam desorption module, the separation module and the plurality of solenoid valves are all communicatively connected with the electrical control module, the series adsorption module comprises adsorber 1, adsorber 2 and adsorber 3 which are sequentially connected in series through corresponding pipelines, the adsorber 1, adsorber 2 and adsorber 3, the separation module comprises a condensation module and an oil-water separator; the electrical control module comprises a control system, a security system and an alarm system, and the security system and the alarm system are both communicatively connected with the control system.
[0006] By adopting the above technical scheme, an adsorption and desorption system of a double adsorber and a desorber is completed through adsorber one, adsorber two and adsorber three. The control system controls the operation of the adsorber according to the VOCs concentration in the exhaust gas discharged from adsorber two and adsorber three. Adsorbers one and two are in operation, and adsorber three is desorbed or shut down, or the adsorber is desorbed, and adsorber two and adsorber three are in operation. During desorption and desorption, dual adsorption operation is always maintained to improve the utilization rate of the adsorbent. At the same time, the system controls the desorption steam situation according to the adsorption situation to avoid the desorption and desorption speed being too fast or too full.
[0007] Preferably, the outer surfaces of adsorber 1, adsorber 2 and adsorber 3 are each provided with a plurality of material ports, wherein a portion of the solenoid valves are fixedly connected to the interior of the corresponding material ports, and the interiors of adsorber 1, adsorber 2 and adsorber 3 are each fixedly connected with a pressure sensor and a temperature sensor, and the three pressure sensors and temperature sensors are all communicatively connected to the alarm system.
[0008] Preferably, a spray condenser and a gas-liquid separator are installed in series on one of the pipelines, one of the pipelines of adsorber one, adsorber two and adsorber three is connected to the pipeline at the inlet of the spray condenser, one of the pipelines of adsorber one, adsorber two and adsorber three is connected to the pipeline at the outlet of the gas-liquid separator, and the gas-liquid separator, adsorber one, adsorber two and adsorber three and the oil-water separator are fixedly connected to the inside with liquid level sensors, and each of the liquid level sensors is communicatively connected to the alarm system.
[0009] By adopting the above technical scheme, the air outlets of adsorber 1, adsorber 2, and adsorber 3 are fixedly connected with VOCs concentration detection sensors. When the system detects that the VOCs concentration exceeds the lower explosion limit of the mixed gas, the system automatically alarms, automatically interlocks and cuts off the air inlet valve in the pipeline within 5 to 8 seconds, opens the emergency discharge valve and bypass valve of the pipeline, and the exhaust gas is introduced into the emergency bypass pipeline for discharge; at the same time, if any one of adsorber 1, adsorber 2 and adsorber 3 exceeds the temperature (120℃) or the pressure (65000Pa), an alarm can be sounded, and the double protection ensures the safe operation of the system, and the emergency discharge valve is opened; the bypass valve of the pipeline is opened, and the exhaust gas is introduced into the emergency pipeline for discharge.
[0010] Preferably, the condensation module includes a primary condenser, a secondary condenser, a delivery pump four and a static pressure box, the delivery pump four and the static pressure box are installed in series, the pipeline at the outlet of the gas-liquid separator is fixedly connected to the input end of the delivery pump four, the outlet end of the static pressure box is fixedly connected to the input end of the secondary condenser through a corresponding pipeline, the pipeline of one of the material ports of adsorber one, adsorber two and adsorber three is fixedly connected to the feed end of the primary condenser, the raw material input module includes water vapor input, nitrogen input and a tap water tank, and the tap water tank is fixedly connected to the water inlet pipe and the water outlet pipe of the primary condenser through corresponding pipelines.
[0011] By adopting the above technical solution, after stopping the adsorption, steam is introduced from the top of adsorber 1, adsorber 2 and adsorber 3, the saturated steam under desorption is condensed by the first-stage condenser and then enters the oil-water separator, the non-condensable gas that has not been condensed enters the second-stage condenser and then returns to the front-end exhaust gas fan for adsorption again, and the utilization rate of the adsorbent is improved through multiple adsorptions.
[0012] Preferably, the discharge ends of the primary condenser and the secondary condenser are fixedly connected to the feed end of the oil-water separator, and the two discharge ends of the oil-water separator are respectively fixedly connected to a wastewater station and an output pump 1, and the output end of the output pump 1 is fixedly connected to an oil storage tank through a corresponding pipeline.
