Displacement monitoring device for building jacking inclination rectification
By using the hoisting part, a pull-line displacement meter and a horizontal measuring device during the hoisting and tilt correction process of the building, the hoisting volume is monitored and adjusted in real time, the problem of inaccurate hoisting volume control is solved and the construction quality and safety are improved.
Patent Information
- Application Number
- CN202421130204.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-05-22
AI Technical Summary
During the lifting and tilting process of building, due to the inaccurate control of the lifting volume of each lifting point, the lifting displacement is not synchronized, which easily leads to the improper correction of the upper structure or the phenomenon of over-topping, affecting the construction quality.
Design a displacement monitoring device for building lifting and tilt correction, including setting up a lifting part and an original substrate on both sides of the original wall, and installing a pull-line displacement meter and a horizontal measuring device between the lifting part and the original substrate for real-time monitoring The lifting volume changes and synchronization, and adjust the hydraulic cylinder to ensure the accuracy and safety of lifting and tilt correction.
Through real-time monitoring and adjustment, we ensure the synchronization of each lifting point and the accuracy of the lifting quantity, improve the construction quality and safety of the building during the lifting and tilting process, and avoid the phenomenon of insufficient correction or over-top of the superstructure. occur.
Smart Images

Figure CN222481435U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building tilt correction, and in particular relates to a displacement monitoring device for building jacking and tilt correction. Background Art
[0002] Uneven settlement of existing buildings will lead to the destruction of the stability and integrity of the superstructure, resulting in the tilt of the building, and even damage such as cracking and deformation of the wall, which will affect its continued use and even cause the entire building to collapse. The building jacking and tilt correction technology uses jacks to achieve jacking and tilt correction of the superstructure. During the jacking and tilt correction process, jacks are usually used to jack up simultaneously on both sides of the original building structure. Since the jacking amount of each jacking point is different, during the jacking and tilt correction construction, the superstructure is easily corrected or over-topped due to inaccurate control of the jacking amount and asynchronous jacking displacement, thereby affecting the construction quality of the building during the jacking and tilt correction process. Utility Model Content
[0003] The embodiment of the utility model provides a displacement monitoring device for building jacking and tilt correction, aiming to solve the problem in the prior art that in the process of building jacking and tilt correction, the jacking quality of the building is easily affected due to inaccurate control of the jacking amount of each jacking point.
[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: to provide a displacement monitoring device for building jacking and tilt correction, comprising:
[0005] Original wall;
[0006] The lifting parts are located on both sides of the original wall and are fixedly connected to the original wall;
[0007] An original base body is located below the original wall body, and the position of the lifting part has a degree of freedom of adjustment in the vertical direction relative to the original base body;
[0008] A wire displacement meter is installed between the lifting part and the original base, the fixed end of the wire displacement meter is fixedly installed on the original base, and the wire of the wire displacement meter is installed on the lifting part;
[0009] A level measuring device is installed on the original wall to monitor the synchronization of the movement of each jacking point.
[0010] In a possible implementation, the lifting portion is located in the middle of the original wall along the vertical direction, a connecting piece is fixedly installed at the bottom of the lifting portion, and a hook for connecting the pull wire on the pull wire displacement meter is fixedly installed on the connecting piece.
[0011] In a possible implementation, the connecting member includes a first wing plate and a second wing plate that are perpendicular to each other, the first wing plate is fixedly mounted on the bottom of the lifting portion, and the second wing plate is fixedly mounted on the side of the original wall.
[0012] In a possible implementation, the level measuring device is installed on two second wing plates located on both sides of the original wall and is disposed through the original wall.
[0013] In a possible implementation, the level measuring device includes:
[0014] A mounting frame, both ends of which are fixedly mounted on the two second wing plates;
[0015] A ball bearing is arranged inside the mounting frame so as to roll along the length direction of the mounting frame, and a mounting hole for mounting the ball bearing is arranged on the mounting frame;
[0016] The early warning switch is installed at both ends of the installation hole, and the ball can be pressed against the early warning switch to control the working state of the early warning switch.
[0017] In a possible implementation, a connecting rod is installed on the mounting frame, two ends of the connecting rod respectively penetrate the two second wing plates, and both ends of the connecting rod are threadedly connected with tightening members for abutting against the outer sides of the second wing plates.
[0018] In a possible implementation, the mounting frame is provided with two mutually intersecting slide grooves, the length directions of the two slide grooves are arranged along the length direction of the mounting frame, and the ball is located at the intersection of the two slide grooves.
[0019] In a possible implementation, steel bars are implanted on the original matrix, a bottom plate is installed on the top of the steel bars, and the fixed end of the wire displacement meter is installed on the bottom plate.
