Bucket structure of excavator for cleaning soil in foundation pit

By designing the bucket structure separated by hydraulic telescopic rods and the anti-adhesion device of soil cleaning chain, the problem of the excavator's inability to quickly replace the bucket and stick to the clay soil during foundation pit excavation is solved, and the excavation efficiency and the service life of the bucket are improved.

CN222456212UActive Publication Date: 2025-02-11JINING HECHANG MACHINERY MANUFACTURING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420904598.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2025-02-11
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

During the excavator's foundation pit excavation process, the bucket cannot be replaced quickly, and the clay soil at the bottom of the foundation pit is easily stuck in the bucket, affecting the capacity and use efficiency of the bucket.

Method used

An excavator bucket structure for foundation pit clearing soil is designed, and the bucket gear is separated or combined with the bucket through hydraulic telescopic rods to facilitate foundation pit excavation and residual soil cleaning. At the same time, the soil cleaning chain in the bucket can prevent the soil from being too close to the inner wall of the bucket, avoid vacuum formation, and promote soil separation.

Benefits of technology

It realizes rapid bucket replacement and effective cleaning of clay soil, improving excavation efficiency and bucket service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222456212U_ABST
    Figure CN222456212U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of excavator buckets, and discloses an excavator bucket structure for foundation pit soil cleaning, which comprises an excavator bucket and a bucket frame, fixing blocks are fixedly connected to the left side and the right side of the outer side of the excavator bucket, and fixing holes are formed in the front upper portion and the rear lower portion of the left side of each fixing block. Adjusting seats are fixedly connected to the positions, close to the left side and the right side, of the middle of the top end of the excavator bucket, fixed seat rings are fixedly connected to the top ends of the adjusting seats, fixed shafts are arranged in the fixed seat rings, and telescopic rod fixing seats are fixedly connected to the positions, close to the left side and the right side, of the middle of the rear end of the excavator bucket. When the bucket tooth frame and the bucket are separated, residual soil at the bottom of the foundation pit is convenient to clean, the loose chain in the bucket can prevent soil from being attached to the inner wall of the bucket too tightly, gaps are reserved between the soil and the wall of the bucket, vacuum is prevented from being formed in the bucket, and the soil can be conveniently separated from the wall of the bucket.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of excavator buckets, in particular to an excavator bucket structure used for clearing soil in a foundation pit. Background Art

[0002] An excavator, also known as a backhoe, is an earth-moving machine that uses a bucket to dig materials above or below the bearing surface and load them into a transport vehicle or unload them to a stockpile. The materials excavated by the excavator are mainly soil, coal, silt, and pre-loose soil and rock. From the development of engineering machinery in recent years, the development of excavators is relatively fast, and excavators have become one of the most important engineering machinery in engineering construction. The three most important parameters of an excavator are operating weight (mass), engine power, and bucket capacity. The bucket refers to the bucket installed on the excavator, also called a digging bucket. According to the working mode, it is divided into a backhoe bucket and a front shovel bucket. The backhoe bucket is generally used. The bucket is a structural product, which is composed of a tooth seat plate, a bottom plate, a side plate, a wall plate, a hanging ear plate, a back plate, a bucket ear plate, a bucket ear sleeve, bucket teeth, a tooth seat, a guard plate or a bucket angle and other parts and components, so welding is the most critical manufacturing process of the bucket, and the welding quality directly affects the structural strength and service life of the bucket.

