Perforated brick humidifying and curing device

By designing a porous brick humidification and maintenance device, using a motor-driven mobile spraying system and rotary spray head, the problems of uneven humidification and waste of water in the prior art are solved, and efficient and uniform porous brick maintenance are achieved.

CN222472894UActive Publication Date: 2025-02-14ANHUI RICHEN BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420840413.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-22
Publication Date
2025-02-14
Estimated Expiration
2034-04-22

AI Technical Summary

Technical Problem

In the prior art, the humidification and maintenance of porous bricks mainly relies on manual spraying, resulting in uneven humidification, affecting the strength of the bricks, wasting water sources, high labor intensity, and low work efficiency.

Method used

Design a porous brick humidification maintenance device, including a maintenance table and a maintenance rack, uses a motor to drive a double-headed reciprocating screw, combined with a transmission belt and rack system, so that the maintenance rack can move on the maintenance table, and the spray head sprays water mist to porous through the water pump. The bricks are cured and the spray range is increased through rotary joints and tooth rods to recover water sources for conservation of use.

Benefits of technology

The uniformity and efficiency of humidification and maintenance of porous bricks is achieved, which reduces water waste, reduces labor intensity and improves work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model provides a perforated brick humidifying and curing device, which belongs to the technical field of perforated bricks and comprises a curing table and a notch arranged on a curing frame, and one side of the curing table is provided with the notch. According to the utility model, the water pump and the motor are started to enable the double-head reciprocating screw rod to rotate, the wheel grooves at the two ends are matched with the transmission belt to enable the adjusting gear at the lower end to rotate, and the rack on the sliding rail is matched to drive the curing frame to move on the curing platform while the nozzle sprays water mist through the water pump to cure the perforated bricks below; meanwhile, a double-end reciprocating screw rod drives a sliding block on the outer side to slide, and a toothed bar on the outer side is matched with gear teeth on the outer side of a rotary joint on one side to rotate while the sliding block slides, so that a mounting frame below the rotary joint drives a spray head to rotate, and meanwhile, the spraying range is widened; and the sprayed water falls into the maintenance table to be recycled for next spraying maintenance, so that the water source is saved, the spraying range can be widened, and the maintenance efficiency of the porous bricks is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of porous brick maintenance, in particular to a porous brick humidification maintenance device. Background Art

[0002] Porous bricks refer to porous bricks made of clay, shale and fly ash as the main raw materials, which are formed and baked. The porosity is not less than 15% to 30%, and the hole type is round or non-round. The hole size is small and the number is large. The load-bearing sintered porous bricks with rectangular or round holes are by no means equivalent to just opening some holes on the bricks. It can directly replace sintered clay bricks for various types of load-bearing, heat-insulating load-bearing and frame filling and other different building wall structures. It has a wide range of promotion and application prospects. Porous bricks need to be humidified and maintained before masonry. Under normal temperature conditions, they need to be watered 1 to 2 days in advance to ensure that the moisture content of the porous bricks reaches 10% to 12% during masonry, thereby ensuring the quality of the project.

[0003] In the prior art, it is common to use water pipes to spray and humidify the piled porous bricks on a large scale at construction sites. This manual spraying method cannot effectively ensure the uneven humidification, thereby affecting the strength of the bricks and causing water waste. At the same time, the manual spraying method has high labor intensity and low work efficiency. How to invent a porous brick humidification and maintenance device to improve these problems has become an urgent problem to be solved by technicians in this field. Utility Model Content

[0004] In order to make up for the above shortcomings, the utility model provides a porous brick humidification and maintenance device, which aims to improve the common large-scale spraying and humidification of stacked porous bricks by manual use of water pipes on construction sites. This manual spraying method cannot effectively ensure the uneven humidification, thereby affecting the strength of the bricks and causing water waste. At the same time, the manual spraying method has high labor intensity and low work efficiency.

[0005] The utility model is achieved in this way:

[0006] The utility model provides a porous brick humidifying and curing device, comprising a curing platform and a curing frame arranged on the curing platform, one side of the curing platform is provided with a notch, one side of the curing platform is provided with a slide rail, the bottom end of the slide rail is fixedly connected with a rack, and one side of the slide rail is provided with a slide groove.

