Aluminum ingot cooling system and aluminum ingot production system
By adopting a multi-stage countercurrent circulation cooling mechanism on the aluminum ingot production line, the problems of large cooling water consumption and low cooling efficiency in the existing technology are solved, and the cooling effect of high-efficiency and low-energy consumption of aluminum ingots is achieved, and the environmentally friendly is achieved.
Patent Information
- Application Number
- CN202420785416.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The existing aluminum ingot production line consumes a large cooling water, has low cooling efficiency and poor cooling effect during the aluminum ingot forming process, resulting in high temperature of the aluminum ingot finished product, affecting the equipment life and posing safety hazards.
The multi-stage countercurrent cooling mechanism of the front circulating spraying mechanism, the step circulating spraying mechanism and the rear atomization cooling mechanism is adopted to realize multiple continuous cooling of aluminum ingots, save cooling water consumption, and improve cooling efficiency and effect. .
It significantly saves the consumption of cooling water, improves the cooling efficiency and effect of aluminum ingots, and realizes the recycling of sensible heat of aluminum ingots, low energy consumption of the system and is environmentally friendly.
Smart Images

Figure CN222492076U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to aluminum ingot production and processing equipment, in particular to an aluminum ingot cooling system and an aluminum ingot production system, belonging to the technical field of aluminum ingot production and processing. Background Art
[0002] Aluminum ash slag is an important waste in the aluminum industry, in which the aluminum content can reach 10-30%. Recycling aluminum resources from aluminum ash slag can reduce costs, protect the environment, save energy and improve resource utilization, which has huge economic and social effects.
[0003] At present, the process of recovering aluminum from aluminum ash slag is relatively mature. For example, a Chinese patent with publication number "CN 116240394A" discloses a method for resource utilization of recycled aluminum aluminum ash slag, which specifically includes the following production steps: S1: screening, screening the aluminum ash slag, and obtaining two different types of aluminum ash slag, fine material and coarse material, through a screening machine; S2: grinding, grinding and crushing the aluminum ash slag obtained in step S1 by a grinder; S3: screening, screening the powdered aluminum ash slag obtained in step S2 again; S4: smelting, placing the aluminum particles obtained in step S3 in a smelting furnace for heating and smelting; S5: extracting the slag obtained in step S4 again; aluminum ash slag with different particle sizes can be obtained by screening, and the two types of aluminum ash slag can be efficiently ground and crushed by grinding. By screening out powdered aluminum ash slag with particle sizes in the same range, the next step of smelting can be accelerated, and aluminum liquid can be obtained by smelting. The aluminum liquid in the slag can be extracted to the maximum extent by re-extraction.
[0004] At present, the production process of aluminum ingots is generally as follows: adding aluminum material to a smelting pot, feeding the molten aluminum after smelting in the smelting boiler to the aluminum ingot mold on the aluminum ingot forming conveyor belt to form, cooling it by a spray cooling mechanism and transferring it to the aluminum ingot finished product conveyor belt, and then removing it by a robot for storage. A typical problem of the existing production line is that a large amount of spray water is consumed during the aluminum ingot forming process, and the cooling effect is not good, which leads to the high temperature of the aluminum ingot finished product on the aluminum ingot finished product conveyor belt, which not only affects the life of the equipment, but also poses a huge safety hazard. In addition, a Chinese patent with the announcement number "CN103464698B" discloses a cooling device for aluminum ingot production, and proposes a cooling method in which multiple cooling methods are combined (using the water in the cooling tray to indirectly cool the aluminum ingot in the aluminum ingot mold to avoid the generation of a large amount of water vapor; while using the cooling pool to cool the aluminum ingot mold to reduce the temperature), which has problems such as low cooling efficiency and poor cooling effect. Utility Model Content
[0005] In view of the problems in the prior art such as large cooling water consumption, low cooling efficiency and poor cooling effect in the cooling process of molten aluminum forming, the utility model provides an aluminum ingot cooling system. The system adopts a multi-stage countercurrent circulation cooling mechanism of a front circulation spray mechanism, a step circulation spray mechanism and a rear atomizing cooling mechanism, which greatly saves the consumption of cooling water, improves the cooling efficiency and enhances the cooling effect. Furthermore, it can also recover part of the sensible heat of the molten aluminum, thereby realizing low-energy consumption, green and environmentally friendly aluminum ingot cooling production.
