Concrete member splicing auxiliary device for constructional engineering

By designing the splicing auxiliary device for concrete components for construction projects, and using technical means such as combined fine-tuning support structures and hydraulic push rods, the precise position adjustment and fixing of concrete components is achieved, and the problem of difficulty in precise adjustment of splicing positions in the existing technology is solved. , improve construction accuracy.

CN222501108UActive Publication Date: 2025-02-18缪波航
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420961122.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2025-02-18
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

When splicing, the combined position of existing concrete components is difficult to accurately adjust due to the casting allowance, and the lifting equipment is easily shaken, which affects the construction accuracy.

Method used

A concrete component splicing auxiliary device for construction engineering was designed, and a combined fine-tuning support structure is adopted, including adjustment support seats, hydraulic push rods, lift brackets and telescopic sleeves. Through the cooperation of hydraulic push rods and lift brackets, the concrete components are realized. precise movement and fixation.

Benefits of technology

The device can stably clamp and adjust the position of the concrete member to ensure splicing accuracy, and solve the problem of inaccurate position adjustment in the prior art.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222501108U_ABST
    Figure CN222501108U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete member splicing auxiliary device for constructional engineering, which comprises a pair of adjusting supporting seats, a pair of adjusting supporting seats and a pair of adjusting supporting seats, wherein a combined fine-tuning supporting structure is mounted on the pair of adjusting supporting seats; the combined fine adjustment supporting structure comprises a pair of adjusting mounting cavities, two pairs of hydraulic push rods, a pair of combined grooves, a pair of lifting supports, a pair of connecting blocks, a pair of telescopic sleeve plates, a connecting plate, a plurality of adjusting bottom feet and a plurality of threaded supporting legs. The utility model relates to the technical field of building construction auxiliary equipment, and has the beneficial effects that the problems that the combination position needs to be accurately adjusted during combination and splicing due to the fact that pouring allowance is left at the combination position during production of the existing concrete member, the concrete member is adjusted and supported through hoisting equipment during construction, and the construction efficiency is high are solved; however, due to the fact that the concrete member is large and is prone to shaking during hoisting and fixing, the combination position of the member cannot be accurately adjusted, and construction precision is affected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction auxiliary equipment, in particular to a concrete component splicing auxiliary device for construction engineering. Background Art

[0002] Concrete components are structural components made of concrete, commonly used in building and infrastructure construction. With the development of technology, prefabricated concrete components are often used for splicing in construction projects to achieve rapid construction. Existing concrete components will leave casting margins at the assembly points during production, so the assembly position needs to be accurately adjusted during splicing. During construction, the concrete components are adjusted and supported by lifting equipment. However, since the concrete components are large and are prone to shaking during lifting and fixing, the assembly position of the components cannot be accurately adjusted, affecting the construction accuracy. Utility Model Content

[0003] To achieve the above purpose, the utility model is implemented through the following technical solutions: a concrete component splicing auxiliary device for construction engineering, comprising: a pair of adjustment support seats, on which a combined fine-tuning support structure is installed;

[0004] The combined fine-tuning support structure includes: a pair of adjustment installation cavities, two pairs of hydraulic push rods, a pair of combination slots, a pair of lifting brackets, a pair of connecting blocks, a pair of telescopic sleeves, a connecting plate, a plurality of adjustment feet and a plurality of threaded legs;

[0005] A pair of adjustment installation cavities are provided inside a pair of adjustment support seats, two pairs of hydraulic push rods are installed in the pair of adjustment installation cavities, a pair of combination grooves are provided on a pair of adjustment support seats, a pair of lifting brackets are movably embedded in the pair of combination grooves, a pair of connecting blocks are installed on the side walls of a pair of lifting brackets, the output ends of the two pairs of hydraulic push rods are connected to the pair of connecting blocks, a pair of telescopic sleeves are installed on the inner wall surfaces of a pair of lifting brackets, both ends of the connecting plates are embedded in the pair of telescopic sleeves, a number of adjustment feet are installed on a pair of adjustment support seats, and a number of threaded legs penetrate a pair of adjustment support seats and are installed on a number of adjustment feet through threads.

