Construction device for water conservancy project aqueduct top pull rod

By designing a construction device for aqueduct top pull rod for water conservancy projects, the combination of lifting drive mechanism and pouring platform is used to solve the problems of safety risks and low construction efficiency in the construction of U-shaped aqueduct top pull rod, and efficient and safe construction results are achieved.

CN222541396UActive Publication Date: 2025-02-28CHINA RAILWAY 12TH BUREAU GROUP 7TH CORPORATION LIMITED +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420240662.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2025-02-28
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

In water conservancy projects, the construction of U-shaped aqueduct top pull rods has problems of safety risks and low construction efficiency, especially during the construction and demolition of support brackets.

Method used

A construction device including a groove top bracket, a lifting drive mechanism and a pouring platform is designed. The pouring platform is driven to be lifted to the construction position through the lifting drive mechanism, and locked and fixed with the groove top bracket to realize the pouring construction of the pull rod.

Benefits of technology

The device improves construction efficiency, reduces the safety risks of high-altitude operations, saves construction space, and reduces the impact of construction on the smoothness in the aqueduct.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model discloses a construction device for a water conservancy project aqueduct top pull rod, which comprises an aqueduct top support, lifting driving mechanisms and a pouring platform, the aqueduct top support is erected on the aqueduct top and stretches across the opening of the aqueduct, the lifting driving mechanisms are arranged at the two ends of the aqueduct top support, and when the output ends of the lifting driving mechanisms are located at the aqueduct bottom, the pouring platform is arranged on the aqueduct top support. The pouring platform is built at the groove bottom and connected with the output end of the lifting driving mechanism, and when the lifting driving mechanism drives the built pouring platform to ascend to the construction position, the pouring platform and the groove top support are locked and fixed. The method has the advantages of improving construction efficiency, reducing construction cost, being safe in construction and saving space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of aqueduct construction, in particular to a construction device for aqueduct top pull rods in water conservancy projects. Background Art

[0002] U-shaped aqueduct is a commonly used water conveyance aqueduct in water conservancy projects. In order to share the water pressure generated when water passes through the aqueduct and ensure the overall force stability of the aqueduct body, it is necessary to cast tie rods on the top of the aqueduct to restrain the deformation of the aqueduct body. At present, when casting the tie rods on the top of the aqueduct, it is usually adopted to set up support brackets from the bottom of the trough to the top of the trough, and then install the formwork, tie the steel bars, and finally pour the concrete.

[0003] The bottom of a large U-shaped aqueduct is at a high altitude from the top, and construction workers need to assemble formwork and tie steel bars at high altitudes, which poses a great safety risk. The construction of supporting brackets is also time-consuming and labor-intensive, affecting construction efficiency. In addition, the interior of the U-shaped aqueduct serves as a construction channel, and the installation of supporting brackets seriously affects the transportation of materials inside the aqueduct. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a construction device for aqueduct top pull rods in water conservancy projects, which can improve construction efficiency, reduce construction costs and save space.

[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0006] A construction device for aqueduct top tie rods in water conservancy projects, comprising a trough top bracket, a lifting drive mechanism and a casting platform, wherein the trough top bracket is erected on the trough top of the aqueduct and spans the notch of the aqueduct, and the lifting drive mechanism is installed at both ends of the trough top bracket. When the output end of the lifting drive mechanism is located at the bottom of the aqueduct, the casting platform is built at the bottom of the trough and connected to the output end of the lifting drive mechanism. When the lifting drive mechanism drives the built casting platform to rise to the construction position, the casting platform is locked and fixed to the trough top bracket.

[0007] As a further improvement of the above technical solution:

[0008] The casting platform includes a template frame, which is connected to the output end of the lifting drive mechanism. A plurality of load-bearing beams are evenly spaced at the bottom of the template frame. Fasteners are provided at both ends of each load-bearing beam to lock and fix the template frame to the trough top bracket when the template frame rises to the construction position.

[0009] The template frame is divided into multiple sections, each section includes a bottom plate and a side plate, the end of the side plate is folded outward to have a connecting edge, and the connecting edges of adjacent side plates are tightly attached to each other and fixed by bolts.