[0013] By adopting the above technical solution, the water phase is discharged into sewage treatment through the oil-water separator, and the non-aqueous phase is directly collected as hazardous waste.
[0014] Preferably, the security system includes a liquid level interlock, the output pump is interlocked with the oil storage tank installation liquid level, and the alarm system includes a temperature monitoring alarm function, and the temperature monitoring alarm function is interlocked with the temperature sensor and the tap water tank.
[0015] Preferably, the output end of the tap water tank is fixedly connected to two delivery pumps three, the output ends of the two delivery pumps three are connected in parallel with the input ends, and the water inlets of the adsorber one, adsorber two and adsorber three are fixedly connected to the output end of the delivery pump three through corresponding pipes.
[0016] By adopting the above technical solution, one of the two output pumps three is running normally, and the other is stopped for standby. At the same time, when the high temperature alarm is issued, the dual output pumps three are started at the same time to quickly input the water in the tap water tank into the series adsorption module, thereby accelerating the cooling of absorber one, absorber two and absorber three, and avoiding the over-temperature alarm time being too long.
[0017] As the technical solution of the utility model, the hardware setting provided is only to facilitate the complete desorption of the desorption container on the basis of the hardware facilities and improve the utilization rate of the adsorbent. The specific method of how to achieve the complete desorption of the desorption container and improve the utilization rate of the adsorbent is not the technical problem to be solved and the object of protection of the utility model. At the same time, the communication method between the devices adopts the existing communication method, which is not the innovation point of this application.
[0018] In summary, the utility model has the following beneficial technical effects:
[0019] 1. This control is equipped with an adsorption and desorption system with two adsorbers and one desorber. The control system controls the operation of the adsorbers according to the VOCs concentration in the exhaust gas discharged from the adsorbers 2 and 3. The adsorbers 1 and 2 are in operation, and the adsorber 3 is desorbed or shut down, or the adsorber is desorbed, and the adsorbers 2 and 3 are in operation. During desorption and desorption, the dual adsorption operation is always maintained to improve the utilization rate of the adsorbent; at the same time, the system controls the desorption steam situation according to the adsorption situation to avoid the desorption and desorption speed being too fast or too full;
[0020] 2. This system is equipped with two-stage adsorption. At the beginning of adsorption, the waste gas first enters adsorber 1 for adsorption, then enters the adsorption hot intermediate spray condenser for cooling, and then the waste gas enters adsorber 2 for secondary adsorption. The waste gas from adsorber 2 or adsorber 3 enters the condensation module, and the waste gas can enter the primary condenser and finally enter the oil-water separator. The waste gas that does not condense after the primary condenser enters the secondary condenser again. After condensation again, the waste gas that still does not condense enters the gas-liquid separator through the static compressor and returns to adsorber 1 or adsorber 2 for adsorption again. The cycle is repeated. The multiple adsorption of waste gas is conducive to improving the utilization rate of macroporous resin adsorbent, increasing the adsorption upper limit of the entire adsorption and desorption system, and reducing the emission of acidic waste gas.
[0021] 3. This system is equipped with an alarm system. The air outlets of adsorber 1, adsorber 2, and adsorber 3 are all fixedly connected with VOCs concentration detection sensors. When the system detects that the VOCs concentration exceeds the lower explosion limit of the mixed gas, the system automatically alarms, automatically interlocks and cuts off the air inlet valve in the pipeline within 5 to 8 seconds, opens the emergency discharge valve and bypass valve of the pipeline, and the exhaust gas is introduced into the emergency bypass pipeline for discharge; at the same time, if any one of adsorber 1, adsorber 2, and adsorber 3 exceeds the temperature (120℃) or the pressure (65000Pa), an alarm will be issued. The double protection ensures the safe operation of the system, opens the emergency discharge valve, opens the bypass valve of the pipeline, and introduces the exhaust gas into the emergency pipeline for discharge. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a flow chart of the adsorption and desorption system of the macroporous resin of the utility model;
[0023] Figure 2 This is a flow chart of the adsorption and desorption system of the macroporous resin of the utility model;
[0024] Figure 3 It is a structural schematic diagram of a primary condenser and a secondary condenser in the adsorption and desorption system of the macroporous resin of the utility model;
[0025] Figure 4 A flow chart of output pump 1, output pump 2 and output pump 3 in the adsorption and desorption system of macroporous resin of the utility model.
