Auxiliary hoisting device for bridge pier cross beam in bridge construction
By designing an auxiliary lifting device for the bridge pier beams during bridge construction, the gravity of the bridge pier beams is used to move the clamping plate closer and use a retractable rope assembly to clamp the binding rope, thus solving the slippage problem during the lifting of the bridge pier beams and improving construction safety.
Patent Information
- Application Number
- CN202421248242.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-03
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-06-03
AI Technical Summary
During bridge construction, the crossbeams of bridge piers are prone to slipping during hoisting, leading to safety issues.
Design an auxiliary lifting device for bridge pier beams during bridge construction. The device utilizes the gravity of the pier beam to press down on the bearing plate, causing the clamping plate to move closer. Combined with a retractable rope assembly, the device clamps the binding rope, thereby improving stability.
This enhances the stability of the bridge pier beams during lifting, prevents slippage, and improves construction safety.
Smart Images

Figure CN222331319U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a lifting auxiliary device for a pier crossbeam during bridge construction. Background Art
[0002] Bridges generally refer to structures built across rivers, lakes, and seas to allow vehicles and pedestrians to pass smoothly. In order to adapt to the modern high-speed development of the transportation industry, bridges are also extended to buildings that are built across mountain streams, poor geology, or to meet other transportation needs to make travel more convenient. Bridges are generally composed of superstructures, substructures, supports, and auxiliary structures. The superstructure is also called the bridge span structure, which is the main structure for crossing obstacles; the substructure includes abutments, piers, and beams. Bridge construction is the process of building a bridge according to the design content, mainly referring to bridge construction technology and construction organization, construction management, construction quality, etc.
[0003] The inventor discovered during the process of implementing the utility model:
[0004] During the bridge construction process, a crane is needed to move the pier beam to the specified position. In order to facilitate lifting, users generally use binding ropes to bind the pier beams, and then connect the binding ropes to the crane. However, during use, the binding ropes are easy to slip off the pier beams, causing the pier beams to fall, affecting the safety of bridge construction. Summary of the invention
[0005] In order to solve the problems existing in the prior art, the utility model proposes a lifting auxiliary device for bridge pier beams during bridge construction. The device utilizes the gravity of the pier beams to press down the bearing plate, thereby driving the two clamping plates to move towards each other, thereby clamping the pier beams. At the same time, a retractable hanging rope assembly is provided to clamp the binding rope passing through the inside thereof, thereby further improving the stability of the pier beams during movement.
[0006] To this end, the technical solution of the utility model is: a lifting auxiliary device for bridge pier beams during construction, comprising a load-bearing block, a load-bearing plate being slidably connected inside the load-bearing block, two clamping plates distributed on the left and right being slidably connected to the upper end of the load-bearing block, a limiting assembly being arranged between one end of the two clamping plates away from each other and the load-bearing block, a driven block being arranged at one end of the two clamping plates away from each other, a driving block matching the driven block being arranged at the outer end of the drive block, and a plurality of hanging rope assemblies being arranged at the outer end of the load-bearing block.
[0007] Furthermore, a vertical rod is provided at the lower end of the bearing plate, the lower end of the vertical rod passes through the bearing block and extends to the lower side of the bearing block, the vertical rod is slidably connected to the bearing block, and a compression spring is provided between the bearing plate and the lower inner wall of the bearing block.
[0008] Furthermore, the limiting assembly comprises a circular ring fixedly connected to the bearing block, and a cross bar fixedly connected to the clamping plate is slidably connected inside the circular ring.
[0009] Furthermore, a tension spring is sleeved on the outer side of the cross bar, and two ends of the tension spring are fixedly connected to the clamping plate and the circular ring respectively.
[0010] Furthermore, the hanging rope assembly comprises an upper hanging ring and a lower hanging ring, and a driving assembly is arranged between the upper hanging ring and the lower hanging ring.
[0011] Furthermore, the driving assembly includes sleeves located at both ends of the upper hanging ring, and the two sleeves are respectively provided with an inner rod fixedly connected to the lower hanging ring and a threaded rod threadedly connected to the lower hanging ring. The inner rod extends through the sleeve at a corresponding position at one end away from the lower hanging ring and is slidably connected to the sleeve, and the threaded rod extends through the sleeve at a corresponding position at one end away from the lower hanging ring and is threadedly connected to the sleeve.