[0020] Compared with the prior art, the scheme shown in the embodiment of the present application is that lifting parts are arranged on both sides of the original wall, and the original base is arranged below the lifting parts. During the lifting process, hydraulic cylinders are arranged between the original base and the two lifting parts, and the hydraulic cylinders located at the two lifting parts work simultaneously to complete the lifting operation. In the present application, a wire displacement meter is installed between the lifting parts and the original base on both sides of the original wall. The fixed end of the wire displacement meter is installed on the original base, and the wire of the wire displacement meter is installed on the lifting part, so as to monitor the change of the lifting amount of the lifting parts located on both sides of the original wall. And through the horizontal measuring device, it is monitored whether the difference of the lifting amount of the original wall located on both sides of the original wall during the rising process has exceeded the limit value, so as to adjust the hydraulic cylinder to ensure the safety of construction during the lifting and tilt correction process, and improve the overall quality of the later building. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of the structure of a displacement monitoring device for building jacking and tilt correction provided by an embodiment of the utility model;
[0022] Figure 2 for Figure 1 A partial enlarged view of the middle A part;
[0023] Figure 3 A schematic diagram of the installation structure of the level measuring device provided in an embodiment of the utility model;
[0024] Figure 4 A schematic diagram of the installation structure of the ball provided in an embodiment of the utility model.
[0025] Description of reference numerals:
[0026] 1. Original wall; 2. Lifting part; 3. Original base; 31. Rebar; 32. Bottom plate; 4. Wire displacement meter; 5. Level measuring device; 51. Mounting frame; 511. Connecting rod; 512. Tightening piece; 52. Ball bearing; 53. Early warning switch; 6. Connecting piece; 7. Hook; 61. First wing plate; 62. Second wing plate. DETAILED DESCRIPTION
[0027] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0028] Please also read Figures 1 to 4 , the displacement monitoring device for building lifting and tilt correction provided by the utility model is now described. The displacement monitoring device for building lifting and tilt correction comprises an original wall 1, a lifting part 2, an original base 3, a wire displacement meter 4 and a horizontal measuring device 5. The lifting part 2 is located on both sides of the original wall 1 and is fixedly connected to the original wall 1; the original base 3 is located below the original wall 1, and the position of the lifting part 2 has the freedom to be adjusted in the vertical direction relative to the original base 3; the wire displacement meter 4 is installed between the lifting part 2 and the original base 3, the fixed end of the wire displacement meter 4 is fixedly installed on the original base 3, and the wire of the wire displacement meter 4 is installed on the lifting part 2; the horizontal measuring device 5 is installed on the original wall 1, and is used to monitor the synchronization of the movement of each lifting point.
[0029] The displacement monitoring device for building jacking and tilt correction provided in this embodiment is provided with jacking parts 2 on both sides of the original wall 1 compared with the prior art. An original base 3 is provided below the jacking part 2. During the jacking process, hydraulic cylinders are provided between the original base 3 and the two jacking parts 2, and the hydraulic cylinders located at the two jacking parts 2 work simultaneously to complete the jacking operation. In this application, a wire displacement meter 4 is installed between the jacking parts 2 and the original base 3 on both sides of the original wall 1. The fixed end of the wire displacement meter 4 is installed on the original base 3, and the wire of the wire displacement meter 4 is installed on the jacking part 2, so as to monitor the change of the jacking amount of the jacking part 2 located on both sides of the original wall 1. And the horizontal measuring device 5 is used to monitor whether the difference in the jacking amount of the original wall 1 on both sides of the original wall 1 during the rising process has exceeded the limit value, so as to adjust the hydraulic cylinder to ensure the safety of construction during the jacking and tilt correction process and improve the overall quality of the later building.
[0030] Specifically, in this embodiment, the lifting portion 2 is a part newly added to the original wall 1 at a later stage.
[0031] Preferably, in this embodiment, the wire displacement meter 4 adopts a product in the prior art, and the working process is not described here any more.
[0032] In some embodiments, the original wall 1 may be formed as follows: Figure 1 , Figure 2 Structure. See also Figure 1 , Figure 2 , the lifting part 2 is located in the middle of the original wall 1 in the vertical direction, and a connecting member 6 is fixedly installed at the bottom of the lifting part 2, and a hook 7 for connecting the pull wire on the pull wire displacement meter 4 is fixedly installed on the connecting member 6. The lifting part 2 is located on both sides of the original wall 1, and the original wall 1 is provided above and below the lifting part 2. The connecting member 6 is installed between the lifting part 2 and the original wall 1, and is located at the bottom of the lifting part 2. The connection strength between the original wall 1 and the lifting part 2 can be strengthened by the connecting member 6. At the same time, the connecting member 6 is installed between the original wall 1 and the lifting part 2, and the lifting amount changes of the original wall 1 and the lifting part 2 can be synchronously monitored.