[0026] Explanation of the reference numerals: 1. adsorber one; 2. adsorber two; 3. adsorber three; 4. gas-liquid separator; 5. primary condenser; 6. secondary condenser; 7. delivery pump four; 8. static pressure tank; 9. oil-water separator; 10. output pump one; 11. oil storage tank; 12. tap water tank; 13. delivery pump three; 14. spray condenser. DETAILED DESCRIPTION
[0027] The following is combined with Figure 1-4 The utility model is described in further detail.
[0028] The utility model embodiment discloses a macroporous resin adsorption and desorption system.
[0029] Reference Figure 1 , Figure 2 , Figure 3 , including a raw material input module, a series adsorption module, a steam desorption module, a separation module, an electrical control module, a plurality of pipelines and a plurality of solenoid valves, Figure 1 The diamond box in the figure is the icon of the solenoid valve. The black filled solenoid valve indicates closed, and the white unfilled solenoid valve indicates open. The series adsorption module, steam desorption module, separation module, and several solenoid valves are all communicated with the electrical control module. The macroporous resin is used as the adsorbent and is placed in adsorber 1, adsorber 2 2, and adsorber 3 3. During the adsorption stage, the temperature inside adsorber 1, adsorber 2 2, and adsorber 3 3 is ≤50°C. During the steam desorption stage, the temperature inside adsorber 1, adsorber 2 2, and adsorber 3 3 is ≤120°C. The series adsorption module includes adsorber 1, adsorber 2 2, and adsorber 3 3, which are connected in series in sequence through corresponding pipelines. The separation module includes a condensation module and an oil-water separator 9. The electrical control module includes a control system, a security system, and an alarm system. , the security system and the alarm system are both connected to the control system in communication. The outlets of adsorber 1, adsorber 2, and adsorber 3 are all fixedly connected with VOCs concentration detection sensors. When the system detects that the VOCs concentration exceeds the lower explosion limit of the mixed gas, the system automatically alarms, and automatically interlocks and cuts off the air intake valve in the pipeline within 5 to 8 seconds, opens the emergency discharge valve and bypass valve of the pipeline, and the exhaust gas is discharged after being introduced into the emergency bypass pipeline; when the control system receives the automatic alarm of the program, the control equipment enters the standby state; adsorber 1, adsorber 2, and adsorber 3 are automatically isolated from the production area without affecting the normal production of the production workshop, and then the control system controls adsorber 1, adsorber 2, and adsorber 3 to enter the desorption state one by one to avoid explosion of adsorber 1, adsorber 2, and adsorber 3 containers;
[0030] Reference Figure 1 , Figure 2 The control system controls the operation of the adsorber according to the VOCs concentration in the exhaust gas discharged from adsorber 2 2 and adsorber 3 3. Adsorbers 1 1 and 2 2 are in operation, and adsorber 3 3 is desorbed or shut down, or adsorber 1 is desorbed, and adsorber 2 2 and adsorber 3 3 are in operation. During desorption and desorption, dual adsorption operation is always maintained to improve the utilization rate of the adsorbent. At the same time, the system controls the desorption steam situation according to the adsorption situation to avoid the desorption and desorption speed being too fast or too full.
[0031] Reference Figure 1 , Figure 3 , Figure 4The desorption process of adsorber 1, adsorber 2 2 and adsorber 3 is to heat the adsorbent with water vapor to provide the energy required to destroy the interaction force between the adsorbate and the adsorbent, so that it reaches the desorption temperature and desorbs. After the adsorption is stopped, steam is introduced from the top of adsorber 1, adsorber 2 2 and adsorber 3 3. The saturated steam under desorption is condensed by the primary condenser 5 and the secondary condenser 6 and then enters the oil-water separator 9. The non-condensable waste gas that cannot be condensed returns to the front output pump 4 and is pumped back to the gas-liquid separator 4, and then enters the adsorber 1 or adsorber 2 2 for adsorption again.
