Tool for fixing pump pipe in inner cavity of hollow high pier
By designing the embedded system, frame system and top fixed tooling, the problems of large freedom of pump pipes and lack of aerial working platform in hollow high pier construction are solved, and the stable fixation and safe construction platform of pump pipes are achieved, reducing safety and quality Risk, low cost and easy to disassemble.
Patent Information
- Application Number
- CN202421113991.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-21
- Publication Date
- 2025-01-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In hollow high pier construction, the pump pipe has a large degree of freedom, causing pipe jumps, impact formwork, and unstable pressure. The traditional inner cavity construction tooling is small in size, inconvenient to disassemble, and the inability to provide a high-altitude working platform, resulting in safety and quality risks.
A hollow high-pier inner cavity fixed pump pipe workpiece including a pre-embedded system, a frame system, a bottom construction platform and a top fixed tool set, is designed to stabilize the pump pipe using a frame frame system and an angle steel fixed frame to provide a construction platform to reduce the Deflection and high-altitude operation risks at the free end of the pump tube.
It realizes stable fixation of the pump pipe, reduces free end vibration, provides a safe construction platform, reduces safety and quality risks, and is low in cost and convenient in disassembly, making it suitable for the overall lifting of tower cranes.
Smart Images

Figure CN222294731U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge engineering construction, and more specifically, to a tooling for fixing a pump pipe in the inner cavity of a hollow high pier. Background Art
[0002] The construction of hollow high piers generally adopts the construction technology of flip mold or hanging formwork. The segment height is generally 4.5m or 6m. When pouring concrete, a high-pressure pump pipe needs to be extended from the outside of the uncast segment template into the center of the section, and a rotating flange is used to match the string tube for material distribution. During the construction of hollow high piers, due to the high segment height, large cross-sectional size and the fact that the pump pipe is only constrained at the previous segment, the concrete output end has a large degree of freedom, which can easily cause phenomena such as pipe jumping, pump pipe impacting the formwork, and unstable pumping pressure, causing a huge impact on the formwork support system, and multiple re-vibrations of the lower layer of concrete cause over-vibration segregation of the lower layer of concrete or cracks in the initial setting stage. The size and rigidity of traditional inner cavity construction tooling are small, inconvenient to disassemble, and the overall cost is high. In addition, it cannot provide a construction platform for high-altitude operations for pump pipe disassembly. In view of the problem of fixing the pump pipe in the inner cavity of hollow high piers, a safe, convenient and economical tooling is urgently needed to solve the shortcomings of the existing technology. Utility Model Content
[0003] The purpose of the utility model is to provide a tooling for fixing a pump pipe in the inner cavity of a hollow high pier. The assembled design has the advantages of convenient disassembly, high efficiency and low cost. The tooling utilizes its own rigidity to effectively solve the problems of free end deflection and stability when the free length of the pump pipe is too long. At the same time, it provides a construction platform for high-altitude operations and reduces safety and quality risks.
[0004] The technical solution adopted by the utility model to solve this technical problem is: a tooling for fixing pump pipes in the inner cavity of a hollow high pier, comprising: a pre-embedded system, a frame system, a bottom construction platform and a top fixing tooling;
[0005] The embedded system includes anchor bars, climbing cones and anchor shoes; the anchor bars are embedded in the cast sections at uniform intervals, and anchor shoes and high-strength bolts are installed at the ends of the anchor bars;
[0006] The frame system is a frame structure, which is installed on the embedded system;
[0007] The bottom construction platform is arranged on the surface of the bottom of the frame system;
[0008] The top fixing fixture is used for limiting the position of the high-pressure pump pipe.
[0009] As a further solution of the utility model, the frame system includes multiple main beams, multiple columns, multiple parallel links and multiple diagonal braces; the multiple main beams are installed on anchor shoes, the multiple columns are evenly arranged on both sides of the main beams and vertically connected to the main beams, and the multiple parallel links and diagonal braces are evenly spaced to connect the columns.
[0010] As a further solution of the utility model, the bottom construction platform includes a plurality of channel steel distribution beams and steel plates; the plurality of distribution beams are laid on the main beams of the frame system, and the steel plates are laid on the channel steel distribution beams.
[0011] As a further solution of the utility model, the top fixing tool comprises angle steel; a plurality of angle steels are assembled to form a fixed frame for the high-pressure pump pipe to pass through, and adjacent angle steels and the angle steels and the frame system are welded and fixed.
[0012] As a further solution of the utility model, the top fixing tooling also includes square timbers, and the square timbers are arranged on two opposite sides / around the fixed frame.
[0013] The utility model has at least the following beneficial effects: The utility model provides a tooling for fixing a pump pipe in the inner cavity of a hollow high pier, which solves the problems of small size and rigidity of traditional tooling, inconvenient disassembly, inability to provide a construction platform for high-altitude disassembly of the pump pipe, and high comprehensive cost, and has the following advantages:
[0014] 1. Easy to operate, meets the requirements of pump pipe reinforcement, and reduces free end vibration.
[0015] 2. Low cost, easy disassembly, small dead weight, high work efficiency, can be directly hoisted as a whole by a tower crane, and only needs to be pre-buried during construction.
[0016] 3. A pouring construction platform is provided, which can be used as a passage back and forth on both sides of the thin-walled pier to ensure safety.
[0017] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the front elevation of the tooling design;
[0019] Figure 2 It is a schematic diagram of the side elevation of the tooling design;
[0020] Figure 3 It is a plan view of tooling design;
[0021] Figure 4 It is a schematic diagram of the connection between the frame system and the embedded system.