[0033] In some embodiments, the connecting member 6 may be Figure 2 See the structure shown. Figure 2The connecting member 6 includes a first wing plate 61 and a second wing plate 62 which are perpendicular to each other. The first wing plate 61 is fixedly mounted on the bottom of the lifting part 2, and the second wing plate 62 is fixedly mounted on the side of the original wall 1. The connecting member 6 is made of angle steel. The first wing plate 61 and the second wing plate 62 are perpendicular to each other and are fixedly mounted on the lifting part 2 and the original wall 1 respectively by expansion bolts. A hook 7 is fixedly mounted on the bottom surface of the first wing plate 61, and the hook 7 is used to connect the wire on the wire displacement meter 4. The setting of the first wing plate 61 and the second wing plate 62 can enhance the stability of the connection position between the connecting member 6 and the original wall 1 and the lifting part 2, and ensure the accuracy of the later lifting amount measurement.
[0034] In some embodiments, the level measuring device 5 may be implemented as follows: Figure 1 , Figure 2 and Figure 3 See also Figure 1 , Figure 2 and Figure 3 , the level measuring device 5 is installed on two second wing plates 62 located on both sides of the original wall 1 and is set through the original wall 1. A through hole for installing the level measuring device 5 is set on the original wall 1, and the through hole is set through the original wall 1 and is located between the two second wing plates 62. The level measuring device 5 is located inside the through hole and fixed between the two opposite second wing plates 62. The fixing effect of the level measuring device 5 is improved by connecting and fixing the two second wing plates 62 to the level measuring device 5, ensuring that the level measuring device 5 can be stably fixed on the original wall 1.
[0035] In some embodiments, the level measuring device 5 may be implemented as follows: Figure 3 See the structure shown. Figure 3, the level measuring device 5 includes a mounting frame 51, a ball 52 and an early warning switch 53. The two ends of the mounting frame 51 are fixedly mounted on the two second wing plates 62 respectively; the ball 52 is rolled and arranged inside the mounting frame 51 along the length direction of the mounting frame 51, and a mounting hole for mounting the ball 52 is arranged on the mounting frame 51; the early warning switch 53 is mounted on the two ends of the mounting hole, and the ball 52 can abut against the early warning switch 53 to control the working state of the early warning switch 53. When the ball 52 abuts against the early warning switch 53, the early warning switch 53 can be controlled to be turned on or off. The two ends of the mounting frame 51 are fixed on the two opposite second wing plates 62 respectively, and a mounting hole is arranged in the middle of the mounting frame 51, and the length direction of the mounting hole is arranged along the length direction of the mounting frame 51. When the mounting frame 51 is installed on the original wall 1, the mounting hole is in a horizontal state. In the later stage, when the lifting amounts on both sides of the original wall 1 are different, the inclination of the original wall 1 will drive the mounting frame 51 to tilt, thereby moving the ball 52 located inside the mounting hole. When the difference in the lifting amounts reaches a certain value, the ball 52 will abut against the early warning switch 53 and cause the early warning switch 53 to send an alarm signal. It is necessary to find out the cause in time and take corrective measures to ensure safety during the later lifting process.
[0036] Specifically, in this embodiment, the warning switch 53 is made of a conventional component, and its working principle will not be described here.
[0037] In some embodiments, the mounting frame 51 may be configured as follows: Figure 3 See the structure shown. Figure 3 , a connecting rod 511 is installed on the mounting frame 51, and the two ends of the connecting rod 511 are respectively passed through the two second wing plates 62, and the two ends of the connecting rod 511 are threadedly connected with a tightening member 512 for abutting against the outside of the second wing plates 62. A connecting rod 511 is fixedly installed on the mounting frame 51, and the two ends of the connecting rod 511 extend out of the two ends of the mounting frame 51. An oblong through hole for installing the connecting rod 511 is provided on the second wing plate 62, and the connecting rod 511 is located inside the oblong through hole, and a tightening member 512 is provided on the outside of the second wing plate 62. The tightening member 512 is a nut, and the connecting rod 511 can be fixed to the second wing plate 62 by the tightening member 512, so that the mounting frame 51 can be installed on the two second wing plates 62, which has a simple structure and is easy to operate.
[0038] Specifically, in this embodiment, the length direction of the connecting rod 511 is arranged along the length direction of the mounting frame 51 .
