Combined connecting and fixing device for aluminum formwork and wood formwork
By designing a combination connection fixture between aluminum formwork and wooden formwork, the fixing problem of aluminum formwork and wooden formwork is solved by using L-shaped connectors and removable fixtures, the fixing problem during the combination of aluminum formwork and wooden formwork is achieved, stable connection is achieved, construction quality defects are avoided, and construction quality is simplified. Construction operations reduce costs.
Patent Information
- Application Number
- CN202420682636.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-04-03
AI Technical Summary
In the prior art, aluminum formwork and wooden formwork cannot be effectively fixed when used in combination, resulting in problems such as expanding molds, blasting molds, and tilting positioning during concrete pouring, resulting in construction quality defects.
Design a combination connection fixture of aluminum formwork and wooden formwork, including multiple L-shaped connection parts and removable fixtures. The connection parts are arranged along the side of the wooden formwork and fixed with the aluminum formwork through fixing beams and fixing holes. Remove the fixing device to fix or separate the connector from the fixing beam to ensure a stable connection.
The stable connection between aluminum formwork and wooden formwork is achieved, which avoids the expansion, explosion and deviation of the mold during concrete pouring, simplifies construction operations, reduces costs and improves construction efficiency.
Smart Images

Figure CN222333270U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction, in particular to a combined connection and fixing device of an aluminum template and a wooden template. Background Art
[0002] Aluminum formwork has higher durability than disposable wooden formwork and can be used repeatedly in multiple projects, thus reducing material costs. In addition, aluminum formwork is lightweight and easy to carry and install, making the construction process more efficient. Its high manufacturing precision and smooth surface help improve the quality and appearance of concrete pouring, so it is widely used in the construction field.
[0003] However, since aluminum formwork is a standard part with fixed size, when non-standard building floors have different heights during construction, it is often necessary to install wooden formwork on top of the aluminum formwork used for standard floors to compensate for the insufficient height of the aluminum formwork.
[0004] This requires that the aluminum formwork and the wooden formwork be fixedly connected together during construction. At present, there is no effective and safe connection method and device for this type of construction method. Often, when pouring concrete, it will cause problems such as concrete expansion, mold explosion, and deviation at the connection part, resulting in construction quality defects and unnecessary repair costs. Utility Model Content
[0005] To this end, the utility model provides a combined connection and fixing device for an aluminum formwork and a wooden formwork, which mainly solves the technical problem that the aluminum formwork and the wooden formwork in the prior art cannot be effectively fixed and connected when used in combination, resulting in construction quality defects such as bulging formwork, thin formwork and deviation during concrete pouring.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A combined connection and fixing device for an aluminum formwork and a wooden formwork, comprising a plurality of connecting pieces; the plurality of connecting pieces are arranged horizontally on the side of the wooden formwork away from a concrete pouring layer; the connecting piece is composed of a first connecting portion and a second connecting portion to form an L-shaped structure; the first connecting portion is fixedly connected to the side of the wooden formwork away from the concrete pouring layer; at least two through-connecting portion fixing holes are provided on the top surface of the second connecting portion; the top and bottom of the aluminum formwork are both provided with fixing beams protruding toward the side away from the concrete pouring layer; the top surface of the fixing beam is provided with fixing beam fixing holes that are adapted to the positions and quantities of the fixing holes of the connecting portion; a detachable fixing device is provided between the fixing holes of the connecting portion and the fixing holes of the fixing beam corresponding to their positions, for fixing or separating the connecting piece from the fixing beam.
[0008] Preferably, the detachable fixing device is a fixing bolt; the fixing bolt includes a fixing bolt rod; the fixing bolt rod can movably pass through the fixing hole of the connecting part and the fixing hole of the fixing beam; a cylindrical fixing bolt cap is provided at either end of the fixing bolt; the diameter of the fixing bolt cap is larger than the aperture of the fixing hole of the connecting part and the fixing hole of the fixing beam; the fixing bolt rod is provided with a locking device for fixing the second connecting part and the fixing beam together.
[0009] Optionally, the locking device is a locking nut; an outer wall of the fixing bolt rod is provided with an external thread; and the locking nut is threadably connected to the fixing bolt rod via the external thread.
[0010] Optionally, the locking device is a triangular-shaped fixing plate; the fixing bolt rod is provided with a communicating fixing groove; the top surface of the fixing groove is located above the bottom surface of the fixing beam; and the fixing plate can be embedded in the fixing groove.
[0011] Preferably, the bottom surface of the second connecting portion can be in contact with the top surface of the fixing beam.
