Municipal construction fence

By designing a flexible assembled municipal construction fence, combined with the spray water pipe and pier structure, the existing fence has solved the problems of inconvenient operation, dust overflow and base layer damage in the heightening process, and achieved the effect of flexible adjustment, dust reduction and protection of the base layer. .

CN222457039UActive Publication Date: 2025-02-11曹永刚
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420198443.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-27
Publication Date
2025-02-11
Estimated Expiration
2034-01-27

AI Technical Summary

Technical Problem

The existing municipal construction fence is inconvenient to operate when raised, and cannot effectively block dust overflow. It is easy to damage the base structure and leave holes when demolished.

Method used

A municipal construction fence including columns, panels, piers and spray water pipes was designed. The columns were fixedly connected through intermediate connecting pieces. The plug grooves and convex edge structures were used to facilitate assembly and disassembly, and spray water pipes were installed on the top of the panel. To reduce dust, add a pier structure between the ground and the fence to avoid direct fixation and damage to the base layer.

Benefits of technology

It realizes flexible adjustment of the fence height, is convenient to operate, effectively prevents dust from overflowing, protects the environment, and avoids damage to the base structure during demolition, leaving no holes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222457039U_ABST
    Figure CN222457039U_ABST
Patent Text Reader

Abstract

The municipal construction fence comprises stand columns, a panel, a pier body and a spraying water pipe, the two stand columns are fixedly connected through a middle connecting piece, a top connecting base is installed at the top ends of the stand columns, a bottom connecting base is installed at the bottom ends of the stand columns, inserting grooves are formed in the two sides of each stand column, and the top ends of the inserting grooves are fixedly connected with the panel. One end of the panel is embedded into the inserting groove of the stand column on one side of the panel, and the other end of the panel is embedded into the inserting groove of the stand column on the other side of the panel. When the height of the whole fence is increased, only the number of the additionally arranged stand columns and the number of the additionally arranged baffles need to be increased, operation is convenient when the fence is heightened, the fence is suitable for different places, all the structures can be detached, and carrying and transferring are convenient; meanwhile, spraying is carried out through the spraying water pipe, so that dust falling is carried out; and the pier body structure is additionally arranged between the ground and the fence, so that an original base layer structure is not damaged, and no hole is left on the ground after the fence is removed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction enclosures, and specifically to a municipal construction enclosure. Background Art

[0002] Municipal construction fences are important safety facilities to protect the safety inside and outside the construction site. The installation of the fence must be completed before the construction of the project, with half of the road surface as the benchmark; the fence is mainly used in the construction and renovation of municipal infrastructure, new construction and expansion of landscaping, engineering rescue, building exterior decoration and renovation, people's livelihood security and other engineering construction.

[0003] The existing fence columns and panels are of fixed size. After assembly, the height of the entire fence is fixed, which makes it inconvenient to raise the fence. A large amount of dust will be generated during some municipal construction processes, and the fence cannot prevent the overflow of dust during the municipal construction process. The bottom of the fence columns are fixed directly to the ground with screws, which will destroy the original base structure. After the fence is dismantled, holes will be left on the ground. Utility Model Content

[0004] The purpose of this application is to provide a municipal construction enclosure to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above objectives, this application provides the following technical solutions:

[0006] The embodiment of the present application proposes a municipal construction fence, including columns, panels, piers and sprinkler pipes, two groups of the columns are fixedly connected by an intermediate connecting plate, the top of the column is installed with a top connecting base, the bottom end of the column is installed with a bottom connecting base, both sides of the column are provided with plug-in grooves, and one end of the panel is embedded in the plug-in groove of the column on one side, and the other end of the panel is embedded in the plug-in groove of the column on the other side.

[0007] As an implementation mode, connection holes are provided on the upper and lower sides of one side of the exterior of the column, a hole body is provided on the middle connection piece, and the middle connection piece is fixedly connected to the column by screws.

[0008] As an implementation mode, a through groove is provided on the top connecting base.

[0009] As an implementation manner, a first flange is provided on the top connection base, a hole is opened on the first flange, and the first flange of the top connection base is fixedly connected to the column by screws.

[0010] As an implementation manner, a second flange is provided on the bottom connection base, a hole is opened on the second flange, and the second flange of the bottom connection base is fixedly connected to the column by screws.

[0011] As an implementation mode, holes are opened at the corners of the bottom connection base, and the bottom connection base and the pier body are fixedly connected by screws.

[0012] As an implementation mode, reflective strips are provided on both the front end surface and the rear end surface of the pier body.

[0013] As an implementation manner, a warning light is installed on the top of the top connection base.

[0014] As an implementation manner, the spray water pipe is located at the top of the panel, and the spray water pipe passes through a through groove connected to the base at the top.

[0015] Compared with the prior art, the beneficial effects of this application are:

[0016] 1. When raising the height of the overall enclosure, the present application only requires the installation of additional columns and baffles. The operation of raising the enclosure is convenient. The enclosure is suitable for different places, and each structure can be disassembled for easy carrying and transportation.