[0006] Preferably, a pair of guide rods are installed on the pair of lifting brackets.

[0007] Preferably, fixed brackets are installed on the two pairs of hydraulic push rods.

[0008] Preferably, two pairs of hydraulic push rods are installed on a pair of connecting blocks through a combination block.

[0009] Preferably, reinforcing ribs are installed below the pair of telescopic sleeves.

[0010] Preferably, a storage cavity is provided in a pair of telescopic sleeves.

[0011] Beneficial Effects

[0012] The utility model provides a concrete component splicing auxiliary device for construction engineering, which has the following beneficial effects: this scheme uses a combined fine-tuning support structure and a lifting support structure supported by the bottom, which can clamp the bottom end of the concrete component and perform stable lifting and lowering adjustments, and is convenient for mobile adjustment in a small size range. It solves the problem that the existing concrete components will leave casting margins at the combination during production, so the combination position needs to be accurately adjusted during combination and splicing. During construction, the concrete components are adjusted and supported by lifting equipment. However, since the concrete components are large and the lifting and fixing are prone to shaking, the combination position of the components cannot be accurately adjusted, affecting the construction accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 The utility model is a schematic diagram of the three-dimensional structure of a concrete component splicing auxiliary device for construction engineering.

[0014] Figure 2 It is a schematic diagram of the front and cross-sectional structure of a concrete component splicing auxiliary device for construction engineering described in the utility model.

[0015] Figure 3 The utility model is a schematic diagram of the main structure of a concrete component splicing auxiliary device for construction engineering.

[0016] Figure 4 This is a schematic diagram of the front and sectional structure of a telescopic sleeve of a concrete component splicing auxiliary device for construction engineering described in the utility model.

[0017] In the figure: 1-adjusting support seat; 2-adjusting installation cavity; 3-hydraulic push rod; 4-combination slot; 5-lifting bracket; 6-connecting block; 7-telescopic sleeve; 8-connecting plate; 9-adjusting foot; 10-threaded support leg; 11-guide rod; 12-fixed bracket; 13-combination block; 14-reinforcement rib; 15-storage cavity. DETAILED DESCRIPTION

[0018] Based on the embodiments of the present utility model, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present utility model.

[0019] Example: See Figure 1-4 The utility model provides a technical solution: a concrete component splicing auxiliary device for construction engineering. This solution takes into account that the installation position of the components cannot be accurately adjusted when the traditional hoisting equipment is used to combine and splice the concrete components, and the position is prone to shaking, and the splicing accuracy cannot be guaranteed. Based on the above content, this case sets the following technical means;

[0020] Specifically, the device comprises at least a pair of adjustable support seats 1, a pair of adjustable mounting chambers 2, two pairs of hydraulic push rods 3, a pair of combination slots 4, a pair of lifting brackets 5, a pair of connecting blocks 6, a pair of telescopic sleeves 7, a connecting plate 8, a plurality of adjustable feet 9 and a plurality of threaded legs 10;

[0021] Place the connecting plate 8 under the concrete component, move a pair of adjustable support seats 1 to insert the connecting plate 8 into the storage cavity 15 opened inside the telescopic sleeve 7, and at the same time adjust the extension length of the threaded legs 10 on the adjusting feet 9 according to the ground environment of the construction location to ensure that the adjusting support seat 1 remains horizontal. The connecting plate 8 cooperates with a pair of telescopic sleeves 7 to support the bottom end of the concrete component while making the lifting bracket 5 fit to the side wall surface of the concrete component and maintain a clamping state. The output end of the hydraulic push rod 3 installed in the adjusting installation cavity 2 through the fixed bracket 12 is telescopically matched with the connecting block 6 to drive the lifting bracket 5 to move its position, thereby driving the concrete component to be adjusted and driven to move the concrete component accurately to the splicing position, and then the concrete components are fixed to each other to ensure construction accuracy.

