Roadbed water flow scouring simulation experiment research device for highway design

By using filter mesh and adjustment components in the experimental research device for roadbed water flow erosion simulation for roadbed design, the problems of silt and sand blockage and real simulation are solved, and more accurate roadbed erosion simulation is achieved, which improves the effectiveness and reliability of the experiment.

CN222365332UActive Publication Date: 2025-01-17XINJIANG HENGZECHEN ROAD & BRIDGE DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421140459.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2025-01-17
Estimated Expiration
2034-05-23

AI Technical Summary

Technical Problem

In the existing experimental research device for roadbed water flow erosion simulation for roadbed design, silt and sand are likely to cause pipeline blockage after water flow erosion, affecting the normal progress of the simulation experiment, and it is difficult to simulate the impact of rainwater convergence and seepage on the roadbed in reality.

Method used

A device including a simulation rack, a erosion disk, a simulator, a filter mesh, a collection box, a drain pipe and a water tank is designed to filter mud and sand through the filter mesh to prevent clogging, and the angle between the erosion disk and the simulator is adjusted through the adjustment component. Simulate the process of rainwater convergence and seepage in reality.

Benefits of technology

It effectively prevents the blockage of silt and sand impurities on the pipeline, ensures the normal operation of the simulation experiment, and can simulate the impact of rainwater on the roadbed erosion and seepage more closely, and conducts in-depth research on the roadbed erosion mechanism.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222365332U_ABST
    Figure CN222365332U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of highway design, and particularly relates to a roadbed water flow scouring simulation experiment research device for highway design, which comprises a simulation frame and a water tank, a scouring disc and a simulation disc are arranged on the simulation frame, a filter screen is mounted at the rear part of the simulation disc, a collection box is mounted below the filter screen, and the collection box is connected with the water tank. A drainage pipe is connected below the collection box, a collection box is installed below the drainage pipe, the collection box is connected with a water tank through a water inlet pipe, a filter screen can be borne through a clamping groove formed in the simulation disc, silt obtained after water flow scouring can be filtered through the filter screen, and impurities in the silt are prevented from blocking a pipeline; and the angle between the washing disc and the simulation disc can be adjusted through the adjusting assembly, so that the effect closer to reality can be simulated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of highway design, in particular to a roadbed water flow scouring simulation experimental research device for highway design. Background Art

[0002] Scour and water damage is a common failure mode in roadbed engineering. With the continuous expansion of domestic engineering construction sites, erosion and water damage problems have become increasingly prominent. It has now become a hot topic of concern in roadbed engineering in the fields of highways, railways, water conservancy, etc. At present, domestic research methods and devices for roadbed erosion mainly focus on two aspects. The first emphasizes the impact of rainfall on roadbed erosion. This type of utility model mainly simulates different rainfall amounts, rainfall intensities, and rainwater to qualitatively analyze the impact of rainfall on the changes in the surface morphology of the roadbed and the impact on the moisture content and mechanical properties of the filler soil, and attempts to establish a quantitative relationship between rainfall and the degree of roadbed erosion. In fact, for most engineering roadbeds, the catchment area behind the slope exceeds the slope surface. The overwash formed by the convergence of rainfall behind the slope is the most important influencing factor of roadbed surface erosion and destruction. For rainfall, the splashing effect of raindrops will cause different degrees of crusting of the surface soil of the roadbed, which will make the soil pores smaller. The reduction of seepage and the advancement of runoff generation time have increased the complexity of the study on water flow and roadbed erosion. At the same time, the simulation of rainfall is difficult to match the actual environment on site. The height of rainfall, the density of raindrops, and the change of rainfall intensity during rainfall cannot be realized in the simulation, which hinders the further in-depth development of roadbed erosion research. The second study is the effect of runoff on roadbed erosion. This type of utility model adopts the method of applying a beam of water flow at the top of the slope to erode the roadbed. It can quantitatively analyze the influence of water flow rate and flow velocity on the amount of sand washed on the roadbed and the depth of gullies. However, in actual roadbed projects, rainwater will first converge behind the slope. The scouring water flow initially proceeds in the form of overflow, and gradually erodes to form gullies or shallow gully runoff over time. At the same time, the effect of seepage on roadbed erosion and stability cannot be ignored. In engineering, it is often necessary to control the amount of seepage to maintain the stability of the roadbed, but the seepage on the slope surface is not considered in this type of device.

