Building construction pay-off pipe

By designing a construction pay-out pipe with stops, blocks and return springs, the problem in the existing technology that construction is time-consuming and laborious and the integrity of the cable cannot be guaranteed is solved, and the purpose of paying out the cable without cutting it is achieved. , improves construction efficiency and prevents cable winding knotting and cable damage.

CN222374037UActive Publication Date: 2025-01-21HUBEI SHANGWO CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421068708.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2025-01-21
Estimated Expiration
2034-05-16

AI Technical Summary

Technical Problem

The existing construction laying pipe needs to be cut off and gradually pushed into the laying pipe when in use, resulting in time-consuming and laborious construction and the inability to ensure cable integrity.

Method used

A construction pay-out pipe including a mounting plate and a cable trough is designed. By setting up stoppers, blocks and return springs, the cable can be put into the cable trough without cutting it, and the cable can be put into the cable trough through the limiter. Grooves prevent cable wraps from tangling.

Benefits of technology

It effectively avoids the tedious process of cutting off and gradually pushing in, improves construction efficiency, ensures the integrity of the cable, and prevents the problems of cable winding and cable damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222374037U_ABST
    Figure CN222374037U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction pay-off pipe which comprises a mounting plate and pay-off grooves, a plurality of pay-off grooves are formed in the mounting plate in a penetrating mode, the pay-off grooves are cylindrical holes, fixing shafts are fixedly connected to the two sides of the upper end of each pay-off groove, rotating shafts are rotatably connected to the interiors of the fixing shafts, and the rotating shafts are fixedly connected to the two sides of the upper end of each pay-off groove. A baffle is fixedly connected to the upper end of the pay-off groove, the baffle is rotationally connected to the upper end of the pay-off groove through a rotating shaft, a reset spring is arranged on the surface of the rotating shaft, a lapping block is fixedly connected to the end, away from the rotating shaft, of the baffle, and a stop block is fixedly connected to the other side of the upper end of the pay-off groove. During construction, after the mounting plate is buried underground, the baffle is opened upwards, the cable is placed in the cable laying groove, the baffle is loosened, the upper end of the cable laying groove is covered with the baffle through the reset effect of the reset spring, and therefore the purpose that the cable can be laid without cutting off the cable is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, and in particular relates to a building construction laying-out pipe. Background Art

[0002] Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roof engineering construction, decoration engineering construction, etc. The place where the construction work is done is called "construction site" or "construction site", also called construction site.

[0003] Cable ducts are often used in the process of laying cables. Cable ducts are tubular devices used to keep cables neatly laid out and protect them from damage. Cable ducts can be made of plastic or metal, and the specific material depends on the requirements of the application scenario.

[0004] When using the cable-laying tube currently used in construction, a section of the cable must first be cut off and inserted into one end of the cable-laying tube, and then the cable is slowly pushed along the cable-laying tube until the cable completely passes through the cable-laying tube. This laying method is time-consuming and labor-intensive, and the integrity of the cable cannot be guaranteed. Utility Model Content

[0005] The technical problem to be solved by the utility model is to overcome the existing defects and provide a construction wire-laying tube to solve the problem raised in the above-mentioned background technology that when using the current construction wire-laying tube, a section of the cable must be cut off first and inserted into one end of the wire-laying tube, and then the cable is slowly pushed along the wire-laying tube until the cable completely passes through the wire-laying tube. This laying method is time-consuming and labor-intensive, and the integrity of the cable cannot be guaranteed.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction wire-laying pipe, comprising a mounting plate and a wire-laying groove, wherein a plurality of wire-laying grooves are provided through the interior of the mounting plate, and the plurality of wire-laying grooves are cylindrical holes, both sides of the upper end of the wire-laying groove are fixedly connected with fixed shafts, a rotating shaft is rotatably connected inside the fixed shaft, a baffle is rotatably connected to the upper end of the wire-laying groove via the rotating shaft, a return spring is provided on the surface of the rotating shaft, a step is fixedly connected to one end of the baffle away from the rotating shaft, and a block is fixedly connected to the other side of the upper end of the wire-laying groove.

[0007] Preferably, the inner side surface of the wire-releasing groove is provided with a limiting groove, and a plurality of the limiting grooves are provided.

[0008] Preferably, the plurality of limit grooves are all arc-shaped structures.

[0009] Preferably, sliding grooves are provided at both ends of the two side surfaces of the mounting plate.

