Climbing frame for bridge pier column
By introducing adjustable climbing bodies and adjustment components in the bridge pier column climbing rack, the problems that need to be disassembled and reinstalled in existing technologies, and the bridge pier columns suitable for different section size are realized, simplified operations, and the operation has simplified operations. And expanded the scope of application.
Patent Information
- Application Number
- CN202420707926.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-04-08
AI Technical Summary
The existing bridge pier column climbing frame needs to be disassembled and reinstalled when the cross-sectional dimensions change, which is troublesome to operate.
A crawling frame for a bridge pier column includes a adjustable climbing shelf body. The relative position of the connection platform is adjusted by adjusting the component (such as two -way screw and driver parts), thereby shrinking or expanding the length of the climbing body.
The design enables the climbing to be suitable for bridge pier columns of different section size or cross -section, which simplifies the operation and expands the scope of application.
Smart Images

Figure CN222412641U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bridge pier construction, and in particular to a climbing frame for bridge piers. Background Art
[0002] Bridge piers refer to the lower load-bearing objects used to support the upper structure. The cross-sections of bridge piers are round, square, rectangular, etc. During the construction of bridge piers, it is usually necessary to use climbing frames to repair and inspect the bridge piers.
[0003] In the related art, a Chinese patent document with publication number CN215405623U discloses a climbing frame suitable for bridge piers, including a climbing frame body, a motor, a steel fence mesh and an electric control box. The cross section of the climbing frame body is a rectangular ring, the steel fence mesh is installed at the bottom of the climbing frame body, and the motor and the electric control box are fixedly installed at the top of the steel fence mesh; it also includes a steel wire rope, and both ends of the steel wire rope are connected to the motor. When in use, the rotation direction of the power output end of the motor is controlled by operating the electric control box, and the steel wire rope moves with the rotation of the power output end of the motor, so that the steel wire rope drives the climbing frame body to move up and down.
[0004] With regard to the above-mentioned related technologies, when the cross-sectional dimensions of the bridge pier column change, the climbing frame body needs to be disassembled and then installed into the corresponding dimensions, which is troublesome to operate. Utility Model Content
[0005] In order to facilitate the adaptation of the climbing frame body to bridge piers of different cross-sectional sizes, the present application provides a climbing frame for bridge piers.
[0006] The present application provides a bridge pier climbing frame adopting the following technical solution:
[0007] A climbing frame for bridge piers, comprising a climbing frame body and an electric motor for connecting a steel wire rope, the climbing frame body comprising two fixed platforms arranged relatively parallel and two connecting platforms arranged relatively slidingly, the electric motor corresponds to the fixed platforms, the electric motor is arranged on the corresponding fixed platforms, the arrangement direction of the two connecting platforms is perpendicular to the arrangement direction of the two fixed platforms, the two ends of the connecting platform are slidably connected to the two fixed platforms, the sliding direction of the connecting platform is parallel to the arrangement direction of the two connecting platforms, the two fixed platforms form a rectangular ring with the two connecting platforms, and the fixed platforms are provided with adjustment components for adjusting the two connecting platforms to move closer or farther away from each other.
[0008] By adopting the above technical solution, the two connecting platforms can be adjusted to move closer or farther away from each other through the adjustment component, so that the length of the entire climbing frame body can be reduced or expanded, thereby making it convenient to be applied to bridge piers with different cross-sectional sizes or variable cross-sections.
[0009] Preferably, the adjustment assembly includes a bidirectional screw rotatably arranged on a fixed platform and a driving member arranged on the fixed platform, the rotation axis of the bidirectional screw is parallel to the arrangement direction of the two connecting platforms, the two connecting platforms are respectively threadedly connected to the two ends of the bidirectional screw, and the driving member is used to drive the bidirectional screw to rotate.
[0010] By adopting the above technical solution, the bidirectional screw is driven to rotate by the driving member, and the bidirectional screw drives the two connecting platforms at both ends to move closer or farther away from each other, which helps to reduce or increase the length of the climbing frame body, and thus can be applied to bridge piers with different cross-sectional sizes or variable cross-sections, thereby expanding the scope of application to a certain extent.