[0007] A maintenance frame, one end of which is equipped with a motor, a double-headed reciprocating screw is installed on the upper end of the maintenance frame, wheel grooves are installed on the outer walls of both ends of the double-headed reciprocating screw, and a transmission belt is installed on the wheel groove, a fixed shaft is installed on the lower end of the maintenance frame, one end of the fixed shaft is fixedly connected with an adjusting gear, a roller is installed on the outer wall of the fixed shaft, two symmetrical sliders are installed on the upper end of the maintenance frame, and a gear rod is fixedly connected to the outer wall of one side of the slider, a water pump is installed on the top of the maintenance frame, an input pipe and an output pipe are respectively installed at both ends of the water pump, a rotating joint is installed on one end of the output pipe, a mounting frame is installed below the rotating joint, and a plurality of nozzles are installed on the inner wall of the mounting frame.

[0008] Preferably, a filter is installed on the upper inner wall of the curing table, and water can be stored inside the curing table.

[0009] Preferably, the output end of the motor is fixedly connected to one end of the double-headed reciprocating screw rod, and both ends of the double-headed reciprocating screw rod are rotatably connected to the inner wall of the curing frame.

[0010] By adopting the above technical solution, when the porous bricks are cured, the water pump and the motor are started to move the curing frame on the curing table, and at the same time, the nozzle sprays water mist through the water pump to cure the porous bricks below.

[0011] Preferably, a transmission groove is provided on the outer wall of the adjusting gear, and the two ends of the transmission belt are respectively connected to the wheel groove and the adjusting gear in transmission.

[0012] Preferably, the outer wall of the fixed shaft is rotatably connected to the inner wall of the maintenance frame, and the outer wall of the fixed shaft is rotatably connected to the inner wall of the roller.

[0013] Preferably, a limiting groove slidably connected to the outer wall of the slider is formed on one side outer wall of the maintenance frame, and the inner wall of the slider is threadedly connected to the outer wall of the double-head reciprocating screw.

[0014] Preferably, the input pipe extends into the interior of the curing table through the notch, the outer wall of the output pipe is rotatably connected to the inner wall of the rotary joint, the outer wall of the rotary joint is fixedly connected to a circle of gear teeth meshing with the gear rod, and the inner wall of the rotary joint is fixedly connected to a connecting pipe connected to the interior of the mounting frame.

[0015] By adopting the above technical solution, when the maintenance platform is moved for maintenance, the double-head reciprocating screw drives the outer slider to slide. When the slider slides, the outer gear rod causes the mounting frame under the rotary joint to drive the nozzle to rotate while increasing the spraying range.

[0016] The beneficial effects of the utility model are:

[0017] Start the water pump and the motor to rotate the double-headed reciprocating screw, and the wheel grooves at both ends cooperate with the transmission belt to rotate the adjusting gear at the lower end, and cooperate with the rack on the slide rail to drive the maintenance frame to move on the maintenance table. At the same time, the nozzle sprays water mist through the water pump to maintain the porous bricks below. At the same time, the double-headed reciprocating screw drives the outer slider to slide. When the slider slides, the outer gear rod cooperates with the outer gear of the rotary joint on one side to rotate, so that the mounting frame under the rotary joint drives the nozzle to rotate while increasing the spraying range. The sprayed water falls into the interior of the maintenance table for recovery for the next spraying and maintenance. While saving water resources, the spraying range can be increased, and the efficiency of maintaining porous bricks can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a schematic diagram of a porous brick humidification and maintenance device provided by an embodiment of the utility model;

[0020] Figure 2 It is a side sectional view of a porous brick humidification and curing device provided by an embodiment of the utility model;

[0021] Figure 3 It is a half-section diagram of a porous brick humidification and curing device provided in an embodiment of the utility model;

[0022] Figure 4 It is a front cross-sectional view of a porous brick humidification and maintenance device provided by an embodiment of the utility model;

[0023] Figure 5 This utility model provides a porous brick humidification maintenance device Figure 1 A magnified view of the structure of the middle A area;

[0024] Figure 6 This utility model provides a porous brick humidification maintenance device Figure 2 A magnified view of the structure of the middle B region;

[0025] Figure 7 This utility model provides a porous brick humidification maintenance device Figure 3 A magnified view of the structure of the middle C region;

[0026] Figure 8 This utility model provides a porous brick humidification maintenance device Figure 4 A magnified view of the structure in region D.