[0017] 2. The spray water pipe of the present application connects the water pump and the water tank. When there is a lot of dust around, spraying is carried out through the spray water pipe to reduce dust, prevent dust from overflowing during municipal construction, and improve the cleanliness of the surrounding environment.

[0018] 3. This application adds a pier structure between the ground and the enclosure. When installing the enclosure, the bottom of the enclosure is not directly fixed on the ground, which will not damage the original base structure. After the enclosure is removed, no holes remain on the ground. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A front perspective view of the present application;

[0020] Figure 2 A rear perspective view of the present application;

[0021] Figure 3 This is a schematic diagram of the structure of the column for this application;

[0022] Figure 4 This is a schematic diagram of the assembly of the middle connecting piece and the column of this application;

[0023] Figure 5 This is a schematic diagram of the assembly of the top connection base and the column of this application;

[0024] Figure 6 This is a schematic diagram of the assembly of the bottom connection base and the column of this application.

[0025] In the figure: 1. column; 2. panel; 3. middle connecting piece; 4. top connecting base; 5. bottom connecting base; 6. plug-in slot; 7. connecting hole; 8. through slot; 9. first convex edge; 10. second convex edge; 11. warning light; 12. sprinkler pipe; 13. pier body; 14. reflective strip. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0027] Example

[0028] See also Figure 1-Figure 4 The embodiment of the present application proposes a municipal construction fence, including a column 1, a panel 2, a pier 13 and a sprinkler pipe 12. The two groups of columns 1 are fixedly connected by an intermediate connecting plate 3. The top of the column 1 is installed with a top connecting base 4, and the bottom of the column 1 is installed with a bottom connecting base 5. Both sides of the column 1 are provided with a plug-in groove 6, and one end of the panel 2 is embedded in the plug-in groove 6 of the column 1 on one side, and the other end of the panel 2 is embedded in the plug-in groove 6 of the column 1 on the other side.

[0029] It can be understood that the column structure of the enclosure is composed of multiple groups of columns 1, and the number of splicing can be selected according to installation requirements. The two groups of columns 1 are fixed by an intermediate connecting plate 3. The fixing method is simple and easy to assemble and disassemble. The panel 2 structure is composed of multiple groups of baffles stacked and spliced. The number of baffles can be selected according to installation requirements to adjust the area of ​​the panel 2.

[0030] For example, when the height of the overall enclosure needs to be increased, it is only necessary to increase the number of columns 1 and the number of baffles. After the number of columns 1 to be spliced ​​is determined and the assembly is completed, the top connecting base 4 is installed at the top of the column structure, and the bottom connecting base 5 is installed at the bottom of the column structure. The enclosure is suitable for different places, and each structure can be disassembled for easy carrying and transportation.

[0031] Among them, the two side edges of the panel 2 are respectively inserted into the insertion grooves 6 of the columns 1 on both sides thereof. When installing the panel 2, it is only necessary to control the spacing between the columns 1 on both sides, and there is no need to use auxiliary fasteners to lock the panel 2. It is simple and convenient to split the panel 2. The plate structure at the top end of the panel 2 is limited by the top connection base 4, and the panel 2 cannot be moved out from the top, thereby improving the structural stability.

[0032] Please continue reading Figure 3Connection holes 7 are provided on the upper and lower sides of one side of the outside of the column 1, a hole body is provided on the middle connecting piece 3, and the middle connecting piece 3 and the column 1 are fixedly connected by screws. There are two groups of hole bodies in the middle connecting piece 3, one group of hole bodies is fixedly connected to one group of columns 1 by screws, and the other group of hole bodies is fixedly connected to another group of columns 1 by screws, so as to realize the splicing and fixation of the two groups of columns 1.

[0033] Please continue reading Figure 2 and Figure 5 A through groove 8 is provided on the top connecting base 4, and a hole for installing a warning light 11 is preset on the top surface of the top connecting base 4. The warning light 11 is fixed to the top connecting base 4 by screws. When a spray water pipe 12 is installed on the enclosure, the spray water pipe 12 passes through the through groove 8 of the top connecting base 4, and the positioning of the spray water pipe 12 is achieved through the top connecting base 4.

[0034] It can be understood that the spray water pipe 12 connects the water pump and the water tank. When there is a lot of dust around, spraying is performed through the spray water pipe 12 to reduce dust, effectively prevent dust from overflowing during municipal construction, and improve the cleanliness of the surrounding environment.

[0035] Please continue reading Figure 3 and Figure 5 A first flange 9 is provided on the top connecting base 4, and a hole is opened on the first flange 9, and the first flange 9 of the top connecting base 4 is fixedly connected to the column 1 by screws. The top connecting base 4 is placed on the top of the column 1, and the hole of the first flange 9 is aligned with the connecting hole 7 of the column 1. At this time, screws are used to fix them to realize the assembly of the two.

[0036] Please continue reading Figure 6 The bottom connection base 5 is provided with a second flange 10, and a hole is formed on the second flange 10, and the second flange 10 of the bottom connection base 5 is fixedly connected with the column 1 by screws. By placing the bottom connection base 5 at the bottom of the column 1, the hole of the second flange 10 is aligned with the connection hole 7 of the column 1, and screws are used to fix them, so that the two are assembled.