[0022] To be more specific, a pair of adjustment installation cavities 2 are opened inside a pair of adjustment support seats 1, two pairs of hydraulic push rods 3 are installed in the pair of adjustment installation cavities 2, a pair of combination grooves 4 are opened on the pair of adjustment support seats 1, a pair of lifting brackets 5 are movably embedded in the pair of combination grooves 4, a pair of connecting blocks 6 are installed on the side walls of the pair of lifting brackets 5, the output ends of the two pairs of hydraulic push rods 3 are connected to the pair of connecting blocks 6, a pair of telescopic sleeves 7 are installed on the inner wall surfaces of the pair of lifting brackets 5, both ends of the connecting plate 8 are embedded in the pair of telescopic sleeves 7, a number of adjustment feet 9 are installed on the pair of adjustment support seats 1, and a number of threaded legs 10 pass through the pair of adjustment support seats 1 and are installed on the number of adjustment feet 9 through threads.

[0023] In the specific implementation process, further, a pair of guide rods 11 are installed on the pair of lifting brackets 5 to provide a limiting guide function when the lifting brackets 5 are adjusted.

[0024] In the specific implementation process, further, fixed brackets 12 are installed on the two pairs of hydraulic push rods 3 to install and fix the hydraulic push rods 3 to ensure that the structure of the hydraulic push rods 3 is stable when driving.

[0025] In the specific implementation process, further, two pairs of hydraulic push rods 3 are installed on a pair of connecting blocks 6 through the combination block 13.

[0026] In the specific implementation process, further, a reinforcing rib 14 is installed under the pair of telescopic sleeves 7 to strengthen the structural strength of the telescopic sleeves 7 and the lifting bracket 5.

[0027] In the specific implementation process, further, a storage cavity 15 is opened in the pair of telescopic sleeves 7.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A concrete component splicing auxiliary device for construction engineering, comprising: A pair of adjustable support seats (1), characterized in that a combined fine-tuning support structure is installed on the pair of adjustable support seats (1); The combined fine-tuning support structure comprises: a pair of adjustment installation cavities (2), two pairs of hydraulic push rods (3), a pair of combination slots (4), a pair of lifting brackets (5), a pair of connecting blocks (6), a pair of telescopic sleeves (7), a connecting plate (8), a plurality of adjustment feet (9) and a plurality of threaded legs (10); A pair of adjustment installation cavities (2) are provided inside a pair of adjustment support seats (1), two pairs of hydraulic push rods (3) are installed in the pair of adjustment installation cavities (2), a pair of combination grooves (4) are provided on the pair of adjustment support seats (1), a pair of lifting brackets (5) are movably embedded in the pair of combination grooves (4), a pair of connection blocks (6) are installed on the side wall surfaces of the pair of lifting brackets (5), the output ends of the two pairs of hydraulic push rods (3) are connected to the pair of connection blocks (6), a pair of telescopic sleeves (7) are installed on the inner side wall surfaces of the pair of lifting brackets (5), both ends of the connection plates (8) are embedded in the pair of telescopic sleeves (7), a plurality of adjustment feet (9) are installed on the pair of adjustment support seats (1), and a plurality of threaded legs (10) penetrate the pair of adjustment support seats (1) and are installed on the plurality of adjustment feet (9) through threads.

2. The concrete component splicing auxiliary device for construction engineering according to claim 1, characterized in that: A pair of guide rods (11) are mounted on the pair of lifting brackets (5).

3. The concrete component splicing auxiliary device for construction engineering according to claim 1, characterized in that: Fixed brackets (12) are installed on the two pairs of hydraulic push rods (3).

4. The concrete component splicing auxiliary device for construction engineering according to claim 1, characterized in that: Two pairs of hydraulic push rods (3) are mounted on a pair of connecting blocks (6) via a combination block (13).

5. The concrete component splicing auxiliary device for construction engineering according to claim 1, characterized in that: A reinforcing rib plate (14) is installed below the pair of telescopic sleeve plates (7).

6. The concrete component splicing auxiliary device for construction engineering according to claim 1, characterized in that: A storage cavity (15) is provided in a pair of telescopic sleeve plates (7).