Water and electricity integrated beam manufacturing pedestal
By designing integrated hydropower beam-making pedestals, the problem of messy power supply and water supply lines on the beam-making pedestals is solved, and the integrated water-power supply in the beam-making pedestals is realized, which improves the safety and management convenience of the construction site.
Patent Information
- Application Number
- CN202323414527.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2033-12-14
AI Technical Summary
During the beam making process, the complicated private connection of power supply lines and water supply pipelines in the prior art leads to unsafe construction sites and difficult to ensure the orderliness and standardization of production.
A hydropower integrated beam pedestal was designed, with power supply lines and water supply pipes embedded in the base base, a box room was opened on the surface of the pedestal body, and a distribution box and an external water connection were installed. All water and electricity were integrated into the machine through these components. On the beam pedestal, water and power are supplied.
The water and electricity supply can be completed without external water pipes and wires in the beam making site, reducing the degree of messy on the site, reducing safety hazards, and improving the convenience and tidyness of construction management.
Smart Images

Figure CN222494741U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of beam-making pedestals, in particular to a hydropower integrated beam-making pedestal. Background Art
[0002] In the field of modern bridge engineering, centralized prefabrication of beams and slabs has the advantages of standardized production, quick and convenient on-site installation, energy-saving and environmentally friendly construction, and is widely used. Under the form of standardization, finalization and assembly of beam components, the construction of large-scale beam yards is imperative.
[0003] In the process of beam making, various equipment is needed, some of which must use external power supply. At the same time, the spray maintenance of beam slabs and the cleaning of the site require a lot of water resources. At present, the power supply lines and water supply pipelines at the beam making site are external, and wires or pipelines are pulled from a centralized point to the beam making pedestal. This causes problems such as private pulling and random connection of on-site power lines and water pipelines for maintenance. In order to build standardized sites, ensure the normal and orderly production of prefabricated beams, reduce safety hazards during construction, and solve the problem of messy water and electricity lines in the beam yard, it is particularly important to build standardized sites, ensure the normal and orderly production of prefabricated beams, and reduce safety hazards during construction.
[0004] Based on this, the utility model designs a hydropower integrated beam-making pedestal to solve the above problems. Utility Model Content
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a hydropower integrated beam-making pedestal, the beam-making pedestal comprising a pedestal foundation and a pedestal body fixed on the pedestal foundation, the pedestal foundation having power supply lines and water supply pipelines pre-buried therein, a box chamber being provided on the surface of the pedestal body, an external water inlet connected to the water supply pipeline and a distribution box connected to the power supply line being installed in the box chamber, water and electricity being supplied to the outside respectively through the external water inlet and the distribution box.
[0006] As a further solution of the utility model, a plurality of nozzle holes perpendicular to the length direction of the platform body are opened on the surface of the platform body, and a spray device is installed in the nozzle hole. The spray device is connected to the water supply pipeline embedded in the platform base through an internal pipeline embedded in the platform body.
[0007] As a further solution of the utility model, the spray device includes a spray head, and two spray heads are installed in the spray head channel along the axial direction of the spray head channel, and the two spray heads are symmetrically arranged about the center of the spray head channel.
[0008] As a further solution of the utility model, a plurality of screw holes for installing tension screws are provided at equal intervals on the surface of the platform body along the length direction of the platform body.
[0009] As a further solution of the utility model, the spray head adopts a telescopic rotating spray head, and the spray head extends out from the spray head channel under the action of water pressure.
[0010] As a further solution of the utility model, two boxes are provided on the surface of the platform body, and the two boxes are used to install an external water inlet and a distribution box respectively.
[0011] As a further solution of the utility model, a manual valve is installed on the external water inlet.
[0012] As a further solution of the utility model, an electromagnetic valve is installed at one end of the internal pipeline close to the water supply pipeline.
[0013] As a further solution of the utility model, electromagnetic valves are provided on the top surfaces at both ends of the platform body.
[0014] As a further solution of the utility model, a steel plate is installed on the top surface of the platform body, and the part of the steel plate located on the electromagnetic valve is detachable.