[0003] The bucket of the excavator is installed during excavation for excavation of foundation pits. After the excavation of the foundation pit is completed, the tool plate cannot contact the ground of the foundation pit due to the bucket teeth, so that the soil remaining on the bottom of the foundation pit needs to be cleaned manually. If mechanical cleaning is required, the driver needs to replace the bucket again, which is a cumbersome and time-consuming process. When the excavator is excavating the foundation pit, the soil at the bottom of the foundation pit is relatively humid, resulting in high soil viscosity and arbitrary adhesion in the bucket, affecting the capacity of the bucket and needing to be cleared, but manual cleaning is time-consuming and inefficient. Utility Model Content

[0004] In order to make up for the above shortcomings, the utility model provides a bucket structure of an excavator for clearing foundation pits, aiming to improve the problems that the bucket of the original excavator cannot be quickly replaced during foundation pit excavation and the sticky soil at the bottom of the foundation pit sticks to the bucket.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a bucket structure of an excavator for clearing soil in a foundation pit, comprising an excavator bucket and a bucket frame, wherein the outer side left and right sides of the excavator bucket are fixedly connected with fixing blocks, the left front upper part and the rear lower part of the fixing block are both provided with fixing holes, the middle left and right sides of the top of the excavator bucket are fixedly connected with an adjustment seat, the top of the adjustment seat is fixedly connected with a fixed seat ring, a fixed shaft is arranged inside the fixed seat ring, the middle left and right sides of the rear end of the excavator bucket are fixedly connected with a telescopic rod fixing seat, the middle left and right sides of the top of the bucket frame are fixedly connected with a bucket adjustment seat The whole frame, the middle and lower part of the front end of the bucket frame is fixedly connected with a fixing block, the bottom of the front end of the bucket frame is fixedly connected with a bucket tooth frame, a telescopic hole is opened on the upper left side of the bucket adjustment frame, a telescopic shaft is arranged in the telescopic hole, a telescopic rod fixing ring is arranged in the middle part of the outer side of the telescopic shaft, a telescopic inner rod is fixedly connected to the lower end of the telescopic rod fixing ring, a telescopic outer column is slidably connected to the outer side of the telescopic inner rod, a telescopic rod fixing ring is fixedly connected to the bottom end of the telescopic outer column, and soil cleaning lifting rings are fixedly connected to the left and right middle parts and left and right sides of the bottom end of the bucket frame, a connecting buckle is arranged in the soil cleaning lifting ring, and a soil cleaning chain is fixedly connected to the bottom end of the connecting buckle.

[0006] Furthermore, a bucket moving seat is fixedly connected to the middle of the left and right sides of the top of the excavator bucket, and a bucket moving shaft is arranged in the middle of the left side of the bucket moving seat.

[0007] Furthermore, a bucket receiving seat is fixedly connected to the middle of the left and right rear ends of the excavator bucket, and a bucket receiving shaft is arranged in the middle of the left side of the bucket receiving seat.

[0008] Furthermore, a telescopic rod fixing pin is arranged in the telescopic rod fixing ring.

[0009] Furthermore, a bucket frame fixing hole is provided at the lower left side of the bucket adjustment frame.

[0010] Furthermore, a plurality of earth-moving bucket teeth are evenly and fixedly connected to the top of the bucket tooth frame.

[0011] Furthermore, a telescopic rod fixing ring is fixedly connected to the top end of the telescopic rod fixing seat.

[0012] Furthermore, a fixing bolt is arranged in the fixing hole, and a fixing nut is threadedly connected to the left side of the fixing bolt.

[0013] Through the above technical solution, the utility model has the following beneficial effects:

[0014] 1. In the utility model, the bucket teeth on the bucket are separated from the bucket, and the bucket teeth are installed on the bucket tooth frame. The bucket tooth frame and the bucket are separated or combined by a hydraulic telescopic rod. When the bucket tooth frame and the bucket are combined, it is convenient to excavate the foundation pit. When the bucket tooth frame and the bucket are separated, it is convenient to clean the residual soil at the bottom of the foundation pit.