[0011] Preferably, the driving member includes a motor arranged on a fixed platform, a first gear coaxially connected to an output shaft of the motor, and a second gear sleeved on a bidirectional screw, and the first gear is meshed with the second gear.
[0012] By adopting the above technical solution, the motor is started, the motor drives the first gear to rotate, the first gear drives the second gear to rotate, and the second gear drives the corresponding bidirectional screw to rotate, thereby facilitating the two connecting platforms to move closer to or further away from each other, helping to reduce or increase the length of the climbing frame body, and conveniently adapting to bridge piers with different cross-sectional sizes.
[0013] Preferably, the climbing frame for bridge piers also includes an electric control box arranged on any fixed platform, and the motor and the electric motor are both electrically connected to the electric control box.
[0014] Preferably, an arc-shaped bonding plate and a straight bonding plate are slidably arranged on the connecting platform, and the arc-shaped bonding plate and the straight bonding plate are both used to abut against the side surfaces of the bridge piers. The sliding directions of the arc-shaped bonding plate and the straight bonding plate are parallel to the arrangement directions of the two connecting platforms, and sliding parts for driving the arc-shaped bonding plate and the straight bonding plate to slide are respectively arranged on the connecting platforms.
[0015] By adopting the above technical solution, the corresponding arc-shaped bonding plate is driven to slide toward the direction close to the fixed platform by the sliding member, which helps to make the arc-shaped bonding plate abut against the arc-shaped side surface of the bridge pier, so as to improve the stability of the climbing frame body mounted on the arc-shaped side bridge pier; the corresponding straight bonding plate is driven to slide toward the direction close to the fixed platform by the sliding member, which helps to make the straight bonding plate abut against the side plane of the bridge pier, and can be suitable for bridge piers with flat sides.
[0016] Preferably, the sliding member includes a cylinder installed on the connecting platform, the cylinder corresponds to the arc-shaped bonding plate and the straight bonding plate respectively, the arc-shaped bonding plate and the straight bonding plate are respectively connected to the piston rod of the corresponding cylinder, and the cylinder is electrically connected to the electric control box.
[0017] Preferably, the arc-shaped laminating plate and the straight laminating plate are respectively hinged on the piston rods of the corresponding cylinders, and the hinge axes of the arc-shaped laminating plate and the straight laminating plate are parallel to the arrangement direction of the two fixed platforms.
[0018] By adopting the above technical solution, the arc-shaped bonding plate and the straight bonding plate can be tilted to abut against the side of the bridge pier, and can then be used on the bridge pier with a variable cross-section.
[0019] Preferably, a hook is provided on the connecting platform, and the hook is hooked and matched with the fixed platform.
[0020] In summary, this application includes the following beneficial technical effects:
[0021] By adjusting the two connecting platforms to move closer or further away from each other through the adjustment component, the length of the entire climbing frame body can be shortened or extended, thereby making it convenient to apply to bridge piers with different cross-sectional sizes or variable cross-sections. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.
[0023] Figure 2 It is a cross-sectional view of the overall structure of an embodiment of the present application.
[0024] Figure 3 yes Figure 2 Enlarged view of part A.
[0025] Figure 4 It is a cross-sectional view of the overall structure of the connection platform in the embodiment of the present application.
[0026] Explanation of the reference numerals: 1. Climbing frame body; 101. Fixed platform; 102. Connecting platform; 2. Electric motor; 3. Adjusting assembly; 31. Bidirectional screw; 32. Driving member; 321. Motor; 322. First gear; 323. Second gear; 4. Electric control box; 5. Arc-shaped bonding plate; 6. Straight bonding plate; 7. Cylinder; 8. Hook; 9. Support plate; 10. Slider. DETAILED DESCRIPTION
[0027] The following is combined with Figure 1-4 This application is described in further detail.
