Precast concrete pile
Through the factory production of prefabricated concrete piles and pile tip design, the problems of cumbersome construction, high cost and poor adaptability of traditional wall foundations are solved, and efficient and precise construction process is achieved, which improves the stability and durability of the wall and adapts to Complex geological conditions shorten the construction cycle and reduce costs.
Patent Information
- Application Number
- CN202421123279.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-21
- Publication Date
- 2025-01-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional wall foundation construction processes are numerous, high costs and long cycles, and on-site installation accuracy errors cause railings to shake, large earthwork operations, serious dust pollution, and difficult to adapt to complex geological conditions.
Precast concrete piles are adopted to improve component quality and accuracy through factory production, reduce on-site steel bars and concrete operations, reserve line pipeline holes and vertical groove design, and combine pile tip design to achieve direct and effective force transmission paths and foundation resistance. Deformation capability, synchronous factory prefabrication and on-site construction.
Significantly shorten the construction cycle, improve construction accuracy and quality, reduce safety hazards and costs, enhance anti-overturn and wind resistance, adapt to complex geological conditions, improve overall construction efficiency and durability, and reduce dust pollution and labor costs.
Smart Images

Figure CN222295896U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a prefabricated concrete pile column. Background Art
[0002] At present, the fence generally adopts the method of cast-in-place foundation + column + metal fence. The traditional foundation method is generally cast-in-place independent foundation, strip foundation or brick foundation; the column method is generally metal column, brick column or cast-in-place concrete column.
[0003] Objective disadvantages: The traditional wall foundation relies on footing to meet the vertical load and anti-overturning requirements of the upper structure, and the amount of foundation pit excavation, earthwork transportation, concrete and formwork used are all large. The metal columns on the wall are connected to the foundation with embedded parts and bolts. Due to the accuracy or error of on-site installation, the railings are prone to shaking on the top surface of the foundation. The labor cost of brick columns or cast-in-place concrete columns is high. Therefore, the traditional foundation method has more processes, the concrete curing time is long, the construction period is long, and the cost is high. Utility Model Content
[0004] The utility model aims to provide a prefabricated concrete pile column which has a more direct and effective force transmission path, does not require earthwork, saves on-site reinforcement work, and has a stronger ability to resist foundation deformation.
[0005] The purpose of the utility model is achieved in this way:
[0006] A prefabricated concrete pile column comprises a pile column body, wherein the pile column body comprises an above-ground part and an underground part, the above-ground part is provided with a line pipeline hole, and a side wall of the above-ground part is provided with a wall interface.
[0007] Improve the quality of components: This utility model greatly improves the quality of components through factory prefabrication. The construction quality has changed from relying on the skill level of on-site construction personnel to industrialized, standardized and controllable production in the factory assembly line. The use of customized steel mold products ensures that the steel bar ratio, pipeline pre-embedding, concrete vibration and component maintenance temperature and humidity are all completed under intelligent control. The dimensional error of each component is controlled at the millimeter level (no more than 3-5 mm), achieving a precision that is difficult to achieve with traditional construction methods.
[0008] Shorten the construction period: The utility model allows factory prefabrication and on-site construction to proceed simultaneously, significantly shortening the construction period and improving the overall benefits. The components produced in the factory are not affected by on-site weather and other factors, and can be carried out simultaneously with the construction of each stage. It has the advantages of fast construction speed, short engineering period and winter construction, which effectively speeds up the overall progress of the project.
[0009] Energy saving and environmental protection: By transferring a large number of traditional on-site operations to the factory, this utility model has greatly reduced noise, dust and construction waste on site, reduced safety hazards and accident risks on the construction site, and responded to the national energy saving and environmental protection requirements. The high degree of mechanization further improves the quality of the project and reduces safety hazards.
[0010] Improve construction accuracy and quality: This utility model improves the construction accuracy and quality of the fence through modular, standardized and integrated design, and extends the service life of the fence. Precise construction not only improves the functional quality of the fence, but also improves the quality of the entire project product.
[0011] Reduce earthwork and avoid dust pollution: The utility model does not need to excavate a large area of foundation pit, and uses pile driving machinery to directly send the piles to the designed depth, avoiding the large amount of earthwork required for traditional foundation construction and reducing dust pollution.
