Protective blocking structure for engineering construction

By designing a construction protection barrier structure containing a spray module, the problem that the existing technology cannot completely isolate dust on construction sites is solved, and effective dust isolation and safety guarantees of construction areas are achieved.

CN222314827UInactive Publication Date: 2025-01-07CHONGQING QUANTAN QUANTUM TECHNOLOGY CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421092948.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2025-01-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing protective barrier structure cannot completely isolate dust during construction on construction sites, resulting in the impact of the external environment.

Method used

A construction protection barrier structure including a baffle body, a placement module, a support module, a water supply module and a spray module are designed to suppress dust by spraying water mist, and fix the baffle body by using the support module and a placement module. , and expand the spray area of ​​the water mist through the spray head spray module to isolate the dust in the construction area.

Benefits of technology

Effectively isolate dust in the construction area to avoid affecting the external environment, and ensure the safety of the construction area through warning lights and warning signs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222314827U_ABST
    Figure CN222314827U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of blocking structures, in particular to a protective blocking structure for engineering construction. The technical problem that a construction environment is separated from an external environment through an existing protective blocking structure, a large amount of dust can be generated during construction on a construction site, and the protective blocking structure cannot completely block the dust in a construction area, so that the external environment is affected is solved. According to the technical scheme, the engineering construction protecting and blocking structure comprises a baffle body, a containing module, a supporting module, a water supply module and a spraying module, a stand column is taken up firstly, then a T-shaped clamping block drives the stand column to be fixedly clamped to the baffle body through a T-shaped clamping groove, and then the lower end of the stand column is sleeved with a square mounting sleeve; and then the mounting columns penetrate through the square mounting sleeves to be in positioning connection with the stand columns through the mounting holes and then are tightened and fixed through nuts, and then the bottom plate penetrates through the fixing holes through expansion screws to be fixedly connected with the ground.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of barrier structures, in particular to a protective barrier structure for engineering construction. Background Art

[0002] In engineering construction, it is usually necessary to use a protective partition structure to block the construction site from the external environment, so that the construction site becomes a relatively closed space and protective measures are taken to ensure the safety of the construction environment. The existing protective partition structure separates the construction environment from the external environment. A large amount of dust is generated during construction at the construction site, and the protective partition structure cannot completely block the dust in the construction area, so that the external environment is affected; therefore, we propose a protective partition structure for engineering construction to solve the above-mentioned problems. Utility Model Content

[0003] In order to overcome the problem that the existing protective barrier structure separates the construction environment from the external environment, a large amount of dust will be generated during construction at the construction site, and the protective barrier structure cannot completely block the dust in the construction area, thus affecting the external environment.

[0004] The technical solution of the utility model is: a protective barrier structure for engineering construction, including a baffle body, a placement module, a support module, a water supply module and a spray module; two groups of support modules for supporting the baffle body for protective barrier are horizontally installed on one side of the baffle body, a placement module for placing the water supply module and connected to the baffle body is provided between the two groups of support modules, a water supply module for supplying water is provided in the middle of the inner side of the placement module, and a spray module for spraying water mist to block dust and connected to the water supply module is installed on the upper end of the baffle body.

[0005] Preferably, after the baffle body is erected, the positioning bolt drives the placement box to be fixedly connected with the baffle body, and then the water supply tank is placed. At the same time, the connecting pipe is picked up, and the square clamping block drives the connecting pipe to be fixedly connected with the baffle body through the square clamping groove. Then, according to the scope of construction, the baffle body is fixedly connected with the strip clamping block and the strip clamping groove for horizontal combination and arrangement. The rectangular groove can be used to place a warning sign to warn pedestrians and avoid entering the construction area by mistake. After all the assembly is completed, the water source is poured into the water supply tank through the water inlet pipe, and then driven by the water pump, the water source enters the water outlet pipe from the water supply tank to reach the connecting pipe. After the water source enters the connecting pipe, it enters the connecting branch pipe through the connecting pipe and then is sprayed with water mist by the nozzle to suppress dust in the construction area. In this process, driven by the driver, the nozzle is rotatably connected with the connecting branch pipe through the connecting shaft to expand the spraying area of ​​the water mist, thereby blocking the dust in the construction area to avoid affecting the external environment.

