Waterproof anti-theft bridge cover plate rapid installation structure
By using a combined connection component of fixed snaps, galvanized rivet nuts and fixing bolts in the installation of the bridge cover, the rapid and convenient installation of the bridge cover is achieved, and the problems of insufficient strength and poor sealing in the traditional installation method are solved. Improves installation quality and safety, ensuring waterproof and dustproof effect.
Patent Information
- Application Number
- CN202421114159.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-21
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-05-21
AI Technical Summary
The traditional bridge cover installation method has insufficient connection points, misalignment of joints, large gaps, inability to seal, and cannot be met in a waterproof and dust-proof environment, resulting in low installation quality and safety hazards, affecting project safety and quality.
Using connecting components including fixed snaps, galvanized rivet nuts and fixing bolts, the bridge cover plate is quickly and conveniently installed through electric rivet guns and screwdrivers. The fixed snaps are divided into first and second connecting plates to limit position And fine-tuned, fixing bolt head flange for improved theft resistance, and protect galvanized rivet nuts with AB glue to protect against water and dust.
It realizes simple and practical installation of the bridge cover plate, solves the problems of insufficient strength of the connecting fixtures and misalignment of joints, improves installation quality and safety, ensures waterproof and dustproof effect, and reduces construction risks and economic losses.
Smart Images

Figure CN222355892U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bridge frames, and in particular to a waterproof and anti-theft bridge frame cover quick installation structure. Background Art
[0002] With the continuous development of urban construction, cable trays are widely used in large-scale industrial, public and residential electrical projects due to their fast construction, flexible wiring, easy loading and unloading, and beautiful appearance. As the volume of the project continues to increase, the construction party requires the design to reduce the floor elevation and reduce the size of the strong and weak electric shaft in order to improve the utilization rate of the building and control the cost, which makes it difficult to install and fix the cable tray in densely arranged areas such as the strong and weak electric shaft, basement, and corridor.
[0003] The traditional bridge cover installation adopts the connection methods of snap-on, clamping, screw fixing, buckle, etc., but the connection points are insufficient in strength, the gap between the bridge and the cover is large and cannot be sealed, and the screws are directly fastened to the cover plane, which easily causes the cover to deform and the anti-corrosion layer to be damaged. For example: (1) When the bridge cover adopts the spring clamp fixing structure, the cover cannot be clamped tightly and is easy to loosen by relying on the spring clamp's own elastic force. It is only suitable for horizontal installation of the bridge. When the bridge is installed vertically, the cover is easy to slide off the pallet. (2) When the card code and hook nail fixing are adopted, small square holes can only be punched on the side of the bridge body as the installation fixing point during the production of the bridge. After the cover is fixed, the gap between the bridge and the cover is large and easy to loosen. (3) When the buckle connection is adopted, the buckle structure on the bridge and the cover needs to be pre-welded in the factory, which is prone to misalignment and insufficient strength. The above-mentioned bridge cover connection and fixing method often has quality problems such as large gap between the cover and the bridge after installation, and uneven surface, and cannot meet the requirements of outdoor, roof and waterproof and dustproof environments. The installation quality and visual effect of the bridge have a great impact on the excellence of the project.
[0004] Since the bridge, cover and coating are supplied as finished products, when they are installed at the construction site, it is impossible to open square holes or weld buckles on the bridge cover after the bridge is cut and cut, resulting in insufficient strength of the connection fixings, misalignment of the bridge and cover seams, large gaps, and other problems. Many projects can only use strong attack screws to fix the cover as a temporary remedial measure, but after fixing, it still cannot solve the quality problems such as large interface misalignment gaps and uneven surfaces. Subsequent rework and repair are impossible, and the fixing method does not meet the requirements of electrical specifications. Since the strong attack screw port is sharp, it is easy to damage the insulation layer of the cable laid in the bridge after being fixed with the bridge, and the cable line is prone to leakage and short circuit, which brings great safety hazards to the safe operation of the electrical trunk line. When the bridge and cover are installed and connected in a small space on site, it is difficult to tighten the fixing bolts, which is labor-intensive and time-consuming. If you are not careful, safety accidents may occur, which seriously affect the safety and overall quality of the project.
[0005] Therefore, changing the traditional construction method to form an installation process that has a simple fixed structure, convenient installation, is waterproof and dustproof, and can effectively protect the bridge and cables has become an urgent problem to be solved by various mechanical and electrical installation construction units. Utility Model Content
[0006] In order to improve the common quality problems and technical difficulties that have always existed in the installation of bridge frames and cover plates, the present application provides a waterproof and anti-theft bridge frame cover plate quick installation structure.