[0015] The utility model has the following beneficial effects:
[0016] The beam-making pedestal is divided into a pedestal foundation and a pedestal body. During the manufacturing process of the pedestal foundation, power supply lines and water supply pipes are pre-buried therein, and a box room is opened on the surface of the pedestal body, in which a distribution box and an external water connecting pipe are installed. The power supply line is connected to the distribution box, and power is supplied to the outside through the distribution box, while the water supply pipe is connected to the external water connecting pipe, and water is supplied to the outside through the external water connecting pipe. In this way, water and electricity are all integrated on the beam-making pedestal. When pouring beams and slabs on the beam-making pedestal, the water required for pouring the beams and slabs can be provided through the external water connecting pipe, and electric energy can be provided for the equipment used in the pouring of the beams and slabs through the distribution box. When the beam-making pedestal is used to produce beams and slabs, the beam-making pedestal can provide the water and electricity required for beam making, eliminating the step of pulling wires from a distance, reducing the length of the exposed parts of the water pipes and wires, making the site tidier, effectively reducing the occurrence of private connections and random pulling, facilitating management, eliminating the impact of messy wires and water pipes on personnel, and reducing safety hazards.
[0017] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0019] Figure 1It is a schematic diagram of the overall structure of the utility model.
[0020] Figure 2 It is a schematic front view of the local structure of the utility model.
[0021] Figure 3 It is a formal schematic diagram of the local structure of the utility model.
[0022] Figure 4 This is a structural schematic diagram of the utility model in which a distribution box is installed on the platform body.
[0023] Figure 5 It is a schematic diagram of the middle structure of the platform body of the utility model.
[0024] Figure 6 This is a schematic diagram of the structure of the platform body of the utility model with an external water inlet installed.
[0025] Legend:
[0026] 1. Pedestal foundation; 11. Power supply line; 12. Water supply pipeline; 2. Platform body; 21. Box chamber; 22. External water inlet; 221. Manual valve; 23. Distribution box; 24. Nozzle channel; 241. Nozzle; 25. Screw hole; 26. Internal pipeline; 261. Solenoid valve; 27. Hanging beam groove; 28. Steel plate. DETAILED DESCRIPTION
[0027] The embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. However, the present invention can be implemented in a variety of different ways as defined and covered below.
[0028] See also Figure 1-6 The utility model provides a technical solution: a water-power integrated beam-making pedestal, the beam-making pedestal comprising a pedestal foundation 1 and a pedestal body 2 fixed on the pedestal foundation 1, a power supply line 11 and a water supply pipeline 12 are pre-buried in the pedestal foundation 1, a box chamber 21 is opened on the surface of the pedestal body 2, an external water inlet 22 connected to the water supply pipeline 12 and a distribution box 23 connected to the power supply line 11 are installed in the box chamber 21, water and electricity are supplied to the outside respectively through the external water inlet 22 and the distribution box 23.
[0029] In this embodiment, when the beam-making pedestal and the platform body 2 are manufactured, a power supply line 11 and a water supply pipe 12 are pre-buried in the beam-making pedestal, and the power supply line 11 and the water supply pipe 12 are extended to the box chamber 21 opened in the platform body 2. An external water inlet 22 and a distribution box 23 are provided in the box chamber 21. The power supply line 11 is connected to the distribution box 23. The distribution box 23 can be used to power the equipment that requires an external power supply during the beam-making process of the beam-making pedestal. For example, in the process of beam-making, when the concrete pouring is completed and the concrete needs to be vibrated by a vibrating rod, the power supply socket of the vibrating rod can be plugged into the distribution box 23 in the box chamber 21 on the surface of the platform body 2, so as to provide the vibrating rod with the electrical energy required for its work, without the need to pull power separately. The water supply line 12 is connected with the external water inlet 22, which can provide the water resources needed in the beam making process. For example, when the beam slab needs to be sprayed for cooling and maintenance or the pedestal foundation 1 needs to be cleaned, a hose is connected to the external water inlet 22, and a sprinkler head is installed on the other end of the hose. The water supply line 12 can supply water to the hose through the external water inlet 22, and then the water is sprayed on the beam slab through the sprinkler head. There is no need to pull an additional water pipe. In the entire beam making process, no external water pipes and wires are required. The electricity and water needed in the beam making process can be supplied through the external water pipe on the platform body 2 and the distribution box 23, making the site more tidy and easy to manage, eliminating the impact of messy wires and pipes on personnel, and reducing safety hazards.
