Mounting equipment

By designing a installation equipment including hanging plates, fixing pipes, connecting ropes and hooks, the problem of unstable hook positions in the lifting of the reinforcement cage and shaking the reinforced cage shakes, and achieves the effect of stable lifting and safe installation.

CN222389386UInactive Publication Date: 2025-01-24李勇佳
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421659492.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2025-01-24
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the installation of the steel cage, the hook is unstable, resulting in the hook position easily deviating during lifting; at the same time, the steel cage is easy to shake during lifting, making it difficult to insert it into the pile hole, which poses certain dangers. .

Method used

Designed a installation equipment, including hanging boards, fixing pipes, connecting ropes and hooks. Through the connection between the hanging plate and the reinforced cage, the fixed pipe has the limit on the reinforcement rope. The problem of instability and the shaking of the reinforcement cage.

Benefits of technology

Through the installation equipment, workers can hang the reinforced cage steadily, reduce the phenomenon of hook shaking, easily put the reinforced cage into the pile hole, and improve the installation efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222389386U_ABST
    Figure CN222389386U_ABST
Patent Text Reader

Abstract

The utility model provides installation equipment, belongs to the technical field of building construction, and aims to solve the problems that the stability between a hook and a reinforcement cage is poor, the position of the hook is easy to deviate during hoisting, and the reinforcement cage is easy to shake when a crane hoists the reinforcement cage. A hanging ring is fixedly installed in the middle of the upper end face of the hanging plate, and a rebar pull rope is fixedly installed on the upper end face of the hanging ring. According to the utility model, the surface of the hook is fixedly provided with the connecting block, the connecting block is internally provided with the through connecting hole, the surface of the connecting hole is provided with the thread, and the connecting hole is internally provided with the fastening screw rod, so that after a worker tightens the fastening screw rod in the connecting hole, the hook can be fixed outside the transverse ring of the reinforcement cage; and the phenomenon that the hook shakes left and right in the hoisting process is avoided, and a worker can easily place the reinforcement cage into a pile hole.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, and more specifically, particularly relates to an installation device. Background Art

[0002] Pile foundation plays an important role in construction. It can transfer loads, reduce settlement and deformation, improve the dynamic characteristics of the foundation, and has an anti-seismic effect. When installing the pile foundation, a crane is required to place the steel cage into the pile hole.

[0003] However, there are still two shortcomings when installing the steel cage:

[0004] First, before using a crane to lift the steel cage, the hook needs to be hung on the steel cage, but the hook and the steel cage are unstable, which makes the position of the hook easily shift during lifting;

[0005] Secondly, since the height of the steel cage is relatively high, when the crane is lifting the steel cage, the steel cage is prone to shaking due to inertia, making it difficult for workers to insert the steel cage into the pile hole, and there is also a certain degree of danger. Utility Model Content

[0006] In order to solve the above technical problems, the utility model provides an installation device to solve the problem that the stability between the hook and the steel cage is poor, which makes the position of the hook easily shift during lifting, and the steel cage is prone to shaking when the crane lifts the steel cage.

[0007] The purpose and effect of the installation device of the utility model are achieved by the following specific technical means: an installation device includes a hanging plate;

[0008] The main body of the hanging plate is a circular plate structure, a hanging ring is fixedly installed at the middle position of the upper end surface of the hanging plate, and a steel bar pull rope is fixedly installed on the upper end surface of the hanging ring;

[0009] A fixed pipe, which is sleeved on the outside of the steel bar pull rope and is located above the hanging plate;

[0010] A connecting rope, wherein a fixing ring is fixedly installed on the inner end surface of the connecting rope, a hook is fixedly installed on the outer end surface of the connecting rope, and a connecting block is fixedly installed on the surface of the hook;

[0011] The steel cage is composed of vertical rods and transverse rings. The vertical rods are arranged in a ring-shaped structure. The transverse rings are welded to the vertical rods. The hooks at the outer ends of the connecting ropes are clamped on the outside of the uppermost transverse rings.