[0012] Furthermore, a notch is provided at the outer end of the upper hanging ring, a limit strip adapted to the notch is rotatably connected inside the upper hanging ring, a latch is slidably connected to the outer end of the upper hanging ring, and a magnetic sheet adapted to the latch is provided inside the limit strip.
[0013] Beneficial effects: Compared with the prior art, the utility model utilizes the gravity of the pier beam to press down the bearing plate, thereby driving the two clamping plates to move towards each other, thereby clamping the pier beam; at the same time, a retractable hanging rope assembly is provided to clamp the binding rope passing through the inside thereof, thereby further improving the stability of the pier beam when moving. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a stereogram of the utility model.
[0015] Figure 2 It is a connection diagram of the load-bearing plate and the clamping plate of the utility model.
[0016] Figure 3 It is a structural diagram of the lanyard assembly of the utility model.
[0017] Figure 4 It is a schematic diagram of the lanyard assembly of the utility model when it is retracted.
[0018] As shown in the figure: 1. load-bearing block; 2. load-bearing plate; 3. vertical rod; 4. compression spring; 5. clamping plate; 6. circular ring; 7. horizontal rod; 8. tension spring; 9. driven block; 10. driving block; 11. hanging rope assembly; 12. upper hanging ring; 13. notch; 14. limit strip; 15. latch; 16. magnetic sheet; 17. lower hanging ring; 18. sleeve; 19. inner rod; 20. threaded rod. DETAILED DESCRIPTION
[0019] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings, but this embodiment should not be understood as a limitation to the present invention.
[0020] The utility model Figures 1 to 4 As shown:
[0021] A lifting auxiliary device for a bridge pier crossbeam during construction comprises a bearing block 1, a bearing plate 2 is slidably connected inside the bearing block 1, two clamping plates 5 distributed left and right are slidably connected to the upper end of the bearing block 1, a limit position assembly is arranged between one end of the two clamping plates 5 away from each other and the bearing block 1, a driven block 9 is arranged at one end of the two clamping plates 5 away from each other, a driving block 10 adapted thereto is arranged at the outer end of the driven block 9, and a plurality of hanging rope assemblies 11 are arranged at the outer end of the bearing block 1;
[0022] Figure 1 As shown, a vertical rod 3 is arranged at the lower end of the bearing plate 2, and the lower end of the vertical rod 3 passes through the bearing block 1 and extends to the lower side of the bearing block 1. The vertical rod 3 is slidably connected with the bearing block 1, and a compression spring 4 is arranged between the bearing plate 2 and the lower inner wall of the bearing block 1. The vertical rod 3 can improve the stability of the movement of the bearing plate 2, and the compression spring 4 can facilitate the resetting of the bearing plate 2;
[0023] Figure 1 As shown, the limit assembly includes a ring 6 fixedly connected to the bearing block 1, and a cross bar 7 fixedly connected to the clamping plate 5 is slidably connected inside the ring 6. The arrangement of the cross bar 7 can improve the stability of the movement of the clamping plate 5. A tension spring 8 is sleeved on the outer side of the cross bar 7. The two ends of the tension spring 8 are respectively fixedly connected to the clamping plate 5 and the ring 6. The tension spring 8 can facilitate the resetting of the clamping plate 5.
[0024] Figure 3 and Figure 4 As shown, the hanging rope assembly 11 includes an upper hanging ring 12 and a lower hanging ring 17, and a driving assembly is arranged between the upper hanging ring 12 and the lower hanging ring 17. The driving assembly includes a sleeve 18 located at both ends of the upper hanging ring 12, and the two sleeves 18 are respectively provided with an inner rod 19 fixedly connected to the lower hanging ring 17 and a threaded rod 20 threadedly connected to the lower hanging ring 17. The end of the inner rod 19 away from the lower hanging ring 17 penetrates into the sleeve 18 at a corresponding position and is slidably connected to the sleeve 18, and the end of the threaded rod 20 away from the lower hanging ring 17 penetrates into the sleeve 18 at a corresponding position and is threadedly connected to the sleeve 18.