[0007] The present application provides a waterproof and anti-theft bridge frame cover quick installation structure, which adopts the following technical solutions:
[0008] A waterproof and anti-theft bridge frame cover quick installation structure, comprising a bridge frame body and a bridge frame cover plate covered on the bridge frame body, the bridge frame body is provided with a connecting assembly, the bridge frame body and the bridge frame cover plate are connected together through the connecting assembly, and the connecting assembly comprises:
[0009] A fixing buckle, one end of which is pressed against the bridge cover, and the other end of which is pressed against the bridge body, and a fixing hole is provided on the fixing buckle;
[0010] A galvanized rivet nut, wherein the galvanized rivet nut is arranged on the bridge body;
[0011] A fixing bolt passes through a fixing hole and is threadedly connected to a galvanized rivet nut, and a head of the fixing bolt is tightly pressed against a fixing buckle.
[0012] By adopting the above technical solution, after the mobile bridge cover is installed on the bridge body, the galvanized rivet nut is fixed to the side wall of the bridge body using an electric rivet gun, and then the fixed buckle is moved to press the bridge cover. After the fixed buckle presses the bridge cover on the bridge body, the fixed bolt is moved through the fixing hole on the fixed buckle and the fixed bolt is tightened on the galvanized rivet nut using an electric screwdriver, thereby completing the fixing of the bridge cover and the bridge body. The overall working structure is simple and practical, and the installation is convenient and the process is simple. Only holes need to be punched on the bridge, and the rivet nut can be mechanically fixed to any part of the bridge with seamless contact and tightness, and the continuous installation of the cover can be completed at one time. The bridge and the connection components are all factory-produced in large quantities, solving the technical problems of difficult on-site bridge inlay installation and hole opening and fixing.
[0013] Optionally, the fixing buckle includes a first connecting plate and a second connecting plate, the first connecting plate is in a horizontal state and is pressed against the outside of the bridge cover plate, the second connecting plate is in a vertical state, one end of the second connecting plate is connected to the first connecting plate, and the other end of the second connecting plate extends to the outside of the galvanized rivet nut on the bridge body, and the fixing hole is opened on the second connecting plate and is connected to the galvanized rivet nut.
[0014] By adopting the above technical solution, the fixing buckle is divided into a first connecting plate and a second connecting plate. The first connecting plate is pressed against the bridge cover plate under the action of gravity, and the second connecting plate is pressed against the bridge cover plate under the action of the fixing bolts. Therefore, the bridge cover plate is limited in both the vertical and horizontal directions by the cooperation of the first connecting plate and the second connecting plate. Moreover, the fixing buckle can be fully engaged with the bridge cover plate by the vertical arrangement of the first connecting plate and the second connecting plate, thereby ensuring the fixing effect.
[0015] Optionally, the fixing hole is arranged as an elongated strip-shaped hole, and the length direction of the fixing hole is arranged vertically.
[0016] By adopting the above technical solution, the fixing hole is set as a long strip of space, so that when the fixing buckle is pressed and fastened with the bridge cover, the height of the fixing buckle can be fine-tuned at the same time. After the bridge cover is subjected to force, the fixing buckle can be automatically guided downward along the bridge body and pressed tightly, ensuring that the contact between the bridge body and the bridge cover is tight and without gap, thereby improving the project quality and the overall visual installation effect.
[0017] Optionally, the head of the fixing bolt is in the shape of a hexagonal plum blossom, and a flange is provided on one surface of the head of the fixing bolt and the fixing buckle, and a plurality of teeth are evenly distributed on the surface of the flange.
[0018] By adopting the above technical solution, the head of the fixing bolt is set to a hexagonal plum blossom type, so that a special hexagonal plum blossom electric screwdriver is required to unscrew the fixing bolt and then disassemble the bridge cover, thereby improving the anti-theft level. The problem of wires and cables in the bridge being easily stolen during the construction process is solved, and economic losses are reduced. Then, a flange with a plurality of tooth grooves is opened on the mounting surface of the fixing bolt head. When the fixing bolt is threadedly connected with the galvanized rivet nut, the flange is pressed against the side wall of the second connecting plate, thereby increasing the contact area and friction between the fixing bolt head and the side wall of the second connecting plate, and improving the fixing strength.
[0019] Optionally, a plurality of reinforcing ribs are provided on the second connecting plate of the fixing buckle.
[0020] By adopting the above technical solution, a plurality of reinforcing ribs are integrally stamped on the second connecting plate of the fixing buckle, thereby reducing the material thickness and improving the structural strength of the second connecting plate, thereby reducing the cost.
