Building waste recovery device for building construction

By introducing crushing and compression functions into the construction waste recycling device, combined with water mist spray dust prevention technology, the problem of existing devices being unable to compress garbage and poor dust prevention effects is solved, effectively compressing and dust reduction of garbage is achieved, and processing is simplified. process.

CN222305950UActive Publication Date: 2025-01-07ZHUYI (FUJIAN) CONSTR DEV CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421066207.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2025-01-07
Estimated Expiration
2034-05-16

AI Technical Summary

Technical Problem

The existing construction waste recycling device cannot compress the garbage after it is broken, and the dustproof effect is insufficient, resulting in dust overflow and difficulty in cleaning.

Method used

A device including a crushing box and a compression box is designed. The crushing box is equipped with a crushing processor and a dustproof mechanism. The crushing rod is driven by a motor to crush the garbage, and dust is suppressed by using a water pump and atomizing spray head. The compression box is retracted by electric power. The rod and gear mechanism compress the garbage into blocks to achieve automatic discharge of garbage and dustproof.

Benefits of technology

It realizes effective compression and sufficient dust reduction of construction waste, avoids dust overflow, simplifies the garbage disposal and transfer process, and improves the practicality of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222305950U_ABST
    Figure CN222305950U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of building construction, and particularly relates to a building waste recovery device for building construction, which comprises a crushing box, a crushing processor is arranged in the crushing box, the bottom of the crushing box is communicated with a compression box, and a second electric telescopic rod is fixedly arranged on the inner wall of the right end of the compression box. The telescopic end of the second electric telescopic rod is fixedly connected with a push plate of a concave structure, the push plate is arranged in the compression box in a left-right sliding mode, and a discharging mechanism used for discharging compressed construction waste is arranged at the left end of the compression box. A water tank is arranged at the bottom of the compression box and connected with a dustproof mechanism through a pipeline, and the dustproof mechanism is installed on the top of the smashing box and used for spraying water mist into the smashing box. The dust prevention mechanism can restrain smoke dust generated in the construction waste smashing process, dust can be fully settled in time, and the problem that dust overflows all around is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, in particular to a construction waste recycling device for building construction. Background Art

[0002] During the construction process, a lot of construction waste will be generated, including a lot of discarded metal pipes, steel wires, fine steel bar scraps and other recyclable materials. These construction wastes have a high recycling value. Therefore, in order to reduce costs, it is necessary to use construction waste recycling equipment to process and recycle the above waste.

[0003] In the Chinese utility model patent with publication number CN219898478U, a construction waste recycling device for building construction is disclosed, which can be inserted and limited between the limiting mechanism and the plug hole through the operation of the limiting mechanism, so as to limit and fix the baffle plate 1 and the baffle plate 2, thereby effectively avoiding the problem of gaps between the baffle plate 1 and the baffle plate 2 due to excessive vibration force. In this way, dust overflow can be effectively avoided, and the safety of the operator can be warned at all times. It is easy to operate and relatively simple, and the practicality is enhanced. However, in this device, after the garbage is crushed, it is directly discharged outside the device, and the scattered construction garbage will cause a burden on cleaning and collection and processing. It does not have the function of compressing and compacting the garbage, and when the baffle is opened to put in the construction garbage again for crushing, dust will overflow from the inside of the device, so there is still a defect of insufficient dust prevention.

[0004] Therefore, there is an urgent need to improve the existing construction waste recycling device and provide a construction waste recycling device for construction with a quick dust reduction function. Utility Model Content

[0005] The purpose of the utility model is to provide a construction waste recycling device for construction with reasonable design, simple structure, ability to compress crushed garbage and sufficient dust reduction, in order to solve the problems existing in the prior art.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A construction waste recycling device, comprising a crushing box, wherein a crushing machine is arranged inside the crushing box, the bottom of the crushing box is connected to a compression box, a second electric telescopic rod is fixedly arranged on the inner wall of the right end of the compression box, the telescopic end of the second electric telescopic rod is fixedly connected to a push plate with a "concave" structure, the push plate is arranged inside the compression box for sliding left and right, and a discharge mechanism for discharging compressed construction waste is arranged at the left end of the compression box; a water tank is arranged at the bottom of the compression box, the water tank is connected to a dustproof mechanism through a pipeline, and the dustproof mechanism is installed on the top of the crushing box for spraying water mist into the crushing box.