[0006] In order to achieve the above technical objectives, the technical solutions adopted by the present utility model are specifically described as follows:
[0007] According to a first embodiment of the present invention, an aluminum ingot cooling system is provided:
[0008] An aluminum ingot cooling system includes an aluminum ingot conveying mechanism, a front circulating spraying mechanism, a step circulating spraying mechanism, and a rear atomizing cooling mechanism. According to the direction of the material, the front circulating spraying mechanism, the step circulating spraying mechanism, and the rear atomizing cooling mechanism are sequentially and serially sleeved on the aluminum ingot conveying mechanism.
[0009] Preferably, the front circulation spray mechanism comprises a front sealing cover, a front spray head and a front circulation water pool. The front sealing cover is arranged above the front section of the aluminum ingot conveying mechanism. The front spray head is arranged in the front sealing cover and connected to the front circulation water pool through a front circulation water pipe. The front circulation water pool is arranged below the front section of the aluminum ingot conveying mechanism. A front circulation water pump is also arranged on the front circulation water pipe.
[0010] Preferably, a main exhaust hood connected to the inner cavity is also arranged on the top of the front sealing hood.
[0011] Preferably, a temperature detector and a water level gauge are provided on the inner side wall of the front circulating water pool, a water supply pipe is provided on the upper part of the side wall of the front circulating water pool, and a drain valve is provided on the bottom wall of the front circulating water pool.
[0012] Preferably, the step circulation spray mechanism includes a multi-stage circulation spray device, which is sequentially and serially mounted on the aluminum ingot conveying mechanism according to the direction of the material and is located downstream of the front circulation spray mechanism. In the multi-stage circulation spray device, the water sprayed by the rear-stage circulation spray device is used as the circulation spray water for the front-stage circulation spray device. Preferably, part of the water sprayed by the first-stage circulation spray device close to the front circulation spray mechanism is transported to the front circulation water pool as the spray water for the front spray head.
[0013] Preferably, the stepped circulation spray mechanism is a three-stage circulation spray device, including a primary spray head, a primary water collection tank, a secondary spray head, a secondary water collection tank, a tertiary spray head and a tertiary water collection tank. According to the direction of the material, the primary spray head, the secondary spray head and the tertiary spray head are sequentially arranged above the middle section of the aluminum ingot conveying mechanism. The primary water collection tank, the secondary water collection tank and the tertiary water collection tank are respectively arranged below the primary spray head, the secondary spray head and the tertiary spray head. The primary spray head is connected to the primary water collection tank through a primary circulation water pipe and a water pump, the secondary spray head is connected to the secondary water collection tank through a secondary circulation water pipe and a water pump, and the tertiary spray head is connected to an external cold water source through a water delivery pipe. The primary water collection tank, the secondary water collection tank and the tertiary water collection tank are arranged in a row in sequence, and the horizontal heights of their tops increase successively, so that the water in the tertiary water collection tank can flow into the secondary water collection tank after overflow, and the water in the secondary water collection tank can flow into the primary water collection tank after overflow.
[0014] Preferably, the first-level water collection tank, the second-level water collection tank and the third-level water collection tank are a large water collection tank with an inclined bottom, which is separated by a first-level partition and a second-level partition. The first-level partition is located between the first-level water collection tank and the second-level water collection tank, and the second-level partition is located between the second-level water collection tank and the third-level water collection tank, and the top height of the first-level partition is lower than the top height of the second-level partition.
[0015] Preferably, an overflow hole is provided on the upper part of the side wall of the primary water collecting tank close to the front circulating water tank. The height of the overflow hole is lower than the top height of the primary partition. The water in the primary water collecting tank flows into the front circulating water tank through the overflow hole.
[0016] Preferably, the step circulation spray mechanism further comprises a middle section sealing cover. The middle section sealing cover is arranged above the primary spray head and the secondary spray head. Preferably, a secondary exhaust cover connected to the inner cavity of the middle section sealing cover is also arranged on the top of the middle section sealing cover.
[0017] Preferably, the post-atomizing cooling mechanism comprises a post-sealing cover and an atomizing spray head. The post-sealing cover is arranged above the rear section of the aluminum ingot conveying mechanism, and the atomizing spray head is arranged in the post-sealing cover.
[0018] Preferably, a cold air inlet is provided at the rear end of the rear sealing cover, an air exhaust port is provided at the front end of the rear sealing cover, and an exhaust fan is provided on the air exhaust port.
[0019] Preferably, the aluminum ingot conveying mechanism is one of a steel belt conveyor, a chain plate conveyor, and a conveying trolley. Preferably, the aluminum ingot conveying mechanism is an inclined design with a material input end lower than its material output end.