[0006] Preferably, one side of the baffle body is linearly provided with a plurality of groups of strip clamping grooves for clamping the strip clamping blocks, and a strip clamping block is installed corresponding to the strip clamping groove on the side of the baffle body away from the strip clamping groove, and one side of the baffle body is horizontally provided with two groups of T-shaped clamping grooves for fixing the clamping support module, and the upper part of the baffle body is horizontally provided with two groups of square clamping grooves for fixing the clamping spray module, and the baffle body is provided with two groups of T-shaped clamping grooves with a rectangular groove for placing warning signs in the middle. According to the scope of construction, the baffle body is fixedly clamped with the strip clamping blocks and the strip clamping grooves for horizontal combination and arrangement, and the rectangular groove can be used to place warning signs to warn pedestrians and avoid entering the construction area by mistake.

[0007] Preferably, the placement module includes positioning bolts and a placement box, and two groups of positioning bolts are horizontally installed on the inner side of the placement box. The positioning bolts drive the placement box to be fixedly connected to the baffle body, and the positioning bolts drive the placement box to be fixedly connected to the baffle body, which is convenient for placing the water supply tank.

[0008] Preferably, the support module includes a column, a warning light, a T-shaped clamping block, a square mounting sleeve, a mounting column, a nut and a base plate. A warning light is installed on the upper end of the column, a T-shaped clamping block is installed on one side of the column, and mounting holes are opened on the four sides of the lower outer part of the column. Pick up the column, and then the T-shaped clamping block drives the column to be fixedly connected with the baffle body through the T-shaped clamping groove, and then the square mounting sleeve is installed on the outer part of the lower end of the column, and then the mounting column passes through the square mounting sleeve and is positioned and connected to the column through the mounting hole, and then tightened and fixed with the nut.

[0009] Preferably, a square mounting sleeve is provided on the outer sleeve of the lower end of the column, and four groups of mounting columns are arranged around the square mounting sleeve. The mounting columns pass through the square mounting sleeve and are positioned and connected to the columns through mounting holes. Nuts are provided on the outer sleeve of the mounting columns, and a base plate is installed on the lower end of the square mounting sleeve. Fixing holes for expansion screws are provided at the corners of the base plate, and then the base plate is fixed to the ground through the expansion screws passing through the fixing holes. The warning lights on the columns can effectively warn pedestrians and prevent them from mistakenly entering the construction site and causing accidental injuries.

[0010] Preferably, the water supply module includes a water supply tank, a water pump, a water inlet pipe and a water outlet pipe. The water pump is installed at a corner on one side of the water supply tank, and the water inlet pipe is installed at a corner on the side of the water supply tank away from the water pump. A water outlet pipe connected to the spray module is installed in the middle of the upper end of the water supply tank. Water source is poured into the water supply tank through the water inlet pipe, and then driven by the water pump, the water source enters the water outlet pipe from the water supply tank and reaches the connecting main pipe.

[0011] Preferably, the spray module includes a connecting main pipe, a square clamping block, a connecting branch pipe, a connecting shaft and a nozzle. A square clamping block is installed at the lower end of the connecting main pipe corresponding to the square clamping groove. Multiple groups of connecting branch pipes are installed horizontally on one side of the connecting main pipe. A connecting shaft is installed at the end of the connecting branch pipe away from the connecting main pipe. The nozzle is rotatably connected to the connecting branch pipe through the connecting shaft. A driver is installed on one side of the connecting shaft. The connecting main pipe is picked up, and the square clamping block drives the connecting main pipe to be fixedly connected with the baffle body through the square clamping groove. When the water source enters the connecting main pipe, it enters the connecting branch pipe through the connecting main pipe and then is sprayed out by the nozzle to suppress dust in the construction area. In this process, driven by the driver, the nozzle is rotatably connected to the connecting branch pipe through the connecting shaft to expand the spraying area of ​​the water mist, thereby blocking the dust in the construction area to avoid affecting the external environment.