[0021] Optionally, an arc-shaped fillet is provided at a connection point between the first connecting plate and the second connecting plate of the fixing buckle.
[0022] By adopting the above technical solution, an arc-shaped fillet is provided at the connection between the first connecting plate and the second connecting plate, so that when the fixing buckles are stacked together, two adjacent fixing buckles will not be completely fitted together, which facilitates the sorting and transportation of the fixing buckles. When the staff are performing installation work, the setting of the fillet reduces the damage caused by collision between the staff and the fixing buckles, thereby improving the safety of the work.
[0023] Optionally, after the fixing bolt and the galvanized rivet nut are connected, a rubber protective cap is provided on the portion of the fixing bolt that passes through the galvanized rivet nut.
[0024] By adopting the above technical solution, a rubber protective cap is sleeved on the portion of the fixing bolt that passes through the galvanized rivet nut. The rubber protective cap protects the threads on the fixing bolt, thereby reducing the probability that the threads on the fixing bolt cannot be removed due to rust damage after being exposed to the environment for a long time.
[0025] Optionally, AB glue is evenly filled between the rubber protective cap and the galvanized rivet nut, and the rubber protective cap and the galvanized rivet nut are bonded together by the AB glue.
[0026] By adopting the above technical solution, AB glue is used to bond the rubber protective cap to the galvanized rivet nut, thereby completing the waterproof and dustproof protection of the end of the galvanized rivet nut, avoiding the problem of water leakage at the fixed connection point of the bridge. It can also ensure that the insulation layer will not be scratched when the bridge cable is laid.
[0027] In summary, the present application includes at least one of the following beneficial technical effects:
[0028] 1. After the bridge cover is installed on the bridge body by moving it, use an electric rivet gun to fix the galvanized rivet nuts to the side walls of the bridge body, then move the fixing buckle to press the bridge cover. After the fixing buckle presses the bridge cover onto the bridge body, move the fixing bolt through the fixing hole on the fixing buckle and use an electric screwdriver to tighten the fixing bolt on the galvanized rivet nut, thereby completing the fixing of the bridge cover and the bridge body. The overall working structure is simple and practical, easy to install, and the process is simple. You only need to drill holes on the bridge, and the rivet nuts can be mechanically fixed to any part of the bridge with seamless contact and tightness, completing the continuous installation of the cover at one time. The bridge and connection components are all factory-produced in large quantities, solving the technical problems of on-site bridge inlay installation and hole opening and fixing difficulties;
[0029] 2. By dividing the fixing buckle into a first connecting plate and a second connecting plate, the first connecting plate is pressed against the bridge cover plate under the action of gravity, and the second connecting plate is pressed against the bridge cover plate under the action of the fixing bolts, so that the bridge cover plate is limited in both the vertical and horizontal directions by the cooperation of the first connecting plate and the second connecting plate, and the fixing buckle can be fully fixed with the bridge cover plate by the way that the first connecting plate and the second connecting plate are arranged perpendicular to each other, thereby ensuring the fixing effect;
[0030] 3. By using AB glue to bond the rubber protective cap to the galvanized rivet nut, the waterproof and dustproof protection of the end of the galvanized rivet nut is completed, avoiding the problem of water leakage at the fixed connection point of the bridge. It can also ensure that the insulation layer will not be scratched when the bridge cable is laid. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a three-dimensional structural schematic diagram of the present application;
[0032] Figure 2 yes Figure 1 Schematic diagram of the cross section of AA;
[0033] Figure 3 yes Figure 2 The enlarged schematic diagram of the middle B part;
[0034] Figure 4 It is a schematic diagram of the structure of the fixing buckle in this application;
[0035] Figure 5 It is a schematic diagram of the structure of the fixing bolt in this application.
[0036] Figure numerals: 1. Bridge body; 11. Bridge cover; 12. Reinforcing ribs; 13. Fillet; 14. Fixing hole; 15. Flange; 16. Tooth groove; 17. Rubber protective cap; 2. Connection assembly; 21. Fixing buckle; 22. Galvanized rivet nut; 23. Fixing bolt; 24. First connecting plate; 25. Second connecting plate. DETAILED DESCRIPTION
[0037] The following is combined with Figure 1 -Attached Figure 5 This application is described in further detail.
[0038] The embodiment of the present application discloses a waterproof and anti-theft bridge frame cover quick installation structure.