[0022] 1 embedded system, 11 anchor bars, 12 climbing cones, 13 high-strength bolts, 14 anchor shoes, 2 frame systems, 21 main beams, 22 columns, 23 parallel joints, 24 diagonal braces, 3 bottom construction platforms, 31 channel steel distribution beams, 32 steel plates, 4 top fixed tooling, 41 angle steels, 42 square timbers. DETAILED DESCRIPTION
[0023] The utility model is described in detail and completely below in conjunction with the accompanying drawings. A person of ordinary skill in the art will be able to implement the utility model based on these descriptions. Before describing the utility model in conjunction with the accompanying drawings, it should be particularly pointed out that the technical solutions and technical features provided in each part of the utility model, including the following description, can be combined with each other without conflict.
[0024] In addition, the embodiments of the present invention involved in the following description are generally only a part of the embodiments of the present invention, rather than all of the embodiments. Therefore, based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0025] The following is a further detailed description of the utility model in conjunction with the accompanying drawings and implementations, and its specific implementation process is as follows:
[0026] like Figures 1 to 4 As shown, the utility model provides a tooling for fixing pump pipes in the inner cavity of a hollow high pier, comprising: a pre-embedded system 1, a frame system 2, a bottom construction platform 3 and a top fixing tooling 4;
[0027] The embedded system 1 includes anchor bars 11, climbing cones 12 and anchor shoes 14; the anchor bars 11 are embedded in the cast sections at uniform intervals, and the anchor shoes 14 and high-strength bolts 13 are installed at the ends of the anchor bars 11;
[0028] The frame system 2 is a frame structure, which is installed on the embedded system 1. The frame system 2 can be assembled on the ground in advance, and then hoisted and fixed on the embedded system 1 by a tower crane;
[0029] The bottom construction platform 3 is arranged on the surface of the bottom of the frame system 2 and is used for construction workers to stand;
[0030] The top fixing tool 4 is used for limiting the position of the high-pressure pump tube, and the top fixing tool 4 is arranged on the top of the frame system 2 .
[0031] This technical solution may also include the following technical details to better achieve the technical effect: the frame system 2 includes multiple main beams 21, multiple columns 22, multiple parallel links 23 and multiple diagonal braces 24; multiple main beams 21 are installed on the anchor shoes 14, multiple columns 22 are evenly arranged on both sides of the main beams 21 and vertically connected to the main beams 21, multiple parallel links 23 are arranged at intervals along the height direction of the columns 22, and diagonal braces 24 are arranged between the upper and lower parallel links 23 to improve the overall stability of the frame system 2. The height of the frame system 2 is higher than the segment formwork, and the high-pressure pump pipe extends to the center of the segment to be cast after passing through the top fixing tooling 4 at the top of the frame system 2.
[0032] This technical solution can also include the following technical details to better achieve the technical effect: the bottom construction platform 3 includes a plurality of channel steel distribution beams 31 and a steel plate 32; the plurality of distribution beams are laid on the main beam 21 of the frame system 2, and the steel plate 32 is laid on the channel steel distribution beam 31, which is used as a personnel standing platform.
[0033] The present technical solution may also include the following technical details to better achieve the technical effect: the top fixing tooling 4 includes an angle steel 41; a number of angle steels 41 are assembled to form a fixed frame for the passage of high-pressure pump pipes, and adjacent angle steels 41 and the angle steels 41 and the frame system 2 are welded and fixed.
[0034] The present technical solution may also include the following technical details to better achieve the technical effect: the top fixing tooling 4 also includes square wood 42, and the square wood 42 is arranged on the opposite sides / around the fixed frame, and the filling wood plays a buffering role, thereby protecting the high-pressure pump pipe.
[0035] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation scheme. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the embodiments shown and described herein.
Claims
1. A tool for fixing pump pipes in the inner cavity of a hollow high pier, characterized in that: include: Embedded system, frame system, bottom construction platform and top fixed tooling; The embedded system includes anchor bars, climbing cones and anchor shoes; the anchor bars are embedded in the cast sections at uniform intervals, and anchor shoes and high-strength bolts are installed at the ends of the anchor bars; The frame system is a frame structure, which is installed on the embedded system; The bottom construction platform is arranged on the surface of the bottom of the frame system; The top fixing fixture is used for limiting the position of the high-pressure pump pipe.
2. The tooling for fixing pump pipes in the inner cavity of a hollow high pier as claimed in claim 1 is characterized in that: The frame system includes multiple main beams, multiple columns, multiple parallel joints and multiple diagonal braces; the multiple main beams are installed on anchor shoes, the multiple columns are evenly arranged on both sides of the main beams and vertically connected to the main beams, and the multiple parallel joints and diagonal braces are evenly spaced to connect the columns.
3. The tooling for fixing pump pipes in the inner cavity of a hollow high pier as claimed in claim 2 is characterized in that: The bottom construction platform includes multiple channel steel distribution beams and steel plates; the multiple distribution beams are laid on the main beams of the frame system, and the steel plates are laid on the channel steel distribution beams.
4. The tooling for fixing pump pipes in the inner cavity of a hollow high pier as claimed in claim 3 is characterized in that: The top fixing tooling includes angle steels; a plurality of angle steels are assembled to form a fixed frame for the high-pressure pump pipe to pass through, and adjacent angle steels and the angle steels and the frame system are welded and fixed.
5. The tooling for fixing pump pipes in the inner cavity of a hollow high pier as claimed in claim 4 is characterized in that: The top fixing tooling also includes square timbers, which are arranged on two opposite sides / around the fixed frame.