[0008] Preferably, the pulverizing machine includes a motor and two pulverizing rods, the motor is fixedly mounted on the right side wall of the pulverizing box, both ends of the two pulverizing rods are rotatably mounted on the middle inner wall of the pulverizing box through bearings, pinions are welded and fixed to the left ends of the two pulverizing rods, the two pinions are meshed with each other, the two pulverizing rods are linked and their rotation directions are opposite to each other, and the right end of one of the pulverizing rods extends out of the pulverizing box and is fixedly connected to the output shaft of the motor.

[0009] Preferably, the inner side of the bottom of the crushing box is tilted to form a funnel shape; guide plates are fixed to the inner walls at both the front and rear ends of the crushing box, and the upper end surface of the guide plates is tilted.

[0010] Preferably, a feed inlet is provided at the middle of the upper end of the compression box, and a discharge port is provided at the bottom of the crushing box, and the feed inlet of the compression box and the discharge port of the crushing box overlap with each other.

[0011] Preferably, the dust prevention mechanism includes a water pump, a water suction pipe, a water supply pipe and a water distribution pipe. The water pump is fixedly installed on the upper right side of the compression box. The input end of the water pump is fixedly connected to the water suction pipe. The other end of the water suction pipe is embedded and connected to the bottom right side wall of the water tank. The output end of the water pump is fixedly connected to the water supply pipe. The water distribution pipe is fixedly installed on the rear end top of the crushing box. A plurality of atomizing nozzles are fixedly installed on the outer wall of the middle front end of the water distribution pipe at equal intervals along its length.

[0012] Preferably, the other end of the water supply pipe is fixedly connected to the water inlet at the right end of the water distribution pipe.

[0013] Preferably, the discharging mechanism includes a first electric telescopic rod, a bracket, a side baffle, a rack, a large gear, a connecting rod and a bottom baffle. The first electric telescopic rod is fixedly installed on the upper left side of the compression box. The telescopic end of the first electric telescopic rod is fixed with a bracket. The bottom of the bracket is fixedly connected to the side baffle. A rack is fixed to the outer wall behind the left end of the side baffle. A large gear is meshed and connected directly behind the rack. The large gear bearing is installed on the outer wall of the left end of the compression box. The bottom baffle is rotatably installed on the lower left side of the compression box, and a connecting rod is hinged on the left side of the bottom baffle.

[0014] Preferably, the top end of the connecting rod is hinged to the outer edge of the large gear away from the center of the circle, and the bottom baffle and the side baffle are linked together.

[0015] Preferably, a limiting rod is welded and fixed to the front end outer wall of the compression box, and the limiting rod is slidably fitted with the front surface of the side baffle.

[0016] Compared with the prior art, the utility model has the following beneficial effects:

[0017] In the scheme of the utility model, the motor is started, and the two crushing rods can be made to rotate synchronously in opposite directions under the action of two mutually meshing small gears to crush the construction waste. The water pump can be started to transport the water in the water tank to the inside of the water distribution pipe through the suction pipe and the water supply pipe, and a plurality of equidistant atomizing nozzles are used for atomizing and spraying. The smoke and dust generated in the process of crushing the construction waste can be suppressed, and timely and sufficient dust reduction can be achieved to avoid the problem of dust overflow.

[0018] After the crushed construction waste falls into the compression box, the utility model can start the second electric telescopic rod to control the push plate to move stably to the left, so that the loose various metal material wastes are pushed to the left end of the compression box and compressed into blocks, and then the first electric telescopic rod is used to push the bracket, the side baffle plate and the rack to rise synchronously, and at the same time the large gear is controlled to rotate and the bottom baffle plate is pushed to rotate downward and tilted through the connecting rod, so that the construction waste compressed into blocks can automatically slide out of the compression box, the discharge is convenient, and the block construction waste is more convenient to transport and handle. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present utility model or the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions, and the following description is made with respect to the drawings:

[0020] Figure 1 This is a three-dimensional front view structural diagram of the utility model;

[0021] Figure 2 This is a three-dimensional top view of the structure of the utility model;

[0022] Figure 3 This is a schematic diagram of the three-dimensional left-side cross-sectional structure of the utility model;

[0023] Figure 4 This is a schematic diagram of the three-dimensional front view cross-sectional structure of the utility model;

[0024] Figure 5 This is a schematic diagram of the structure of the discharging state of the discharging mechanism of the utility model;

[0025] Figure 6 It is a schematic diagram of the overall rear view structure of the discharging mechanism of the utility model.