[0030] like Figure 1-6 As shown, a plurality of nozzle holes 24 perpendicular to the length direction of the platform body 2 are opened on the surface of the platform body 2, and a spray device is installed in the nozzle hole 24. The spray device is connected to the water supply pipeline 12 embedded in the pedestal base 1 through an internal pipeline 26 embedded in the platform body 2.
[0031] In this embodiment, when the platform body 2 is manufactured, a nozzle channel 24 for accommodating a spray device is reserved on the surface of the platform body 2. The opening direction of the nozzle channel 24 is perpendicular to the length direction of the platform body 2, and multiple nozzle channels 24 are opened at equal intervals along the length direction of the platform body 2. At the same time, an internal pipeline 26 is embedded in the platform body 2 to connect the water supply pipeline and the spray device. The water supply pipeline 12 can be connected to the spray device through the internal pipeline 26 to supply water to the spray device. The entire beam and slab can be sprayed through the spray devices in the multiple nozzle channels 24, thereby realizing the automation of spray maintenance. Manual spraying is no longer required, and the water supply pipeline 12 and the spray device required for spraying are all integrated on the platform body 2, further reducing the external pipelines during beam manufacturing, and the overall integration is higher.
[0032] like Figure 2-6 As shown, the spray device includes a spray head 241 , and two spray heads 241 are installed in the spray head channel 24 along the axial direction of the spray head channel 24 , and the two spray heads 241 are symmetrically arranged about the center of the spray head channel 24 .
[0033] In this embodiment, two nozzles 241 are installed in the nozzle hole 241, and the two nozzles 241 are respectively used to spray the front and rear sides of the beam plate to ensure the spraying range.
[0034] like Figure 1-6 As shown, a plurality of screw holes 25 for installing tension screws are provided at equal intervals on the surface of the platform body 2 along the length direction of the platform body 2 .
[0035] In this embodiment, a plurality of screw holes 25 for installing tension screws are provided at equal intervals on the surface of the platform body 2 along the length direction of the platform body 2. When installing the template, the tension screws are passed through the screw holes 25 reserved on the surface of the platform body 2 to position and fix the template.
[0036] like Figure 5-6 As shown, the nozzle 241 is a telescopic rotating nozzle, and the nozzle 241 extends from the nozzle channel 24 under the action of water pressure.
[0037] In this embodiment, the nozzle 241 adopts a telescopic rotating nozzle. When pouring the beams and slabs, it is necessary to build a template. The template is fixed to the side of the platform body 2 by a tension screw. At this time, the nozzle 241 is retracted in the hole of the nozzle 241, and the template will block the hole of the nozzle 241. When the pouring is completed and the template is removed, under the action of the water pressure of the water supply pipeline 12, the nozzle 241 will extend from the hole of the nozzle 241 to spray the beams and slabs above the platform body 2.
[0038] like Figure 1-3 As shown, two boxes 21 are provided on the surface of the platform body 2, and the two boxes 21 are used to install an external water inlet 22 and a distribution box 23 respectively.
[0039] In this embodiment, two boxes 21 are opened on the platform body 2, and the external water inlet 22 and the distribution box 23 are respectively installed in the two boxes 21. The external water inlet 22 and the distribution box 23 are installed separately to reduce safety hazards.
[0040] like Figure 6 As shown, a manual valve 221 is installed on the external water inlet 22 .
[0041] In this embodiment, a manual valve 221 is installed on the external water inlet 22. When an external pipeline is connected to the external water inlet 22, the opening and closing of the external water inlet 22 can be controlled by the manual valve 221, so that the external water inlet 22 can be controlled independently.
[0042] like Figure 6 As shown, an electromagnetic valve 261 is installed at one end of the internal pipeline 26 close to the water supply pipeline 12.
