Project cost progress management device

By designing an engineering cost progress management device including display rack, rainproof cover, progress board and data rack, the problem of easy data falling during the movement of engineering construction is solved, and the security of data and the convenience of display are achieved.

CN222545911UActive Publication Date: 2025-02-28齐琳
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420468636.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2025-02-28
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

During the construction process, as the project progresses, when the publicity column needs to be moved, the project progress data is easily dropped or damaged, resulting in inconvenient display.

Method used

An engineering cost progress management device is designed, including display rack, rain cover, progress board, progress light and data rack. The display frame can be temporarily locked through the rotation of the hinge and the locking part to prevent data from being scattered; the rainproof cover can be slid and stored, reducing the overall volume, making it easier to carry.

Benefits of technology

It effectively prevents the scattering and damage of data during the movement process, simplifies the display and management of project progress, and improves the work efficiency of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model discloses a project cost progress management device, which belongs to the technical field of project cost, and comprises a showing stand used for showing project progress and a rainproof cover arranged at the upper end of the showing stand, a progress board is arranged outside the showing stand, a progress lamp is arranged at the upper end of the progress board, a data frame is arranged at the upper end of the progress board, and a display screen is arranged on the data frame. When the showing stand needs to be transferred after the project is finished, the showing stand connected through the hinge can be rotationally buckled, the locking frame and the clamping head which are movably installed at the upper end are buckled to the upper end of the second positioning foot, then the two sets of showing stands are temporarily locked, showing data are protected inside, the situation that the data are scattered in the showing stand moving process is avoided, and the showing stand is convenient to transport. The rainproof cover can be stored in a sliding mode, the overall size is reduced, carrying and transferring are convenient, and the rainproof cover can be unfolded after being transferred to a target position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of engineering cost, and in particular relates to an engineering cost progress management device. Background Art

[0002] Project cost management is the process of forecasting, planning, controlling, calculating, analyzing and evaluating project cost by comprehensively applying knowledge and skills in management, economics and engineering technology. The forecast or determination of project cost and its components in accordance with the procedures, methods and basis stipulated by laws, regulations and standards is called project pricing. The basis for project pricing includes project measurement and pricing standards, project pricing quotas and project cost information related to pricing content, pricing methods and price standards.

[0003] At the construction site, a bulletin board is usually placed to display the project progress and publicize the project information. If the bulletin board is moved as the project construction progresses, the information may easily fall off when it is transported or moved, and needs to be reorganized, which is inconvenient to use. Utility Model Content

[0004] The utility model aims to provide a construction cost progress management device to solve the technical problem in the background technology that if the publicity column is moved along with the progress of the project construction, the data may be easily dropped when the publicity column is transported or moved.

[0005] To achieve the above purpose, the specific technical solution of the utility model is as follows: a construction cost progress management device, comprising

[0006] A display stand is used to display the progress of the project, and a rain cover is installed on the upper end of the display stand. A progress board is arranged on the outside of the display stand, a progress light is arranged on the upper end of the progress board, and a document rack is arranged on the upper end of the progress board.

[0007] Preferably, the document racks are arranged in two groups and are slidably mounted inside sliding grooves provided on the surface of the display rack.

[0008] Preferably, a transparent slot is arranged on one side of the progress light for distinguishing the progress of the progress light at the lower end and the data items inside the data rack.

[0009] Preferably, the lower end of the rain cover is mounted on the upper end of the display frame through mounting feet for support, and the lower end of the mounting feet is fixed to the upper surface of the display frame by screws.

[0010] Preferably, the rainproof cover is composed of two sections of slidingly spliced ​​structure, the inner shell is slidably installed in the inner cavity of the outer shell, the display stand is composed of two symmetrical plate sections, and one side is connected and fixed by a hinge, and the outer side of the display stand is fixed by a locking part.

[0011] Preferably, the locking portion includes a locking frame rotatably mounted on the outside of the display frame and a snap-fit ​​head fixedly mounted on the end of the locking frame, the locking frame is movably mounted on the upper end of a first positioning foot mounted on the side of one display frame through a mounting shaft, and a second positioning foot is fixedly mounted on the outer side of the other display frame, and a U-shaped frame fixedly arranged on one side of the second positioning foot matches the snap-fit ​​head for buckling and fastening.