[0020] According to a second embodiment of the present invention, an aluminum ingot production system is provided:
[0021] An aluminum ingot production system comprises an ingot casting mechanism, an aluminum ingot forming conveyor belt and an aluminum ingot cooling system as described in the first embodiment, which are sequentially arranged in series. An aluminum ingot mold is also arranged on the aluminum ingot forming conveyor belt.
[0022] Preferably, the aluminum ingot production system further comprises an aluminum ingot finished product conveyor belt, a stacking robot and an aluminum ingot storage rack which are sequentially arranged in series downstream of the aluminum ingot cooling system as described in the first embodiment.
[0023] In the utility model, the aluminum ingot forming conveyor belt, the aluminum ingot conveying mechanism, and the aluminum ingot finished product conveyor belt are sequentially connected in series, or the three are an integral conveyor belt, which can be reasonably designed and selected according to actual working conditions.
[0024] In the utility model, the front circulation spray mechanism includes a front sealing cover, a front spray head and a front circulation water pool. The front circulation spray mechanism is arranged at the front end of the aluminum ingot conveying mechanism. The aluminum material with the highest temperature is first cooled by the front circulation spray mechanism, and the cooling water is repeatedly circulated in the front circulation spray mechanism until the temperature of the circulating water rises to a certain temperature (for example, it needs to be discharged through the drain valve and replaced with new water after it is higher than 80°C) or the water volume is insufficient (when the water volume in the circulating water pool is lower than the set water level), so that the circulating water cannot meet the initial cooling demand for the high-temperature aluminum material. At this time, cold water needs to be added to the circulating water pool (for example, cold water is injected into the front circulation water pool through a water supply pipe and a water pump, or water is added through the overflow hole between the primary water collecting tank). In addition, by providing a front sealing hood (for example, supported by a steel bracket and arranged above the aluminum ingot conveyor belt) and a top main exhaust hood connected to the interior thereof above the front end of the front aluminum ingot conveying mechanism, the water vapor generated during the preliminary cooling of the high-temperature aluminum material can be collected and extracted for utilization. In other words, the front circulating spray mechanism can achieve preliminary cooling of the high-temperature aluminum material on the one hand, and obtain hot steam that can be reused on the other hand, thereby realizing sensible heat recovery of the high-temperature aluminum material.
[0025] In the utility model, the stepped circulation spray mechanism includes a multi-stage circulation spray device, for example, a three-stage circulation spray device, including a primary spray head, a primary water collection tank, a secondary spray head, a secondary water collection tank, a tertiary spray head and a tertiary water collection tank, etc. The aluminum material preliminarily cooled by the pre-circulation spray mechanism still has a certain high temperature, and is stepped cooled by the stepped circulation spray mechanism. Specifically, the aluminum material after preliminary cooling first enters the primary cooling zone of the stepped circulation spray mechanism, and the primary spray head uses water from the primary water collection tank to perform primary cooling on the aluminum material. The water that passes through the material layer falls into the primary water collection tank for recycling. Then the aluminum material after primary cooling enters the secondary cooling zone, and the secondary spray head uses water from the secondary water collection tank to perform secondary cooling on the aluminum material. The water that passes through the material layer falls into the secondary water collection tank for recycling (circulated for the secondary spray head and replenishing water to the primary water collection tank). Then, the aluminum material after secondary cooling enters the tertiary cooling zone, and the tertiary spray head uses external cold water to perform tertiary cooling on the aluminum material. The water that passes through the material layer falls into the tertiary water collection tank for recycling (circulated for the tertiary spray head and replenishing water to the secondary water collection tank). The aluminum material is cooled in multiple stages through the stepped circulation spray mechanism in which the cooling water temperature is gradually reduced, and the cooling water is recycled in countercurrent (relative to the material direction). While improving the cooling efficiency of the aluminum material, the use of cooling water is greatly reduced, saving production costs.
[0026] Furthermore, since the temperature of the aluminum material after preliminary cooling is relatively high, a middle sealing cover and an auxiliary exhaust hood arranged on the top of the middle sealing cover are provided above the first-stage spray head and the second-stage spray head of the stepped circulation spray mechanism, so as to recover the hot steam generated during the first-stage cooling and the second-stage cooling process for secondary utilization, thereby further improving the sensible heat recovery effect of the aluminum material.