[0012] Reducing on-site reinforcement and concrete operations: The utility model adopts factory-prefabricated piles and columns, which eliminates the need for on-site reinforcement processing and concrete pouring, reducing the workload and wet work volume at the construction site.
[0013] Strong ability to resist foundation deformation: The buried depth of the piles of the utility model has been accurately calculated, which can resist uneven settlement of the foundation, prevent foundation deformation and cracking of the upper wall, and has more advantages than traditional brick footing foundations or concrete foundations.
[0014] Adaptability to complex geological conditions: The pile design of the utility model is suitable for a variety of complex foundations, such as soft soil foundations, fill areas and collapsible sites. The depth of the pile into the soil is determined by calculation to avoid the influence of adverse geology, and the adaptability is stronger.
[0015] Short construction period and high comprehensive benefits: The utility model does not require foundation pit excavation and concrete curing. After the piles are pressed into the predetermined elevation, the next step of construction can be carried out. The construction efficiency is high, the construction period is shortened, and the comprehensive benefits are improved.
[0016] Strong durability: Factory-prefabricated components have high precision and stable mechanical properties. There is no rust problem that may occur in metal columns fixed with pre-embedded bolts or post-added expansion bolts, which significantly improves the durability of the components.
[0017] Vertical load distribution: When bearing vertical load, the utility model not only relies on the reaction force provided by the soil at the bottom of the foundation, but also utilizes the friction force provided by the soil on the side walls of the foundation to enhance the bearing capacity of the foundation.
[0018] Horizontal load balance: Under the action of horizontal load, the utility model balances the relevant bending moment through the constraint force of the soil around the pile column on the pile. Compared with the traditional foundation that needs to increase the footing size to ensure the overall stability of the wall, the force transmission method of the utility model is more direct and effective, thereby improving the stability of the structure.
[0019] The purpose of the utility model can also be solved by the following technical measures:
[0020] Furthermore, the line pipeline hole is opened at the center position of the above-ground part.
[0021] Integrated design: A line pipeline hole is reserved in the center of the ground part, which makes the layout of power, communication and other pipelines more convenient, helps to realize the integrated design of the fence and various pipeline systems, and simplifies the construction process.
[0022] Easy maintenance: The reserved pipeline holes make it easier to maintain and overhaul the lines in the future, reduce the cost and complexity of demolition and reconstruction, and improve the overall construction and maintenance efficiency.
[0023] Integrated construction: By reserving holes for lines and pipelines during the prefabrication of piles, the traditional construction process of laying out pipelines and drilling holes after the completion of the fence is avoided, reducing the extension of construction period and increase in costs caused by secondary construction.
[0024] Reduce the risk of damage: The arrangement of pipeline holes is completed during the prefabrication process, avoiding the risk of structural damage caused by drilling holes in the existing structure at a later stage, and improving the overall stability and aesthetics of the fence.
[0025] Reduce on-site operations: The design of reserved pipeline holes is completed in the factory, which reduces the workload of on-site pipeline installation and adjustment and speeds up the overall construction progress.
[0026] Synchronous construction: Factory prefabrication and on-site installation can be carried out simultaneously, and lines and pipelines can be laid out while the fence is being installed, shortening the construction period and improving construction efficiency.
[0027] Neat and beautiful: Arranging the lines and pipelines in the reserved holes makes the overall appearance of the fence more neat and beautiful, avoids the visual clutter caused by exposed lines, and improves the overall aesthetics of the project.
[0028] Reasonable use of space: The reserved pipeline holes make reasonable use of the space of the piles, do not occupy additional ground and underground space, and optimize the overall space utilization.
[0029] Multifunctional integration: The reserved line and pipeline holes provide more functional integration possibilities for the fence, such as convenient integration of lighting systems, security systems, etc., which improves the versatility and intelligence level of the fence.
[0030] Adapt to future needs: Space is reserved for power, communication and other lines that may be added in the future, with good scalability and adaptability.
[0031] Reduce labor costs: The prefabrication process is completed in one step, which reduces the labor cost and time cost of on-site construction.
[0032] Save material costs: avoid material waste and loss that may occur in the later hole opening and pipeline layout, and reduce the overall construction cost.
[0033] Furthermore, the two opposite side walls of the above-ground part are provided with the wall interfaces, and the wall interfaces are vertical grooves.
[0034] Vertical groove design: Vertical grooves are opened on the two opposite walls of the above-ground part as the wall interface, which makes the connection between the wall and the piles more stable and firm, reduces the possibility of wall shaking, and improves the stability of the overall structure.