[0025] In this embodiment, components identical or corresponding to those in the above embodiment are denoted by corresponding reference numerals. For the sake of simplicity, only the differences from the above embodiment are described below. Figure 3 and Figure 4As shown, a notch 13 is provided at the outer end of the upper hanging ring 12, and a limit strip 14 adapted to the notch 13 is rotatably connected inside the upper hanging ring 12. A latch 15 slidably connected to the outer end of the upper hanging ring 12 is penetrated, and a magnetic sheet 16 adapted to the latch 15 is provided inside the limit strip 14. When the binding rope is too thick to pass through the hanging rope assembly 11, the user can connect a hollow piece to the end of the binding rope, and then pass the hollow piece through the upper hanging ring 12 to connect the binding rope with the hanging rope assembly 11. The limit strip 14 can prevent the hollow piece from being separated from the hanging rope assembly 11.
[0026] The working principle of this embodiment:
[0027] The user passes the binding rope through the hanging rope assembly 11 and rotates the threaded rod 20 to contract the hanging rope assembly 11 to clamp the binding rope. Then the user places the pier beam on the upper end of the load-bearing plate 2. The gravity of the pier beam will press down the load-bearing plate 2. At this time, the two driving blocks 10 that move downward at the upper end of the load-bearing plate 2 will squeeze the driven blocks 9 to drive the two clamping plates 5 to move towards each other, thereby clamping the pier beam. Finally, the user connects the binding rope passing through the hanging rope assembly 11 to the crane to complete the assembly of the pier beam.
[0028] Parts not described in detail in this specification are well-known technologies in the art.
[0029] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A lifting auxiliary device for a bridge pier beam during bridge construction, comprising a bearing block (1), characterized in that: The bearing block (1) is slidably connected to a bearing plate (2) inside, and two clamping plates (5) distributed on the left and right are slidably connected to the upper end of the bearing block (1), and a limit assembly is arranged between the ends of the two clamping plates (5) that are away from each other and the bearing block (1), and a driven block (9) is arranged at the ends of the two clamping plates (5) that are away from each other, and a driving block (10) that is compatible with the driven block (9) is arranged at the outer end of the driven block (9), and a plurality of hanging rope assemblies (11) are arranged at the outer end of the bearing block (1).
2. According to claim 1, a lifting auxiliary device for bridge pier beams in bridge construction is characterized by: A vertical rod (3) is arranged at the lower end of the bearing plate (2), the lower end of the vertical rod (3) passes through the bearing block (1) and extends to the lower side of the bearing block (1), the vertical rod (3) is slidably connected to the bearing block (1), and a compression spring (4) is arranged between the bearing plate (2) and the lower inner wall of the bearing block (1).
3. The auxiliary lifting device for bridge pier beams in bridge construction according to claim 1 or 2, characterized in that: The limiting assembly comprises a circular ring (6) fixedly connected to the bearing block (1), and a cross bar (7) fixedly connected to the clamping plate (5) is slidably connected inside the circular ring (6).
4. The auxiliary lifting device for bridge pier beams in bridge construction according to claim 3, characterized in that: A tension spring (8) is sleeved on the outer side of the cross bar (7), and two ends of the tension spring (8) are respectively fixedly connected to the clamping plate (5) and the circular ring (6).
5. The auxiliary lifting device for bridge pier beams in bridge construction according to claim 1, 2 or 4, characterized in that: The hanging rope assembly (11) comprises an upper hanging ring (12) and a lower hanging ring (17), and a driving assembly is arranged between the upper hanging ring (12) and the lower hanging ring (17).
6. The auxiliary lifting device for bridge pier beams in bridge construction according to claim 5, characterized in that: The drive assembly comprises sleeves (18) located at both ends of the upper hanging ring (12), and the two sleeves (18) are respectively provided with an inner rod (19) fixedly connected to the lower hanging ring (17) and a threaded rod (20) threadedly connected to the lower hanging ring (17), the inner rod (19) having one end away from the lower hanging ring (17) passing through the sleeve (18) at a corresponding position and being slidably connected to the sleeve (18), and the threaded rod (20) having one end away from the lower hanging ring (17) passing through the sleeve (18) at a corresponding position and being threadedly connected to the sleeve (18).
7. The auxiliary lifting device for bridge pier beams in bridge construction according to claim 6, characterized in that: The outer end of the upper hanging ring (12) is provided with a notch (13), the interior of the upper hanging ring (12) is rotatably connected to a limit strip (14) adapted to the notch (13), the outer end of the upper hanging ring (12) is penetrated by a latch (15) slidably connected to the upper hanging ring (12), and the interior of the limit strip (14) is provided with a magnetic sheet (16) adapted to the latch (15).