Auxiliary beam rib binding and beam protection layer construction device
By designing an auxiliary beam reinforcement binding and beam protective layer construction device, the efficient up and down movement of beam reinforcement is achieved using jacks and hydraulic systems, the problems of low efficiency and poor safety in the existing construction methods are solved, and the construction quality and safety are improved .
Patent Information
- Application Number
- CN202420610077.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-03-27
AI Technical Summary
In the existing construction methods, the beam reinforcement binding efficiency is low, and the operator needs to lift the beam for a long time, which leads to deformation of the steel beam and is difficult to ensure construction safety and quality.
Design an auxiliary beam reinforcement binding and beam protective layer construction device, including pushing structure and control structure, pushing structure to drive frame rods through jacks and brackets, and control structure controls the lifting and lowering of jacks through hydraulic systems to achieve efficient up and down movement of beam reinforcements.
The device improves the efficiency and safety of beam reinforcement binding, reduces manpower demand, ensures the construction quality of steel bar projects, and facilitates the multiple use of the device, reducing production costs.