[0012] The utility model has at least the following beneficial effects:
[0013] A connecting piece is provided, and the connecting piece is provided on the side of the wooden formwork away from the concrete pouring layer. The connecting piece is composed of a first connecting part and a second connecting part to form an L-shaped structure. The first connecting part is fixedly connected to the side of the wooden formwork away from the concrete pouring layer. A connecting part fixing hole is provided on the top surface of the second connecting part. A fixing beam is provided on the top and bottom of the aluminum formwork. A fixing beam fixing hole is provided on the top surface of the fixing beam. A detachable fixing device is provided between the connecting part fixing hole and the fixing beam fixing hole corresponding to the position thereof. When in use, the connecting piece is fixed to the fixing beam by the detachable fixing device, so that the wooden formwork and the aluminum formwork are fixed together; when dismantling, the connecting piece is separated from the fixing beam by the detachable fixing device, so that the wooden formwork and the aluminum formwork are disassembled, which is simple and quick to operate and speeds up the construction progress; at the same time, the connecting piece can be removed from the wooden formwork and can be used again, thereby reducing costs; in addition, by adopting this connection method, the aluminum formwork and the wooden formwork are stably connected together, thereby avoiding construction quality defects caused by bulging mold, thin mold and offset during pouring.
[0014] It can be seen that the combined connection and fixing device of the aluminum formwork and the wooden formwork of the utility model has the advantages of simple structure, recyclable use, low cost, simple and quick operation, and easy construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly explain the prior art and the present invention, the following briefly introduces the drawings required for describing the prior art and the present invention. Obviously, the drawings described below are only exemplary, and for ordinary technicians in this field, other drawings can be derived from the provided drawings without creative work.
[0016] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so that people familiar with this technology can understand and read them. They are not used to limit the conditions under which the present invention can be implemented. Any structural modification, change in proportion or adjustment of size should still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.
[0017] Figure 1 This is a front structural schematic diagram of a combined connection and fixing device of an aluminum formwork and a wooden formwork after installation of the utility model;
[0018] Figure 2 It is a schematic diagram of the side structure of a combined connection and fixing device of an aluminum formwork and a wooden formwork after installation of the utility model;
[0019] Description of reference numerals:
[0020] 1. Connecting piece; 101. First connecting part; 102. Second connecting part; 2. Aluminum formwork; 201. Fixed beam; 3. Fixed bolt; 301. Fixed bolt rod; 302. Fixed bolt cap; 4. Fixed plate; 5. Wooden formwork; 6. Concrete pouring layer. DETAILED DESCRIPTION
[0021] The present application is further described below in detail through specific embodiments in conjunction with the accompanying drawings.
[0022] In the description of this application: unless otherwise specified, the meaning of "plurality" is two or more. The terms "first", "second", "third", etc. in this application are intended to distinguish the objects referred to, and do not have special meanings in terms of technical connotations (for example, they should not be understood as emphasizing the importance or order, etc.). Expressions such as "including", "comprising", "having", etc. also mean "not limited to" (certain units, components, materials, steps, etc.).
[0023] The terms such as "upper", "lower", "left", "right", "middle", etc. used in this application are usually used to facilitate intuitive understanding by comparing with the accompanying drawings, and are not absolute limitations on the positional relationship in the actual product. Without departing from the technical concept disclosed in this application, changes in these relative positional relationships should also be regarded as the scope of this application.
[0024] The utility model discloses a combined connection and fixing device of an aluminum formwork and a wooden formwork, such as Figure 1 , Figure 2 As shown, a plurality of connecting members 1 are provided, and the plurality of connecting members 1 are fixedly provided in the horizontal direction on the side of the wooden formwork 5 away from the concrete pouring layer 6. The connecting member 1 is composed of a first connecting portion 101 and a second connecting portion 102 to form an L-shaped structure. In actual application, the connecting member 1 can be made of angle iron, and the first connecting portion 101 is fixedly connected to the side of the wooden formwork 5 away from the concrete pouring layer 6. At least two through connecting portion fixing holes are provided on the top surface of the second connecting portion 102. In this embodiment, there are two connecting portion fixing holes; the top and bottom of the aluminum formwork 2 are provided with fixing beams 201 protruding toward the side away from the concrete pouring layer 6, and the top surface of the fixing beam 201 Fixed beam fixing holes that are adapted to the positions and numbers of the fixing holes of the connecting part are provided, and a detachable fixing device is provided between the fixing holes of the connecting part and the fixing beam fixing holes corresponding to their positions, which is used to fix or separate the connecting piece 1 and the fixing beam 201. In this way, when in use, the connecting piece 1 and the fixing beam 201 are fixed by the detachable fixing device, so that the wooden formwork 5 and the aluminum formwork 2 are fixed together; when dismantling, the connecting piece 1 and the fixing beam 201 are separated by the detachable fixing device, so that the wooden formwork 5 and the aluminum formwork 2 are disassembled, which is simple and quick to operate, and speeds up the construction progress; at the same time, the connecting piece 1 can be removed from the wooden formwork 5 and can be used again, thereby reducing costs.