[0003] In the prior art, the roadbed water flow flushing device is used because the materials used for roadbed simulation are mostly mud and sand. Therefore, after being flushed by water flow, the mud and sand will block the pipeline of the simulation device, so it needs to be improved. Utility Model Content

[0004] The purpose of this section is to summarize some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the abstract of the specification and the name of the utility model of this application to avoid blurring the purpose of this section, the abstract of the specification and the name of the utility model, and such simplifications or omissions cannot be used to limit the scope of the utility model.

[0005] In view of the problems existing in the existing roadbed water flow scouring simulation experimental research device for highway design, the utility model is proposed.

[0006] Therefore, the purpose of the utility model is to provide a roadbed water flow scouring simulation experimental research device for highway design. The filter net can be carried by the slot opened on the simulation disk, and the sediment after the water flow scouring can be filtered through the filter net to prevent impurities in the sediment from clogging the pipeline, thereby affecting the normal use of the simulation rotating device, and the angle between the scouring disk and the simulation disk can be adjusted by adjusting the component, so as to simulate an effect that is closer to reality.

[0007] In order to solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions:

[0008] A roadbed water flow scouring simulation experimental research device for highway design, comprising a simulation frame and a water tank;

[0009] The simulation frame is provided with a flushing plate and a simulation plate, a filter screen is installed at the rear of the simulation plate, a collection box is installed below the filter screen, a drain pipe is connected below the collection box, a collection box is installed below the drain pipe, and the collection box is connected to the water tank through a water inlet pipe.

[0010] As a preferred solution of the roadbed water flow scouring simulation experimental research device for highway design described in the utility model, a water pump is installed between the collection box and the water tank.

[0011] As a preferred solution of the roadbed water flow scouring simulation experimental research device for highway design described in the utility model, a connecting pipe is installed at the bottom of the water tank, the connecting pipe is connected to the water outlet, and the water outlet is located on the inner wall of the scouring plate.

[0012] As a preferred solution of the roadbed water flow scour simulation experimental research device for highway design described in the utility model, wherein: rotating shafts are arranged on both sides of the scour disc, the rotating shafts are rotatably connected to the simulation frame, a card slot is installed on the simulation disc, and the filter net is card-connected with the card slot.

[0013] As a preferred solution of the roadbed water flow scour simulation experimental research device for highway design described in the utility model, it also includes an adjustment component, the adjustment component includes an adjustment rod and a connecting block, and the first bevel gear is installed on the adjustment rod.

[0014] As a preferred solution of the roadbed water flow scour simulation experimental research device for highway design described in the utility model, wherein: the connecting block is fixedly connected to the scour plate, a threaded rod is screwed on the connecting block, and a second bevel gear is installed at the bottom of the threaded rod.

[0015] As a preferred solution of the roadbed water flow scour simulation experimental research device for highway design described in the utility model, wherein: the second bevel gear is meshingly connected with the first bevel gear.

