Construction engineering building climbing frame

By integrating automatic cleaning systems and fast disassembly supporting parts on the building climbing racks, the cumbersome problems of sand and dust accumulation and support of supporting parts in traditional building climbing racks have been solved, and the efficient and safe construction process is achieved.

CN222413970UActive Publication Date: 2025-01-28GUIZHOU SHENGRUI ENGINEERING MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420524632.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2025-01-28
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

The construction climbing frames used in traditional construction projects have problems such as dust accumulation and cumbersome installation of support parts during the construction process, which increases the labor volume and construction complexity.

Method used

A building climbing rack is designed with an automatic cleaning system and a fast -moving supporting parts structure. The automatic cleaning system moves through the drive motor and air pump drive wire rope, and the dust and impurities on the headboard are sucking the headboard. Quickly disassemble the supporting parts through the design of fastening bolts and limited tanks to achieve fast installation and demolition.

Benefits of technology

The automatic cleaning of unspley operation was achieved, reducing the amount of labor, and simplifying the construction process by quickly disassembling supporting parts, improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222413970U_ABST
    Figure CN222413970U_ABST
Patent Text Reader

Abstract

The utility model provides a building climbing frame for constructional engineering. The building engineering building climbing frame comprises a walkway plate, vertical keels are connected to the left side and the right side of the walkway plate in a front-back symmetry mode through bolts, a fixing frame is arranged between every two adjacent vertical keels, an inclined support and a zigzag support are connected to the interior of each fixing frame, and a plurality of through grooves are longitudinally distributed in the surface of each fixing frame; the upper sides of the through grooves communicate with limiting grooves, a plurality of limiting pieces are welded to the surfaces of the side walls, close to each other, of the two vertical keels, the number of the limiting pieces is matched with the number of the through grooves, threaded holes are formed in the edge of the surface of the fixing frame, and the surfaces of the vertical keels are in threaded connection with fastening bolts. The building climbing frame for the constructional engineering has the advantages that the vertical keel supporting piece is convenient to disassemble and assemble, and the walkway plate can be automatically cleaned.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction engineering, in particular to a construction engineering building climbing frame. Background Art

[0002] The construction industry is an industry that revolves around the design, construction, decoration and management of buildings. Urban buildings are an important part of the city, and buildings are not just man-made works for people to stay, rest, and entertain themselves. They are closely related to our economy, culture and life in a large way. During the construction process, climbing frames are usually built outside the walls of the building to assist workers in their work and the transportation of building materials. The height of the climbing frames will increase as the height of the building gradually increases.

[0003] However, traditional construction climbing frames for construction projects still have certain shortcomings: first, construction and the movement of people often cause a lot of dust to accumulate on the walkway boards. Traditionally, these impurities are cleaned regularly by workers, which increases the workload and is not easy to clean. Secondly, inclined supports and zigzag supports are generally required to be installed between each set of vertical purlins on both sides of the climbing frame to ensure structural stability, but the installation is cumbersome and inconvenient for disassembly after the subsequent construction is completed.

[0004] Therefore, it is necessary to provide a new construction engineering building climbing frame to solve the above-mentioned technical problems. Utility Model Content

[0005] The technical problem solved by the utility model is to provide a construction engineering building climbing frame which has a vertical keel support which is convenient to disassemble and assemble and can automatically clean the walkway plate.