[0010] Preferably, a sliding block is slidably connected inside the sliding groove.

[0011] Preferably, a mounting block is fixedly connected to one side surface of the sliding block.

[0012] Preferably, a mounting screw hole is formed through the surface of the mounting block.

[0013] Compared with the prior art, the utility model provides a construction line-laying pipe, which has the following beneficial effects:

[0014] 1. The utility model provides structures such as baffles and building blocks. During construction, the installation plate is buried underground first, and then the baffle is lifted upwards to put the cable into the cable trough. The baffle is loosened, and the baffle is covered on the upper end of the cable trough by the reset effect of the reset spring, thereby achieving the purpose of laying out the cable without cutting the cable. This effectively avoids the problem that the cable laying tube currently used in construction needs to cut off a section of the cable first, insert it into one end of the cable laying tube, and then slowly push the cable along the cable laying tube until the cable completely passes through the cable laying tube. This laying method is time-consuming and labor-intensive, and the integrity of the cable cannot be guaranteed.

[0015] 2. The utility model provides a limit groove. After the cable is laid out in the wire laying groove, the limit effect of the limit groove can effectively prevent the cable from being entangled and knotted in the wire laying groove. The stopper and the bridge block can prevent the baffle from continuing to rotate into the wire laying groove, which would damage the cable.

[0016] 3. The utility model provides a mounting block, and when several wire-releasing tubes are connected and installed, the mounting block of one wire-releasing tube is slid to the upper end, and the mounting block of the adjacent wire-releasing tube is slid to the lower end, and then the mounting block is threadedly connected to the inside of the mounting screw hole by a fixing bolt, so that the purpose of installing two wire-releasing tubes can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0018] Figure 1 This is a structural schematic diagram of a construction line-laying pipe proposed by the utility model;

[0019] Figure 2 This is a front view of a wire laying groove in a wire laying pipe for construction proposed by the utility model;

[0020] Figure 3 This is a structural schematic diagram of the rotating shaft in a construction line-laying pipe proposed by the utility model;

[0021] Figure 4 This is a structural schematic diagram of a sliding groove in a construction wire-laying pipe proposed by the utility model;

[0022] In the figure: 1. Mounting plate; 2. Sliding groove; 3. Sliding block; 4. Mounting block; 5. Mounting screw hole; 6. Wire release groove; 7. Limiting groove; 8. Fixed shaft; 9. Rotating shaft; 10. Reset spring; 11. Baffle; 12. Step block; 13. Baffle. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figure 1-4 The utility model provides a technical solution: a construction wire-laying pipe, comprising a mounting plate 1 and a wire-laying groove 6, wherein a plurality of wire-laying grooves 6 are provided inside the mounting plate 1, and the plurality of wire-laying grooves 6 are cylindrical holes, and both sides of the upper ends of the wire-laying grooves 6 are fixedly connected with fixed shafts 8, and the interior of the fixed shafts 8 is rotatably connected with a rotating shaft 9, and the upper end of the wire-laying groove 6 is rotatably connected with a baffle plate 11 through the rotating shaft 9, and a return spring 10 is provided on the surface of the rotating shaft 9, and a stepping block 12 is fixedly connected to one end of the baffle plate 11 away from the rotating shaft 9, and a stopper 13 is fixedly connected to the other side of the upper end of the wire-laying groove 6, and through the structures such as the stopper 13 and the stepping block 12, during construction, the mounting plate 1 is first buried underground, and then lifted upward. Open the baffle 11, put the cable into the wire-releasing groove 6, loosen the baffle 11, and through the reset effect of the reset spring 10, the baffle 11 covers the upper end of the wire-releasing groove 6, thereby achieving the purpose of laying out the cable without cutting the cable, and effectively avoiding the problem that when using the wire-releasing tube currently used in construction, a section of the cable must be cut off first, and it must be inserted into one end of the wire-releasing tube, and then the cable must be slowly pushed along the wire-releasing tube until the cable completely passes through the wire-releasing tube. This laying method is time-consuming and labor-intensive, and the integrity of the cable cannot be guaranteed. The baffle 13 and the step block 12 can be set to prevent the baffle 11 from continuing to rotate into the wire-releasing groove 6, causing the baffle 11 to damage the cable.

[0025] In the present invention, preferably, a limiting groove 7 is provided on the inner side surface of the wire-releasing groove 6, and a plurality of limiting grooves 7 are provided.