[0039] Reference Figure 1 and Figure 2The waterproof and anti-theft bridge cover quick installation structure comprises a bridge body 1 and a bridge cover 11 covered on the bridge body 1, and a connecting component 2 is arranged on the bridge body 1. The bridge body 1 and the bridge cover 11 are connected together through the connecting component 2.
[0040] Reference Figure 2 and Figure 3 The connection assembly 2 includes a fixing buckle 21, a galvanized rivet nut 22 and a fixing bolt 23. The fixing buckle 21 includes a first connecting plate 24 and a second connecting plate 25. The first connecting plate 24 is in a horizontal state and is pressed against the upper surface of the bridge cover 11. The second connecting plate 25 is fixedly connected to the plate end of the first connecting plate 24 and is in a vertical state, and part of the second connecting plate 25 is pressed against the outer side wall of the bridge cover 11 in the horizontal direction. The bottom end of the second connecting plate 25 extends vertically downward to the side of the outer side wall of the bridge body 1.
[0041] Reference Figure 4 A plurality of reinforcing ribs 12 are integrally formed on the plate surface of the second connecting plate 25. An arc-shaped fillet 13 is provided at the connection between the second connecting plate 25 and the first connecting plate 24.
[0042] Reference Figure 3 and Figure 4 The galvanized rivet nut 22 is fixedly mounted on the side wall of the bridge body 1. A fixing hole 14 connected to the galvanized rivet nut 22 is provided on the plate surface of the second connecting plate 25. The fixing hole 14 is arranged in a long strip shape, and the length direction of the fixing hole 14 is arranged vertically. The fixing bolt 23 passes through the fixing hole 14 horizontally and is threadedly connected to the galvanized rivet nut 22.
[0043] Reference Figure 3 and Figure 5 The head of the fixing bolt 23 is in the shape of a hexagonal plum blossom. The side of the fixing bolt 23 close to the second connecting plate 25 is fixedly connected with a flange 15, and a plurality of tooth grooves 16 are evenly distributed on the side wall of the flange 15 close to the second connecting plate 25. When the fixing bolt 23 is tightened on the galvanized rivet nut 22, the flange 15 is pressed against the outer side wall of the second connecting plate 25.
[0044] Reference Figure 3 and Figure 4, design the fixing buckle 21 of the height-adjustable fixing hole 14, adopt factory-based mechanical stamping processing, and the bending, punching the fixing hole 14, and adding the reinforcing ribs 12 are stamped and completed at one time. The quality of the finished product is guaranteed and the production efficiency is improved. The integrated stamping reinforcement ribs 12 are designed to reduce the material thickness, improve the strength of the fixed structure, and reduce costs. The accessories are hot-dip galvanized for excellent anti-corrosion performance and extend the service life. The process fully considers the structural characteristics of the bridge itself. When the bridge cover 11 is installed, the fixing buckle 21 and the bridge cover 11 are clamped and tightened, and the cover height can be fine-tuned at the same time. After the bridge cover 11 is subjected to force, it can be automatically guided downward along the bridge body 1 and pressed tightly, ensuring that the contact between the bridge body 1 and the bridge cover 11 is tight and gapless, improving the project quality and the overall visual installation effect.
[0045] Reference Figure 3 and Figure 5 , the integrated anti-theft and anti-loosening fixing bolts 23 are designed, and the flange 15 is used to ensure that the fixing bolts 23 and the fixing buckles 21 will not loosen after the bridge cover 11 and the bridge body 1 are locked, and no flat gasket transition is required to save costs. Use an electric screwdriver to quickly fix the bridge cover 11. The hexagonal plum-shaped claw-type bolts with flange surfaces require professional tools to disassemble and assemble the bridge cover 11, which improves the anti-theft level. Solve the problem that the wires and cables in the bridge body 1 are easily stolen during the construction process, and reduce economic losses.
[0046] Reference Figure 3 After fixing the bolt 23 and the galvanized rivet nut 22, a rubber protective cap 17 is sleeved on the portion of the fixing bolt 23 that passes through the galvanized rivet nut 22. AB glue is evenly filled between the rubber protective cap 17 and the galvanized rivet nut 22, and the rubber protective cap 17 and the galvanized rivet nut 22 are bonded together by the AB glue.
[0047] Reference Figure 3 , design a waterproof and dustproof structural process for the second bridge frame fixing parts, design an integrated crimping process for the galvanized rivet nut 22 and the bridge frame body 1, and the galvanized rivet nut 22 is seamlessly connected to the bridge frame body 1, which completely solves the problem of the traditional fixed connection point installation process being unable to be waterproof and dustproof from the source. At the same time, a multifunctional waterproof rubber protective cap 17 is put on the end of the galvanized rivet nut 22 in the bridge frame body 1, and it is fixed to the end of the galvanized rivet nut 22 by AB glue bonding, which solves the waterproof and anti-collision problems from the structural point of view, and avoids the problem of water leakage at the fixed connection point on the bridge frame body 1. It can also ensure that the cables in the bridge frame body 1 will not scratch the insulation layer when they come into contact with the galvanized rivet nut 22 during laying.