[0010] The fastener includes a screw and a plurality of locking nuts. The lower end of the screw is passed through the load-bearing beam and is locked and fixed by a locking nut. When the template frame rises to the construction position, the upper end of the screw passes through the slot top bracket and is locked and fixed by a locking nut.

[0011] The slot top bracket is provided with a sliding slot for the screw rod to pass through.

[0012] The lifting drive mechanism comprises a winch and a steel wire rope, one end of the steel wire rope is connected to the winch, and the other end is connected to the casting platform.

[0013] It also includes an assembly platform for building the casting platform, the assembly platform includes a support frame and a support plate, the support frame is arranged on the bottom of the aqueduct, the support plate is overlapped on the support frame and forms support for the constructed casting platform.

[0014] The support frame is formed by fixedly overlapping a plurality of transverse beam tubes and a plurality of vertical beam tubes, and the support plate is overlapped on the vertical beam tubes.

[0015] The assembly platform also includes a plurality of leveling parts, each of which is fixed on each of the vertical beam tubes.

[0016] The leveling member comprises a fixing nut and an adjusting bolt. The fixing nut is fixedly connected to the vertical beam tube. The adjusting bolt is threadedly connected to the fixing nut and supports the support plate.

[0017] Compared with the prior art, the advantages of the utility model are:

[0018] During construction, first set up the trough top support on the top of the aqueduct according to the tie rod construction position, and install the lifting drive mechanism, then build the casting platform at the bottom of the trough. After the construction is completed, the casting platform is connected to the output end of the lifting drive mechanism, and then the lifting drive mechanism is started to drive the casting platform to the construction position to carry out the casting construction of the tie rod. Compared with the traditional aqueduct tie rod construction, this device lifts the casting platform to the construction position through the lifting drive mechanism, and does not need to install and remove the support bracket, especially when carrying out tie rod construction at multiple points, which reduces a lot of workload and improves construction efficiency. At the same time, after the casting platform is assembled at the bottom of the trough, it is lifted to the construction position and fixed to the trough top support by the lifting drive mechanism. Construction personnel do not need to perform high-altitude operations on the support support, ensuring construction safety. In addition, after the casting platform is fixed to the trough top support, space in the aqueduct is freed up, reducing the impact of construction on the patency of the aqueduct. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram (front view) of the overall structure of the utility model.

[0020] Figure 2It is a schematic diagram of locking and fixing the casting platform and the trough top bracket of the utility model.

[0021] Figure 3 It is a structural schematic diagram (top view) of the utility model.

[0022] Figure 4 It is a structural schematic diagram of an assembly platform of the utility model.

[0023] The symbols in the figure represent:

[0024] 1. Trench top bracket; 11. Slide; 2. Lifting drive mechanism; 21. Winch; 22. Wire rope; 3. Casting platform; 31. Formwork frame; 311. Bottom plate; 312. Side plate; 32. Load-bearing beam; 33. Fastener; 331. Screw; 332. Locking nut; 4. Assembly table; 41. Support frame; 411. Crossbeam tube; 412. Vertical beam tube; 42. Support plate; 43. Leveling piece; 431. Fixing nut; 432. Adjusting bolt; 5. Aqueduct. DETAILED DESCRIPTION

[0025] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0026] like Figure 1 and Figure 2 As shown, the construction device for the top tie rod of the aqueduct of the water conservancy project in this embodiment includes a trough top bracket 1, a lifting drive mechanism 2 and a casting platform 3. The trough top bracket 1 is set up on the top of the aqueduct 5 and crosses the notch of the aqueduct 5. The lifting drive mechanism 2 is installed at both ends of the trough top bracket 1. When the output end of the lifting drive mechanism 2 is located at the bottom of the aqueduct 5, the casting platform 3 is completed at the bottom of the trough and connected to the output end of the lifting drive mechanism 2. When the lifting drive mechanism 2 drives the built casting platform 3 to rise to the construction position, the casting platform 3 is locked and fixed with the trough top bracket 1. During construction, the trough top bracket 1 is first set up on the top of the aqueduct 5 according to the construction position of the tie rod, and the lifting drive mechanism 2 is installed. Then, the casting platform 3 is built at the bottom of the trough. After the construction is completed, the casting platform 3 is connected to the output end of the lifting drive mechanism 2, and then the lifting drive mechanism 2 is started to drive the casting platform 3 to the construction position to perform the casting construction of the tie rod. Compared with the traditional aqueduct tie rod construction, the device lifts the casting platform 3 to the construction position through the lifting drive mechanism 2, and there is no need to install and remove the support bracket, especially when performing tie rod construction at multiple points, which reduces a lot of workload and improves construction efficiency. At the same time, after the casting platform 3 is assembled and built at the bottom of the trough, it is lifted to the construction position and fixed to the trough top bracket 1 through the lifting drive mechanism 2. Construction personnel do not need to perform high-altitude operations on the support bracket, ensuring construction safety. In addition, after the casting platform 3 is fixed to the trough top bracket 1, space in the aqueduct 5 is vacated, reducing the impact of construction on the patency of the aqueduct 5.

