Welding supporting device for large-diameter heat supply pipeline penetrating through construction pipe opening

By designing a welding support device including support plate, U-frame, hand-cranked hoist and positioning pressure plate, the problems of unstable pipeline lifting and low welding accuracy during heating pipeline crossing construction are solved, and fast and stable Pipe lifting and efficient welding construction.

CN222471201UActive Publication Date: 2025-02-14LUOYANG CITY CONSTR RECONNAISSANCE DESIGN RES INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420396298.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2025-02-14
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

During the construction of heating pipes through the construction process, it is difficult for the prior art to quickly and stably lift large-diameter pipes to the required height, affecting welding accuracy and construction efficiency.

Method used

A welding support device including a support plate, a U-frame, a hand-cranked hoist and a positioning pressure plate is designed. By setting up a U-frame and a hand-crank hoist on the support plate, combining the positioning pressure plate and counterweight block, stable lifting and height adjustment of the pipeline is achieved.

Benefits of technology

The device can quickly and stably lift the pipes to the required height, improving the efficiency and accuracy of welding construction and reducing construction difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222471201U_ABST
    Figure CN222471201U_ABST
Patent Text Reader

Abstract

The utility model discloses a large-caliber heat supply pipeline crossing construction pipe orifice welding supporting device which comprises a supporting plate, a U-shaped frame, a hand hoist and positioning pressing plates, the positioning pressing plates are arranged at the two ends of the supporting plate respectively, a balancing weight is arranged at the top of each positioning plate, the U-shaped frame is arranged in the middle of the supporting plate, the hand hoist is arranged below the U-shaped frame, and the hand hoist is arranged below the U-shaped frame. Displacement frames are arranged on the supporting plates on the two sides of the U-shaped frame, supporting handles are arranged at the two ends of each displacement frame, ropes are wound around the supporting handles, first positioning drill rods are arranged at the ends of the ropes, and the first positioning drill rods are fixed in the grooves. According to the pipeline welding device, the supporting plate can be stably placed on the ground above a groove, a pipeline can be rapidly hoisted to the needed height by arranging the hand-cranking hoist, the line type of the pipeline can be adjusted by moving the U-shaped frame, time and labor are saved, working efficiency is improved, accurate welding of a pipe opening is facilitated, and the pipeline welding device is convenient to use, easy to operate and easy to popularize.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a pipeline welding support device, in particular to a large-diameter heating pipeline crossing construction pipe opening welding support device, belonging to the technical field of pipeline welding. Background Art

[0002] During the heating pipe crossing construction, it is necessary to lay the heating pipe in the trench and weld the interface of the heating pipe. In this process, the two pipes need to be lifted to a certain height before the pipe mouths can be welded. Since the pipes are heavy, in order to lift the pipes smoothly, the staff will cross the sticks at the bottom of the pipes and lift the ends of the sticks until the pipes are lifted to the required height. The welding workers can then quickly weld the pipe mouths. However, this construction method is time-consuming and labor-intensive, and the manual lifting of the pipes cannot guarantee the stability of the pipes during welding, which seriously affects the accuracy of the pipe interface welding. Utility Model Content

[0003] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a large-diameter heating pipe crossing construction pipe opening welding support device, which can quickly lift the pipe to the required height and is conducive to the welding construction of the pipe ends.

[0004] The technical solution adopted by the utility model to solve the technical problem is:

[0005] A large-diameter heating pipeline crossing construction pipe opening welding support device comprises a support plate, a U-shaped frame, a hand-cranked hoist and a positioning pressure plate, wherein positioning pressure plates are respectively arranged at both ends of the support plate, a counterweight is arranged on the top of the positioning pressure plate, a U-shaped frame is arranged in the middle of the support plate, a limiting bolt is arranged on the top of the U-shaped frame, a hand-cranked hoist is connected to the bottom of the U-shaped frame through a U-shaped ring, displacement frames are sleeved on the support plates on both sides of the U-shaped frame, support handles are respectively arranged at both end surfaces of the displacement frame, a pull rope is wound around the support handle, a first positioning drill is connected to the end of the pull rope, and the first positioning drill is fixed to the bottom of the groove.

[0006] A groove is dug in the middle of the top surface of the support plate, and a guide wheel is arranged in the groove.

[0007] The limiting bolts are located on the U-shaped frame above the supporting plate.

[0008] The displacement frame is fixedly connected to the support plate by bolts.