[0006] In order to solve the above technical problems, the utility model provides a construction engineering building climbing frame including: a walkway plate, the left and right sides of the walkway plate are symmetrically connected with vertical keels by bolts, a fixing frame is arranged between two adjacent vertical keels, the interior of the fixing frame is connected with an oblique support and a zigzag support, a plurality of through grooves are longitudinally distributed on the surface of the fixing frame, the upper side of the through grooves is connected to a limiting groove, a plurality of limiting members are welded on the surface of a side wall relatively close to two groups of vertical keels, the number of the limiting members matches the number of the through grooves, a threaded hole is opened at the edge position of the surface of the fixing frame, and the surface of the vertical keels is provided with a threaded hole. A fastening bolt is threadedly connected, and the end of the fastening bolt is threadedly connected to the threaded hole, and the surfaces of the vertical keels on both sides are connected to support frames by bolts, and the support frames are located on the upper side of the walkway board. The surfaces of the two support frames are rotatably connected to wire wheels, and a wire rope is connected between the two wire wheels. A driving motor is installed on the surface of the wire wheel on one side, and a mounting seat is fixedly connected to one side of the surface of the wire rope, the top of the mounting seat is connected to a collecting box by bolts, and the bottom of the mounting seat is symmetrically connected to suction heads, an air intake pipe is connected between the suction head and the collecting box, and an air pump is installed on the surface of the air intake pipe.

[0007] As a further solution of the utility model, a slide groove is provided on the upper surface of the support frame, a slider is slidably connected inside the slide groove, and a fixing piece is connected between the surface of the slider and the mounting seat.

[0008] Through the above technical solution, a lot of dust often accumulates on the walkway board due to construction and the movement of people. At this time, the drive motor and the air pump can be operated, and the drive motor drives the rope between the two wire wheels to move. The mounting base installed on the rope will also move synchronously above the walkway board. By setting a slider on the support frame and fixing the mounting base with a fixing part, the mounting base can maintain stable horizontal lateral movement. At the same time, the two sets of suction heads in the structure will absorb the dust and other impurities on the walkway board into the collection box, so that no manual operation is required. In addition, the support in the structure is split into two halves, which is convenient for later disassembly or installation on the walkway boards of other floors.

[0009] As a further solution of the utility model, a first protective net and a second protective net are respectively connected between the plurality of vertical keels by bolts.

[0010] Through the above technical solution, the first protective net and the second protective net are set to seal the area of ​​the walkway board close to the outside, so as to prevent workers from falling from a height accidentally while working.

[0011] As a further solution of the utility model, a track is connected to the surface of the walkway plate on one side of the second protective net by bolts, and two tracks are symmetrically arranged on the left and right. A fall arrester is arranged at one side of the track, and a mounting part is welded on the surface of the fall arrester.

[0012] Through the above technical solution, the climbing frame is hoisted by installing an external electric hoist on the wall, so that the height of the climbing frame can be continuously adjusted as the construction progresses. The fall arrester arranged on one side of the track can prevent the climbing frame from falling down due to a hoisting failure, thereby achieving a safety protection effect.

[0013] As a further solution of the utility model, the surface of the walkway board between the track and the vertical keel is rotatably connected with a second flap, and the surface of the walkway board between the two tracks is rotatably connected with a first flap.

[0014] Through the above technical solution, the first flap and the second flap are provided so that the walkway plate can be docked with the floor of the building on one side, making it convenient for workers to enter and exit work.

[0015] As a further solution of the utility model, a filter screen is installed at one side of the top of the collection box, and a sealing door is connected to the surface of the collection box on one side of the filter screen through a hinge.

[0016] Through the above technical solution, a filter can be set up to exhaust the air and store impurities inside the collection box, and a sealed door can be set up on it so that workers can open it regularly to clean the inside.

[0017] As a further solution of the utility model, ear plates are welded on the relatively close side wall surfaces of the two support frames, and a limiting bolt is connected between the two ear plates.

[0018] Through the above technical solution, the device splits the support frame into two groups, which is convenient for subsequent disassembly, assembly and transportation, and the structural design is convenient for workers to operate.

