Hanging basket for bridge construction
By installing the friction block and design of the elastic board connected to the bottom of the hanging basket, the problem of decreased friction and slipping after use after use is used to improve the safety of the operation and reduce the risk of injury.
Patent Information
- Application Number
- CN202420731467.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2025-01-24
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
After long-term use, the bottom of the existing hanging basket will cause the friction to decrease, especially when the inside of the hanging basket is wet after rain and snow, and the staff will easily slip, which will affect the safety of the operation.
A hanging basket for bridge construction is designed. The bottom of the hanging basket is equipped with a friction block connected by a rubber rod. The rubber rod deforms when under pressure, causing the friction block to move downward, increasing the friction with the shoe sole and preventing slipping. At the same time, elastic plates are provided at the bottom four corners of the hanging basket body to extend the contact time between the hanging basket body and the ground and play a buffering role.
Effectively prevent the slippery problem caused by the humidity of the internal basket, improve the safety of the staff, and reduce the risk of injuries to the staff through the buffer effect of the elastic board.
Smart Images

Figure CN222390260U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hanging baskets, in particular to a hanging basket for bridge construction. Background Art
[0002] At present, during the construction of bridges, when it is necessary to install drainage pipes and repair load-bearing components on both sides of the bridge, it is necessary to use construction auxiliary facilities to get close to the construction work surface. Sometimes, due to the constraints of the environmental conditions of the bridge, it is impossible to set up a construction scaffold under the bridge. Therefore, we need to use a construction auxiliary device such as a hanging basket to construct the bridge.
[0003] The bottom of an existing hanging basket is usually made of wire mesh. After long-term use, the bottom of the hanging basket is worn flat and the friction is reduced. As a result, the inside of the hanging basket becomes wet after rain or snow, and workers may slip when working inside the hanging basket, which not only affects the normal operation of the workers, but also increases the chance of accidents.
[0004] In order to solve the above problems, we have made improvements and proposed a hanging basket for bridge construction. Utility Model Content
[0005] In order to solve the above technical problems, the utility model provides the following technical solutions:
[0006] The utility model provides a hanging basket for bridge construction, comprising a hanging basket main body, a mounting plate fixedly connected to the bottom end of the hanging basket main body, a plurality of through-hole grooves opened at the bottom of the hanging basket main body, a connecting block fixedly connected to the top end of the mounting plate, a plurality of groups of rubber rods fixedly connected to the top end of the connecting block, friction blocks fixedly connected to the top ends of the plurality of groups of rubber rods, and the friction blocks pass through the through-hole grooves to the interior of the hanging basket main body.
[0007] As a preferred technical solution of the utility model, each group of rubber rods is provided with two rubber rods, and the two rubber rods are spirally wound around each other.
[0008] As a preferred technical solution of the utility model, the four corners of the bottom end of the mounting plate are fixedly connected to mounting blocks, an elastic plate is provided on the inner side of the mounting block, the four corners of the elastic plate are fixedly connected to connecting rods, and the connecting rods are slidably connected to the inside of the mounting block.
[0009] As a preferred technical solution of the utility model, a plurality of conical protrusions are provided on the top of the friction block, and the plurality of conical protrusions are arranged in an array.
[0010] As a preferred technical solution of the utility model, the bottoms of the left and right sides of the hanging basket body are fixedly connected with hanging rods, and the shape of the hanging rods is U-shaped, and the top of the hanging rods is fixedly connected with a pair of hanging rings.
[0011] As a preferred technical solution of the utility model, a pair of fixing blocks are sleeved on the outer side of the suspension rod, and the fixing blocks are fixedly connected to the top of the hanging basket body, and the pair of fixing blocks are respectively arranged on both sides of the U-shape.
[0012] The beneficial effects of the utility model are:
[0013] 1. In the utility model, a connecting block is installed on the mounting plate at the bottom end of the hanging basket body, and the connecting block is connected to the friction block through multiple groups of rubber rods. The friction block protrudes inside the hanging basket body. During the operation, the staff stands inside the hanging basket body with the soles of their feet on the friction block. The rubber rod is deformed to make the friction block move downward until the soles of the staff contact the bottom of the hanging basket body. The friction block interacts with the pattern of the staff's soles. The resistance of the friction block to the soles makes it difficult for the staff to slip inside the hanging basket body, thereby avoiding moisture inside the hanging basket body and slipping of the staff when working inside the hanging basket body, thereby avoiding slipping that affects the staff's operation and also avoiding an increase in the probability of accidents.