[0026] In the figure:

[0027] 1. Water tank; 2. Compression box; 3. Crushing box; 4. Motor; 5. Crushing rod; 6. Pinion; 7. Guide plate; 8. Dust-proof mechanism; 81. Water pump; 82. Suction pipe; 83. Water delivery pipe; 84. Water distribution pipe; 85. Atomizing nozzle; 9. Discharging mechanism; 91. First electric telescopic rod; 92. Bracket; 93. Side baffle; 94. Rack; 95. Big gear; 96. Connecting rod; 97. Bottom baffle; 10. Limit rod; 11. Second electric telescopic rod; 12. Push plate. DETAILED DESCRIPTION

[0028] The embodiments described below are only some of the embodiments of the present invention and do not represent all the embodiments consistent with the present invention. Now, in conjunction with the accompanying drawings, the exemplary embodiments are described as follows:

[0029] like Figure 1-6 As shown in Figure 1, the construction waste recycling device for construction of the utility model includes a water tank 1, a compression box 2 is fixed on the upper end of the water tank 1, a crushing box 3 is fixed above the compression box 2, and a crushing machine is arranged inside the crushing box 3; the bottom of the crushing box 3 is connected with the top of the compression box 2, and a second electric telescopic rod 11 is fixed on the inner wall of the right end of the compression box 2, and a push plate 12 with a "concave" structure is fixedly connected to the telescopic end of the second electric telescopic rod 11, and the push plate 12 is slidable left and right inside the compression box 2, and a discharging mechanism 9 for discharging compressed construction waste is arranged at the left end of the compression box 2; the water tank 1 is connected with a dustproof mechanism 8 through a pipeline, and the dustproof mechanism 8 is installed on the top of the crushing box 3 for spraying water mist into the crushing box 3.

[0030] As a preferred embodiment, on the basis of the above structure, preferably, the crushing machine includes a motor 4 and two crushing rods 5, the motor 4 is fixedly mounted on the right side wall of the crushing box 3, both ends of the two crushing rods 5 are rotatably mounted on the middle inner wall of the crushing box 3 through bearings, and the left ends of the two crushing rods 5 are welded and fixed with pinions 6, the two pinions 6 are meshed with each other, the two crushing rods 5 are linked and the rotation directions of the two are opposite to each other, and the right end of one of the crushing rods 5 extends out of the crushing box 3 and is fixedly connected to the output shaft of the motor 4.

[0031] In this embodiment, two mutually meshing pinions 6 are used to control the two crushing rods 5 to rotate synchronously in opposite directions, thereby starting to crush the construction waste.

[0032] As a preferred embodiment, based on the above structure, a feed port is further opened in the middle of the upper end of the compression box 2, and a discharge port is opened at the bottom of the crushing box 3, and the feed port of the compression box 2 and the discharge port of the crushing box 3 overlap with each other.

[0033] On the basis of the above structure, preferably, the left and right ends of the inner bottom of the crushing box 3 are inclined to form a funnel shape.

[0034] On the basis of the above structure, preferably, guide plates 7 are fixed to the inner walls at both the front and rear ends of the crushing box 3, and the upper end surface of the guide plate 7 is arranged in an inclined shape.

[0035] In this embodiment, the material guide plate 7 is provided to facilitate guiding the construction waste put into the crushing box 3 to between the two crushing rods 5, so as to facilitate the crushing process of the construction waste.

[0036] As a preferred embodiment, on the basis of the above structure, the dust prevention mechanism 8 further includes a water pump 81, a water suction pipe 82, a water supply pipe 83 and a water distribution pipe 84. The water pump 81 is fixedly installed on the upper right side of the compression box 2, and the input end of the water pump 81 is fixedly connected to the water suction pipe 82. The other end of the water suction pipe 82 is embedded and connected to the bottom right side wall of the water tank 1. The output end of the water pump 81 is fixedly connected to the water supply pipe 83. The water distribution pipe 84 is fixedly installed on the rear end top of the crushing box 3. A plurality of atomizing nozzles 85 are fixedly installed on the outer wall of the middle part of the front end of the water distribution pipe 84 at equal intervals along its length direction.

[0037] In this embodiment, water in the water tank 1 can be pumped out by using a water pump 81 and transported to the inside of the water distribution pipe 84 through a pumping pipe 82 and a water supply pipe 83; a plurality of atomizing nozzles 85 arranged at equal intervals can be used to atomize and spray the water, thereby facilitating dust suppression, achieving more complete dust removal and better results.

[0038] As a preferred implementation, on the basis of the above structure, further, the other end of the water supply pipe 83 is fixedly connected to the water inlet at the right end of the water distribution pipe 84 .