[0035] Precise docking: The vertical groove design can ensure the precise docking of the fence and the piles, reduce the connection problems caused by on-site installation errors, and improve the installation quality.
[0036] Diversified design: The reserved interface of the fence can be set according to actual needs, providing greater design flexibility to adapt to the installation needs of fences of different types and specifications.
[0037] According to the specific requirements of the project, the location and quantity of the reserved interfaces can be flexibly adjusted to provide customized solutions to meet diverse project needs.
[0038] Simplified installation steps: The vertical groove design of the prefabricated piles simplifies the installation steps of the fence, reduces the workload of on-site cutting and adjustment, and speeds up the construction progress.
[0039] Reduce labor and time costs: The vertical groove design makes the installation of the fence more convenient, reduces the labor and time costs during the construction process, and improves the overall construction efficiency.
[0040] Hidden connectors: The vertical groove design allows the connectors of the fence to be hidden in the grooves, improving the overall aesthetics and consistency of the fence and avoiding the visual clutter caused by exposed connectors.
[0041] Neat appearance: The vertical groove design of the reserved interface makes the appearance of the fence neater and enhances the overall visual effect of the project.
[0042] Reduced corrosion and damage: The connection method in the vertical groove reduces the chance of the connection parts being exposed to the external environment, reduces the risk of corrosion and damage, and extends the service life of the fence.
[0043] Improve wind resistance: Vertical grooves provide stronger mechanical bite force, improve the wind resistance and lateral load resistance of the fence, and enhance the safety of the fence.
[0044] Furthermore, the underground part is provided with a pile tip.
[0045] Pile tip design: The pile tip is set in the underground part. The sharp shape of the pile tip enhances the ability of the pile to penetrate the ground during construction, making it easier for the pile to reach the predetermined depth. It is particularly suitable for sites with hard geological conditions.
[0046] Improve construction efficiency: The pile tip can penetrate the hard soil layer more efficiently, reducing the resistance and time during the piling process and improving construction efficiency.
[0047] Enhanced stability: The pile tip design allows the pile to be more firmly embedded in the foundation in the underground part, enhancing the overall stability and anti-overturning ability of the pile, especially under vertical and lateral loads.
[0048] Reduce settlement: The pile tip can better disperse the stress at the bottom of the pile, reduce the settlement of the pile, and improve the long-term stability of the structure.
[0049] Flexible selection: Depending on the specific conditions of the project site, the pile tip can be selectively reserved to adapt to different geological conditions. For harder foundations, the pile tip is retained to enhance penetration; for softer foundations, the pile tip can be selected to avoid unnecessary construction complexity.
[0050] Improve adaptability: This flexible design enables the piles to adapt to various geological conditions, improving the adaptability and flexibility of engineering design and construction.
[0051] Reduced excavation: The pile tip design reduces foundation excavation and earthwork transportation, reducing construction costs and environmental impact. For harder foundations, the pile tip can reduce the frequency and intensity of piling equipment and simplify the construction process.
[0052] Optimize the construction process: During the construction process, the pile tip can optimize the use efficiency of the piling equipment, reduce adjustments and pauses during the piling process, and ensure the continuity and efficiency of the construction process.
[0053] Accurate positioning: The design of the pile tip helps to accurately position the pile during the piling process, reduce the deviation of the pile in the foundation, and improve the overall construction accuracy.
[0054] Reduce errors: Through the guiding effect of the pile tip, the inclination or deviation of the pile caused by geological unevenness is reduced, ensuring the verticality and position accuracy of the pile.
[0055] Enhanced durability: The pile tip can reduce the wear of the pile during the construction process, protect the bottom structure of the pile, and extend the service life of the pile.
[0056] Reduced maintenance costs: As the overall stability and durability of the piles are enhanced, the frequency and cost of subsequent maintenance and repair are reduced, improving the long-term economic benefits of the project.
[0057] Furthermore, the underground part is a pile tip.
[0058] The beneficial effects of the utility model are as follows:
[0059] This utility model greatly improves the quality of components through factory prefabrication. The construction quality has changed from relying on the skill level of on-site construction personnel to industrialized, standardized and controllable production in a factory assembly line. The use of customized steel mold products ensures that the steel bar ratio, pipeline pre-embedding, concrete vibration and component maintenance temperature and humidity are all completed under intelligent control. The dimensional error of each component is controlled at the millimeter level (no more than 3-5 mm), achieving a precision that is difficult to achieve with traditional construction methods.