[0012] Beneficial effects of the utility model:

[0013] 1. According to the previous protective barrier structure, the construction environment is separated from the external environment. Since a lot of dust will be generated during construction on the construction site, and the protective barrier structure cannot completely block the dust in the construction area, the external environment is affected. The difference is that first pick up the column, then the T-shaped clamping block drives the column to be fixedly clamped with the baffle body through the T-shaped clamping groove, and then the square installation sleeve is set on the outside of the lower end of the column, and then the installation column passes through the square installation sleeve through the installation hole and is positioned and connected with the column, and then tightened with the nut, and then the bottom plate passes through the fixed The fixed hole is fixedly connected to the ground, and the warning light on the column can effectively warn pedestrians to prevent them from mistakenly entering the construction site and causing accidental injuries. After the baffle body is erected, the positioning bolt drives the placement box to be fixedly connected to the baffle body, and then the water supply tank is placed. At the same time, pick up the connecting pipe, and the square clamping block drives the connecting pipe to be fixedly connected to the baffle body through the square clamping groove. Then, according to the scope of construction, the baffle body is fixedly connected to the strip clamping groove through the strip clamping block for horizontal combination and arrangement. The rectangular groove can be used to place warning signs to warn pedestrians and prevent them from mistakenly entering the construction area.

[0014] 2. After all the assembly is completed, pour the water source into the water supply tank through the water inlet pipe, and then drive the water pump to let the water source enter the water outlet pipe from the water supply tank to reach the connecting main pipe. After the water source enters the connecting main pipe, it enters the connecting branch pipe through the connecting main pipe and then sprays water mist from the nozzle to suppress the dust in the construction area. In this process, driven by the driver, the nozzle is connected to the connecting branch pipe through the connecting shaft to expand the spraying area of ​​the water mist, thereby blocking the dust in the construction area to avoid affecting the external environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0016] Figure 2 This is a schematic diagram of the baffle body structure of the utility model;

[0017] Figure 3 This is a schematic diagram of the support module structure of the utility model;

[0018] Figure 4 It is a schematic diagram of the spray module structure of the utility model.

[0019] Explanation of the accompanying drawings: 1. baffle body; 2. placement module; 3. support module; 4. water supply module; 5. spray module; 101. strip clamping groove; 102. T-shaped clamping groove; 103. square clamping groove; 104. rectangular groove; 105. strip clamping block; 201. positioning bolt; 202. placement box; 301. column; 302. warning light; 303. mounting hole; 304. T-shaped clamping block; 305. square mounting sleeve; 306. mounting column; 307. nut; 308. bottom plate; 309. fixing hole; 401. water supply tank; 402. water pump; 403. water inlet pipe; 404. water outlet pipe; 501. connecting main pipe; 502. square clamping block; 503. connecting branch pipe; 504. connecting shaft; 505. nozzle. DETAILED DESCRIPTION

[0020] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0021] See also Figure 1-2The utility model provides an embodiment: a protective barrier structure for engineering construction, comprising a baffle body 1, a placement module 2, a support module 3, a water supply module 4 and a spray module 5; two groups of support modules 3 for supporting the baffle body 1 for protective barrier are horizontally installed on one side of the baffle body 1, a placement module 2 for placing the water supply module 4 and connected to the baffle body 1 is provided between the two groups of support modules 3, a water supply module 4 for supplying water is provided in the middle of the inner side of the placement module 2, a spray module 5 for spraying water mist to block dust and connected to the water supply module 4 is installed on the upper end of the baffle body 1, and a plurality of strip clamping blocks 105 for clamping are linearly provided on one side of the baffle body 1 Slot 101, a strip clamping block 105 is installed corresponding to the strip clamping slot 101 on one side of the baffle body 1 away from the strip clamping slot 101, two groups of T-shaped clamping slots 102 for fixing the clamping support module 3 are horizontally opened on one side of the baffle body 1, and two groups of square clamping slots 103 for fixing the clamping spray module 5 are horizontally opened on the upper side of the baffle body 1. The baffle body 1 is provided with two groups of T-shaped clamping slots 102, and a rectangular slot 104 for placing a warning sign is opened in the middle. The placement module 2 includes a positioning bolt 201 and a placement box 202. Two groups of positioning bolts 201 are horizontally installed on the inner side of the placement box 202, and the positioning bolts 201 drive the placement box 202 to be fixedly connected with the baffle body 1.