[0014] 2. In the utility model, mounting blocks are arranged at the four corners of the bottom end of the mounting plate, and the elastic plate is installed on the inner side of the mounting block through a connecting rod. After the main body of the hanging basket contacts the ground, the elastic plate contacts the ground first, and then the elastic plate is deformed by force, thereby prolonging the landing time of the main body of the hanging basket, thereby playing a buffering role and avoiding injuries to the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0016] Figure 1 It is a top perspective view of the utility model;
[0017] Figure 2 It is a bottom-up stereogram of the present utility model;
[0018] Figure 3 It is a schematic diagram of the friction block of the utility model;
[0019] Figure 4 It is a schematic diagram of the elastic plate of the utility model;
[0020] In the figure: 1. hanging basket body; 2. hanging rod; 3. fixing block; 4. lifting ring; 5. through hole groove; 6. friction block; 7. elastic plate; 8. mounting plate; 9. connecting block; 10. rubber rod; 11. conical protrusion; 12. connecting rod; 13. mounting block. DETAILED DESCRIPTION
[0021] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0022] Example: Figure 1-4 As shown, a hanging basket for bridge construction includes a hanging basket body 1, a mounting plate 8 is fixedly connected to the bottom end of the hanging basket body 1, a plurality of through-hole grooves 5 are opened at the bottom of the hanging basket body 1, a connecting block 9 is fixedly connected to the top end of the mounting plate 8, a plurality of groups of rubber rods 10 are fixedly connected to the top end of the connecting block 9, a friction block 6 is fixedly connected to the top end of the plurality of groups of rubber rods 10, and the friction block 6 passes through the through-hole grooves 5 to the inside of the hanging basket body 1, the cross-sectional areas of the connecting block 9 and the friction block 6 are both smaller than the cross-sectional area of the through-hole grooves 5, that is, a gap is set between the friction block 6, the connecting block 9 and the through-hole grooves 5, and the gap is used to make water flow out of the gap to avoid water accumulation inside the hanging basket body 1, and a plurality of holes and grooves are opened on the mounting plate 8 for drainage;
[0023] A connecting block 9 is installed on the mounting plate 8 at the bottom end of the hanging basket body 1. The connecting block 9 is connected to the friction block 6 through multiple groups of rubber rods 10. The friction block 6 protrudes from the inside of the hanging basket body 1. During operation, the staff stands inside the hanging basket body 1 with the soles of their feet on the friction block 6. The rubber rod 10 is deformed to cause the friction block 6 to move downward until the soles of the staff contact the bottom of the hanging basket body 1. The friction block 6 interacts with the pattern of the staff's soles. The resistance of the friction block 6 to the soles makes it difficult for the staff to slip inside the hanging basket body 1, thereby avoiding moisture inside the hanging basket body 1 and slipping of the staff when working inside the hanging basket body 1, thereby avoiding slipping that affects the staff's operation and also avoiding an increase in the probability of accidents.
[0024] Specifically, Figure 3 As shown, each group of rubber rods 10 is provided with two rubber rods 10, and the two rubber rods 10 are spirally wound around each other. When the rubber rods 10 are spirally wound together, they can bend to the side to avoid axial action on the rubber rods 10, thereby avoiding axial force on the rubber rods 10, and then expanding radially to damage the internal structure of the rubber rods 10, thereby increasing the service life of the rubber rods 10.
[0025] Specifically, Figure 2 and Figure 4As shown, the four corners of the bottom end of the mounting plate 8 are fixedly connected with mounting blocks 13, and the inner side of the mounting block 13 is provided with an elastic plate 7, the elastic plate 7 is arc-shaped, and the four corners of the elastic plate 7 are fixedly connected with connecting rods 12, and the connecting rods 12 are slidably connected to the inside of the mounting block 13. When the hanging basket main body 1 is lowered to the ground, since the contact time between the hanging basket main body 1 and the ground is short, the hanging basket main body 1 is subjected to a large reaction force from the ground, so that the staff in the hanging basket main body 1 is vibrated, and mounting blocks 13 are provided at the four corners of the bottom end of the mounting plate 8, and the elastic plate 7 is installed on the inner side of the mounting block 13 through the connecting rod 12. After the hanging basket main body 1 contacts the ground, the elastic plate 7 contacts the ground first, and then the elastic plate 7 is deformed by the force, which prolongs the landing time of the hanging basket main body 1, thereby playing a buffering role and avoiding injuries to the staff.