[0027] In this embodiment, the pouring platform 3 includes a template frame 31, which is connected to the output end of the lifting drive mechanism 2. A plurality of bearing beams 32 are evenly spaced at the bottom of the template frame 31, and fasteners 33 are provided at both ends of each bearing beam 32 to be locked and fixed with the trough top bracket 1 when the template frame 31 rises to the construction position. In this structure, the template frame 31 serves as a template for pouring the tie rod, which is carried on the bearing beam 32, and the bearing beam 32 is locked and fixed with the trough top bracket 1 through the fastener 33, so as to fix the template frame 31 at the construction position, and the structure is simple and easy to operate.

[0028] In this embodiment, the template frame 31 is divided into multiple sections, each section includes a bottom plate 311 and a side plate 312. The end of the side plate 312 is folded outward to have a connecting edge. The connecting edges of adjacent side plates 312 are closely attached to each other and are fixed by bolts. In this structure, the template frame 31 is divided into multiple sections, which is convenient for disassembly and transfer after the tie rod is cast. The adjacent sections are connected by the connecting edges on the side plates 312 through bolts. The connecting edges are formed by folding the side plates 312 outward, providing an operating space for bolt connection. The design is ingenious, the operation is convenient, and it is easy to disassemble.

[0029] In this embodiment, the fastener 33 includes a screw 331 and a plurality of locking nuts 332. The lower end of the screw 331 is inserted into the load-bearing beam 32 and is locked and fixed by the locking nut 332. When the template frame 31 rises to the construction position, the upper end of the screw 331 passes through the slot top bracket 1 and is locked and fixed by a locking nut 332. In this structure, the load-bearing beam 32 and the slot top bracket 1 are locked and fixed by the screw 331 and the locking nut 332, so as to fix the template frame 31. The design is ingenious, and the bolt connection operation is convenient and easy to disassemble.

[0030] In this embodiment, a slide groove 11 for the screw rod 331 to pass through is provided on the trough top bracket 1. The slide groove 11 is provided to facilitate the insertion and fixing of the screw rod 331.

[0031] In this embodiment, the lifting drive mechanism 2 includes a winch 21 and a wire rope 22, one end of the wire rope 22 is connected to the winch 21, and the other end is connected to the casting platform 3. The winch 21 drives the wire rope 22 to drive the casting platform 3 to rise and fall, and the lifting is stable and efficient.

[0032] In this embodiment, an assembly platform 4 for building the pouring platform 3 is also included, and the assembly platform 4 includes a support frame 41 and a support plate 42. The support frame 41 is arranged at the bottom of the aqueduct 5, and the support plate 42 is overlapped on the support frame 41 and supports the constructed pouring platform 3. In this structure, the assembly platform 4 is arranged at the bottom of the aqueduct 5, which solves the problem that the space at the bottom of the aqueduct 5 is narrow and inconvenient for construction.

[0033] In this embodiment, the support frame 41 is formed by a plurality of cross beam tubes 411 and a plurality of vertical beam tubes 412 fixedly overlapped, and the support plate 42 is overlapped on the vertical beam tubes 412. It has a simple structure and is easy to build, form and disassemble.

[0034] In this embodiment, the assembly platform 4 further includes a plurality of leveling members 43, each of which is fixedly mounted on each of the vertical beam tubes 412. In this structure, the leveling members 43 can be arranged to adjust the height and levelness of the support plate 42.