[0027] In the figure: 1. Maintenance table; 2. Filter; 3. Notch; 4. Slide rail; 5. Rack; 6. Slide; 7. Maintenance frame; 8. Limiting groove; 9. Double-head reciprocating screw; 10. Wheel groove; 11. Transmission belt; 12. Fixed shaft; 13. Roller; 14. Adjusting gear; 15. Motor; 16. Slider; 17. Rack; 18. Water pump; 19. Input pipe; 20. Output pipe; 21. Rotary joint; 22. Connecting pipe; 23. Mounting frame; 24. Sprinkler. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0029] Example

[0030] Reference Figure 1-Figure 8 A porous brick humidification and curing device comprises a curing table 1 and a curing frame 7 arranged on the curing table 1. A notch 3 is provided on one side of the curing table 1. A slide rail 4 is installed on one side of the curing table 1. A rack 5 is fixedly connected to the bottom end of the slide rail 4. A slide groove 6 is provided on one side of the slide rail 4.

[0031] A maintenance frame 7, a motor 15 is installed at one end of the maintenance frame 7, a double-headed reciprocating screw 9 is installed at the upper end of the maintenance frame 7, wheel grooves 10 are installed on the outer walls of both ends of the double-headed reciprocating screw 9, and a transmission belt 11 is installed on the wheel groove 10, a fixed shaft 12 is installed at the lower end of the maintenance frame 7, one end of the fixed shaft 12 is fixedly connected to an adjusting gear 14, a roller 13 is installed on the outer wall of the fixed shaft 12, two symmetrical sliders 16 are installed at the upper end of the maintenance frame 7, and a gear rod 17 is fixedly connected to the outer wall of one side of the slider 16, a water pump 18 is installed above the maintenance frame 7, an input pipe 19 and an output pipe 20 are installed at both ends of the water pump 18, a rotary joint 21 is installed at one end of the output pipe 20, a mounting frame 23 is installed below the rotary joint 21, and a plurality of nozzles 24 are installed on the inner wall of the mounting frame 23.

[0032] Furthermore, a filter screen 2 is installed on the upper inner wall of the curing table 1, and water can be stored inside the curing table 1. The output end of the motor 15 is fixedly connected to one end of the double-headed reciprocating screw 9, and the two ends of the double-headed reciprocating screw 9 are rotatably connected to the inner wall of the curing frame 7.

[0033] It should be noted that: when the porous bricks are cured, the water pump 18 and the motor 15 are started to rotate the double-headed reciprocating screw 9, and the wheel grooves 10 at both ends cooperate with the transmission belt 11 to rotate the adjusting gear 14 at the lower end, and cooperate with the rack 5 on the slide rail 4 to drive the curing frame 7 to move on the curing platform 1. At the same time, the nozzle 24 sprays water mist through the water pump 18 to cure the porous bricks below.

[0034] Furthermore, a transmission groove is provided on the outer wall of the adjusting gear 14, and the two ends of the transmission belt 11 are respectively connected to the wheel groove 10 and the adjusting gear 14 in transmission, the outer wall of the fixed shaft 12 is rotatably connected to the inner wall of the maintenance frame 7, the outer wall of the fixed shaft 12 is rotatably connected to the inner wall of the roller 13, and a limiting groove 8 is provided on the outer wall of one side of the maintenance frame 7, and the inner wall of the slider 16 is threadedly connected to the outer wall of the double-headed reciprocating screw 9, the input pipe 19 extends into the interior of the maintenance platform 1 through the notch 3, the outer wall of the output pipe 20 is rotatably connected to the inner wall of the rotary joint 21, the outer wall of the rotary joint 21 is fixedly connected to a circle of gear teeth meshing with the gear rod 17, and the inner wall of the rotary joint 21 is fixedly connected to a connecting pipe 22 connected to the interior of the mounting frame 23.

[0035] It should be noted that: when the curing platform 1 is moved for curing, the double-head reciprocating screw 9 drives the outer slider 16 to slide. When the slider 16 slides, the outer gear rod 17 cooperates with the gear teeth on the outer side of the rotary joint 21 on one side to rotate, so that the mounting frame 23 under the rotary joint 21 drives the nozzle 24 to rotate while increasing the spraying range.