[0022] See also Figure 3-4In this embodiment, the support module 3 includes a column 301, a warning light 302, a T-shaped clamping block 304, a square mounting sleeve 305, a mounting column 306, a nut 307 and a bottom plate 308. The warning light 302 is installed on the upper end of the column 301, a T-shaped clamping block 304 is installed on one side of the column 301, mounting holes 303 are opened around the lower outer periphery of the column 301, and a square mounting sleeve 305 is sleeved on the lower outer end of the column 301. Four groups of mounting columns 306 are arranged around the square mounting sleeve 305, and the mounting columns 306 pass through the square mounting sleeve 305 and are positioned and connected with the column 301 through the mounting hole 303. The outer sleeve of the mounting column 306 is provided with a nut 307. The lower end of the square mounting sleeve 305 is provided with a bottom plate 308, and the corners of the bottom plate 308 are provided with fixing holes 309 for the expansion screws to pass through. The water supply module 4 includes a water supply tank 401, a water pump 402, A water inlet pipe 403 and a water outlet pipe 404 are provided. A water pump 402 is installed at a corner of one side of the water supply tank 401. A water inlet pipe 403 is installed at a corner of the side of the water supply tank 401 away from the water pump 402. A water outlet pipe 404 connected to a spray module 5 is installed at the middle of the upper end of the water supply tank 401. The spray module 5 includes a connecting main pipe 501, a square clamping block 502, a connecting branch pipe 503, a connecting shaft 504 and a nozzle 505. The connecting main pipe 501 A square clamping block 502 is installed at the lower end corresponding to the square clamping groove 103, and multiple groups of connecting branch pipes 503 are installed horizontally on one side of the connecting main pipe 501. A connecting shaft 504 is installed at the end of the connecting branch pipe 503 away from the connecting main pipe 501. The nozzle 505 is rotatably connected to the connecting branch pipe 503 through the connecting shaft 504, and a driver (the model of the driver is AQMD6030BLS-E3) is installed on one side of the connecting shaft 504.

[0023] When working, first pick up the column 301, then the T-shaped clamping block 304 drives the column 301 to be fixedly clamped with the baffle body 1 through the T-shaped clamping groove 102, and then the square installation sleeve 305 is sleeved on the lower end of the column 301. Then the installation column 306 passes through the square installation sleeve 305 and is positioned and connected with the column 301 through the installation hole 303, and then tightened and fixed with the nut 307, and then the bottom plate 308 is fixedly connected to the ground through the expansion screw through the fixing hole 309, and the warning light 302 on the column 301 can effectively warn pedestrians to prevent pedestrians from mistakenly entering the construction site and causing accidental injuries;

[0024] After the baffle body 1 is erected, the positioning bolt 201 drives the placement box 202 to be fixedly connected with the baffle body 1, and then the water supply tank 401 is placed. At the same time, the connecting pipe 501 is picked up, and the square clamping block 502 drives the connecting pipe 501 to be fixedly connected with the baffle body 1 through the square clamping groove 103. Then, according to the scope of construction, the baffle body 1 is fixedly connected with the bar clamping groove 101 through the strip clamping block 105 to be arranged in a horizontal combination. The rectangular groove 104 can be used to place a warning sign to warn pedestrians and avoid entering the construction area by mistake.

[0025] After all the assembly is completed, pour the water source into the water supply tank 401 through the water inlet pipe 403, and then driven by the water pump 402, the water source enters the water outlet pipe 404 from the water supply tank 401 to reach the connecting main pipe 501. After the water source enters the connecting main pipe 501, it enters the connecting branch pipe 503 through the connecting main pipe 501 and then sprays water mist from the nozzle 505 to suppress the dust in the construction area. In this process, driven by the driver, the nozzle 505 is rotatably connected to the connecting branch pipe 503 through the connecting shaft 504 to expand the spraying area of ​​the water mist, thereby blocking the dust in the construction area to avoid affecting the external environment. When the construction is completed, each clamping part is disassembled in turn for sorting, storage and maintenance, which is convenient for the next use.

[0026] Through the above steps, after the baffle body 1 is erected, the positioning bolt 201 drives the placement box 202 to be fixedly connected with the baffle body 1, and then the water supply tank 401 is placed. At the same time, the connecting pipe 501 is picked up, and the square clamping block 502 drives the connecting pipe 501 to be fixedly connected with the baffle body 1 through the square clamping groove 103. Then, according to the scope of construction, the baffle body 1 is fixedly connected with the strip clamping groove 101 through the strip clamping block 105 for horizontal combination arrangement. The rectangular groove 104 can be used to place a warning sign to warn pedestrians and avoid entering the construction area by mistake. After all the assembly is completed, The water source is poured into the water supply tank 401 through the water inlet pipe 403, and then driven by the water pump 402, the water source enters the water outlet pipe 404 from the water supply tank 401 to reach the connecting main pipe 501. After the water source enters the connecting main pipe 501, it enters the connecting branch pipe 503 through the connecting main pipe 501 and then sprays water mist from the nozzle 505 to suppress the dust in the construction area. In this process, driven by the driver, the nozzle 505 is rotatably connected to the connecting branch pipe 503 through the connecting shaft 504, thereby expanding the spraying area of ​​the water mist, thereby blocking the dust in the construction area to avoid affecting the external environment.