[0027] In the utility model, the water in the primary water collecting tank, the secondary water collecting tank and the tertiary water collecting tank is used in a countercurrent circulation. The countercurrent circulation mode of the water flow can be achieved by countercurrent transportation through a water pump and a pipe, or by gravity. In the utility model, in order to reduce energy consumption, the preferred implementation scheme is to adopt countercurrent transportation. The three water collecting tanks are closely connected to form a row, but the heights of the primary water collecting tank, the secondary water collecting tank and the tertiary water collecting tank are gradually increased. Overflow holes are provided between the primary water collecting tank and the secondary water collecting tank, and between the secondary water collecting tank and the tertiary water collecting tank. The gravity overflow of water is achieved through the height difference and overflow holes of each water collecting tank. Alternatively, a large water collecting tank with an inclined bottom is divided into three water collecting tanks (from low to high, the first-level water collecting tank, the second-level water collecting tank, and the third-level water collecting tank) by two partitions distributed along the inclined direction, and the height of the partition between the first-level water collecting tank and the second-level water collecting tank is lower than the height of the partition between the second-level water collecting tank and the third-level water collecting tank, thereby meeting the countercurrent transportation of cooling water.
[0028] In the utility model, a post-atomizing cooling mechanism is added to perform a final cooling treatment on the aluminum material. A low-temperature humid air flow is formed in the post-sealed cover of the post-atomizing cooling mechanism by spraying atomized water and inhaling cold air. The low-temperature humid air flow flows over the aluminum ingot to further cool the aluminum ingot without causing the aluminum ingot to be over-humidified.
[0029] Compared with the prior art, the beneficial technical effects of the utility model are as follows:
[0030] 1: The utility model realizes multiple continuous cooling of the aluminum ingot through the reasonable design of the front circulation spray mechanism, the step circulation spray mechanism and the rear atomization cooling mechanism, which ensures and improves the cooling effect and efficiency of the aluminum ingot, while saving the consumption of cooling water, and further recycles the sensible heat of the aluminum ingot. The system has low energy consumption and is more environmentally friendly.
[0031] 3: The aluminum ingot cooling system and aluminum ingot production system of the utility model have a simple overall structure, ingenious design, good cooling effect on the aluminum ingot, low water consumption, convenient operation and strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the overall structure of the aluminum ingot cooling system of the utility model.
[0033] Figure 2 It is an enlarged schematic diagram of the front circulation spray mechanism and the step circulation spray mechanism described in the utility model.
[0034] Figure 3 It is an enlarged schematic diagram of the rear-mounted atomizing cooling mechanism of the utility model.
[0035] Figure 4 It is a schematic diagram of the overall structure of the aluminum ingot production system described in the utility model.
[0036] Reference numerals: 1: aluminum ingot conveying mechanism; 2: front circulation spraying mechanism; 201: front sealing cover; 202: front spray head; 203: front circulation water pool; 204: front circulation water pipe; 205: front circulation water pump; 206: main exhaust hood; 207: temperature detector; 208: water level gauge; 209: water supply pipe; 210: drain valve; 3: step circulation spraying mechanism; 301: first-level spray head; 302: first-level water collection pool; 303: second-level spray head; 304: second-level water collection pool; 305: third-level spray head; 3 06: three-stage water collection tank; 307: primary circulating water pipe; 308: secondary circulating water pipe; 309: primary partition; 310: secondary partition; 311: overflow hole; 312: middle sealing cover; 313: auxiliary exhaust hood; 4: rear atomizing cooling mechanism; 401: rear sealing cover; 402: atomizing spray head; 403: cold air inlet; 404: exhaust port; 405: exhaust fan; 5: ingot casting mechanism; 6: aluminum ingot forming conveyor belt; 7: aluminum ingot mold; 8: aluminum ingot finished product conveyor belt; 9: stacking robot; 10: aluminum ingot storage rack. DETAILED DESCRIPTION
[0037] The technical solution of the utility model is illustrated below, and the scope of protection requested for the utility model includes but is not limited to the following embodiments.
[0038] An aluminum ingot cooling system includes an aluminum ingot conveying mechanism 1, a front circulation spraying mechanism 2, a step circulation spraying mechanism 3, and a rear atomizing cooling mechanism 4. According to the direction of the material, the front circulation spraying mechanism 2, the step circulation spraying mechanism 3, and the rear atomizing cooling mechanism 4 are sequentially and serially sleeved on the aluminum ingot conveying mechanism 1.
[0039] Preferably, the front circulation spray mechanism 2 includes a front sealing cover 201, a front spray head 202 and a front circulation water pool 203. The front sealing cover 201 is arranged above the front section of the aluminum ingot conveying mechanism 1. The front spray head 202 is arranged in the front sealing cover 201 and is connected to the front circulation water pool 203 through a front circulation water pipe 204. The front circulation water pool 203 is arranged below the front section of the aluminum ingot conveying mechanism 1. A front circulation water pump 205 is also arranged on the front circulation water pipe 204.