[0025] Preferably, the embodiment of the present application provides a preferred implementation of a detachable fixing device, specifically: the detachable fixing device is a fixing bolt 3, the fixing bolt 3 includes a fixing bolt rod 301, the fixing bolt rod 301 can be movably passed through the connection part fixing hole and the fixing beam fixing hole, and either end of the fixing bolt 3 is provided with a cylindrical fixing bolt cap 302, and the diameter of the fixing bolt cap 302 is larger than the diameter of the connection part fixing hole and the fixing beam fixing hole; the fixing bolt rod 301 is provided with a locking device for fixing the second connection part 102 and the fixing beam 201 together. When in use, it is only necessary to insert the fixing bolt 3 into the connection part fixing hole and the fixing beam fixing hole, and fix the second connection part 102 and the fixing beam 201 together through the locking device.
[0026] Optionally, the embodiment of the present application provides a preferred implementation of the locking device, specifically: the locking device is a locking nut, the outer wall of the fixing bolt rod 301 is provided with an external thread, the locking nut is threadedly connected to the fixing bolt rod 301 through the external thread, and the locking nut is rotated to fix the second connecting part 102 and the fixed beam 201 together under the action of the thread.
[0027] Optionally, the embodiment of the present application also provides another preferred implementation of the locking device, specifically: the locking device is a triangular-shaped fixing plate 4, the fixing bolt rod 301 is provided with a communicating fixing groove, the top surface of the fixing groove is located above the bottom surface of the fixing beam 201, when in use, the fixing plate 4 is inserted into the fixing groove, and the left side of the fixing plate 4 is knocked with a hammer, the fixing plate 4 is embedded in the fixing groove, and at the same time, the second connecting part 102 and the fixing beam 201 are fixed together under its squeezing; when dismantling, the right side of the fixing plate 4 is knocked with a hammer to make the fixing plate 4 withdraw from the fixing groove, which is convenient and quick.
[0028] Preferably, in order to make the wooden formwork 5 and the aluminum formwork 2 more tightly fixed and improve the construction quality, the bottom surface of the second connecting portion 102 can be cut into the top surface of the fixed beam 201.
[0029] The above is a relatively specific and detailed description of the present application through general description and specific embodiments. It should be understood that, based on the technical concept of the present application, several conventional adjustments or further innovations can be made to these specific embodiments; however, as long as they do not deviate from the technical concept of the present application, the technical solutions obtained by these conventional adjustments or further innovations also fall within the scope of protection of the claims of the present application.
Claims
1. A combined connection and fixing device of an aluminum formwork and a wooden formwork, characterized in that: The invention comprises a plurality of connecting members (1); the plurality of connecting members (1) are arranged in a horizontal direction on the side of a wooden formwork (5) away from a concrete pouring layer (6); the connecting member (1) is composed of a first connecting portion (101) and a second connecting portion (102) to form an L-shaped structure; the first connecting portion (101) is fixedly connected to the side of the wooden formwork (5) away from the concrete pouring layer (6); the top surface of the second connecting portion (102) is provided with at least two through-going connecting portion fixing holes; the top and bottom of the aluminum formwork (2) are both provided with fixing beams (201) protruding toward the side away from the concrete pouring layer (6); the top surface of the fixing beam (201) is provided with fixing beam fixing holes that are adapted to the positions and numbers of the fixing beam fixing holes; a detachable fixing device is provided between the fixing beam fixing holes of the connecting portion and the fixing beam fixing holes corresponding to the positions thereof, for fixing or separating the connecting member (1) from the fixing beam (201).
2. The combined connection and fixing device of an aluminum formwork and a wooden formwork according to claim 1 is characterized in that: The detachable fixing device is a fixing bolt (3); the fixing bolt (3) comprises a fixing bolt rod (301); the fixing bolt rod (301) can movably pass through the fixing hole of the connecting part and the fixing hole of the fixing beam; a cylindrical fixing bolt cap (302) is provided at either end of the fixing bolt (3); the diameter of the fixing bolt cap (302) is larger than the diameter of the fixing hole of the connecting part and the fixing hole of the fixing beam; the fixing bolt rod (301) is provided with a locking device for fixing the second connecting part (102) and the fixing beam (201) together.
3. The combined connection and fixing device of an aluminum formwork and a wooden formwork according to claim 2 is characterized in that: The locking device is a locking nut; the outer wall of the fixing bolt rod (301) is provided with an external thread; the locking nut is threadedly connected to the fixing bolt rod (301) via the external thread.
4. The combined connection and fixing device of an aluminum formwork and a wooden formwork according to claim 2 is characterized in that: The locking device is a triangular-shaped fixing plate (4); the fixing bolt rod (301) is provided with a communicating fixing groove; the top surface of the fixing groove is located above the bottom surface of the fixing beam (201); and the fixing plate (4) can be embedded in the fixing groove.