[0015] 2. In the utility model, when the bucket is shoveling mud, the loose chain in the bucket can prevent the mud from being too tightly attached to the inner wall of the bucket, leaving some gaps between the mud and the bucket wall to avoid vacuum formation inside. When the bucket is throwing mud, the mud can easily fall off the bucket wall because the negative pressure is destroyed by the gap in the middle. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is an overall structural diagram of a bucket structure of an excavator for clearing soil in a foundation pit proposed by the utility model;

[0017] Figure 2 A partial structural diagram of a bucket frame of a bucket structure of an excavator for clearing soil in a foundation pit proposed by the utility model;

[0018] Figure 3 A partial structural diagram of a bucket of an excavator bucket structure for clearing soil in a foundation pit proposed by the utility model;

[0019] Figure 4 A partial structural diagram of a telescopic rod of a bucket structure of an excavator for clearing soil in a foundation pit proposed by the utility model;

[0020] Figure 5 for Figure 2 Enlarged view of point A in the middle;

[0021] Figure 6 for Figure 2 Enlarged view of point B in the middle;

[0022] Figure 7 for Figure 2 Enlarged view of center C.

[0023] Legend:

[0024] 1. Excavator bucket; 2. Bucket moving seat; 3. Bucket retracting seat; 4. Bucket moving shaft; 5. Bucket retracting shaft; 6. Earth-moving bucket teeth; 7. Bucket frame; 8. Bucket tooth frame; 9. Bucket adjustment frame; 10. Adjustment seat; 11. Fixed seat ring; 12. Fixed shaft; 13. Bucket frame fixed hole; 14. Telescopic shaft; 15. Telescopic hole; 16. Telescopic inner rod; 17. Telescopic outer column; 18. Telescopic rod fixing ring; 19. Telescopic rod fixing seat; 20. Telescopic rod fixing pin; 21. Soil cleaning chain; 22. Soil cleaning lifting ring; 23. Connecting buckle; 24. Fixing block; 25. Fixing hole; 26. Fixing bolt; 27. Fixing nut. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] Reference Figure 1-Figure 7 The utility model provides an embodiment: a bucket structure of an excavator for clearing soil in a foundation pit, including an excavator bucket 1 and a bucket frame 7. The outer left and right sides of the excavator bucket 1 are fixedly connected with fixed blocks 24. The left front upper part and the rear lower part of the fixed block 24 are both provided with fixing holes 25. The middle of the top of the excavator bucket 1 is fixedly connected to the left and right sides. The top of the adjusting seat 10 is fixedly connected to a fixed seat ring 11. The fixed seat ring 11 is provided with a fixed shaft 12 inside. The middle of the rear end of the excavator bucket 1 and the left and right sides are fixedly connected to a telescopic rod fixing seat 19. The middle of the top of the bucket frame 7 and the left and right sides are fixedly connected to a bucket adjustment frame 9. The bucket frame 7 A fixing block 24 is fixedly connected to the middle and lower part of the front end, a bucket tooth frame 8 is fixedly connected to the bottom of the front end of the bucket frame 7, a telescopic hole 15 is opened on the upper left side of the bucket adjustment frame 9, a telescopic shaft 14 is arranged in the telescopic hole 15, a telescopic rod fixing ring 18 is arranged in the middle part of the outer side of the telescopic shaft 14, a telescopic inner rod 16 is fixedly connected to the lower end of the telescopic rod fixing ring 18, a telescopic outer column 17 is slidably connected to the outer side of the telescopic inner rod 16, and the bottom end of the telescopic outer column 17 is fixedly connected to the telescopic rod fixing ring 18, and a soil cleaning lifting ring 22 is fixedly connected to the left and right sides of the middle of the bottom end of the bucket frame 7, a connecting buckle 23 is arranged in the soil cleaning lifting ring 22, and a soil cleaning chain 21 is fixedly connected to the bottom end of the connecting buckle 23.

[0027] After the foundation pit is basically excavated and formed, it is necessary to clean the residual soil at the bottom of the foundation pit. At this time, the fixing bolts 26 and fixing nuts 27 of the fixing blocks 24 on the excavator bucket 1 and the bucket frame 7 are removed, the telescopic inner rod 16 is retracted into the telescopic outer column 17, the bucket frame 7 is raised, and the tool plate of the excavator bucket 1 is exposed, so that the excavator can clean the residual soil at the bottom of the foundation pit. After the cleaning is completed, the telescopic inner rod 16 is extended into and out of the telescopic outer column 17, the bucket frame 7 is lowered, the bucket tooth frame 8 of the bucket frame 7 is combined with the tool plate of the excavator bucket 1, and the fixing bolts 26 and fixing nuts 27 on the fixing block 24 are reinstalled and tightened, which does not affect the excavator bucket 1 in performing other earthwork construction.