[0040] Preferably, a main exhaust hood 206 communicating with the inner cavity is further provided on the top of the front sealing hood 201 .
[0041] Preferably, a temperature detector 207 and a water level gauge 208 are provided on the inner wall of the front circulating water pool 203. A water supply pipe 209 is provided on the upper part of the side wall of the front circulating water pool 203. A drain valve 210 is provided on the bottom wall of the front circulating water pool 203.
[0042] Preferably, the step circulation spray mechanism 3 includes a multi-stage circulation spray device, which is sequentially and serially mounted on the aluminum ingot conveying mechanism 1 according to the direction of the material, and is located downstream of the front circulation spray mechanism 2. In the multi-stage circulation spray device, the water sprayed by the rear-stage circulation spray device is used as the circulation spray water for the front-stage circulation spray device. Preferably, part of the water sprayed by the first-stage circulation spray device close to the front circulation spray mechanism 2 is transported to the front circulation water pool 203 as the spray water for the front spray head 202.
[0043] Preferably, the step circulation spray mechanism 3 is a three-stage circulation spray device, including a primary spray head 301, a primary water collection tank 302, a secondary spray head 303, a secondary water collection tank 304, a tertiary spray head 305 and a tertiary water collection tank 306. According to the direction of the material, the primary spray head 301, the secondary spray head 303 and the tertiary spray head 305 are sequentially arranged above the middle section of the aluminum ingot conveying mechanism 1. The primary water collection tank 302, the secondary water collection tank 304 and the tertiary water collection tank 306 are respectively arranged below the primary spray head 301, the secondary spray head 303 and the tertiary spray head 305. The primary spray head 301 is connected to the primary water collection tank 302 through the primary circulation water pipe 307 and the water pump, the secondary spray head 303 is connected to the secondary water collection tank 304 through the secondary circulation water pipe 308 and the water pump, and the tertiary spray head 305 is connected to the external cold water source through the water delivery pipe. The primary water collection tank 302, the secondary water collection tank 304, and the tertiary water collection tank 306 are arranged closely in a row, and the horizontal heights of their tops increase successively, so that the water in the tertiary water collection tank 306 can flow into the secondary water collection tank 304 after overflow, and the water in the secondary water collection tank 304 can flow into the primary water collection tank 302 after overflow.
[0044] Preferably, the primary water collection tank 302, the secondary water collection tank 304 and the tertiary water collection tank 306 are a large water collection tank with an inclined bottom, which are separated by a primary partition 309 and a secondary partition 310. The primary partition 309 is located between the primary water collection tank 302 and the secondary water collection tank 304, the secondary partition 310 is located between the secondary water collection tank 304 and the tertiary water collection tank 306, and the top height of the primary partition 309 is lower than the top height of the secondary partition 310.
[0045] Preferably, an overflow hole 311 is provided on the upper part of the side wall of the first-level water collecting tank 302 close to the front circulating water tank 203. The height of the overflow hole 311 is lower than the top height of the first-level partition 309. The water in the first-level water collecting tank 302 flows into the front circulating water tank 203 through the overflow hole 311.
[0046] Preferably, the step circulation spray mechanism 3 further comprises a middle section sealing cover 312. The middle section sealing cover 312 is arranged above the primary spray head 301 and the secondary spray head 303. Preferably, a secondary exhaust cover 313 connected to the inner cavity of the middle section sealing cover 312 is also arranged on the top.
[0047] Preferably, the post-atomizing cooling mechanism 4 comprises a post-sealing cover 401 and an atomizing spray head 402. The post-sealing cover 401 is disposed above the rear section of the aluminum ingot conveying mechanism 1, and the atomizing spray head 402 is disposed in the post-sealing cover 401.
[0048] Preferably, a cold air inlet 403 is provided at the rear end of the rear sealing cover 401 , an air exhaust port 404 is provided at the front end of the rear sealing cover 401 , and an exhaust fan 405 is provided on the air exhaust port 404 .
[0049] Preferably, the aluminum ingot conveying mechanism 1 is a steel belt conveyor, a chain plate conveyor, or a conveying trolley. Preferably, the aluminum ingot conveying mechanism 1 is an inclined design with a material input end lower than a material output end.