[0039] In some embodiments, the mounting frame 51 may be configured as follows: Figure 4 See the structure shown. Figure 4, the mounting frame 51 is provided with two mutually intersecting slides, the length directions of the two slides are arranged along the length direction of the mounting frame 51, and the ball 52 is located at the intersection of the two slides. The length direction of the slide is arranged according to the length direction of the mounting frame 51. A slide rail for mounting the ball 52 is fixedly installed on the inner wall of the mounting frame 51, and two mutually intersecting slides are arranged inside the slide rail, and the length direction of the slide is arranged along the length direction of the mounting frame 51. And in the cross section perpendicular to the length direction of the mounting frame 51, the two intersecting slides form a cross-shaped cross structure, and the ball 52 is located at the intersection of the two slides. The outer side surface of the ball 52 abuts against the corners at the intersection of the two slides. The contact area between the ball 52 and the guide roller can be reduced, and the resistance of the ball 52 during rolling can be reduced. It is ensured that the ball 52 can roll stably inside the mounting frame 51 according to the inclination angle.
[0040] In some embodiments, the original substrate 3 may be Figure 1 See the structure shown. Figure 1 , a steel bar 31 is implanted on the original matrix 3, a bottom plate 32 is installed on the top of the steel bar 31, and the fixed end of the wire displacement meter 4 is installed on the bottom plate 32. A steel bar 31 is fixedly installed at the bottom of the bottom plate 32, and the other end of the steel bar 31 is fixed to the original matrix 3 by using the steel bar implantation technology, and a wire displacement meter 4 is installed on the top of the bottom plate 32. To ensure the stability of the installation position of the wire displacement meter.
[0041] Preferably, in this embodiment, a bracket is installed on the fixed end of the rope displacement meter, and the bracket is provided with a through hole for installation on the bottom plate 32, and the bottom plate 32 is provided with a threaded hole corresponding to the through hole, so that the bracket can be fixed to the bottom plate 32 with bolts.
[0042] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A displacement monitoring device for building lifting and tilt correction, characterized in that: include: Original wall (1); The lifting parts (2) are located on both sides of the original wall (1) and are fixedly connected to the original wall (1); An original base (3) is located below the original wall (1), and the position of the lifting portion (2) has a degree of freedom of adjustment in the vertical direction relative to the original base (3); A wire displacement meter (4) is installed between the lifting part (2) and the original base (3), the fixed end of the wire displacement meter (4) is fixedly installed on the original base (3), and the wire of the wire displacement meter (4) is installed on the lifting part (2); A level measuring device (5) is installed on the original wall (1) and is used to monitor the synchronization of the movement of each jacking point.
2. The displacement monitoring device for building lifting and tilt correction according to claim 1, characterized in that: The lifting part (2) is located in the middle of the original wall (1) in the vertical direction, a connecting piece (6) is fixedly installed at the bottom of the lifting part (2), and a hook (7) for connecting the pull wire on the pull wire displacement meter (4) is fixedly installed on the connecting piece (6).
3. The displacement monitoring device for building lifting and tilt correction as claimed in claim 2, characterized in that: The connecting member (6) comprises a first wing plate (61) and a second wing plate (62) which are perpendicular to each other, wherein the first wing plate (61) is fixedly mounted on the bottom of the lifting portion (2), and the second wing plate (62) is fixedly mounted on the side of the original wall (1).
4. The displacement monitoring device for building lifting and tilt correction as claimed in claim 3, characterized in that: The level measuring device (5) is installed on two second wing plates (62) located on both sides of the original wall (1) and is arranged through the original wall (1).
5. The displacement monitoring device for building lifting and tilt correction as claimed in claim 4, characterized in that: The level measuring device (5) comprises: A mounting frame (51), both ends of which are respectively fixedly mounted on the two second wing plates (62); A ball (52) is arranged inside the mounting frame (51) in a rolling manner along the length direction of the mounting frame (51), and a mounting hole for mounting the ball (52) is provided on the mounting frame (51); The early warning switch (53) is installed at both ends of the installation hole, and the ball (52) can be pressed against the early warning switch (53) to control the working state of the early warning switch (53).
6. The displacement monitoring device for building lifting and tilt correction as claimed in claim 5, characterized in that: A connecting rod (511) is installed on the mounting frame (51), and both ends of the connecting rod (511) are respectively arranged to penetrate the two second wing plates (62), and both ends of the connecting rod (511) are threadedly connected to tightening members (512) for abutting against the outer sides of the second wing plates (62).
7. The displacement monitoring device for building lifting and tilt correction as claimed in claim 5, characterized in that: The mounting frame (51) is provided with two mutually intersecting slide grooves, the length directions of the two slide grooves are arranged along the length direction of the mounting frame (51), and the ball (52) is located at the intersection of the two slide grooves.
8. The displacement monitoring device for building lifting and tilt correction according to claim 1, characterized in that: A steel bar (31) is implanted on the original matrix (3), a bottom plate (32) is installed on the top of the steel bar (31), and a fixed end of the wire displacement meter (4) is installed on the bottom plate (32).