[0026] In the utility model, preferably, the plurality of limit grooves 7 are all arc-shaped structures. Through the setting of the limit grooves 7, after the cables are laid out inside the wire laying groove 6, the limiting effect of the limit grooves 7 can effectively prevent the cables from getting entangled and knotted inside the wire laying groove 6.

[0027] In the present invention, preferably, sliding grooves 2 are provided at both ends of the two side surfaces of the mounting plate 1 .

[0028] In the utility model, preferably, a sliding block 3 is slidably connected inside the sliding groove 2 .

[0029] In the present invention, preferably, a mounting block 4 is fixedly connected to one side surface of the sliding block 3 .

[0030] In the utility model, preferably, a mounting screw hole 5 is formed through the surface of the mounting block 4. Through the provided mounting block 4, when several wire-releasing tubes are connected and installed to each other, the mounting block 4 of one wire-releasing tube is slid to the upper end, and the mounting block 4 of the adjacent wire-releasing tube is slid to the lower end, and then the fixing bolts are threadedly connected to the inside of the mounting screw hole 5, thereby achieving the purpose of installing the two wire-releasing tubes.

[0031] The working principle and use process of the utility model are as follows: when in use, the installation plate 1 is first buried underground through the provided structures such as the stopper 13 and the stepping block 12, and then the baffle 11 is lifted upwards to put the cable into the cable-releasing groove 6, and the baffle 11 is loosened. Through the reset effect of the reset spring 10, the baffle 11 covers the upper end of the cable-releasing groove 6, thereby achieving the purpose of laying out the cable without cutting the cable, and effectively avoiding the need for the cable-releasing tube currently used in construction to cut off a section of the cable first, insert it into one end of the cable-releasing tube, and then slowly push the cable along the cable-releasing tube until the cable completely passes through the cable-releasing tube. This laying method is relatively time-consuming and labor-intensive, and has no The problem of not being able to ensure the integrity of the cable is that the limit groove 7 is set, and after the cable is laid out inside the wire laying groove 6, the limiting effect of the limit groove 7 can effectively prevent the cable from being entangled and knotted inside the wire laying groove 6, and the set stopper 13 and the stepping block 12 can prevent the baffle 11 from continuing to rotate into the wire laying groove 6, which causes the baffle 11 to damage the cable. Through the set mounting block 4, when several wire laying tubes are connected and installed with each other, the mounting block 4 of one wire laying tube is slid to the upper end, and the mounting block 4 of the adjacent wire laying tube is slid to the lower end, and then the fixing bolts are threadedly connected to the inside of the mounting screw hole 5, so as to achieve the purpose of installing the two wire laying tubes.

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction wire-laying pipe, comprising a mounting plate (1) and a wire-laying groove (6), characterized in that: A plurality of wire-releasing grooves (6) are provided through the interior of the mounting plate (1), and the plurality of wire-releasing grooves (6) are all cylindrical holes. Both sides of the upper ends of the wire-releasing grooves (6) are fixedly connected with fixed shafts (8), and the interior of the fixed shaft (8) is rotatably connected with a rotating shaft (9). The upper end of the wire-releasing groove (6) is rotatably connected with a baffle plate (11) via the rotating shaft (9), and a return spring (10) is provided on the surface of the rotating shaft (9). The baffle plate (11) is fixedly connected with a stepping block (12) at one end away from the rotating shaft (9), and a baffle block (13) is fixedly connected to the other side of the upper end of the wire-releasing groove (6).

2. A construction line-laying pipe according to claim 1, characterized in that: The inner side surface of the wire-releasing groove (6) is provided with a limiting groove (7), and a plurality of the limiting grooves (7) are provided.

3. A construction line-laying pipe according to claim 2, characterized in that: The plurality of limiting grooves (7) are all arc-shaped structures.

4. A construction line-laying pipe according to claim 1, characterized in that: Sliding grooves (2) are provided at both ends of the two side surfaces of the mounting plate (1).

5. A construction laying pipe according to claim 4, characterized in that: A sliding block (3) is slidably connected inside the sliding groove (2).

6. A construction laying pipe according to claim 5, characterized in that: A mounting block (4) is fixedly connected to one side surface of the sliding block (3).

7. A construction line-laying pipe according to claim 6, characterized in that: The surface of the mounting block (4) is provided with mounting screw holes (5).