360-degree visual pile foundation pore-forming monitoring device
The 360° visual pile foundation borehole monitoring device, which uses a measuring rope to connect the borehole lighting lamp and the 360° camera, combined with a pulley device frame, solves the problems of high cost, complexity and borehole wall damage in existing pile foundation borehole monitoring, and achieves efficient and intuitive pile foundation borehole monitoring.
Patent Information
- Application Number
- CN202420982000.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-05-08
AI Technical Summary
Existing methods for monitoring pile foundation borehole formation suffer from high costs, significant damage to the borehole wall, complex operation, and difficulty in achieving true visualization.
A 360° visual pile foundation borehole monitoring device is adopted, which connects the borehole lighting lamp and the 360° camera through a measuring rope and is combined with a pulley device frame to achieve all-round image recording of the borehole wall and the installation of the reinforcing cage.
It enables efficient, intuitive, and digital monitoring of pile foundation drilling, reduces the complexity and difficulty of instruments, minimizes damage to the borehole wall, and lowers costs and labor intensity.
Smart Images

Figure CN222315122U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of pile foundation monitoring, in particular to a 360-degree visualized pile foundation hole forming monitoring device. Background Art
[0002] At present, the monitoring of pile foundation drilling is mainly completed in the following ways:
[0003] 1. The cage method is to judge the quality of pile foundation hole formation by the lowering of a specific size steel cage. It can only roughly understand the hole condition and cannot provide specific indicators.
[0004] 2. Mechanical method: Use a winch to lower the borehole probe and sediment probe into the hole, and transmit data to the host through the probe to reflect the quality of the hole. It will come into contact with the hole wall, causing secondary damage to the hole wall; the daily maintenance workload of the mechanical joints is large.
[0005] 3. Ultrasonic method: first, place the winch on the borehole and level it, and align the ultrasonic probe with the center of the hole. Then, connect the operator and turn on the power to start the detection. As the probe is lowered into the mud, the signals of the surface state of the borehole side wall in two or four directions are synchronously recorded on the recording paper. This method is costly and can only be used for monitoring pile foundations with water. Utility Model Content
[0006] Therefore, in order to solve the above-mentioned shortcomings, the utility model provides a 360° visual pile foundation hole monitoring device, which is mainly used for monitoring the activities in the hole after the waterless pile foundation is drilled and for checking the installation quality of the steel cage after the steel cage is lowered. It is efficient, intuitive and digital.
[0007] The utility model is implemented in this way: a 360° visual pile foundation hole monitoring device is constructed, characterized in that: a 360° visual pile foundation hole monitoring device is characterized in that: the main structure includes a borehole lighting lamp connected by a measuring rope, a 360° camera connected at the end by a threaded joint, and a pulley device frame, the pulley device is set up at the corresponding hole mouth, and the 360° camera connected with the measuring rope is set up on the pulley.
[0008] According to the utility model, a 360° visual pile foundation hole formation monitoring device is characterized in that: the camera (2) is wirelessly connected to communicate with a mobile phone, and after the camera is debugged with the mobile phone, recording begins. As the camera is slowly and evenly lowered, the image of the hole wall or the steel cage installation is recorded on the camera.
[0009] The utility model has the following advantages: (1) the instrument required for this method is smart and convenient, and easy to carry; (2) this method can truly achieve real visualization of pile foundation hole formation; (3) this method is easy to install and remove the instrument, the labor intensity of the operators is low, and the safety risk is small; (4) this method is easy to operate, and the operator configuration requirements are low under the operation intensity; (5) the camera and measuring rope used in this method are small and light, so the pulley bracket used can be made of lightweight materials to save costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 This is a structural diagram of the monitoring device of this application.
[0011] Among them: a borehole lighting lamp 1, a 360° camera 2, a pulley device frame 3, and a pulley 4. DETAILED DESCRIPTION
[0012] The following will be combined with the attached Figure 1 The utility model is described in detail, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0013] The utility model provides a 360° visual pile foundation hole monitoring device through improvement. Figure 1 As shown, it can be implemented in the following manner; the main structure includes a borehole lighting lamp 1 connected by a measuring rope, a 360° camera 2 connected at the end by a threaded joint, and a pulley device frame 3, the pulley device frame 3 is arranged at the corresponding hole, and the 360° camera 2 connected with the measuring rope is set on the pulley 4.
[0014] The camera 2 is wirelessly connected and communicated with the mobile phone. After the camera is debugged with the mobile phone, recording begins. As the camera is slowly and evenly lowered, the image of the hole wall or the steel cage installation is recorded on the camera.
[0015] The main structure of this patent is that the measuring rope is connected to the borehole lighting lamp and the end is connected to the 360° camera using a threaded joint. At the same time, a pulley bracket is set up in conjunction with the hole to be measured to lower the camera to achieve the purpose of pile foundation hole monitoring. For easy carrying, all the required components can be disassembled into small and flexible components.
[0016] Operation process: During installation, first set up the pulley device at the hole mouth, and set up the 360° camera connected with the measuring rope on the pulley. Wirelessly connect the camera to the mobile phone, debug the camera with the mobile phone, and start recording. As the camera is slowly and evenly lowered, the image of the hole wall or the steel cage installation is recorded on the camera. After the camera reaches the bottom of the hole, the measuring rope will have a noticeable slack, and the depth of the hole can be judged by the scale line of the measuring rope. After the camera is retracted, the image data such as the sediment at the bottom of the hole, the construction quality of the hole wall, and the installation quality of the steel cage can be viewed on the mobile phone. The inclination of the pile hole can also be preliminarily determined by the difference between the position of the camera at the bottom of the hole and the hanging position of the hole mouth.
[0017] This patent has the following advantages and beneficial effects: (1) The instrument required for this method is smart and convenient, and easy to carry; (2) This method can truly achieve real visualization of pile foundation hole formation; (3) This method is easy to install and remove the instrument, the labor intensity of the operators is low, and the safety risk is small; (4) This method has low operating difficulty, and the operator configuration requirements are low under high operating intensity; (5) The camera and measuring rope used in this method are small and light, so the pulley bracket used can be made of lightweight materials to save costs.
[0018] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A 360° visual pile foundation hole monitoring device, characterized in that ; The device structure comprises a borehole lighting lamp (1) connected by a measuring rope, a 360° camera (2) connected at the end by a threaded joint, and a pulley device frame (3). The pulley device frame (3) is arranged at a corresponding hole, and the 360° camera (2) connected with the measuring rope is set on the pulley (4).
2. A 360° visual pile foundation hole monitoring device according to claim 1, characterized in that: The camera (2) is wirelessly connected to the mobile phone for communication. After the camera is debugged with the mobile phone, recording begins. As the camera is slowly lowered at a uniform speed, images of the hole wall or steel cage installation are recorded on the camera.