[0019] Compared with the related art, the construction engineering building climbing frame provided by the utility model has the following beneficial effects:

[0020] 1. In the utility model, due to construction and the movement of people, a lot of sand and dust often accumulates on the walkway board. At this time, the drive motor and the air pump can be operated, and the drive motor drives the rope between the two wire wheels to move, and the mounting seat installed on the rope will also move synchronously above the walkway board. By arranging a slider on the support frame and fixing the mounting seat with a fixing piece, the mounting seat can maintain stable horizontal lateral movement. At the same time, the two groups of suction heads in the structure will absorb the dust and other impurities on the walkway board into the collection box, so that no manual operation is required. In addition, the support member in the structure is split into two halves, which is convenient for later disassembly or installation on the walkway board of other floors;

[0021] 2. In the utility model, the support assembly supporting the two vertical purlins in the device can be effectively installed only by two fastening bolts. When the worker operates, first connect the vertical purlin on one side with the walkway board, then insert the through slot on the fixing frame into the limit piece, and move it downward until the limit piece enters the limit slot, and then install the vertical purlin on the other side, and use the fastening bolts to fix the fixing frame to the vertical purlin, so that the support assembly can be quickly installed, and it is also very convenient to dismantle after the construction is completed. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings.

[0023] Figure 1 It is a schematic diagram of the overall structure of a construction engineering building climbing frame in the utility model;

[0024] Figure 2 A schematic diagram of the local structure of a construction engineering climbing frame in the utility model Figure 1 ;

[0025] Figure 3 A schematic diagram of the local structure of a construction engineering climbing frame in the utility model Figure 2 ;

[0026] Figure 4 It is a schematic diagram of the partial structural disassembly of a construction engineering building climbing frame in the utility model.

[0027] Description of main symbols:

[0028] 1. Walkway board; 2. Vertical keel; 3. First flap; 4. Second flap; 5. Mounting piece; 6. Fall arrester; 7. First protective net; 8. Second protective net; 9. Track; 10. Support frame; 11. Slide; 12. Wire wheel; 13. Oblique support; 14. Zigzag support; 15. Fixed frame; 16. Wire rope; 17. Driving motor; 18. Collection box; 19. Air pump; 20. Suction head; 21. Mounting seat; 22. Fixing piece; 23. Sliding block; 24. Through slot; 25. Limiting slot; 26. Threaded hole; 27. Fastening bolt; 28. Limiting piece. DETAILED DESCRIPTION

[0029] Please combine Figures 1 to 4 ,in, Figure 1 It is a schematic diagram of the overall structure of a construction engineering building climbing frame in the utility model; Figure 2 A schematic diagram of the local structure of a construction engineering climbing frame in the utility model Figure 1 ; Figure 3 A schematic diagram of the local structure of a construction engineering climbing frame in the utility model Figure 2 ; Figure 4 The following is a schematic diagram of the partial structure of a construction engineering building climbing frame in the utility model. A construction engineering building climbing frame includes:

[0030] The walkway board 1 has vertical keels 2 symmetrically connected to the left and right sides of the walkway board 1 by bolts, a fixing frame 15 is arranged between two adjacent vertical keels 2, the inside of the fixing frame 15 is connected with an oblique support 13 and a zigzag support 14, a plurality of through grooves 24 are longitudinally distributed on the surface of the fixing frame 15, the upper side of the through grooves 24 is connected with the limiting groove 25, a plurality of limiting members 28 are welded on the surface of the side wall where the two groups of vertical keels 2 are relatively close, the number of the limiting members 28 matches the number of the through grooves 24, a threaded hole 26 is opened at the edge position of the surface of the fixing frame 15, and a fastening bolt 27 is threadedly connected to the surface of the vertical keel 2, and the fastening bolt 27 The ends are threadedly connected with the threaded holes 26, and the surfaces of the vertical keels 2 on both sides are connected with support frames 10 by bolts. The support frames 10 are located on the upper side of the walkway board 1, and the surfaces of the two support frames 10 are rotatably connected with wire wheels 12, and a wire rope 16 is connected between the two wire wheels 12. A driving motor 17 is installed on the surface of the wire wheel 12 on one side, and a mounting seat 21 is fixedly connected to one side of the surface of the wire rope 16. The top of the mounting seat 21 is connected with a collecting box 18 by bolts, and the bottom of the mounting seat 21 is symmetrically connected with a suction head 20, and an air intake pipe is connected between the suction head 20 and the collecting box 18, and an air pump 19 is installed on the surface of the air intake pipe.