[0016] Compared with the prior art, the beneficial effects of the utility model are: the filter net can be carried by the card slot opened on the simulation disk, and the sediment flushed by the water flow can be filtered through the filter net to prevent impurities in the sediment from clogging the pipeline, thereby affecting the normal use of the simulation transfer device, and the angle between the flushing disk and the simulation disk can be adjusted by the adjustment component, so as to simulate an effect closer to reality. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solution of the implementation of the utility model, the utility model will be described in detail below in combination with the drawings and detailed implementation. Obviously, the drawings described below are only some implementations of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0018] Figure 1 It is a schematic diagram of the structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the three-dimensional structure of the simulation frame of the utility model;

[0020] Figure 3 This is a schematic diagram of the structure of the simulation frame of the utility model from a top view;

[0021] Figure 4 This is a schematic diagram of the structure of the simulation frame of the utility model when viewed from above;

[0022] Figure 5 For this utility model Figure 4 Schematic diagram of the enlarged structure of part A in FIG.

[0023] In the figure; 100 simulation frame, 110 flushing plate, 120 simulation plate, 130 filter screen, 140 card slot, 150 collection box, 160 drain pipe, 170 collection box, 180 water pump, 190 water inlet pipe, 200 water tank, 210 connecting pipe, 220 water outlet, 300 adjustment component, 310 adjustment rod, 320 first bevel gear, 330 second bevel gear, 340 threaded rod, 350 connection block. DETAILED DESCRIPTION

[0024] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below with reference to the accompanying drawings.

[0025] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific implementation methods disclosed below.

[0026] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the implementation of the present invention, for the sake of convenience, the cross-sectional diagram showing the device structure will not be partially enlarged according to the general proportion, and the schematic diagram is only an example, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0027] In order to make the purpose, technical solution and advantages of the present invention more clear, the implementation mode of the present invention will be further described in detail below with reference to the accompanying drawings.

[0028] The utility model provides the following technical solutions: a roadbed water flow scouring simulation experimental research device for highway design, during use, the card slots on the simulation disk can carry the filter net, and the filter net can filter the sediment after the water flow scouring, so as to prevent the impurities in the sediment from clogging the pipeline, thereby affecting the normal use of the simulation device, and the angle between the scouring disk and the simulation disk can be adjusted by adjusting the components, so as to simulate a more realistic effect.

[0029] Figure 1-Figure 5 The structure diagram of the first embodiment of the utility model of a roadbed water flow scour simulation experimental research device for highway design is shown in FIG. Figure 1-Figure 5 , a roadbed water flow scour simulation experimental research device for highway design in this embodiment, the main part of which includes a simulation frame 100 and a water tank 200;

[0030] A flushing disc 110 and a simulation disc 120 are provided on the simulation frame 100, a filter screen 130 is installed at the rear of the simulation disc 120, a collecting box 150 is installed below the filter screen 130, a drain pipe 160 is connected below the collecting box 150, a collecting box 170 is installed below the drain pipe 160, the collecting box 170 is connected to the water tank 200 through a water inlet pipe 190, a water pump 180 is installed between the collecting box 170 and the water tank 200, a connecting pipe 210 is installed at the bottom of the water tank 200, the connecting pipe 210 is connected to the water outlet 220, and the water outlet 220 is located on the inner wall of the flushing disc 110, rotating shafts are provided on both sides of the flushing disc 110, the rotating shafts are rotatably connected to the simulation frame 100, a card slot 140 is installed on the simulation disc 120, and the filter screen 130 is connected to the collecting box 150. The flushing frame is connected with the card slot 140, and is used to simulate the water flow flushing the roadbed. The simulation plate 120 is used to carry the simulated roadbed. The filter screen 130 is used to filter impurities in the sediment. The card slot 140 is used to facilitate the installation and removal of the filter screen 130. The collection box 150 is used to connect the drain pipe 160, and the drain pipe 160 is used to connect the collection box 170. The collection box 170 is used to collect the simulated water and precipitate it. The water pump 180 is used to transport the water in the collection box 170 to the water tank 200 through the water inlet pipe 190. The water tank 200 is used to carry the simulated water. The connecting pipe 210 is used to connect to the water outlet 220, and the water outlet 220 is used to discharge the water in the water tank 200, so as to realize the simulated water flow flushing the roadbed;