[0012] Furthermore, twelve through holes are provided on the surface of the hanging plate, and the twelve through holes are arranged in a ring-shaped structure, and the fixing ring on the inner end surface of the connecting rope is clamped in the inside of the through hole.

[0013] Furthermore, a protective sleeve is fixedly installed at the middle position of the upper end surface of the hanging plate, a thread is provided on the outer end surface of the protective sleeve, and a hanging ring is located inside the protective sleeve.

[0014] Furthermore, a thread is provided at the inner lower end of the fixing tube, the fixing tube is threadedly connected to the protective sleeve, and a thread is provided at the upper position of the outer end surface of the fixing tube.

[0015] Furthermore, a connection hole is provided in the middle of the surface of the connection block, a thread is provided inside the connection hole, and a locking screw is connected to the thread inside the connection hole.

[0016] Furthermore, the hanging plate is located at an upper position inside the steel cage, and the center of the hanging plate and the center of the fixed pipe are on the same straight line.

[0017] Compared with the prior art, the utility model has the following beneficial effects:

[0018] In the utility model, the fixing ring on one side of the inner end of the connecting rope is clamped inside the through hole, and the hook on one side of the outer end of the connecting rope is clamped outside the transverse ring of the steel cage, so that the hanging plate and the steel cage can be connected together, which is convenient for workers to lift the steel cage.

[0019] In addition, a connecting block is fixedly installed on the surface of the hook, a through connecting hole is opened inside the connecting block, a thread is opened on the surface of the connecting hole, and a fastening screw is arranged inside the connecting hole. After the workers tighten the fastening screw inside the connecting hole, the hook can be fixed to the outside of the horizontal ring of the steel cage to avoid the hook shaking left and right during lifting, so that the workers can easily put the steel cage into the pile hole.

[0020] In addition, a protective cover is installed on the upper end surface of the hanging plate. The protective cover is located outside the lifting ring, and a thread is provided on the outside of the protective cover. The lower end of the fixed pipe is threadedly connected to the outside of the protective cover, and the steel bar pull rope is located inside the fixed pipe. The fixed pipe can protect the steel bar pull rope, and an internal thread is provided at the lower end of the fixed pipe, and an external thread is provided at the upper end of the fixed pipe. Workers can thread the upper end of the fixed pipe to the lower end of another fixed pipe. In this way, two or three fixed pipes can be connected together according to the length of the steel bar pull rope, which can better limit the steel bar pull rope. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the overall device structure of the utility model.

[0022] Figure 2It is a schematic diagram of the connection structure of the hanging plate and the fixed pipe of the utility model.

[0023] Figure 3 It is a schematic diagram of the connecting rope and hook structure of the utility model.

[0024] Figure 4 It is a schematic diagram of the hook and connecting block structure of the utility model.

[0025] Figure 5 It is a schematic cross-sectional structure diagram of a fixing tube and a protective sleeve of the utility model.

[0026] Figure 6 It is a structural schematic diagram of a hanging plate and a hanging ring of the utility model.

[0027] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:

[0028] 1. Hanging plate; 101. Through hole; 102. Protective cover; 103. Lifting ring; 2. Fixed pipe; 3. Connecting rope; 301. Fixed ring; 302. Hook; 4. Connecting block; 401. Connecting hole; 5. Steel cage; 6. Steel pull rope. DETAILED DESCRIPTION

[0029] The implementation of the utility model is further described in detail below in conjunction with the drawings and examples. Example

[0030] As attached Figure 1 To Attachment Figure 6 As shown:

[0031] The utility model provides a mounting device, comprising a hanging plate 1;

[0032] The main body of the hanging plate 1 is a circular plate structure, a hanging ring 103 is fixedly installed at the middle position of the upper end surface of the hanging plate 1, and a steel bar pull rope 6 is fixedly installed on the upper end surface of the hanging ring 103;

[0033] A fixed pipe 2, which is sleeved on the outside of the steel bar pull rope 6 and is located above the hanging plate 1;

[0034] A connecting rope 3, a fixing ring 301 is fixedly installed on the inner end surface of the connecting rope 3, a hook 302 is fixedly installed on the outer end surface of the connecting rope 3, and a connecting block 4 is fixedly installed on the surface of the hook 302;

[0035] The steel cage 5 is composed of a vertical rod and a transverse ring. The vertical rod is arranged in a ring-shaped structure. The transverse ring is welded to the vertical rod. The hook 302 at the outer end of the connecting rope 3 is clamped on the outside of the uppermost transverse ring.