[0048] The working principle of the embodiment of the present application is as follows:
[0049] After the movable bridge cover 11 is covered on the bridge body 1, the galvanized rivet nut 22 is fixed to the side wall of the bridge body 1 using an electric rivet gun, and then the fixing buckle 21 is moved to press the bridge cover 11. After the fixing buckle 21 presses the bridge cover 11 on the bridge body 1, the fixing bolt 23 is moved through the fixing hole 14 on the fixing buckle 21 and the fixing bolt 23 is tightened on the galvanized rivet nut 22 using an electric screwdriver, thereby completing the fixing of the bridge cover 11 and the bridge body 1. The overall working structure is simple and practical, and the installation is convenient and the process is simple. It only needs to punch holes on the bridge, and the rivet nut can be mechanically fixed to any part of the bridge with seamless contact and tightness, and the continuous installation of the cover can be completed at one time. The bridge and the connecting components 2 are both factory-produced in large quantities, which solves the technical problems of difficult on-site bridge inlay installation and hole opening and fixing.
[0050] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A waterproof and anti-theft bridge cover quick installation structure, characterized by: The invention comprises a bridge frame body (1) and a bridge frame cover plate (11) which is covered on the bridge frame body (1), wherein a connecting component (2) is arranged on the bridge frame body (1), and the bridge frame body (1) and the bridge frame cover plate (11) are connected together via the connecting component (2), and the connecting component (2) comprises: A fixing buckle (21), one end of the fixing buckle (21) being pressed against the bridge cover plate (11), and the other end of the fixing buckle (21) being pressed against the bridge body (1), and a fixing hole (14) being provided on the fixing buckle (21); A galvanized rivet nut (22), wherein the galvanized rivet nut (22) is arranged on the bridge body (1); A fixing bolt (23), wherein the fixing bolt (23) passes through the fixing hole (14) and is threadedly connected to the galvanized rivet nut (22), and the head of the fixing bolt (23) is tightly pressed against the fixing buckle (21).
2. A waterproof and anti-theft bridge cover quick installation structure according to claim 1, characterized in that: The fixing buckle (21) comprises a first connecting plate (24) and a second connecting plate (25), wherein the first connecting plate (24) is in a horizontal state and is pressed against the outside of the bridge cover plate (11), and the second connecting plate (25) is in a vertical state, one end of the second connecting plate (25) is connected to the first connecting plate (24), and the other end of the second connecting plate (25) extends to the outside of the galvanized rivet nut (22) on the bridge body (1), and the fixing hole (14) is formed on the second connecting plate (25) and is connected to the galvanized rivet nut (22).
3. A waterproof and anti-theft bridge cover quick installation structure according to claim 2, characterized in that: The fixing hole (14) is arranged in the form of a long strip-shaped hole, and the length direction of the fixing hole (14) is arranged vertically.
4. The waterproof and anti-theft bridge cover quick installation structure according to claim 1 is characterized by: The head of the fixing bolt (23) is in the shape of a hexagonal plum blossom, and a flange (15) is provided on one surface of the head of the fixing bolt (23) and the fixing buckle (21), and a plurality of tooth grooves (16) are evenly distributed on the surface of the flange (15).
5. The waterproof and anti-theft bridge cover quick installation structure according to claim 2 is characterized by: A plurality of reinforcing ribs (12) are provided on the second connecting plate (25) of the fixing buckle (21).
6. A waterproof and anti-theft bridge cover quick installation structure according to claim 2, characterized in that: An arc-shaped fillet (13) is provided at the connection between the first connecting plate (24) and the second connecting plate (25) of the fixing buckle (21).
7. The waterproof and anti-theft bridge cover quick installation structure according to claim 1, characterized in that: After the fixing bolt (23) and the galvanized rivet nut (22) are fixed, a rubber protective cap (17) is sleeved on the portion of the fixing bolt (23) that passes through the galvanized rivet nut (22).
8. The waterproof and anti-theft bridge cover quick installation structure according to claim 7, characterized in that: AB glue is evenly filled between the rubber protective cap (17) and the galvanized rivet nut (22), and the rubber protective cap (17) and the galvanized rivet nut (22) are bonded together by the AB glue.