[0035] In this embodiment, the leveling member 43 includes a fixing nut 431 and an adjusting bolt 432. The fixing nut 431 is fixedly connected to the vertical beam tube 412. The adjusting bolt 432 is threadedly connected to the fixing nut 431 and supports the support plate 42. It has a simple structure, ingenious design and convenient operation.

[0036] Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technician familiar with the art can use the above disclosed technical content to make many possible changes and modifications to the technical solution of the present invention without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention should fall within the scope of protection of the technical solution of the present invention.

Claims

1. A construction device for aqueduct top tie rods in water conservancy projects, characterized in that: The invention comprises a trough top bracket (1), a lifting drive mechanism (2) and a casting platform (3); the trough top bracket (1) is erected on the trough top of the aqueduct (5) and straddles the notch of the aqueduct (5); the lifting drive mechanism (2) is installed at both ends of the trough top bracket (1); when the output end of the lifting drive mechanism (2) is located at the bottom of the aqueduct (5), the casting platform (3) is built at the bottom of the trough and connected to the output end of the lifting drive mechanism (2); when the lifting drive mechanism (2) drives the built casting platform (3) to rise to the construction position, the casting platform (3) is locked and fixed to the trough top bracket (1).

2. The construction device for the top tie rod of aqueduct in water conservancy engineering according to claim 1 is characterized in that: The casting platform (3) comprises a template frame (31), the template frame (31) is connected to the output end of the lifting drive mechanism (2), a plurality of load-bearing beams (32) are evenly spaced and laid on the bottom of the template frame (31), and fasteners (33) are provided at both ends of each of the load-bearing beams (32) for locking and fixing with the trough top bracket (1) when the template frame (31) rises to a construction position.

3. The construction device for the top tie rod of aqueduct in water conservancy project according to claim 2 is characterized in that: The template frame (31) is divided into a plurality of sections, each section comprising a bottom plate (311) and a side plate (312), the end of the side plate (312) being folded outward to have a connecting edge, and the connecting edges of adjacent side plates (312) are tightly attached to each other and are fastened by bolts.

4. The construction device for the top tie rod of aqueduct in water conservancy engineering according to claim 3 is characterized in that: The fastener (33) comprises a screw rod (331) and a plurality of locking nuts (332); the lower end of the screw rod (331) is passed through the load-bearing beam (32) and is locked and fixed by the locking nut (332); when the template frame (31) rises to the construction position, the upper end of the screw rod (331) passes through the slot top bracket (1) and is locked and fixed by a locking nut (332).

5. The construction device for the top tie rod of aqueduct in water conservancy project according to claim 4 is characterized in that: The slot top bracket (1) is provided with a sliding slot (11) for the screw rod (331) to pass through.

6. The construction device for the top tie rod of aqueduct in a hydraulic engineering project according to any one of claims 1 to 5, characterized in that: The lifting drive mechanism (2) comprises a hoist (21) and a steel wire rope (22); one end of the steel wire rope (22) is connected to the hoist (21), and the other end is connected to the casting platform (3).

7. The construction device for the top tie rod of aqueduct in water conservancy project according to claim 6, characterized in that: It also includes an assembly platform (4) for constructing the pouring platform (3), the assembly platform (4) including a support frame (41) and a support plate (42), the support frame (41) being arranged at the bottom of the aqueduct (5), the support plate (42) being overlapped on the support frame (41) and supporting the constructed pouring platform (3).

8. The construction device for the top tie rod of aqueduct in water conservancy project according to claim 7 is characterized in that: The support frame (41) is formed by fixedly overlapping a plurality of transverse beam tubes (411) and a plurality of vertical beam tubes (412), and the support plate (42) is overlapped on the vertical beam tubes (412).

9. The construction device for the top tie rod of aqueduct in water conservancy engineering according to claim 8, characterized in that: The assembly platform (4) further comprises a plurality of leveling members (43), each of the leveling members (43) being fixedly mounted on each of the vertical beam tubes (412).

10. The construction device for the top tie rod of aqueduct in water conservancy engineering according to claim 9, characterized in that: The leveling member (43) comprises a fixing nut (431) and an adjusting bolt (432); the fixing nut (431) is fixedly connected to the vertical beam tube (412); the adjusting bolt (432) is threadedly connected to the fixing nut (431) and supports the support plate (42).