[0031] like Figure 1-4 As shown, a slide groove 11 is provided on the upper surface of the support frame 10 , a slider 23 is slidably connected inside the slide groove 11 , and a fixing member 22 is connected between the surface of the slider 23 and the mounting seat 21 .

[0032] Due to construction and the movement of people, a lot of dust often accumulates on the walkway board 1. At this time, the drive motor 17 and the air pump 19 can be operated. The drive motor 17 drives the rope 16 between the two wire wheels 12 to move, and the mounting seat 21 installed on the rope 16 will also move synchronously above the walkway board 1. By arranging a slider 23 on the support frame 10 and fixing the mounting seat 21 with a fixing member 22, the mounting seat 21 can maintain stable horizontal lateral movement. At the same time, the two groups of suction heads 20 in the structure will absorb the dust and other impurities on the walkway board 1 into the collection box 18, so that no manual operation is required. In addition, the support member in the structure is split into two halves, which is convenient for later disassembly or installation on the walkway board 1 on other floors.

[0033] like Figure 1-4 As shown, a first protection net 7 and a second protection net 8 are respectively connected between the plurality of vertical keels 2 by bolts.

[0034] The first protection net 7 and the second protection net 8 are arranged to seal the area of ​​the walkway board 1 close to the outside, so as to prevent workers from falling from a height accidentally while working.

[0035] like Figure 1-4 As shown, the surface of the walkway plate 1 on one side of the second protective net 8 is connected with a track 9 by bolts, and two tracks 9 are symmetrically arranged on the left and right. A fall arrester 6 is arranged at one side of the track 9, and a mounting part 5 is welded on the surface of the fall arrester 6.

[0036] The climbing frame is hoisted by installing an external electric hoist on the wall, so that the height of the climbing frame can be continuously adjusted as the construction progresses. The fall arrester 6 arranged on one side of the track 9 can prevent the climbing frame from falling down due to a hoisting failure, thereby achieving a safety protection effect.

[0037] like Figure 1-4 As shown, the surface of the walkway board 1 between the track 9 and the vertical keel 2 is rotatably connected with the second flap 4, and the surface of the walkway board 1 between the two tracks 9 is rotatably connected with the first flap 3.

[0038] The first flap 3 and the second flap 4 are provided so that the walkway plate 1 can be docked with the floor of the building on one side, making it convenient for workers to enter and exit the work.

[0039] like Figure 1-4 As shown, a filter screen is installed at one side of the top of the collection box 18, and a sealing door is connected to the surface of the collection box 18 located at one side of the filter screen through a hinge.

[0040] The filter screen can be provided to exhaust the air and store the impurities in the collecting box 18, and the sealing door can be provided on it so that the workers can open it regularly to clean the inside.

[0041] like Figure 1-4 As shown, ear plates are welded on the relatively close side wall surfaces of the two support frames 10, and limiting bolts are connected between the two ear plates.

[0042] The device splits the support frame 10 into two groups, which is convenient for subsequent disassembly, assembly and transportation, and the structural design is convenient for workers to operate.

[0043] The working principle of a construction engineering building climbing frame provided by the utility model is as follows:

[0044] Step 1: Due to construction and movement of people, a lot of sand and dust often accumulates on the walkway board 1. At this time, the drive motor 17 and the air pump 19 can be operated. The drive motor 17 drives the rope 16 between the two wire wheels 12 to move, and the mounting seat 21 installed on the rope 16 will also move synchronously above the walkway board 1. By arranging a slider 23 on the support frame 10 and fixing the mounting seat 21 with a fixing member 22, the mounting seat 21 can maintain stable horizontal lateral movement. At the same time, the two groups of suction heads 20 in the structure will absorb the dust and other impurities on the walkway board 1 into the collection box 18, so that no manual operation is required. In addition, the support member in the structure is split into two halves, which is convenient for later disassembly or installation on the walkway board 1 on other floors;

[0045] The second step: the support assembly supporting the two vertical purlins 2 in the device can be effectively installed only by two fastening bolts 27. When the worker operates, first connect the vertical purlin 2 on one side to the walkway board 1, then insert the through groove 24 on the fixing frame 15 into the limit piece 28, and move it downward until the limit piece 28 enters the limit groove 25, then install the vertical purlin 2 on the other side, and use the fastening bolts 27 to fix the fixing frame 15 to the vertical purlin 2, so that the support assembly can be quickly installed, and it is also very convenient to dismantle after the construction is completed.

