Fabricated building wall structure

Through the prefabricated building technology, the wall plate is spliced ​​and paved with steel bars to pour cement, which solves the problem of the existing prefabricated building wall structure, inconvenient transportation and complex assembly, and realizes the solidity of the wall and the convenience of assembly.

CN222413554UActive Publication Date: 2025-01-28CHONGQING TECH & BUSINESS INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420262441.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-02
Publication Date
2025-01-28
Estimated Expiration
2034-02-02

AI Technical Summary

Technical Problem

The wall structure of the existing prefabricated buildings is large in size and inconvenient to transport. The assembly process requires strict construction, which affects building safety.

Method used

The wall plate is used to stitch the wall plate, spread horizontal and vertical steel bars between the wall plates, and pour cement to form a strong wall. The design of the wall plate is connected by the two cement plates from the connection beam. The connected beam is provided with a groove and hole. The top and bottom of the cement board are designed as L -shaped, which is convenient for card connection and dislocation.

Benefits of technology

The formation of the wall is strong and easy to assemble, reducing the complexity of on -site construction, and improving the safety of building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222413554U_ABST
    Figure CN222413554U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of wall bodies, and discloses a fabricated building wall body structure which comprises a wall body formed by splicing a plurality of groups of wall plates, transverse reinforcing steel bars and longitudinal reinforcing steel bars are laid between the wall plates, and cement is poured between the wall plates; the wallboard comprises two cement boards connected through two connecting beams, the two connecting beams are provided with grooves used for containing transverse steel bars, and the middle portions of the connecting beams are provided with holes used for allowing longitudinal steel bars to be inserted therein. According to the fabricated building wall structure, the wallboards are spliced through a fabricated method, then the gaps between the wallboards are embedded with the steel bars and filled with the concrete, and therefore the formed wall is firm and convenient to assemble.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of walls, in particular to an assembled building wall structure. Background Art

[0002] Prefabricated buildings refer to buildings that transfer a large amount of on-site work in traditional construction methods to factories, where building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in the factory, transported to the construction site, and assembled and installed on site through reliable connection methods.

[0003] Prefabricated buildings mainly include prefabricated concrete structures, steel structures, modern wooden structures, etc. They are representatives of modern industrialized production methods because they adopt standardized design, factory production, assembly construction, information management, and intelligent applications.

[0004] The wall panels of prefabricated buildings are generally connected by reserved steel bars and poured concrete. However, the wall is large in size and inconvenient to transport. Strict construction is required during the assembly process, otherwise it will affect the safety of the building. For this reason, we propose a prefabricated building wall structure. Utility Model Content

[0005] In view of the above-mentioned deficiencies in the prior art, the utility model provides an assembled building wall structure.

[0006] The utility model provides the following technical solution: an assembled building wall structure, comprising a wall formed by splicing a plurality of wall panels, wherein transverse steel bars and longitudinal steel bars are laid between the wall panels and cement is poured;

[0007] The wall panel comprises two cement boards connected by two connecting beams, the two connecting beams are provided with A grooves for placing transverse steel bars, and the middle of the connecting beams is provided with holes for inserting longitudinal steel bars;

[0008] The top and bottom ends of the two cement boards are both L-shaped, and the top end of the cement board is an outward L-shape, while the bottom end of the cement board is an inward L-shape, and the two cement boards are clamped together.

[0009] Preferably, two protrusions are installed on the top of the cement board, and two B grooves corresponding to the protrusions are opened on the bottom of the cement board.

[0010] Preferably, during the staggered laying process of the wall panels, the connecting beams are always aligned vertically, and the B groove at the bottom of the upper cement board is stuck in the protrusion at the top of the lower cement board.

[0011] Preferably, there is a spacing between the connecting beam and the top and bottom ends of the cement board.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] The prefabricated building wall structure adopts an assembly method to splice the wall panels, and then steel bars are implanted in the gaps between the wall panels and filled with concrete. The wall formed in this way is strong and easy to assemble. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 It is a structural schematic diagram of the wall panel of the utility model.