[0050] An aluminum ingot production system includes an ingot casting mechanism 5, an aluminum ingot forming conveyor belt 6, and the aluminum ingot cooling system as described above, which are sequentially arranged in series. An aluminum ingot mold 7 is also arranged on the aluminum ingot forming conveyor belt 6.
[0051] Preferably, the aluminum ingot production system further comprises an aluminum ingot finished product conveyor belt 8, a stacking robot 9 and an aluminum ingot storage rack 10 which are sequentially connected in series downstream of the aluminum ingot cooling system.
[0052] Example 1
[0053] like Figure 1-3 As shown, an aluminum ingot cooling system includes an aluminum ingot conveying mechanism 1, a front circulation spraying mechanism 2, a step circulation spraying mechanism 3, and a rear atomizing cooling mechanism 4. According to the direction of the material, the front circulation spraying mechanism 2, the step circulation spraying mechanism 3, and the rear atomizing cooling mechanism 4 are sequentially arranged in series on the aluminum ingot conveying mechanism 1.
[0054] Example 2
[0055] Example 1 is repeated, except that the front circulation spray mechanism 2 includes a front sealing cover 201, a front spray head 202 and a front circulation water pool 203. The front sealing cover 201 is arranged above the front section of the aluminum ingot conveying mechanism 1. The front spray head 202 is arranged in the front sealing cover 201 and is connected to the front circulation water pool 203 through a front circulation water pipe 204. The front circulation water pool 203 is arranged below the front section of the aluminum ingot conveying mechanism 1. A front circulation water pump 205 is also arranged on the front circulation water pipe 204.
[0056] Example 3
[0057] The second embodiment is repeated, except that a main exhaust hood 206 communicating with the inner cavity is further provided on the top of the front sealing hood 201 .
[0058] Example 4
[0059] Example 3 is repeated, except that a temperature detector 207 and a water level gauge 208 are further provided on the inner wall of the front circulating water pool 203. A water supply pipe 209 is further provided on the upper part of the side wall of the front circulating water pool 203. A drain valve 210 is further provided on the bottom wall of the front circulating water pool 203.
[0060] Example 5
[0061] Example 4 is repeated, except that the step circulation spray mechanism 3 includes a multi-stage circulation spray device, which is sequentially and serially sleeved on the aluminum ingot conveying mechanism 1 according to the direction of the material, and is located downstream of the front circulation spray mechanism 2. In the multi-stage circulation spray device, the water sprayed by the latter stage circulation spray device is used as the circulation spray water of the former stage circulation spray device.
[0062] Example 6
[0063] Repeat Example 5, except that part of the water after spraying by the first-stage circulating spray device close to the front circulating spray mechanism 2 is transported to the front circulating water pool 203 as spray water for the front spray head 202.
[0064] Example 7
[0065] Example 6 is repeated, except that the step circulation spray mechanism 3 is a three-stage circulation spray device, including a primary spray head 301, a primary water collection tank 302, a secondary spray head 303, a secondary water collection tank 304, a tertiary spray head 305 and a tertiary water collection tank 306. According to the direction of the material, the primary spray head 301, the secondary spray head 303, and the tertiary spray head 305 are sequentially arranged above the middle section of the aluminum ingot conveying mechanism 1. The primary water collection tank 302, the secondary water collection tank 304, and the tertiary water collection tank 306 are respectively arranged below the primary spray head 301, the secondary spray head 303, and the tertiary spray head 305. The primary spray head 301 is connected to the primary water collection tank 302 through the primary circulating water pipe 307 and the water pump, the secondary spray head 303 is connected to the secondary water collection tank 304 through the secondary circulating water pipe 308 and the water pump, and the tertiary spray head 305 is connected to the external cold water source through the water delivery pipe. The primary water collection tank 302, the secondary water collection tank 304, and the tertiary water collection tank 306 are arranged in a row in sequence, and the horizontal heights of their tops are increased in sequence, so that the water in the tertiary water collection tank 306 can flow into the secondary water collection tank 304 after overflowing, and the water in the secondary water collection tank 304 can flow into the primary water collection tank 302 after overflowing.
[0066] Example 8
[0067] Example 7 is repeated, except that the primary water collection tank 302, the secondary water collection tank 304, and the tertiary water collection tank 306 are formed into a large water collection tank with an inclined bottom surface, which is separated by a primary partition 309 and a secondary partition 310. The primary partition 309 is located between the primary water collection tank 302 and the secondary water collection tank 304, and the secondary partition 310 is located between the secondary water collection tank 304 and the tertiary water collection tank 306, and the top height of the primary partition 309 is lower than the top height of the secondary partition 310.