[0036] Among them, twelve through holes 101 are opened on the surface of the hanging plate 1, and the twelve through holes 101 are arranged in a ring-shaped structure. The fixing ring 301 on the inner end face of the connecting rope 3 is clamped in the inside of the through hole 101, the fixing ring 301 on the inner end side of the connecting rope 3 is clamped in the inside of the through hole 101, and the hook 302 on the outer end side of the connecting rope 3 is clamped on the outside of the transverse ring of the steel cage 5. In this way, the hanging plate 1 can be connected with the steel cage 5, which is convenient for lifting the steel cage 5.

[0037] A protective sleeve 102 is fixedly installed at the middle position of the upper end surface of the hanging plate 1 , a thread is provided on the outer end surface of the protective sleeve 102 , and a hanging ring 103 is located inside the protective sleeve 102 .

[0038] Among them, a thread is provided at the inner lower end of the fixed tube 2, and the fixed tube 2 is threadedly connected to the protective sleeve 102. A thread is provided at the upper position of the outer end surface of the fixed tube 2. When the steel bar pull rope 6 is about to shake, the steel bar pull rope 6 will touch the fixed tube 2. The fixed tube 2 can reduce the movement amplitude of the steel bar pull rope 6, thereby also reducing the swing amplitude of the steel cage 5. An internal thread is provided at the inner lower end of the fixed tube 2, and an external thread is provided at the outer upper end of the fixed tube 2. Workers can thread the upper end of the fixed tube 2 to the lower end of another fixed tube 2, so that two or three fixed tubes 2 can be connected together according to the length of the steel bar pull rope 6, which can better limit the steel bar pull rope 6.

[0039] Among them, a connecting hole 401 is opened in the middle position of the surface of the connecting block 4, a thread is opened inside the connecting hole 401, a locking screw is connected to the thread inside the connecting hole 401, a through connecting hole 401 is opened inside the connecting block 4, a thread is opened on the surface of the connecting hole 401, and a fastening screw is arranged inside the connecting hole 401. After the worker tightens the fastening screw inside the connecting hole 401, the hook 302 can be fixed to the outside of the horizontal ring of the steel cage 5 to avoid the hook 302 shaking left and right during lifting.

[0040] Among them, the hanging plate 1 is located at the upper inner position of the steel cage 5, and the center of the hanging plate 1 is on the same straight line as the center of the fixed pipe 2, so that the rotation amplitude of the steel cage 5 can be reduced when the steel cage 5 is hoisted.

[0041] The specific usage and function of this embodiment are as follows:

[0042] In the utility model, the surface of the hanging plate 1 is provided with a through hole 101 in an annular shape, the fixing ring 301 on one side of the inner end of the connecting rope 3 is clamped to the inside of the through hole 101, and the hook 302 on one side of the outer end of the connecting rope 3 is clamped to the outside of the transverse ring of the steel cage 5, so that the hanging plate 1 can be connected with the steel cage 5, and a lifting ring 103 is fixedly installed in the middle position of the upper end surface of the hanging plate 1, and a steel bar pull rope 6 is installed on the upper end of the lifting ring 103, and the upper end of the steel bar pull rope 6 can be connected to the telescopic arm of the crane, and the telescopic arm of the crane drives the hanging plate 1 The hook 302 moves with the steel cage 5, and the steel cage 5 is placed in the pile hole. The surface of the hook 302 is fixedly installed with a connecting block 4, and a through-shaped connecting hole 401 is provided inside the connecting block 4. The surface of the connecting hole 401 is provided with a thread, and a fastening screw is provided inside the connecting hole 401. After the worker tightens the fastening screw inside the connecting hole 401, the hook 302 can be fixed to the outside of the horizontal ring of the steel cage 5, so as to avoid the hook 302 from shaking left and right during the lifting process, so that the worker can easily The steel cage 5 is placed into the pile hole, and a protective sleeve 102 is also installed on the upper end surface of the hanging plate 1. The protective sleeve 102 is located outside the lifting ring 103. The outside of the protective sleeve 102 is provided with a thread. The lower end of the fixed pipe 2 is threadedly connected to the outside of the protective sleeve 102, and the steel bar rope 6 is located inside the fixed pipe 2. The fixed pipe 2 can protect the steel bar rope 6. In addition, the steel cage 5 has a certain swing phenomenon during horizontal lifting. Through the setting of the fixed pipe 2, the steel bar rope 6 will touch the fixed pipe 2 when it is about to shake. The fixed pipe 2 can reduce the movement amplitude of the steel bar rope 6, thereby also reducing the swing amplitude of the steel cage 5. The inner lower end of the fixed pipe 2 is provided with an internal thread, and the outer upper end of the fixed pipe 2 is provided with an external thread. The worker can thread the upper end of the fixed pipe 2 to the lower end of another fixed pipe 2. In this way, two or three fixed pipes 2 can be connected together according to the length of the steel bar rope 6, which can better limit the steel bar rope 6.

