The utility model discloses a
civil engineering pile foundation
drill bit includes: the
drill cylinder, the
drill cylinder is equipped with a plurality of intercepting piece that distributes along the drill cylinder inner wall circumference, every intercepting piece includes: steel
wire rope, is welded on the rotary drum inner wall, and the length is greater than the
radius of drill cylinder, the
pier head clamp is installed in the steel
wire rope far from the rotary drum inner wall one end, and the steel
wire rope appears silk phenomenon through the design
pier head clamp, is avoided. The utility model discloses through the inner wall design blocking piece of drill cylinder, when encountering boulder, in the process of drilling cylinder in-depth, boulder will be
cut or extruded displacement by drill tooth, and extruded steel wire
rope enters into the drill cylinder, when the drill cylinder is filled, and the drill cylinder is proposed, through the steel wire
rope, makes boulder fall out of the drill cylinder, and then completes the boulder's taking out work, compared with traditional GPS-10
engineering drilling
machine, can
handle the situation that cannot continue to drill in the construction process and encounter boulder or boulder, compared with rotary drilling
machine, can save the cost, and is convenient and fast.