[0009] The support handle is distributed in a T-shape, a through hole is dug at one end of the support handle, a pull rope is arranged in the through hole, a limited end is arranged at one end of the pull rope, and the other end of the pull rope is connected to a connecting ring, and the connecting ring is arranged at the top surface of the first positioning drill.

[0010] The positioning plate is distributed in a U-shape, support rods are arranged around the top surface of the positioning plate, and counterweight blocks are arranged between the support rods. An extension plate is arranged at the end of the positioning plate, and the extension plate is fixed to the ground outside the groove by a second positioning drill.

[0011] The positive beneficial effects of the utility model are:

[0012] 1. The utility model provides a positioning plate at the end of the base frame, and a counterweight block above the positioning plate, so that the support plate can be stably placed horizontally on the ground above the groove. A displacement frame is slidably connected to the support plate, and a first positioning drill is connected to the displacement frame through a pull rope below. The position of the first positioning drill can be adjusted according to the depth of the groove, and the support plate can be firmly fixed above the groove through the first positioning drill, thereby ensuring the stability of the construction.

[0013] 2. The utility model arranges a U-shaped frame in the middle of the support plate, and a hand-cranked hoist at the bottom of the U-shaped frame. When in use, the chain at the end of the hand-cranked hoist is wound around the pipe, and the pipe can be quickly lifted to the required height by the hand-cranked hoist, which saves time and effort and improves work efficiency.

[0014] 3. The utility model arranges a guide wheel in the middle of the support plate to facilitate the movement of the limit bolt on the top of the U-shaped frame along the guide wheel, and can adjust the position of the hand-cranked hoist according to the position of the pipeline. At the same time, the suspended pipeline is also partially adjusted to facilitate the docking of the two pipeline openings, thereby improving the accuracy of pipe opening welding and reducing the construction difficulty. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the utility model;

[0016] Figure 2 This is a structural schematic diagram of the positioning pressing plate of the utility model;

[0017] Figure 3 This is a schematic diagram of the structure of the U-shaped frame of the utility model;

[0018] Figure 4 This is a schematic diagram of the structure of the displacement frame of the utility model;

[0019] Among them: 1-support plate, 2-guide wheel, 3-displacement frame, 4-handle, 401-through hole, 5-pull rope, 501-limit end, 6-first positioning drill, 7-connecting ring, 8-U-shaped frame, 9-limiting bolt, 10-U-shaped ring, 11-hand hoist, 12-positioning pressure plate, 13-second positioning drill, 14-support rod, 15-counterweight block. DETAILED DESCRIPTION

[0020] The utility model is further explained and illustrated below in conjunction with the accompanying drawings:

[0021] For example, see Figure 1-Figure 4 A large-diameter heating pipeline crossing construction pipe opening welding support device comprises a support plate 1, a U-shaped frame 8, a hand-cranked hoist 11 and a positioning plate 12. Positioning plates 12 are respectively arranged at both ends of the support plate 1, a counterweight 15 is arranged on the top of the positioning plate 12, a U-shaped frame 8 is arranged in the middle of the support plate 1, a limiting bolt 9 is arranged on the top of the U-shaped frame 8, and a hand-cranked hoist 11 is connected to the bottom of the U-shaped frame 8 through a U-shaped ring 10. Displacement frames 3 are sleeved on the support plates 1 on both sides of the U-shaped frame 8, and support handles 4 are respectively arranged on the two end surfaces of the displacement frame 3. A pull rope 5 is wound on the support handle 4, and a first positioning drill 6 is connected to the end of the pull rope 5, and the first positioning drill 6 is fixed at the bottom of the groove.

[0022] A groove is dug in the middle of the top surface of the support plate 1, and a guide wheel 2 is arranged in the groove.

[0023] The limiting bolts 9 are located on the U-shaped frame 8 above the supporting plate 1 .

[0024] The displacement frame 3 is fixedly connected to the support plate 1 by bolts.

[0025] The support handle 4 is distributed in a T-shape, and a through hole 401 is dug at one end of the support handle 4. A pull rope 5 is arranged in the through hole 401. A limited end 501 is arranged at one end of the pull rope 5. The other end of the pull rope 5 is connected to a connecting ring 7. The connecting ring 7 is arranged at the top surface of the first positioning drill 6.