[0043] Embodiment 2: Based on the hanger plate 1 in Embodiment 1, twelve through holes 101 are installed in a ring shape on the surface of the hanger plate 1, and the fixing ring 301 on the inner end face of the connecting rope 3 is clamped inside the through hole 101. In actual operation, workers can increase the number of through holes 101 on the surface of the hanger plate 1 according to the size of the hanger plate 1. Increasing the number of through holes 101 means that the number of connecting ropes 3 between the hanger plate 1 and the steel cage 5 can be increased, which can improve the stability of the steel cage 5 during lifting.

Claims

1. A mounting device, characterized in that: The invention comprises a hanging plate (1), wherein the main body of the hanging plate (1) is a circular plate-shaped structure, a hanging ring (103) is fixedly installed at the middle position of the upper end surface of the hanging plate (1), and a steel bar pull rope (6) is fixedly installed on the upper end surface of the hanging ring (103); a fixing pipe (2), wherein the fixing pipe (2) is sleeved on the outside of the steel bar pull rope (6), and the fixing pipe (2) is located above the hanging plate (1); a connecting rope (3), wherein a fixing ring (301) is fixedly installed on the inner end surface of the connecting rope (3), a hook (302) is fixedly installed on the outer end surface of the connecting rope (3), and a connecting block (4) is fixedly installed on the surface of the hook (302); and a steel bar cage (5), wherein the steel bar cage (5) is composed of a vertical rod and a transverse ring, wherein the vertical rod is arranged in a ring-shaped structure, the transverse ring is welded to the vertical rod, and the hook (302) at the outer end of the connecting rope (3) is clamped on the outside of the uppermost transverse ring.

2. A mounting device as claimed in claim 1, characterized in that: The surface of the hanging plate (1) is provided with twelve through holes (101), the twelve through holes (101) being arranged in a ring-shaped structure, and the fixing ring (301) on the inner end surface of the connecting rope (3) is clamped inside the through holes (101).

3. A mounting device as claimed in claim 1, characterized in that: A protective sleeve (102) is fixedly mounted at the middle position of the upper end surface of the hanging plate (1), a thread is provided on the outer end surface of the protective sleeve (102), and a hanging ring (103) is located inside the protective sleeve (102).

4. A mounting device as claimed in claim 1, characterized in that: The inner lower end of the fixing tube (2) is provided with a thread, the fixing tube (2) is threadedly connected to the protective sleeve (102), and a thread is provided at the upper position of the outer end surface of the fixing tube (2).

5. A mounting device as claimed in claim 1, characterized in that: A connection hole (401) is provided in the middle of the surface of the connection block (4), a thread is provided inside the connection hole (401), and a locking screw is connected to the thread inside the connection hole (401).

6. A mounting device as claimed in claim 1, characterized in that: The hanging plate (1) is located at an upper position inside the steel cage (5), and the center of the hanging plate (1) and the center of the fixed pipe (2) are on the same straight line.