[0046] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above utility model, the details of the power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by the technical personnel in this field;

[0047] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.

[0048] Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations or direct or indirect applications may be made to these embodiments without departing from the principles and spirit of the present invention. In other related technical fields, the scope of the present invention is defined by the attached claims and their equivalents, which are equally included in the scope of patent protection of the present invention.

Claims

1. A construction engineering building climbing frame, characterized in that: The invention comprises a walkway plate (1), wherein both left and right sides of the walkway plate (1) are symmetrically connected to vertical keels (2) by bolts, a fixing frame (15) is arranged between two adjacent vertical keels (2), the inside of the fixing frame (15) is connected to an inclined support (13) and a zigzag support (14), a plurality of through grooves (24) are longitudinally distributed on the surface of the fixing frame (15), the upper side of the through grooves (24) is connected to a limiting groove (25), a plurality of limiting members (28) are welded to the surface of a side wall of two groups of vertical keels (2) that are relatively close to each other, the number of the limiting members (28) matches the number of the through grooves (24), a threaded hole (26) is opened at the edge position of the surface of the fixing frame (15), a fastening bolt (27) is threadedly connected to the surface of the vertical keel (2), and the fastening bolt (27) is fastened to the surface of the vertical keel (2). 7) is threadedly connected between the end portion and the threaded hole (26), the surfaces of the vertical keels (2) on both sides are connected to support frames (10) by bolts, the support frames (10) are located on the upper side of the walkway board (1), the surfaces of the two support frames (10) are rotatably connected to wire wheels (12), a wire rope (16) is connected between the two wire wheels (12), a driving motor (17) is installed on the surface of the wire wheel (12) on one side, a mounting seat (21) is fixedly connected to one side of the surface of the wire rope (16), the top of the mounting seat (21) is connected to a collection box (18) by bolts, the bottom of the mounting seat (21) is symmetrically connected to a suction head (20), an air intake pipe is connected between the suction head (20) and the collection box (18), and an air pump (19) is installed on the surface of the air intake pipe.

2. The construction engineering building climbing frame according to claim 1, characterized in that: The upper surface of the support frame (10) is provided with a slide groove (11), the interior of the slide groove (11) is slidably connected with a slider (23), and a fixing member (22) is connected between the surface of the slider (23) and the mounting seat (21).

3. The construction engineering building climbing frame according to claim 1, characterized in that: A first protective net (7) and a second protective net (8) are respectively connected between the plurality of vertical keels (2) via bolts.

4. The construction engineering building climbing frame according to claim 3, characterized in that: A track (9) is connected to the surface of the walkway plate (1) on one side of the second protective net (8) by bolts, and two tracks (9) are symmetrically arranged on the left and right. A fall arrester (6) is arranged at a position on one side of the track (9), and a mounting part (5) is welded on the surface of the fall arrester (6).

5. The construction engineering building climbing frame according to claim 4, characterized in that: The surface of the walkway board (1) between the track (9) and the vertical keel (2) is rotatably connected to a second flap (4), and the surface of the walkway board (1) between the two tracks (9) is rotatably connected to a first flap (3).

6. The construction engineering building climbing frame according to claim 1, characterized in that: A filter screen is installed at one side of the top of the collection box (18), and a sealing door is connected to the surface of the collection box (18) located on one side of the filter screen via a hinge.

7. The construction engineering building climbing frame according to claim 1, characterized in that: A lug plate is welded on the relatively close side wall surfaces of the two support frames (10), and a limiting bolt is connected between the two lug plates.