[0068] Example 9
[0069] Example 8 is repeated, except that an overflow hole 311 is further provided on the upper portion of the side wall of the primary water collecting tank 302 close to the front circulating water tank 203. The overflow hole 311 is arranged at a height lower than the top height of the primary partition 309. The water in the primary water collecting tank 302 flows into the front circulating water tank 203 through the overflow hole 311.
[0070] Example 10
[0071] The embodiment 9 is repeated, except that the step circulation spray mechanism 3 further includes a middle section sealing cover 312. The middle section sealing cover 312 is arranged above the primary spray head 301 and the secondary spray head 303.
[0072] Embodiment 11
[0073] The embodiment 10 is repeated, except that a secondary exhaust hood 313 communicating with the inner cavity of the middle sealing hood 312 is further provided on the top of the middle sealing hood 312.
[0074] Example 12
[0075] The embodiment 11 is repeated, except that the post-atomizing cooling mechanism 4 comprises a post-sealing cover 401 and an atomizing spray head 402. The post-sealing cover 401 is disposed above the rear section of the aluminum ingot conveying mechanism 1, and the atomizing spray head 402 is disposed inside the post-sealing cover 401.
[0076] Embodiment 13
[0077] Example 12 is repeated, except that a cold air intake port 403 is provided at the rear end of the rear sealing cover 401, an exhaust port 404 is provided at the front end of the rear sealing cover 401, and an exhaust fan 405 is provided on the exhaust port 404.
[0078] Embodiment 14
[0079] Example 13 is repeated, except that the aluminum ingot conveying mechanism 1 is a steel belt conveyor.
[0080] Embodiment 15
[0081] Example 14 is repeated, except that the aluminum ingot conveying mechanism 1 is designed to be inclined with the material input end being lower than the material output end.
[0082] Example 16
[0083] like Figure 4 As shown, an aluminum ingot production system comprises an ingot casting mechanism 5, an aluminum ingot forming conveyor belt 6 and an aluminum ingot cooling system as described above, which are sequentially arranged in series. An aluminum ingot mold 7 is also arranged on the aluminum ingot forming conveyor belt 6.
[0084] Embodiment 17
[0085] Example 16 is repeated, except that the aluminum ingot production system further includes an aluminum ingot finished product conveyor belt 8, a stacking robot 9 and an aluminum ingot storage rack 10 which are sequentially connected in series downstream of the aluminum ingot cooling system.
Claims
1. An aluminum ingot cooling system, characterized in that: The system comprises an aluminum ingot conveying mechanism (1), a front circulation spraying mechanism (2), a step circulation spraying mechanism (3) and a rear atomizing cooling mechanism (4); according to the direction of the material, the front circulation spraying mechanism (2), the step circulation spraying mechanism (3) and the rear atomizing cooling mechanism (4) are sequentially and serially sleeved on the aluminum ingot conveying mechanism (1).
2. The system according to claim 1, characterized in that: The front circulation spray mechanism (2) comprises a front sealing cover (201), a front spray head (202) and a front circulation water pool (203); the front sealing cover (201) is arranged above the front section of the aluminum ingot conveying mechanism (1); the front spray head (202) is arranged in the front sealing cover (201) and connected to the front circulation water pool (203) through a front circulation water pipe (204); the front circulation water pool (203) is arranged below the front section of the aluminum ingot conveying mechanism (1); and a front circulation water pump (205) is also arranged on the front circulation water pipe (204).
3. The system according to claim 2, characterized in that: A main exhaust hood (206) communicating with the inner cavity is also provided on the top of the front sealing hood (201); and / or A temperature detector (207) and a water level gauge (208) are also provided on the inner wall of the front circulating water pool (203); a water supply pipe (209) is also provided on the upper part of the side wall of the front circulating water pool (203); and a drain valve (210) is also provided on the bottom wall of the front circulating water pool (203).
4. The system according to claim 2, characterized in that: The step circulation spray mechanism (3) comprises a multi-stage circulation spray device. According to the direction of the material, the multi-stage circulation spray device is sequentially arranged in series on the aluminum ingot conveying mechanism (1) and is located downstream of the front circulation spray mechanism (2). In the multi-stage circulation spray device, the water sprayed by the rear-stage circulation spray device is used as the circulation spray water of the front-stage circulation spray device.
5. The system according to claim 4, characterized in that: Part of the water sprayed by the first-stage circulating spray device close to the front circulating spray mechanism (2) is transported to the front circulating water pool (203) as spray water for the front spray head (202).