[0031] The adjusting assembly 300 is also included. The adjusting assembly 300 includes an adjusting rod 310 and a connecting block 350. A first bevel gear 320 is installed on the adjusting rod 310. The connecting block 350 is fixedly connected to the flushing plate 110. A threaded rod 340 is screwed on the connecting block 350. A second bevel gear 330 is installed at the bottom of the threaded rod 340. The second bevel gear 330 is meshed and connected with the first bevel gear 320. The adjusting assembly 300 is used to adjust the angle of the flushing plate 110 to restore the flushing environment in reality. The adjusting rod 310 is used to drive the first bevel gear 320 to rotate. The first bevel gear 320 is used to drive the threaded rod 340 to rotate. When the threaded rod 340 rotates, the connecting block 350 is driven to rise and fall. The connecting block 350 is used to be screwed with the threaded rod 340 and is rotatably connected to one side of the flushing plate 110 to drive the flushing plate 110 to rise and fall.

[0032] Combination Figure 1-Figure 5, a roadbed water flow scouring simulation experimental research device for highway design in this embodiment, the specific working principle is as follows, the card slot 140 opened on the simulation disk 120 can carry the filter screen 130, and the filter screen 130 can filter the sediment after the water flow scouring to prevent the impurities in the sediment from clogging the pipeline, thereby affecting the normal use of the simulation device, and the angle between the scouring disk 110 and the simulation disk 120 can be adjusted by the adjustment component 300, so as to simulate a more realistic effect, and the first bevel gear 320 can be driven to rotate by rotating the adjustment rod 310, and the first bevel gear 320 drives the second bevel gear 330 to rotate when the first bevel gear 320 rotates, and the second bevel gear 330 drives the threaded rod 340 to rotate when the second bevel gear 330 rotates, and the threaded rod 340 drives the connecting block 350 to rise and fall when the connecting block 350 rises and falls, and drives the scouring disk 110 to rise and fall, and the angle of the scouring disk 110 is locked;

[0033] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A roadbed water scour simulation experimental research device for highway design, characterized by: It comprises a simulation frame (100) and a water tank (200); The simulation frame (100) is provided with a flushing disc (110) and a simulation disc (120); a filter screen (130) is installed at the rear of the simulation disc (120); a collection box (150) is installed below the filter screen (130); a drainage pipe (160) is connected below the collection box (150); a collection box (170) is installed below the drainage pipe (160); and the collection box (170) is connected to a water tank (200) via a water inlet pipe (190).

2. The roadbed water scour simulation experimental research device for highway design according to claim 1, characterized in that: A water pump (180) is installed between the collection box (170) and the water tank (200).

3. The roadbed water scour simulation experimental research device for highway design according to claim 1, characterized in that: A connecting pipe (210) is installed at the bottom of the water tank (200), and the connecting pipe (210) is connected to a water outlet (220), and the water outlet (220) is located on the inner wall of the flushing plate (110).

4. The roadbed water scour simulation experimental research device for highway design according to claim 1, characterized in that: Rotating shafts are arranged on both sides of the flushing disc (110), and the rotating shafts are rotatably connected to the simulation frame (100). A clamping slot (140) is installed on the simulation disc (120), and the filter screen (130) is clamped with the clamping slot (140).

5. The roadbed water scour simulation experimental research device for highway design according to claim 1, characterized in that: It also includes an adjustment component (300), wherein the adjustment component (300) includes an adjustment rod (310) and a connecting block (350), and a first bevel gear (320) is mounted on the adjustment rod (310).

6. The roadbed water scour simulation experimental research device for highway design according to claim 5, characterized in that: The connection block (350) is fixedly connected to the flushing plate (110), a threaded rod (340) is screwed onto the connection block (350), and a second bevel gear (330) is installed at the bottom of the threaded rod (340).

7. The roadbed water scour simulation experimental research device for highway design according to claim 6, characterized in that: The second bevel gear (330) is meshingly connected with the first bevel gear (320).