[0028] The present application embodiment discloses a climbing frame for bridge piers. Figure 1 and Figure 2The climbing frame for bridge piers includes a climbing frame body 1, an electric control box 4 and a motor 2 for connecting a steel wire rope. The climbing frame body 1 includes a fixed platform 101 and a connecting platform 102. Two fixed platforms 101 are relatively parallel. The longitudinal section of the fixed platform 101 is U-shaped to facilitate the standing of construction workers. The arrangement direction of the two fixed platforms 101 is parallel to the length direction of the fixed platform 101; the motor 2 corresponds to the fixed platform 101, and two motors 2 are symmetrically installed on each fixed platform 101 so that the steel wire rope can balance and drive the fixed platform 101 to rise and fall. The electric control box 4 is fixedly installed on any fixed platform 101.
[0029] Reference Figure 1 and Figure 2 Two connecting platforms 102 are relatively slidably arranged, and the arrangement direction of the two connecting platforms 102 is perpendicular to the arrangement direction of the two fixed platforms 101. The longitudinal section of the connecting platform 102 is U-shaped, and the cross-section of the connecting platform 102 is also U-shaped. The two ends of the U-shaped connecting platform 102 are respectively slidably connected with the two fixed platforms 101. The connecting platform 102 is located below the fixed platform 101. An inverted L-shaped hook 8 is fixed to the top wall of the connecting platform 102. The hook 8 is engaged with the top wall of the fixed platform 101, so that the connecting platform 102 is not easily separated from the fixed platform 101; the two fixed platforms 101 and the two connecting platforms 102 form a closed rectangular ring, and an adjusting component 3 for adjusting the two connecting platforms 102 to move closer or farther away from each other is provided on the fixed platform 101. The adjusting component 3 and the motor 2 are electrically connected to the electric control box 4. The electric control box 4 is manipulated to make the motor 2 and the adjusting component 3 work, which provides convenience for the operation of the construction personnel.
[0030] During construction, the two connecting platforms 102 are adjusted to move closer or further away from each other by adjusting the adjustment component 3, which helps to reduce or increase the length of the entire climbing frame body 1, and thus can be applied to bridge piers with different cross-sectional sizes or variable cross-sections, thereby expanding the scope of application to a certain extent.
[0031] Reference Figure 2 and Figure 3 In order to facilitate the adjustment of the two connecting platforms 102 to move closer to or farther away from each other, two support plates 9 are relatively fixed on the bottom wall of the fixed platform 101. The adjustment component 3 includes a bidirectional screw 31 and a driving member 32. The bidirectional screw 31 rotates and penetrates the two support plates 9 on the bottom wall of the fixed platform 101. The rotation axis of the bidirectional screw 31 is parallel to the arrangement direction of the two connecting platforms 102; a slider 10 is fixed to the bottom wall of the connecting platform 102 close to one end of the fixed platform 101, and the two sliders 10 at the same end of the two connecting platforms 102 are respectively threadedly connected to the two ends of the bidirectional screw 31 on the corresponding side. The driving member 32 is arranged on the bottom wall of the fixed platform 101, and the driving member 32 is used to drive the bidirectional screw 31 to rotate.
[0032] Reference Figure 2 and Figure 3 In order to facilitate driving the bidirectional screw 31 to rotate, the driving member 32 includes a motor 321, a first gear 322 and a second gear 323. The motor 321 is fixedly mounted on the bottom wall of the fixed platform 101. The first gear 322 is coaxially fixedly connected to the output shaft of the motor 321. The second gear 323 is fixedly sleeved on the middle part of the bidirectional screw 31. The first gear 322 is meshed with the second gear 323. The motor 321 is electrically connected to the electric control box 4, which helps to centrally control the use of the motor 321 through the electric control box 4.
[0033] When it is necessary to adjust the two connecting platforms 102 to move closer to or farther away from each other, the motors 321 on the two fixed platforms 101 are started at the same time. The two motors 321 drive the corresponding first gears 322 to rotate, and the first gear 322 drives the second gear 323 to rotate. The second gear 323 drives the bidirectional screw 31 to rotate in the same direction. The rotation of the bidirectional screw 31 drives the two sliders 10 to move closer to or farther away from each other, so that the slider 10 drives the corresponding connecting platform 102 to slide in the direction of approaching or moving away from the fixed platform 101, which helps to reduce or expand the length of the entire climbing frame body 1, so as to adapt to rectangular cross-section bridge piers of different sizes.