[0026] Specifically, Figure 3 As shown, a plurality of conical protrusions 11 are provided at the top of the friction block 6, and the plurality of conical protrusions 11 are arranged in an array. The conical protrusions 11 are provided at the top of the friction block 6, and the conical protrusions 11 can better cooperate with the sole pattern and further prevent the sole from slipping.
[0027] Specifically, Figure 1 and Figure 2 As shown, the bottom of the left and right sides of the hanging basket body 1 are fixedly connected with a hanging rod 2, and the shape of the hanging rod 2 is U-shaped, and a pair of lifting rings 4 are fixedly connected to the top of the hanging rod 2. A pair of fixing blocks 3 are sleeved on the outside of the hanging rod 2, and the fixing blocks 3 are fixedly connected to the top of the hanging basket body 1. The pair of fixing blocks 3 are respectively arranged on both sides of the U, and the ropes are connected to the lifting rings 4. The lifting equipment operates on the lifting rings 4, and the hanging basket body 1 is lifted by the hanging rod 2. The fixed blocks 3 are connected between the hanging rod 2 and the hanging basket body 1, so as to improve the stability of the hanging rod 2 and make the lifting of the hanging basket body 1 more stable.
[0028] Working principle: the staff enters the interior of the hanging basket body 1, the lifting equipment operates the lifting ring 4, and lifts the hanging basket body 1 through the lifting rod 2. After the hanging basket body 1 reaches the working position, the hanging basket body 1 stops, and the staff stands inside the hanging basket body 1, with the soles of their feet stepping on the friction block 6. The rubber rod 10 is deformed, causing the friction block 6 to move downward until the soles of the staff contact the bottom of the hanging basket body 1. The conical protrusions 11 cooperate with the sole patterns to prevent the soles from slipping, so that the staff can work normally in the hanging basket body 1. After the work is completed, the lifting equipment lowers the hanging basket body 1. When the hanging basket body 1 is about to contact the ground, the elastic plate 7 contacts the ground first. As the hanging basket body 1 continues to be lowered, the elastic plate 7 is deformed by force, which prolongs the landing time of the hanging basket body 1, thereby playing a buffering role and avoiding injuries to the staff.
[0029] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A suspended basket for bridge construction, comprising a suspended basket body (1), characterized in that: The bottom end of the hanging basket body (1) is fixedly connected to a mounting plate (8), a plurality of through-hole grooves (5) are provided at the bottom of the hanging basket body (1), a connecting block (9) is fixedly connected to the top end of the mounting plate (8), a plurality of groups of rubber rods (10) are fixedly connected to the top end of the connecting block (9), a friction block (6) is fixedly connected to the top end of the plurality of groups of rubber rods (10), and the friction block (6) passes through the through-hole grooves (5) to the interior of the hanging basket body (1).
2. A suspended platform for bridge construction according to claim 1, characterized in that: Each group of rubber rods (10) is provided with two rubber rods (10), and the two rubber rods (10) are spirally wound around each other.
3. A suspended platform for bridge construction according to claim 1, characterized in that: The four corners of the bottom end of the mounting plate (8) are fixedly connected to mounting blocks (13), an elastic plate (7) is arranged inside the mounting block (13), the four corners of the elastic plate (7) are fixedly connected to connecting rods (12), and the connecting rods (12) are slidably connected to the inside of the mounting block (13).
4. A suspended platform for bridge construction according to claim 1, characterized in that: A plurality of conical protrusions (11) are provided at the top end of the friction block (6), and the plurality of conical protrusions (11) are arranged in an array.
5. A suspended platform for bridge construction according to claim 1, characterized in that: The bottoms of the left and right sides of the hanging basket body (1) are fixedly connected to hanging rods (2), and the shape of the hanging rods (2) is U-shaped. The tops of the hanging rods (2) are fixedly connected to a pair of hanging rings (4).
6. A suspended platform for bridge construction according to claim 5, characterized in that: A pair of fixing blocks (3) are sleeved on the outer side of the suspension rod (2), and the fixing blocks (3) are fixedly connected to the top of the hanging basket body (1), and the pair of fixing blocks (3) are respectively arranged on both sides of the U-shape.