[0039] As a preferred embodiment, on the basis of the above structure, the discharging mechanism 9 further includes a first electric telescopic rod 91, a bracket 92, a side baffle 93, a rack 94, a large gear 95, a connecting rod 96 and a bottom baffle 97. The first electric telescopic rod 91 is fixedly installed on the upper left of the compression box 2. The telescopic end of the first electric telescopic rod 91 is fixed with a bracket 92, and the bottom of the bracket 92 is fixedly connected with the side baffle 93. A rack 94 is fixed to the outer wall of the left rear end of the side baffle 93, and a large gear 95 is meshed and connected directly behind the rack 94. The bearing of the large gear 95 is installed on the outer wall of the left end of the compression box 2. A bottom baffle 97 is rotatably installed at the lower left of the compression box 2, and a connecting rod 96 is hinged on the left side of the bottom baffle 97.

[0040] In this embodiment, the side baffles 93 and the bottom baffles 97 in the closed state are used to facilitate the stable compression and compaction of the construction waste, and the first electric telescopic rod 91, the rack 94 and the large gear 95 are used to facilitate the control of the opening and closing states of the side baffles 93 and the bottom baffles 97.

[0041] As a preferred embodiment, on the basis of the above structure, further, the top end of the connecting rod 96 is hinged to the outer edge of the large gear 95 away from the center of the circle, and the bottom baffle 97 and the side baffle 93 are linked.

[0042] In this embodiment, when the large gear 95 rotates, the connecting rod 96 can be used to push the bottom baffle 97 to rotate downward and open, so that the construction waste that has been compressed into blocks can be automatically discharged from the compression box 2.

[0043] As a preferred embodiment, on the basis of the above structure, further, a limit rod 10 is welded and fixed on the front end outer wall of the compression box 2, and the limit rod 10 is slidably fitted with the front surface of the side baffle 93.

[0044] In this embodiment, the setting of the limiting rod 10 can improve the strength of the side baffle 93 and the lifting stability thereof.

[0045] As an embodiment, the sewage in the compression box 2 is directly discharged through the discharge mechanism 9. As another embodiment, a sewage hole is provided at the bottom of the compression box 2 to communicate with the water tank 1, so that the sewage in the compression box 2 can flow back to the water tank 1 to form a water cycle, and then the water in the water tank 1 can be replaced regularly. As another embodiment, a sewage pipe is provided on one side of the bottom of the compression box 2 to communicate with the external sewage treatment system, and then the water tank 1 is regularly replenished with clean water to meet the working requirements of the dust prevention mechanism 8.

[0046] The working principle of the utility model is as follows:

[0047] When in use, water is firstly injected through the water inlet on the right front outer wall of the water tank 1. When the construction waste to be recycled is put into the crushing box 3, the guide plate 7 can be used to guide the waste to the position of the two crushing rods 5, and the motor 4 is started. The two crushing rods 5 can be controlled to rotate synchronously in opposite directions by two meshingly connected pinions 6, and the waste crushing process can be started. During this process, the water pump 81 can be turned on to transport the water in the water tank 1 to the inside of the water distribution pipe 84 through the water pumping pipe 82 and the water delivery pipe 83, and the water is sprayed out through a plurality of atomizing nozzles 85 equidistantly arranged on the outer wall of the water distribution pipe 84, so that the smoke and dust generated in the process of crushing the waste can be suppressed, and the dust can be reduced in time and fully to avoid the problem of dust overflow, which not only protects the environment but also protects the health of the staff.

[0048] The crushed construction waste can fall into the compression box 2 through the discharge port at the bottom of the crushing box 3 and the feed port at the middle of the upper end of the compression box 2. Then, the second electric telescopic rod 11 can be started to control the push plate 12 to move left steadily, so that the loose metal material waste can be pushed to the left end of the compression box 2 and compressed into blocks. Then, the push plate 12 is controlled to reset, and the bracket 92, the side baffle 93 and the rack 94 are pushed to rise synchronously through the first electric telescopic rod 91. At the same time, the upwardly moved rack 94 can drive the large gear 95 to rotate and push the bottom baffle 97 to rotate downward through the connecting rod 96 to form an inclined state. Figure 5 As shown in , the compressed block-shaped construction waste can automatically slide out of the compression box 2 by gravity, so that the material can be discharged conveniently. Moreover, the block-shaped construction waste is more convenient to transport and process, and the practicality of the device is stronger.

[0049] The above are only preferred specific embodiments of the utility model and are not intended to limit the protection scope of the utility model; any equivalent changes, modifications, substitutions and variations made by technicians in this technical field based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the existing technology should be within the protection scope determined by the claims.