[0027] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the purpose of the present invention.

Claims

1. A protective barrier structure for engineering construction, comprising a barrier body (1); characterized in that: It also comprises a placement module (2), a support module (3), a water supply module (4) and a spray module (5); two groups of support modules (3) for supporting the baffle body (1) for protection and blocking are transversely mounted on one side of the baffle body (1); a placement module (2) for placing the water supply module (4) and connected to the baffle body (1) is arranged between the two groups of support modules (3); a water supply module (4) for supplying water is arranged in the middle of the inner side of the placement module (2); and a spray module (5) for spraying water mist for blocking dust and connected to the water supply module (4) is arranged on the upper end of the baffle body (1).

2. The protective barrier structure for engineering construction according to claim 1 is characterized by: A plurality of groups of strip-shaped clamping grooves (101) for clamping strip-shaped clamping blocks (105) are linearly provided on one side of the baffle body (1), and a strip-shaped clamping block (105) is installed corresponding to the strip-shaped clamping groove (101) on one side of the baffle body (1) away from the strip-shaped clamping groove (101). Two groups of T-shaped clamping grooves (102) for fixing and clamping a support module (3) are transversely provided on one side of the baffle body (1), and two groups of square clamping grooves (103) for fixing and clamping a spraying module (5) are transversely provided on the upper side of the baffle body (1). A rectangular groove (104) for placing a warning sign is provided in the middle of the two groups of T-shaped clamping grooves (102) provided on the baffle body (1).

3. The protective barrier structure for engineering construction according to claim 1 is characterized by: The placement module (2) comprises positioning bolts (201) and a placement box (202). Two groups of positioning bolts (201) are transversely mounted on one inner side of the placement box (202). The positioning bolts (201) drive the placement box (202) to be fixedly connected to the baffle body (1).

4. The protective barrier structure for engineering construction according to claim 1 is characterized by: The support module (3) comprises a column (301), a warning light (302), a T-shaped clamping block (304), a square mounting sleeve (305), a mounting column (306), a nut (307) and a bottom plate (308); the warning light (302) is mounted on the upper end of the column (301); the T-shaped clamping block (304) is mounted on one side of the column (301); and mounting holes (303) are provided around the lower outer periphery of the column (301).

5. The protective barrier structure for engineering construction according to claim 4 is characterized by: The lower end of the column (301) is covered with a square mounting sleeve (305), and four groups of mounting columns (306) are arranged around the square mounting sleeve (305). The mounting columns (306) pass through the square mounting sleeve (305) and are positioned and connected to the column (301) through the mounting holes (303). The outer sleeve of the mounting column (306) is covered with a nut (307). The lower end of the square mounting sleeve (305) is installed with a bottom plate (308), and the bottom plate (308) is provided with fixing holes (309) at the corners for the expansion screws to pass through.

6. The protective barrier structure for engineering construction according to claim 1 is characterized by: The water supply module (4) comprises a water supply box (401), a water pump (402), a water inlet pipe (403) and a water outlet pipe (404); the water pump (402) is installed at a corner of one side of the water supply box (401); the water inlet pipe (403) is installed at a corner of the side of the water supply box (401) away from the water pump (402); and the water outlet pipe (404) connected to the spray module (5) is installed at the middle of the upper end of the water supply box (401).

7. The protective barrier structure for engineering construction according to claim 2 is characterized by: The spray module (5) comprises a connecting main pipe (501), a square clamping block (502), a connecting branch pipe (503), a connecting shaft (504) and a nozzle (505); a square clamping block (502) is installed at the lower end of the connecting main pipe (501) corresponding to the square clamping groove (103); a plurality of connecting branch pipes (503) are installed transversely on one side of the connecting main pipe (501); a connecting shaft (504) is installed at one end of the connecting branch pipe (503) away from the connecting main pipe (501); the nozzle (505) is rotatably connected to the connecting branch pipe (503) via the connecting shaft (504); and a driver is installed on one side of the connecting shaft (504).

Citation Information

Cited By

  • Protective blocking structure for engineering construction

    CN224326105U