[0032] Reference Figure 1 The outer surfaces of adsorber 1, adsorber 2, and adsorber 3 are all provided with a plurality of material ports, including a feed port, a discharge port, a desorption port, a steam inlet, a steam outlet, a nitrogen inlet, a cleaning water inlet, and a cleaning water outlet, etc., and a self-operated pressure regulating valve is installed in the pipeline connecting the steam and adsorber 1, adsorber 2, and adsorber 3, and the steam can be adjusted according to the data detected by the pressure sensor, and some of the solenoid valves are fixedly connected to the inside of the corresponding material port, and the inside of adsorber 1, adsorber 2, and adsorber 3 are all fixedly connected with a pressure sensor and a temperature sensor, and the inside of adsorber 1, adsorber 2, and adsorber 3 is installed with a pressure sensor with a remote alarm function (65 000Pa, adjustable during operation), when the system detects abnormal pressure, the system automatically alarms, automatically interlocks and cuts off the gas valve and steam valve entering the pipeline within 5 to 8 seconds, and opens the emergency discharge valve; opens the bypass valve of the pipeline, and introduces the exhaust gas into the emergency pipeline for emptying. The three pressure sensors and temperature sensors are all connected to the alarm system for communication, and are adapted to the cooling spray water through the upper and lower temperature monitoring facilities of the temperature sensor. When the temperature is too high, the controller controls the valve of the cleaning water inlet to open, and tap water is injected into the cleaning water inlet for cooling, so as to avoid excessive internal temperature of adsorber 1, adsorber 2 and adsorber 3. Over-temperature (120℃) and over-pressure (65000Pa) can be alarmed, and double protection ensures safe operation of the system.
[0033] Reference Figure 1 , Figure 4, a spray condenser 14 and a gas-liquid separator 4 are installed in series on one of the pipelines, one of the pipelines of adsorber 1 1, adsorber 2 2 and adsorber 3 3 is connected to the pipeline at the inlet of the spray condenser 14, one of the pipelines of adsorber 1 1, adsorber 2 2 and adsorber 3 3 is connected to the pipeline at the outlet of the gas-liquid separator 4, the gas-liquid separator 4, adsorber 1 1, adsorber 2 2 and adsorber 3 3 and the oil-water separator 9 are fixedly connected with liquid level sensors, each liquid level sensor is communicatively connected to the alarm system, one end of the spray condenser 14 is connected to the output pump 2, that is, the gas separated by the gas-liquid separator 4 is transported by the output pump 2 and the gas phase product finally adsorbed is discharged into the atmosphere through the chimney, and the liquid separated by the gas-liquid separator 4 finally enters the oil-water separator 9 through the pipeline for separation.
[0034] Reference Figure 1 , Figure 3 The condensation module includes a primary condenser 5, a secondary condenser 6, a delivery pump 4 7 and a static pressure box 8. The primary condenser 5 condenses all exhaust gases, and the secondary condenser 6 cools down the restless exhaust gases and sends them back to the adsorber 1 or adsorber 2 2 for further adsorption. The delivery pump 4 7 and the static pressure box 8 are installed in series. The pipeline at the outlet of the gas-liquid separator 4 is fixedly connected to the input end of the delivery pump 4 7. The outlet end of the static pressure box 8 is fixedly connected to the input end of the secondary condenser 6 through a corresponding pipeline. The pipeline of one of the material ports of adsorber 1 1, adsorber 2 2 and adsorber 3 3 is fixedly connected to the feed end of the primary condenser 5. The raw material input module includes water vapor input, nitrogen input and a tap water tank 12. The tap water tank 12 is fixedly connected to the water inlet pipe and the water outlet pipe of the primary condenser 5 through corresponding pipelines.
[0035] Reference Figure 1 , Figure 3 The discharge ends of the primary condenser 5 and the secondary condenser 6 are fixedly connected to the feed end of the oil-water separator 9. The primary condenser adopts a standard spiral plate cold water tower, the water temperature (37℃-32℃) refrigerant, the cold side inlet 32 degrees, the outlet 37 degrees; the hot side inlet 140 degrees, the outlet 35 degrees, the secondary condenser 6 is also a spiral plate chiller (temperature 7℃) refrigerant, the cold side inlet 7 degrees, the outlet 15 degrees; the hot side inlet 35 degrees, the outlet 20 degrees, the two discharge ends of the oil-water separator 9 are respectively fixedly connected with a wastewater station and an output pump 10, the waste liquid enters the oil-water separator 9 for treatment, the water phase is discharged into the wastewater station for sewage treatment, the non-aqueous phase, that is, the oil phase, is directly collected as hazardous waste, the output end of the output pump 10 is fixedly connected to an oil storage tank 11 through a corresponding pipeline, and the output pump 10 adopts a pneumatic diaphragm pump to discharge the oil phase.