[0016] In the figure: 1, wall panel; 11, cement board; 12, connecting beam; 13, groove A; 14, hole; 15, bump; 16, groove B. DETAILED DESCRIPTION

[0017] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution of the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings of the embodiments of the present disclosure. In order to keep the following description of the embodiments of the present disclosure clear and concise, the present disclosure omits detailed descriptions of known functions and known components to avoid unnecessary confusion of the concepts of the present invention.

[0018] See also Figure 1-2 , an assembled building wall structure, including a wall formed by splicing a plurality of wall panels 1, wherein transverse and longitudinal steel bars are laid between the wall panels 1 and cement is poured.

[0019] The wall panel 1 includes two cement boards 11 connected by two connecting beams 12. The two connecting beams 12 are provided with A grooves 13 for placing transverse steel bars, and the middle of the connecting beams 12 is provided with holes 14 for inserting longitudinal steel bars. Installation positions are reserved on the wall panel 1 for the transverse steel bars and the longitudinal steel bars, and the steel bars are used to strengthen the strength of the wall.

[0020] The top and bottom ends of the two cement boards 11 are both L-shaped, and the top end of the cement board 11 is L-shaped outward, while the bottom end of the cement board 11 is L-shaped inward. The two cement boards 11 are clamped together, so that the upper and lower wall panels 1 are convenient to connect and not easy to fall off.

[0021] Two protrusions 15 are installed on the top of the cement board 11, and two B grooves 16 corresponding to the protrusions 15 are opened at the bottom of the cement board 11, which is convenient for positioning during the laying process of the wall panel 1 and can make the connecting beams 12 in the same plane, facilitating the insertion of steel bars.

[0022] During the staggered laying process of the wall panel 1, the connecting beam 12 is always aligned up and down, and the B groove 16 at the bottom of the upper cement board 11 is stuck in the protrusion 15 at the top of the lower cement board 11, which facilitates the laying of the wall panel 1. Each time the wall panel 1 is laid, a staggered method is adopted.

[0023] There is a gap between the connecting beam 12 and the top and bottom ends of the cement board 11, so that the poured concrete can flow through the gap between the connecting beams 12, so that the concrete can flow in the wall composed of the wall panels 1 to complete the filling. An expansion agent or a contraction agent needs to be added to the concrete to prevent the concrete from expanding and contracting, and curing is carried out to avoid problems during the concrete solidification process.

[0024] The above embodiments are only exemplary embodiments of the present invention and are not intended to limit the present invention. The protection scope of the present invention is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present invention, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.

Claims

1. An assembled building wall structure, characterized in that: A wall body is formed by splicing a plurality of sets of wall panels (1), wherein transverse steel bars and longitudinal steel bars are laid between the wall panels (1) and cement is poured; The wall panel (1) comprises two cement boards (11) connected by two connecting beams (12), the two connecting beams (12) are provided with A grooves (13) for placing transverse steel bars, and the middle of the connecting beams (12) is provided with holes (14) for inserting longitudinal steel bars; The top and bottom ends of the two cement boards (11) are both L-shaped, and the top end of the cement board (11) is L-shaped outward, while the bottom end of the cement board (11) is L-shaped inward, and the two cement boards (11) are mutually clamped.

2. The assembled building wall structure according to claim 1, characterized in that: Two protrusions (15) are installed on the top of the cement board (11), and two B grooves (16) corresponding to the protrusions (15) are provided on the bottom of the cement board (11).

3. The assembled building wall structure according to claim 2, characterized in that: During the staggered laying process of the wall panels (1), the connecting beams (12) are always aligned vertically, and the B grooves (16) at the bottom of the upper cement board (11) are stuck in the protrusions (15) at the top of the lower cement board (11).

4. The assembled building wall structure according to claim 1, characterized in that: There is a gap between the connection beam (12) and the top and bottom ends of the cement board (11).