Power system and automatic monitoring equipment thereof
By setting up multi-layer shock absorbing components in the power system automation monitoring equipment, the problem of equipment damage and shaking under external forces is solved, the stability and service life of the equipment are improved, and the normal operation of the power system is ensured.
CN222318984UActive Publication Date: 2025-01-07HEBEI URBAN CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202420873082.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-04-25
Smart Images

Figure CN222318984U_ABST
Abstract
The utility model discloses an electric power system and an automatic monitoring device thereof, comprising a pedestal, a first damping assembly, a second damping assembly and a third damping assembly, one side of the pedestal is provided with a support frame, and one side of the support frame far away from the pedestal is provided with a monitoring device body; one side of the first damping assembly is installed on the base, and the other side of the first damping assembly is connected to the supporting frame. One side of the second damping assembly is installed on the base, the other side of the second damping assembly is connected to the supporting frame, and the second damping assembly and the first damping assembly are arranged in a spaced mode. Through the arrangement of the first damping assembly, when the detection and monitoring equipment body is subjected to external force, a preliminary buffering effect is achieved, then through the arrangement of the second damping assembly, a further buffering effect is achieved, and finally through the arrangement of the third damping assembly, the further buffering effect is achieved; therefore, the monitoring equipment is not easy to damage under the action of external force, and normal operation of a power system is ensured.