[0036] The security system includes a liquid level interlock, and the output pump 1 is interlocked with the oil storage tank installation liquid level. When the high and low liquid level interlocks are triggered, the security system outputs an emergency stop signal to the control system. After receiving the signal, the control system immediately controls the parking of the abnormal equipment. The alarm system includes a temperature monitoring and alarm function, and the temperature monitoring and alarm function is interlocked with the temperature sensor and the tap water tank 12. When the temperature is too high, the control system increases the output of the output pump 3 13 to quickly cool down the adsorber 1 1, adsorber 2 2 and adsorber 3 3.
[0037] Reference Figure 1 , Figure 3 , Figure 4 The output end of the tap water tank 12 is fixedly connected to two delivery pumps 3 13, one for use and one for standby, the output ends and input ends of the two delivery pumps 3 13 are connected in parallel, the delivery pump 3 13 uses the tap water in the tap water tank 12 as cooling water at room temperature to cool down the adsorber 1 1, adsorber 2 2, and adsorber 3 3, and the water inlets of the adsorber 1 1, adsorber 2 2, and adsorber 3 3 are fixedly connected to the output end of the delivery pump 3 13 through corresponding pipes.
[0038] The implementation principle of the macroporous resin adsorption and desorption system of the utility model embodiment is:
[0039] 1. At the beginning of adsorption, the waste gas first enters adsorber 1 for adsorption, then enters adsorption heat intermediate spray condenser 14 for cooling (the waste gas temperature rises due to adsorption heat release), and then the waste gas enters adsorber 2 2 for secondary adsorption; when the VOCs concentration in the waste gas at the outlet of adsorber 2 reaches a certain value, the adsorption of adsorber 1 is stopped, and adsorber 2 2 and adsorber 3 3 are switched to adsorption, and adsorber 1 enters the desorption process, that is, adsorber 1 is desorbed, and adsorber 2 2 and adsorber 3 3 continue to adsorb; when the VOCs concentration in the waste gas at the outlet of adsorber 3 3 reaches a certain value, the adsorption of adsorber 3 3 is stopped, and adsorber 1 1 and adsorber 2 2 are switched back to adsorption, and adsorber 3 3 enters the desorption process, and the cycle is repeated to maintain secondary adsorption;
[0040] 2. The adsorber switching time is based on the previous continuous sampling detection of the inlet concentration and the device outlet concentration. The higher inlet concentration and the non-penetration time are used to set the adsorption time and switching cycle;
[0041] 3. When adsorption starts, the waste gas first enters adsorber 1 for adsorption, then enters adsorption hot intermediate spray condenser 14 for cooling, and then the waste gas enters adsorber 2 2 for secondary adsorption. The waste gas from adsorber 2 2 or adsorber 3 3 enters the condensation module, and the waste gas can enter the primary condenser 5, and finally enter the oil-water separator 9. The waste gas that does not condense through the primary condenser 5 enters the secondary condenser 6 again. After condensation again, the waste gas that still does not condense enters the gas-liquid separator 4 through the static compressor, and returns to adsorber 1 or adsorber 2 2 for adsorption again. The cycle repeats, and the liquid in the gas-liquid separator 4, the liquid in the primary condenser 5 and the secondary condenser 6 all finally enter the oil-water separator 9. The oil phase material in the oil-water separator 9 is discharged into the oil storage tank, and the waste water is discharged into the wastewater station;
[0042] 4. After the desorption process (steam desorption, water cooling, air + nitrogen drainage and conditioning) has been carried out for a period of time, the organic matter adsorbed in the macroporous resin is basically completely resolved, and then it is cooled to the set temperature by water, and after air + nitrogen drainage and conditioning, adsorber 1 or adsorber 2 or adsorber 3 is regenerated and ready for use.