[0060] The utility model does not need to excavate a large area of foundation pit, and directly delivers the pile column to the designed depth by using a pile driving machine, thus avoiding a large amount of earthwork required for traditional foundation construction and reducing dust pollution.
[0061] The utility model reserves a line pipeline hole 4 at the center of the above-ground part 2 of the pile column, which makes line layout convenient, reduces secondary construction, improves construction efficiency, optimizes space utilization, enhances functional integration, and reduces construction costs. These improvements significantly improve the comprehensive performance and construction benefits of the fence.
[0062] The utility model, by providing vertical grooves on the two opposite walls of the ground part 2 as the wall interface 21, not only enhances the stability and firmness of the wall connection, but also provides greater design flexibility to meet different wall requirements. At the same time, the vertical groove design simplifies the installation steps, improves the construction efficiency, enhances the overall aesthetics and durability of the structure, and reduces the maintenance cost. Overall, these improvements significantly improve the comprehensive performance and construction efficiency of the wall.
[0063] The utility model, by setting a pile tip 31 in the underground part 3 of the pile column, significantly enhances the penetration ability and overall stability of the pile column, improves the construction efficiency and accuracy, and flexibly adapts to different geological conditions, simplifies the construction process, and improves the adaptability and economic benefits of the project. The application of the pile tip 31 design not only optimizes the installation process of the pile column, but also significantly extends the service life of the pile column and reduces the long-term maintenance cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 Schematic diagram of precast concrete piles.
[0065] Figure 2 for Figure 1 AA section view.
[0066] Figure 3 for Figure 1 BB cross-sectional view. DETAILED DESCRIPTION
[0067] The utility model is further described below in conjunction with the accompanying drawings and embodiments:
[0068] Example, combined with Figures 1 to 3 As shown, a prefabricated concrete pile column comprises a pile column body 1, wherein the pile column body 1 comprises an above-ground part 2 and an underground part 3, wherein the above-ground part 2 is provided with a line pipeline hole 4, and a side wall of the above-ground part 2 is provided with a wall interface 21.
[0069] Furthermore, the line pipeline hole 4 is opened at the center position of the above-ground part 2 .
[0070] Furthermore, the wall interfaces 21 are formed on two opposite side walls of the above-ground part 2, and the wall interfaces 21 are vertical grooves.
[0071] Furthermore, the underground part 3 is provided with a pile tip 31 .
[0072] The cross section of the above-ground portion 2 may be rectangular or have other shapes.
[0073] The height of the pile body 1 can be determined according to the specific project conditions.
[0074] The reserved interface of the fence is set according to the actual needs of the fence.
[0075] The depth of the pile body 1 into the soil should be determined according to calculations and the soil conditions on site, and a suitable pile driving process should be selected. When driving the pile, the control of the soil depth is mainly controlled, and the control of the pile driving force is supplemented.
[0076] The width of the pile tip 31 may be the same as the cross-sectional width of the pile body 1 . For example, when the aboveground portion 2 is 400 mm, the width of the pile tip 31 may be 400 mm.
[0077] The pile tip 31 can be selectively reserved according to the project site conditions. When the project site soil is hard, the pile tip 31 can be selected to be retained. When the site soil is soft, it is not necessary to specially set it.
[0078] In another embodiment, the underground part 3 is a pile tip 31 .
Claims
1. A prefabricated concrete pile, comprising a pile body (1), characterized in that: The pile column body (1) comprises an above-ground part (2) and an underground part (3); a line pipeline hole (4) is reserved in the above-ground part (2); and a wall interface (21) is provided on the side wall of the above-ground part (2).
2. The precast concrete pile according to claim 1, characterized in that: The line pipeline hole (4) is opened at the center of the above-ground part (2).
3. The precast concrete pile according to claim 1, characterized in that: The two opposite side walls of the above-ground part (2) are provided with the wall interface (21), and the wall interface (21) is a vertical groove.
4. The precast concrete pile according to claim 1, characterized in that: The underground part (3) is provided with a pile tip (31).
5. The precast concrete pile according to claim 1, characterized in that: The underground part (3) is a pile tip (31).