[0028] The top of the excavator bucket 1 is fixedly connected to a bucket moving seat 2 at the middle of the left and right sides, and a bucket moving shaft 4 is arranged in the middle of the left side of the bucket moving seat 2. The rear end of the excavator bucket 1 is fixedly connected to a bucket receiving seat 3 at the middle of the left side of the bucket receiving seat 3. A bucket receiving shaft 5 is arranged in the middle of the left side of the bucket receiving seat 3. A telescopic rod fixing pin 20 is arranged in the telescopic rod fixing ring 18. A bucket frame fixing hole 13 is opened in the lower left part of the bucket adjustment frame 9. A plurality of earth-moving bucket teeth 6 are evenly fixedly connected to the top of the bucket tooth frame 8. A telescopic rod fixing ring 18 is fixedly connected to the top of the telescopic rod fixing seat 19. A fixing bolt 26 is arranged in the fixing hole 25, and a fixing nut 27 is threadedly connected to the left side of the fixing bolt 26.

[0029] When the driver is excavating the foundation pit, he needs to remove the bucket moving shaft 4 and the bucket receiving shaft 5 of the bucket moving seat 2 and the bucket receiving seat 3, move the arm of the excavator to the position of the bucket moving seat 2 and the bucket receiving seat 3, and then install the bucket moving shaft 4 and the bucket receiving shaft 5 at the position of the bucket moving seat 2 and the bucket receiving seat 3 and fix them. The driver operates the excavator to excavate the foundation pit. In the early stage of excavation, the soil cleaning chain 21 is untied from the soil cleaning ring 22. When the foundation pit is When digging to the lower layer, the soil has high moisture and high viscosity. At this time, the sticky soil will adhere to the excavator bucket 1. The soil cleaning chain 21 is installed on the excavator bucket 1 through the connecting buckle 23. When the excavator bucket 1 shovels mud, the loose soil cleaning chain 21 can prevent the soil and the inner wall of the excavator bucket 1 from fitting too tightly, leaving some gaps between the soil and the bucket wall to avoid vacuum formation inside. When the excavator bucket 1 throws mud, the negative pressure is destroyed by the gap in the middle, and the soil can easily fall off the bucket wall.

[0030] Working principle: When the driver is excavating the foundation pit, he needs to remove the bucket moving shaft 4 and the bucket receiving shaft 5 of the bucket moving seat 2 and the bucket receiving seat 3, move the excavator's arm to the position of the bucket moving seat 2 and the bucket receiving seat 3, and then install the bucket moving shaft 4 and the bucket receiving shaft 5 at the position of the bucket moving seat 2 and the bucket receiving seat 3 and fix them. The driver operates the excavator to excavate the foundation pit. During the early excavation, the soil cleaning chain 21 is untied from the soil cleaning ring 22. When the foundation pit is dug to the lower layer, the soil has high moisture and high viscosity. At this time, the sticky soil will adhere to the excavator bucket 1. The soil cleaning chain 21 is installed on the excavator bucket 1 through the connecting buckle 23. When the excavator bucket 1 is shoveling mud, the loose soil cleaning chain 21 can prevent the soil from fitting too tightly to the inner wall of the excavator bucket 1. Some gaps are left in between to avoid vacuum formation inside. When the excavator bucket 1 throws mud, the negative pressure is destroyed by the gap in the middle, and the mud can easily fall off the bucket wall. After the foundation pit is basically excavated and formed, the residual soil at the bottom of the foundation pit needs to be cleaned. At this time, the fixing bolts 26 and fixing nuts 27 of the fixing blocks 24 on the excavator bucket 1 and the bucket frame 7 are removed, and the telescopic inner rod 16 is retracted into the telescopic outer column 17, and the bucket frame 7 is raised to expose the tool plate of the excavator bucket 1, so that the excavator can clean the residual soil at the bottom of the foundation pit. After the cleaning is completed, the telescopic inner rod 16 extends toward and from the telescopic outer column 17, the bucket frame 7 is lowered, and the bucket tooth frame 8 of the bucket frame 7 is combined with the tool plate of the excavator bucket 1. After the fixing bolts 26 and fixing nuts 27 on the fixing block 24 are reinstalled and tightened, the excavator bucket 1 will not be affected from carrying out other earthwork construction.