[0043] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.
Claims
1. The adsorption and desorption system of macroporous resin includes a raw material input module, characterized in that: It also includes a series adsorption module, a steam desorption module, a separation module, an electrical control module, a plurality of pipelines and a plurality of solenoid valves, wherein the series adsorption module, the steam desorption module, the separation module and the plurality of solenoid valves are all in communication connection with the electrical control module, the series adsorption module includes an adsorber 1 (1), an adsorber 2 (2) and an adsorber 3 (3) which are sequentially connected in series through corresponding pipelines, the adsorber 1 (1), the adsorber 2 (2) and the adsorber 3 (3), and the separation module includes a condensation module and an oil-water separator (9); The electrical control module includes a control system, a security system and an alarm system, and both the security system and the alarm system are communicatively connected with the control system.
2. The macroporous resin adsorption and desorption system according to claim 1, characterized in that: The outer surfaces of the adsorber 1 (1), the adsorber 2 (2) and the adsorber 3 (3) are each provided with a plurality of material ports, wherein a portion of the solenoid valves are fixedly connected to the inside of the corresponding material ports, and the insides of the adsorber 1 (1), the adsorber 2 (2) and the adsorber 3 (3) are each fixedly connected with a pressure sensor and a temperature sensor, and the three pressure sensors and the temperature sensors are all connected to the alarm system for communication.
3. The macroporous resin adsorption and desorption system according to claim 2, characterized in that: A spray condenser (14) and a gas-liquid separator (4) are installed in series on one of the pipelines; one of the pipelines of the adsorber one (1), adsorber two (2) and adsorber three (3) is connected to the pipeline at the inlet of the spray condenser (14); one of the pipelines of the adsorber one (1), adsorber two (2) and adsorber three (3) is connected to the pipeline at the outlet of the gas-liquid separator (4); and liquid level sensors are fixedly connected to the inside of the gas-liquid separator (4), adsorber one (1), adsorber two (2) and adsorber three (3) and the oil-water separator (9); each of the liquid level sensors is connected to the alarm system for communication.
4. The macroporous resin adsorption and desorption system according to claim 3, characterized in that: The condensation module comprises a primary condenser (5), a secondary condenser (6), a delivery pump four (7) and a static pressure box (8), wherein the delivery pump four (7) and the static pressure box (8) are installed in series, the pipeline at the outlet of the gas-liquid separator (4) is fixedly connected to the input end of the delivery pump four (7), the outlet end of the static pressure box (8) is fixedly connected to the input end of the secondary condenser (6) through a corresponding pipeline, the pipeline of one of the material ports of the adsorber one (1), the adsorber two (2) and the adsorber three (3) is fixedly connected to the feed end of the primary condenser (5), the raw material input module comprises a water vapor input, a nitrogen input and a tap water tank (12), and the tap water tank (12) is fixedly connected to the water inlet pipe and the water outlet pipe of the primary condenser (5) through corresponding pipelines.
5. The macroporous resin adsorption and desorption system according to claim 4, characterized in that: The discharge ends of the primary condenser (5) and the secondary condenser (6) are both fixedly connected to the feed end of the oil-water separator (9); the two discharge ends of the oil-water separator (9) are respectively fixedly connected to a wastewater station and an output pump 1 (10); and the output end of the output pump 1 (10) is fixedly connected to an oil storage tank (11) via a corresponding pipeline.
6. The macroporous resin adsorption and desorption system according to claim 5, characterized in that: The security system includes a liquid level interlock, the output pump 1 is interlocked with the oil storage tank installation liquid level, and the alarm system includes a temperature monitoring alarm function, and the temperature monitoring alarm function is interlocked with the temperature sensor and the tap water tank (12).
7. The macroporous resin adsorption and desorption system according to claim 6, characterized in that: The output end of the tap water tank (12) is fixedly connected to two delivery pumps three (13), the output ends of the two delivery pumps three (13) are connected in parallel with the input ends, and the water inlets of the adsorber one (1), adsorber two (2) and adsorber three (3) are fixedly connected to the output end of the delivery pump three (13) through corresponding pipelines.
Citation Information
Cited By
Crude oil loading precooling two-stage deep adsorption and desorption VOCs gas recovery device and method
CN121927398A