[0034] Reference Figure 2 and Figure 4 , an arc-shaped bonding plate 5 and a straight bonding plate 6 are slidably arranged on the connecting platform 102, the arc-shaped bonding plate 5 and the straight bonding plate 6 are arranged in the vertical direction, and the arc-shaped bonding plate 5 is located above the straight bonding plate 6, the arc-shaped bonding plate 5 bulges outward in the direction away from the fixed platform 101, and the arc-shaped bonding plate 5 and the straight bonding plate 6 are both used to abut against the side of the bridge pier, and the sliding directions of the arc-shaped bonding plate 5 and the straight bonding plate 6 are parallel to the arrangement direction of the two connecting platforms 102, and the arc-shaped bonding plate 5 and the straight bonding plate 6 are both located between the two fixed platforms 101, and sliding parts for driving the arc-shaped bonding plate 5 and the straight bonding plate 6 to slide are respectively provided on the connecting platform 102.
[0035] Reference Figure 2 and Figure 4 The sliding part includes a cylinder 7 installed on the connecting platform 102, the arc-shaped bonding plate 5 and the straight bonding plate 6 correspond to the two cylinders 7, the two cylinders 7 corresponding to the straight bonding plate 6 are fixedly installed on the bottom wall of the connecting platform 102, the two cylinders 7 corresponding to the arc-shaped bonding plate 5 are embedded in the bottom wall of the connecting platform 102, the extension direction of the cylinder 7 is parallel to the arrangement direction of the two connecting platforms 102, the arc-shaped bonding plate 5 and the straight bonding plate 6 are respectively hinged to the piston rod of the corresponding cylinder 7 through a hinge shaft, the hinge axis of the arc-shaped bonding plate 5 and the straight bonding plate 6 are parallel to the arrangement direction of the two fixed platforms 101, and the cylinder 7 is electrically connected to the electric control box 4.
[0036] When the side of the bridge pier is curved, start the two cylinders 7 corresponding to the curved bonding plate 5, and the corresponding cylinders 7 drive the curved bonding plate 5 to slide in the direction close to the fixed platform 101, so that the curved bonding plate 5 abuts against the side wall of the bridge pier; start the two cylinders 7 corresponding to the straight bonding plate 6, and the corresponding two cylinders 7 drive the straight bonding plate 6 to slide in the direction away from the fixed platform 101, so that the straight bonding plate 6 is located on the side of the curved bonding plate 5 away from the fixed platform 101, which helps to maintain the stability of the climbing frame body 1 and is suitable for bridge piers with curved surfaces on both sides.
[0037] When the side of the bridge pier is a plane, the two cylinders 7 corresponding to the straight bonding plate 6 are started, and the corresponding two cylinders 7 drive the straight bonding plate 6 to slide in the direction close to the fixed platform 101, so that the straight bonding plate 6 abuts against the side plane of the bridge pier, and the two cylinders 7 corresponding to the arc bonding plate 5 are started, and the corresponding cylinders 7 drive the arc bonding plate 5 to slide in the direction away from the fixed platform 101, so that the arc bonding plate 5 is separated from the side wall of the bridge pier, so that it can be applied to bridge piers with flat sides, and then can be adapted to bridge piers with different cross sections, further expanding the scope of application. Since the straight bonding plate 6 and the arc bonding plate 5 are hingedly arranged, they can adapt to the inclined surface at the variable cross section.
[0038] The implementation principle of the embodiment of the present application is: during construction, the motors 321 on the two fixed platforms 101 are started at the same time, the two motors 321 drive the corresponding first gears 322 to rotate, the first gear 322 drives the second gear 323 to rotate, and the second gear 323 drives the bidirectional screw 31 to rotate in the same direction, and the rotation of the bidirectional screw 31 drives the two sliders 10 to move closer to or away from each other, so that the slider 10 drives the corresponding connecting platform 102 to slide in the direction of approaching or moving away from the fixed platform 101, which helps to reduce or increase the length of the climbing frame body 1, and adjust the position of the connecting platform 102 according to the actual cross-sectional size of the bridge pier; then, according to the side shape of the bridge pier, choose whether to adjust the arc-shaped bonding plate 5 or the straight bonding plate 6 to move in the direction close to the fixed platform 101 to abut the side of the bridge pier, so as to facilitate use on bridge piers with different cross-sectional sizes, thereby expanding the scope of application to a certain extent.