[0031] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A bucket structure of an excavator for clearing foundation pits, comprising an excavator bucket (1) and a bucket frame (7), characterized in that: The outer side of the excavator bucket (1) is fixedly connected with a fixing block (24) on both sides, and the fixing block (24) is provided with a fixing hole (25) on the left upper front part and the lower rear part. The top middle of the excavator bucket (1) is fixedly connected with an adjustment seat (10) on both sides, and the top of the adjustment seat (10) is fixedly connected with a fixed seat ring (11). A fixed shaft (12) is arranged inside the fixed seat ring (11). The rear end of the excavator bucket (1) is fixedly connected with a telescopic rod fixing seat (19) on both sides, and the top middle of the bucket frame (7) is fixedly connected with a bucket adjustment frame (9) on both sides. The middle of the front end of the bucket frame (7) is fixedly connected with a fixing block (24). The bottom of the front end of the bucket frame (7) is fixedly connected with a fixing block (24). A bucket tooth frame (8) is fixedly connected, a telescopic hole (15) is opened on the upper left side of the bucket adjustment frame (9), a telescopic shaft (14) is arranged in the telescopic hole (15), a telescopic rod fixing ring (18) is arranged in the middle of the outer side of the telescopic shaft (14), a telescopic inner rod (16) is fixedly connected to the lower end of the telescopic rod fixing ring (18), a telescopic outer column (17) is slidably connected to the outer side of the telescopic inner rod (16), the bottom end of the telescopic outer column (17) is fixedly connected to the telescopic rod fixing ring (18), and a soil cleaning lifting ring (22) is fixedly connected to the middle left and right sides of the bottom end of the bucket frame (7), a connecting buckle (23) is arranged in the soil cleaning lifting ring (22), and a soil cleaning chain (21) is fixedly connected to the bottom end of the connecting buckle (23).

2. The bucket structure of an excavator for clearing a foundation pit according to claim 1, characterized in that: The top of the excavator bucket (1) is fixedly connected to a bucket moving seat (2) at the middle of the left and right sides, and a bucket moving shaft (4) is arranged at the middle of the left side of the bucket moving seat (2).

3. The bucket structure of an excavator for clearing a foundation pit according to claim 1, characterized in that: The rear end of the excavator bucket (1) is fixedly connected to a bucket receiving seat (3) at the middle of the left and right sides, and a bucket receiving shaft (5) is arranged at the middle of the left side of the bucket receiving seat (3).

4. The bucket structure of an excavator for clearing a foundation pit according to claim 1, characterized in that: A telescopic rod fixing pin (20) is arranged inside the telescopic rod fixing ring (18).

5. The bucket structure of an excavator for clearing a foundation pit according to claim 1, characterized in that: A bucket frame fixing hole (13) is provided at the lower left side of the bucket adjustment frame (9).

6. The bucket structure of an excavator for clearing a foundation pit according to claim 1, characterized in that: A plurality of earth-moving bucket teeth (6) are evenly and fixedly connected to the top of the bucket tooth frame (8).

7. The bucket structure of an excavator for clearing a foundation pit according to claim 1, characterized in that: The top end of the telescopic rod fixing seat (19) is fixedly connected with a telescopic rod fixing ring (18).

8. The bucket structure of an excavator for clearing a foundation pit according to claim 1, characterized in that: A fixing bolt (26) is arranged in the fixing hole (25), and a fixing nut (27) is threadedly connected to the left side of the fixing bolt (26).