[0037] Among them, the installation part of the enclosure is arranged on the rear end face of the structure, so that the front face of the enclosure is neat, simple and beautiful.

[0038] Please continue reading Figure 2 and Figure 6The corners of the bottom connection base 5 are provided with holes, and the bottom connection base 5 is fixedly connected to the pier body 13 by screws, and the column structure is fixed to the pier body 13 through the holes at the corners of the bottom connection base 5. Among them, by adding the pier body 13 structure between the ground and the enclosure, when the enclosure is installed, the bottom of the enclosure is not directly fixed to the ground, and the original base structure will not be damaged. After the enclosure is removed, no holes remain on the ground.

[0039] Please continue reading Figure 1 and Figure 2 The front and rear surfaces of the pier body 13 are both provided with reflective strips 14, which can reflect ambient light at night, thereby providing a certain warning to passers-by and drivers.

[0040] Please continue reading Figure 1 and Figure 2 A warning light 11 is installed on the top of the top connecting base 4. The warning light 11 flashes at night to further serve as a warning and improve the safety protection performance of the overall enclosure.

[0041] Please continue reading Figure 1 , Figure 2 and Figure 5 The spray water pipe 12 is located at the top of the panel 2, and the spray water pipe 12 passes through the through groove 8 of the top connecting base 4. The spray water pipe 12 passes through the through groove 8 of the top connecting base 4, and the positioning of the spray water pipe 12 is achieved through the top connecting base 4. When laying the spray water pipe 12, it is quick and convenient.

[0042] Based on the above structure, in the embodiment of the present application, the column structure of the enclosure is composed of multiple groups of columns 1. When assembling the enclosure, the number of splicing is selected according to the installation requirements. The panel 2 structure is composed of multiple groups of baffles stacked and spliced. The number of splicing of baffles is selected according to the installation requirements. After the number of splicing of columns 1 is determined and the assembly is completed, the bottom connecting base 5 is installed at the bottom of the column structure, and the bottom connecting base 5 is fixed on the pier body 13. The two sides of the panel 2 are respectively inserted into the plug-in grooves 6 of the columns 1 on both sides. When installing the panel 2, it is only necessary to control the spacing between the columns 1 on both sides. After the panel 2 is installed, the top connecting base 4 is installed at the top of the column structure. The plate structure at the top of the panel 2 is limited by the top connecting base 4, and the panel 2 cannot be moved out from the top, ensuring the stability of the structure.

[0043] According to the above installation method, multiple groups of structural parts are assembled to form a fence together, and finally the warning light 11 and the spray water pipe 12 are installed. The spray water pipe 12 connects the water pump and the water tank. When there is a lot of dust around, spraying is carried out through the spray water pipe 12 to reduce dust. The warning light 11 flashes at night, and the reflective strip 14 can reflect the surrounding light at night, which plays a certain warning role for passers-by and drivers.

[0044] Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A municipal construction enclosure, comprising a column (1), a panel (2), a pier (13) and a sprinkler pipe (12), characterized in that: The two groups of upright posts (1) are fixedly connected via an intermediate connecting piece (3), and a top connecting base (4) is installed at the top of the upright posts (1); A bottom connection base (5) is installed at the bottom end of the column (1), and plug-in slots (6) are provided on both sides of the column (1), and one end of the panel (2) is embedded in the plug-in slot (6) of the column (1) on one side, and the other end of the panel (2) is embedded in the plug-in slot (6) of the column (1) on the other side.

2. The municipal construction enclosure according to claim 1 is characterized by: The upper and lower parts of one side of the exterior of the column (1) are provided with connection holes (7), the middle connecting piece (3) is provided with a hole, and the middle connecting piece (3) and the column (1) are fixedly connected by screws.

3. The municipal construction enclosure according to claim 1 is characterized by: The top connection base (4) is provided with a through slot (8).

4. The municipal construction enclosure according to claim 3 is characterized by: The top connection base (4) is provided with a first flange (9), a hole is opened on the first flange (9), and the first flange (9) of the top connection base (4) is fixedly connected to the column (1) by screws.

5. The municipal construction enclosure according to claim 1 is characterized by: The bottom connection base (5) is provided with a second flange (10), and a hole is opened on the second flange (10), and the second flange (10) of the bottom connection base (5) is fixedly connected to the column (1) by screws.

6. The municipal construction enclosure according to claim 5 is characterized by: Holes are provided at the corners of the bottom connection base (5), and the bottom connection base (5) and the pier body (13) are fixedly connected by screws.

7. The municipal construction enclosure according to claim 1 is characterized by: Reflective strips (14) are provided on the front end surface and the rear end surface of the pier body (13).

8. The municipal construction enclosure according to claim 7 is characterized by: A warning light (11) is installed on the top of the top connection base (4).

9. The municipal construction enclosure according to claim 3 is characterized by: The spray water pipe (12) is located at the top of the panel (2), and the spray water pipe (12) passes through the through groove (8) connected to the base (4) at the top.