[0026] The positioning plate 12 is distributed in a U-shape, with support rods 14 arranged around the top surface of the positioning plate 12, and counterweights 15 arranged between the support rods 14. An extension plate is arranged at the end of the positioning plate 12, and the extension plate is fixed to the ground outside the groove by a second positioning drill 13.

[0027] In the above description, the support plate is located above the groove and placed horizontally on the ground above the groove. A positioning plate is placed at the end of the support plate and the positioning plate is fixed to the ground by a second positioning drill.

[0028] In the above description, the first positioning rod is inserted into the ground inside the groove, and a pull rope is connected to the connecting ring on the top of the first positioning rod, and the other end of the pull rope is wrapped around the support handle for fixing.

[0029] In the above description, the limiting end is larger than the through hole.

[0030] In the above description, the first positioning drill, the second positioning drill and the counterweight block all have the function of fixing the support plate on the top of the groove.

[0031] In the above description, the function of the hand hoist is to lift the pipe to the required height to facilitate the workers to weld the pipe mouth. At the same time, the linear shape of the pipe can be adjusted by moving the U-shaped frame, that is, the pipe can be adjusted left and right.

[0032] In the above description, the bottom of the positioning rod is distributed in a pointed cone shape. When in use, the positioning rod is hammered into the ground by a hammer.

[0033] The utility model provides a positioning pressure plate at the end of the base frame, and a counterweight block is provided above the positioning pressure plate, so that the support plate can be stably placed horizontally on the ground above the groove; a displacement frame is slidably connected to the support plate, and a first positioning drill is connected to the displacement frame through a pull rope below the displacement frame, so that the position of the first positioning drill can be adjusted according to the depth of the groove, and the support plate can be firmly fixed above the groove through the first positioning drill, thereby ensuring the stability of the support plate during construction; a hand-cranked hoist is provided below the U-shaped frame, so that the staff can lift the pipeline to the required height, and at the same time, the linear shape of the pipeline can be adjusted left and right by moving the U-shaped frame, which saves time and labor, improves work efficiency, is convenient to use, and is simple to operate.

Claims

1. A large-diameter heating pipe crossing construction pipe opening welding support device, comprising a support plate (1), a U-shaped frame (8), a hand-cranked hoist (11) and a positioning pressure plate (12), characterized in that: Positioning plates (12) are respectively provided at both ends of the support plate (1), a counterweight (15) is provided on the top of the positioning plate (12), a U-shaped frame (8) is provided in the middle of the support plate (1), a limiting bolt (9) is provided on the top of the U-shaped frame (8), a hand-cranked hoist (11) is connected to the bottom of the U-shaped frame (8) via a U-shaped ring (10), a displacement frame (3) is sleeved on the support plates (1) on both sides of the U-shaped frame (8), support handles (4) are respectively provided on the two end surfaces of the displacement frame (3), a pull rope (5) is wound around the support handle (4), and the end of the pull rope (5) is connected to a first positioning drill (6), and the first positioning drill (6) is fixed to the bottom of the groove.

2. A large-diameter heating pipeline crossing construction pipe orifice welding support device according to claim 1, characterized in that: A groove is excavated in the middle of the top surface of the support plate (1), and a guide wheel (2) is arranged in the groove.

3. A large-diameter heating pipeline crossing construction pipe orifice welding support device according to claim 1, characterized in that: The limiting bolt (9) is located on the U-shaped frame (8) above the support plate (1).

4. A large-diameter heating pipeline crossing construction pipe orifice welding support device according to claim 1, characterized in that: The displacement frame (3) is fixedly connected to the support plate (1) by means of bolts.

5. A large-diameter heating pipeline crossing construction pipe orifice welding support device according to claim 1, characterized in that: The support handle (4) is arranged in a T-shape, a through hole (401) is dug at one end of the support handle (4), a pull rope (5) is arranged in the through hole (401), a limited end (501) is arranged at one end of the pull rope (5), and the other end of the pull rope (5) is connected to a connecting ring (7), and the connecting ring (7) is arranged at the top surface of the first positioning rod (6).

6. A large-diameter heating pipeline crossing construction pipe orifice welding support device according to claim 5, characterized in that: The positioning plate (12) is distributed in a U-shape, support rods (14) are arranged around the top surface of the positioning plate (12), and counterweights (15) are arranged between the support rods (14). An extension plate is arranged at the end of the positioning plate (12), and the extension plate is fixed to the ground outside the groove by a second positioning rod (13).