Claims

1. A construction waste recycling device for construction, comprising a crushing box (3), wherein a crushing processor is provided inside the crushing box (3), characterized in that: The bottom of the crushing box (3) is connected to the compression box (2); a second electric telescopic rod (11) is fixedly provided on the inner wall of the right end of the compression box (2); a push plate (12) with a "concave" structure is fixedly connected to the telescopic end of the second electric telescopic rod (11); the push plate (12) is slidable left and right inside the compression box (2); a discharge mechanism (9) for discharging compressed construction waste is provided at the left end of the compression box (2); a water tank (1) is provided at the bottom of the compression box (2); the water tank (1) is connected to a dustproof mechanism (8) through a pipeline; the dustproof mechanism (8) is installed at the top of the crushing box (3) and is used to spray water mist into the crushing box (3).

2. A construction waste recycling device for construction according to claim 1, characterized in that: The pulverizing machine comprises a motor (4) and two pulverizing rods (5), wherein the motor (4) is fixedly mounted on the right side wall of a pulverizing box (3), and both ends of the two pulverizing rods (5) are rotatably mounted on the middle inner side wall of the pulverizing box (3) through bearings, and pinions (6) are welded and fixed to the left ends of the two pulverizing rods (5), the two pinions (6) are meshed with each other, the two pulverizing rods (5) are linked to each other, and the rotation directions of the two pulverizing rods (5) are opposite to each other, and the right end of one of the pulverizing rods (5) extends out of the pulverizing box (3) and is fixedly connected to the output shaft of the motor (4).

3. A construction waste recycling device for construction according to claim 1, characterized in that: The inner side of the bottom of the crushing box (3) is tilted to form a funnel shape; guide plates (7) are fixed to the inner walls at both the front and rear ends of the crushing box (3), and the upper end surface of the guide plate (7) is tilted.

4. The construction waste recycling device for construction according to claim 1, characterized in that: The dust prevention mechanism (8) comprises a water pump (81), a water suction pipe (82), a water delivery pipe (83) and a water distribution pipe (84). The water pump (81) is fixedly mounted on the upper right side of the compression box (2). The input end of the water pump (81) is fixedly connected to the water suction pipe (82). The other end of the water suction pipe (82) is embedded and connected to the right side wall of the bottom of the water box (1). The output end of the water pump (81) is fixedly connected to the water delivery pipe (83). The water distribution pipe (84) is fixedly mounted on the top of the rear end of the crushing box (3). A plurality of atomizing nozzles (85) are fixedly mounted on the outer wall of the middle part of the front end of the water distribution pipe (84) at equal intervals along its length direction.

5. A construction waste recycling device for construction according to claim 4, characterized in that: The other end of the water supply pipe (83) is fixedly connected to the water inlet at the right end of the water distribution pipe (84).

6. A construction waste recycling device for construction according to claim 1, characterized in that: The discharging mechanism (9) comprises a first electric telescopic rod (91), a bracket (92), a side baffle (93), a rack (94), a large gear (95), a connecting rod (96) and a bottom baffle (97). The first electric telescopic rod (91) is fixedly mounted on the upper left side of the compression box (2). The telescopic end of the first electric telescopic rod (91) is fixedly mounted with the bracket (92). The bottom of the bracket (92) is fixedly connected with the side baffle (93). A rack (94) is fixedly mounted on the rear outer wall of the left end of the side baffle (93). The rear of the rack (94) is meshed with the large gear (95). The bearing of the large gear (95) is mounted on the outer wall of the left end of the compression box (2). The bottom baffle (97) is rotatably mounted on the lower left side of the compression box (2). The left side of the bottom baffle (97) is hinged with the connecting rod (96).

7. A construction waste recycling device for construction according to claim 6, characterized in that: The top end of the connecting rod (96) is hinged to the outer edge of the large gear (95) away from the center of the circle, and the bottom baffle (97) and the side baffle (93) are linked.

8. A construction waste recycling device for construction according to claim 7, characterized in that: A limiting rod (10) is welded and fixed to the front end outer wall of the compression box (2), and the limiting rod (10) is slidably fitted with the front surface of the side baffle (93).

9. The construction waste recycling device for construction according to claim 1, characterized in that: A feed inlet is provided at the middle of the upper end of the compression box (2), and a discharge outlet is provided at the bottom of the crushing box (3); the feed inlet of the compression box (2) and the discharge outlet of the crushing box (3) overlap with each other.

Citation Information

Patent Citations

  • Building waste recovery device for building construction

    CN219898478U