6. The system according to claim 4, characterized in that: The step circulation spray mechanism (3) is a three-stage circulation spray device, comprising a first-stage spray head (301), a first-stage water collecting tank (302), a second-stage spray head (303), a second-stage water collecting tank (304), a third-stage spray head (305) and a third-stage water collecting tank (306); according to the direction of the material, the first-stage spray head (301), the second-stage spray head (303) and the third-stage spray head (305) are sequentially arranged above the middle section of the aluminum ingot conveying mechanism (1); the first-stage water collecting tank (302), the second-stage water collecting tank (304) and the third-stage water collecting tank (306) are respectively arranged below the first-stage spray head (301), the second-stage spray head (303) and the third-stage spray head (305); The spray head (301) is connected to the primary water collecting tank (302) through the primary circulating water pipe (307) and a water pump, the secondary spray head (303) is connected to the secondary water collecting tank (304) through the secondary circulating water pipe (308) and a water pump, and the tertiary spray head (305) is connected to an external cold water source through a water pipe; the primary water collecting tank (302), the secondary water collecting tank (304), and the tertiary water collecting tank (306) are arranged in a row in sequence, and the horizontal heights of their tops are increased in sequence, so that the water in the tertiary water collecting tank (306) can flow into the secondary water collecting tank (304) after overflowing, and the water in the secondary water collecting tank (304) can flow into the primary water collecting tank (302) after overflowing.
7. The system according to claim 6, characterized in that: The primary water collection tank (302), the secondary water collection tank (304), and the tertiary water collection tank (306) are a large water collection tank with an inclined bottom surface, which is separated by a primary partition (309) and a secondary partition (310). The primary partition (309) is located between the primary water collection tank (302) and the secondary water collection tank (304), and the secondary partition (310) is located between the secondary water collection tank (304) and the tertiary water collection tank (306). The top height of the primary partition (309) is lower than the top height of the secondary partition (310).
8. The system according to claim 7, characterized in that: An overflow hole (311) is also provided on the upper portion of the side wall of the primary water collecting tank (302) close to the front circulating water tank (203). The height of the overflow hole (311) is lower than the top height of the primary baffle (309). Water in the primary water collecting tank (302) flows into the front circulating water tank (203) through the overflow hole (311).
9. The system according to claim 8, characterized in that: The stepped circulation spray mechanism (3) further comprises a middle section sealing cover (312); the middle section sealing cover (312) is arranged above the first-stage spray head (301) and the second-stage spray head (303).
10. The system according to claim 9, characterized in that: An auxiliary air extraction hood (313) communicating with the inner cavity of the middle sealing hood (312) is also provided on the top of the middle sealing hood (312).
11. The system according to any one of claims 1 to 10, characterized in that: The rear atomizing cooling mechanism (4) comprises a rear sealing cover (401) and an atomizing spray head (402); the rear sealing cover (401) is arranged above the rear section of the aluminum ingot conveying mechanism (1), and the atomizing spray head (402) is arranged inside the rear sealing cover (401).
12. The system according to claim 11, characterized in that: A cold air inlet (403) is provided at the rear end of the rear sealing cover (401), an air exhaust port (404) is provided at the front end of the rear sealing cover (401), and an exhaust fan (405) is provided on the air exhaust port (404).
13. The system according to any one of claims 1 to 10 and 12, characterized in that: The aluminum ingot conveying mechanism (1) is one of a steel belt conveyor, a chain plate conveyor, and a conveying trolley.
14. The system according to claim 11, characterized in that: The aluminum ingot conveying mechanism (1) is one of a steel belt conveyor, a chain plate conveyor, and a conveying trolley.
15. The system according to claim 13, characterized in that: The aluminum ingot conveying mechanism (1) is designed to be inclined such that the material input end is lower than the material output end.
16. The system according to claim 14, characterized in that: The aluminum ingot conveying mechanism (1) is designed to be inclined such that the material input end is lower than the material output end.
17. An aluminum ingot production system, characterized in that: The aluminum ingot production system comprises an ingot casting mechanism (5), an aluminum ingot forming conveyor belt (6) and an aluminum ingot cooling system as described in any one of claims 1 to 16, which are arranged in series in sequence; an aluminum ingot mold (7) is also arranged on the aluminum ingot forming conveyor belt (6).
18. The aluminum ingot production system according to claim 17, characterized in that: The aluminum ingot production system also includes an aluminum ingot finished product conveyor belt (8), a stacking robot (9) and an aluminum ingot storage rack (10) which are sequentially arranged in series downstream of the aluminum ingot cooling system.