[0043] In this embodiment, an electromagnetic valve 261 is installed at one end of the internal pipeline 26 close to the water supply pipeline 12. The opening and closing of the internal pipeline 26 is controlled by the electromagnetic valve 261, so as to control the operation of the nozzle 241. The external water inlet 22 and the internal pipeline 26 are respectively controlled by the manual valve 221 and the electromagnetic valve 261, so as to realize the separate control of the external water inlet 22 and the internal pipeline 26. Since the spray maintenance needs to be carried out at regular intervals, the electromagnetic valve 261 can better control the spray time, making the overall device more convenient to use.
[0044] like Figure 1-6 As shown, the top surfaces at both ends of the platform body 2 are provided with hanging beam grooves 27 .
[0045] In this embodiment, the top surfaces at both ends of the platform body 2 are provided with hanging beam grooves 27, and the distance between the hanging beam grooves 27 and the ends of the platform body 2 is 1m. The hanging beam grooves 27 will form a gap under the manufactured beam slab, making it convenient to lift the manufactured beam slab.
[0046] like Figure 4-6 As shown, a steel plate 28 is installed on the top surface of the platform body 2, and the part of the steel plate 28 located on the hanging beam groove 27 is detachable.
[0047] In this embodiment, a steel plate 28 is installed on the top surface of the platform body 2. The part of the steel plate 28 located on the hanging beam groove 27 is removable. The steel plate 28 serves as the bottom mold of the template. Stop strips are set on both sides of the steel plate 28 to prevent leakage of slurry. When the beam is lifted, the steel plate 28 located above the hanging beam groove 27 can be lifted together with the beam.
[0048] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A hydropower integrated beam-making pedestal, the beam-making pedestal comprising a pedestal foundation (1) and a pedestal body (2) fixed on the pedestal foundation (1), characterized in that: The pedestal base (1) is pre-buried with a power supply line (11) and a water supply pipeline (12); the surface of the pedestal body (2) is provided with a box chamber (21); an external water inlet (22) connected to the water supply pipeline (12) and a distribution box (23) connected to the power supply line (11) are installed in the box chamber (21); water and power are respectively supplied to the outside through the external water inlet (22) and the distribution box (23).
2. The hydropower integrated beam-making pedestal according to claim 1, characterized in that: The surface of the platform body (2) is provided with a plurality of nozzle channels (24) perpendicular to the length direction of the platform body (2), and a spray device is installed in the nozzle channel (24), and the spray device is connected to the water supply pipeline (12) pre-buried in the platform base (1) through an internal pipeline (26) pre-buried in the platform body (2).
3. The hydropower integrated beam-making pedestal according to claim 2, characterized in that: The spray device comprises a spray head (241), two spray heads (241) are installed in the spray head channel (24) along the axial direction of the spray head channel (24), and the two spray heads (241) are symmetrically arranged about the center of the spray head channel (24).
4. The hydropower integrated beam-making pedestal according to claim 1, characterized in that: The surface of the platform body (2) is provided with a plurality of screw holes (25) for installing tension screws at equal intervals along the length direction of the platform body (2).
5. The hydropower integrated beam-making pedestal according to claim 3, characterized in that: The spray head (241) is a telescopic rotating spray head, and the spray head (241) extends out from the spray head channel (24) under the action of water pressure.
6. The hydropower integrated beam-making pedestal according to claim 1, characterized in that: The surface of the platform body (2) is provided with two chambers (21), and the two chambers (21) are respectively used to install an external water inlet (22) and a distribution box (23).
7. The hydropower integrated beam-making pedestal according to claim 1, characterized in that: A manual valve (221) is installed on the external water inlet (22).
8. The hydropower integrated beam-making pedestal according to claim 2, characterized in that: An electromagnetic valve (261) is installed at one end of the internal pipeline (26) close to the water supply pipeline (12).
9. The hydropower integrated beam-making pedestal according to claim 1, characterized in that: The top surfaces at both ends of the platform body (2) are provided with hanging beam grooves (27).
10. The hydropower integrated beam-making pedestal according to claim 9, characterized in that: A steel plate (28) is installed on the top surface of the platform body (2), and the portion of the steel plate (28) located on the hanging beam groove (27) is detachable.