[0036] The working principle of this porous brick humidification and maintenance device:

[0037] When the porous bricks are maintained, the water pump 18 and the motor 15 are started to rotate the double-headed reciprocating screw 9, and the wheel grooves 10 at both ends cooperate with the transmission belt 11 to rotate the adjusting gear 14 at the lower end, and cooperate with the rack 5 on the slide rail 4 to drive the maintenance frame 7 to move on the maintenance platform 1. At the same time, the nozzle 24 sprays water mist through the water pump 18 to maintain the porous bricks below. At the same time, the double-headed reciprocating screw 9 drives the outer slider 16 to slide. When the slider 16 slides, the outer gear rod 17 cooperates with the outer gear teeth of the rotary joint 21 on one side to rotate, so that the mounting frame 23 under the rotary joint 21 drives the nozzle 24 to rotate while increasing the spraying range. The sprayed water falls into the interior of the maintenance platform 1 for recovery for the next spraying maintenance. While saving water resources, the spraying range can be increased, and the efficiency of maintaining the porous bricks can be improved.

[0038] It should be noted that the specific model and specifications of the motor need to be selected and determined based on the actual specifications of the device, and the specific selection calculation method adopts the existing technology in this field, so it will not be described in detail.

[0039] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A porous brick humidification curing device, comprising a curing platform (1) and a curing frame (7) arranged on the curing platform (1), characterized in that: A notch (3) is provided on one side of the curing platform (1), a slide rail (4) is installed on one side of the curing platform (1), a rack (5) is fixedly connected to the bottom end of the slide rail (4), and a slide groove (6) is provided on one side of the slide rail (4); A maintenance frame (7), one end of which is equipped with a motor (15), the upper end of which is equipped with a double-headed reciprocating screw (9), the outer walls of both ends of which are equipped with wheel grooves (10), the wheel grooves (10) are equipped with a transmission belt (11), the lower end of which is equipped with a fixed shaft (12), one end of which is fixedly connected with an adjusting gear (14), the outer wall of which is equipped with a roller (13), and the maintenance frame (7) is provided with a maintenance frame (7). Two symmetrical slide blocks (16) are installed at the upper end of the maintenance frame (7), and a gear rod (17) is fixedly connected to an outer wall of one side of the slide block (16). A water pump (18) is installed above the maintenance frame (7), and an input pipe (19) and an output pipe (20) are installed at both ends of the water pump (18), and a rotating joint (21) is installed at one end of the output pipe (20). A mounting frame (23) is installed below the rotating joint (21), and a plurality of nozzles (24) are installed on the inner wall of the mounting frame (23).

2. A porous brick humidification and curing device according to claim 1, characterized in that: A filter screen (2) is installed on the upper inner wall of the curing platform (1), and water can be stored inside the curing platform (1).

3. A porous brick humidification and curing device according to claim 2, characterized in that: The output end of the motor (15) is fixedly connected to one end of the double-ended reciprocating screw (9), and the two ends of the double-ended reciprocating screw (9) are rotatably connected to the inner wall of the maintenance frame (7).

4. A porous brick humidification and curing device according to claim 1, characterized in that: The outer wall of the adjusting gear (14) is provided with a transmission groove, and the two ends of the transmission belt (11) are respectively connected to the wheel groove (10) and the adjusting gear (14) in transmission connection.

5. A porous brick humidification and curing device according to claim 4, characterized in that: The outer wall of the fixed shaft (12) is rotatably connected to the inner wall of the maintenance frame (7), and the outer wall of the fixed shaft (12) is rotatably connected to the inner wall of the roller (13).

6. A porous brick humidification and curing device according to claim 5, characterized in that: A limiting groove (8) is provided on one side outer wall of the maintenance frame (7) and is slidably connected to the outer wall of the slider (16); the inner wall of the slider (16) is threadedly connected to the outer wall of the double-head reciprocating screw (9).

7. A porous brick humidification and curing device according to claim 6, characterized in that: The input pipe (19) extends into the interior of the curing platform (1) through the notch (3); the outer wall of the output pipe (20) is rotatably connected to the inner wall of the rotary joint (21); the outer wall of the rotary joint (21) is fixedly connected to a circle of gear teeth meshing with the gear rod (17); and the inner wall of the rotary joint (21) is fixedly connected to a connecting pipe (22) connected to the interior of the mounting frame (23).