[0039] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A climbing frame for a bridge pier, comprising a climbing frame body (1) and an electric motor (2) for connecting a steel wire rope, characterized in that: The climbing frame body (1) comprises two fixed platforms (101) arranged in parallel with each other and two connecting platforms (102) arranged in a sliding manner with respect to each other. The motor (2) corresponds to the fixed platform (101). The motor (2) is arranged on the corresponding fixed platform (101). The arrangement direction of the two connecting platforms (102) is perpendicular to the arrangement direction of the two fixed platforms (101). Both ends of the connecting platform (102) are slidably connected to the two fixed platforms (101). The sliding direction of the connecting platform (102) is parallel to the arrangement direction of the two connecting platforms (102). The two fixed platforms (101) and the two connecting platforms (102) form a rectangular ring. The fixed platform (101) is provided with an adjustment component (3) for adjusting the two connecting platforms (102) to move closer to or farther from each other.
2. A climbing frame for bridge piers according to claim 1, characterized in that: The adjustment assembly (3) comprises a bidirectional screw (31) rotatably arranged on a fixed platform (101) and a driving member (32) arranged on the fixed platform (101); the rotation axis of the bidirectional screw (31) is parallel to the arrangement direction of the two connecting platforms (102); the two connecting platforms (102) are respectively threadedly connected to the two ends of the bidirectional screw (31); and the driving member (32) is used to drive the bidirectional screw (31) to rotate.
3. A climbing frame for bridge piers according to claim 2, characterized in that: The driving member (32) comprises a motor (321) arranged on a fixed platform (101), a first gear (322) coaxially connected to an output shaft of the motor (321), and a second gear (323) sleeved on the bidirectional screw (31), wherein the first gear (322) meshes with the second gear (323).
4. A climbing frame for bridge piers according to claim 3, characterized in that: The climbing frame for bridge piers also includes an electric control box (4) arranged on any fixed platform (101), and the motor (321) and the electric motor (2) are both electrically connected to the electric control box (4).
5. A climbing frame for bridge piers according to claim 4, characterized in that: An arc-shaped bonding plate (5) and a straight bonding plate (6) are slidably arranged on the connecting platform (102); the arc-shaped bonding plate (5) and the straight bonding plate (6) are both used to abut against the side of the bridge pier; the sliding directions of the arc-shaped bonding plate (5) and the straight bonding plate (6) are both parallel to the arrangement direction of the two connecting platforms (102); and sliding parts for driving the arc-shaped bonding plate (5) and the straight bonding plate (6) to slide are respectively arranged on the connecting platform (102).
6. A climbing frame for bridge piers according to claim 5, characterized in that: The sliding member comprises a cylinder (7) mounted on a connecting platform (102), wherein the cylinder (7) corresponds to a curved bonding plate (5) and a straight bonding plate (6), respectively, and the curved bonding plate (5) and the straight bonding plate (6) are respectively connected to piston rods of corresponding cylinders (7), and the cylinder (7) is electrically connected to an electric control box (4).
7. A climbing frame for bridge piers according to claim 6, characterized in that: The arc-shaped laminating plate (5) and the straight laminating plate (6) are respectively hinged on the piston rod of the corresponding cylinder (7), and the hinge axes of the arc-shaped laminating plate (5) and the straight laminating plate (6) are parallel to the arrangement direction of the two fixed platforms (101).
8. A climbing frame for bridge piers according to any one of claims 1 to 7, characterized in that: The connecting platform (102) is provided with a hook (8), and the hook (8) is hooked and matched with the fixing platform (101).
Citation Information
Patent Citations
Climbing frame suitable for bridge pier column
CN215405623U