[0012] Preferably, the information rack includes a clamping bar arranged outside the display rack, and sliders are fixedly installed on both sides of the clamping bar. An insert block on one side of the slider is slidably installed inside a movable member installed inside a slide groove and is movably connected by a spring. A screw hole is opened on one side of the slider, and the slider and the movable member can be fastened by screws.

[0013] Preferably, a plug hole is provided at the upper end of the clamping strip, a positioning pin can be inserted into the plug hole to fix the data, a plug-in plate can be embedded and installed inside the display frame, and reinforcing ribs are arranged at intervals inside the clamping strip.

[0014] Preferably, a support portion is provided at the lower end of the display rack, and the support portion includes a support screw, a fixed foot is fixedly installed at the lower end of the support screw, stabilizing piles are movably inserted on both sides of the fixed foot, and a support sleeve is sleeved on the upper end of the support screw.

[0015] Preferably, a bevel gear sleeve is movably installed in the inner cavity at the lower end of the display rack, a thread groove is opened in the middle of the bevel gear sleeve, which is threadedly connected to the support screw, a transmission gear is meshingly installed on one side of the bevel gear sleeve, a worm wheel is coaxially fixedly installed on one side of the transmission gear, and the worm installed on one side of the worm gear sleeve rod is driven.

[0016] The utility model of a construction cost progress management device has the following advantages:

[0017] The construction cost progress management device can rotate and lock the hinged display rack when the display rack needs to be transported after the project is completed, and the locking rack and the locking head movably installed at the upper end are locked at the upper end of the second positioning foot, thereby temporarily locking the two groups of display racks to protect the display materials, so as to avoid the materials from being scattered during the movement of the display rack, or the device installed at the upper end from being damaged by collision. The rainproof cover can be slid for storage, and the overall volume is reduced, which is convenient for transportation and transfer, and can be moved to the destination and unfolded. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0020] Figure 2 For the utility model Figure 1 The enlarged structural diagram at A in the middle;

[0021] Figure 3 This is a schematic diagram of the data rack structure of the utility model;

[0022] Figure 4 It is a schematic diagram of the overall folding structure of the utility model;

[0023] Figure 5 For the utility model Figure 4 The enlarged structural diagram at B in the middle;

[0024] Figure 6 It is a schematic diagram of the support part installation structure of the utility model.

[0025] Explanation of the marks in the figure: 100, display stand; 110, transparent slot; 120, plug-in board; 130, slide groove; 140, locking part; 141, locking frame; 142, first positioning foot; 143, locking head; 144, second positioning foot; 200, rain cover; 210, installation foot; 300, progress board; 310, progress light; 400, document rack; 410, clamping strip; 420, slider; 430, socket; 440, positioning pin; 450, reinforcing rib; 460, moving part; 500, supporting part; 510, supporting sleeve rod; 520, stabilizing pile; 530, supporting screw; 540, fixing support foot; 550, bevel gear sleeve; 560, transmission gear; 570, worm wheel; 580, worm. DETAILED DESCRIPTION

[0026] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the embodiments of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0027] In the description of the embodiments of the present invention, it should be understood that the terms "length", "vertical", "horizontal", "top", "bottom", etc. indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present invention.

[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the embodiments of the present utility model, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0029] In the embodiments of the present utility model, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present utility model can be understood according to specific circumstances.

[0030] The disclosure below provides many different embodiments or examples for realizing different structures of the embodiments of the present utility model. In order to simplify the disclosure of the embodiments of the present utility model, the components and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the embodiments of the present utility model. In addition, the embodiments of the present utility model can repeat reference numbers and / or reference letters in different examples, and this repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed.

[0031] In order to better understand the purpose, structure and function of the utility model, the following is a further detailed description of a construction cost progress management device of the utility model in conjunction with the accompanying drawings.

[0032] like Figure 1-Figure 6As shown, a construction cost progress management device of the utility model includes a display frame 100 for displaying the construction progress to facilitate the control of the construction progress, and a rainproof cover 200 installed on the upper end of the display frame 100 for protecting the display materials at the lower end. A progress board 300 for displaying the construction progress is arranged on the outside of the display frame 100, and a progress light 310 for displaying the progress is arranged on the upper end of the progress board 300. A data rack 400 for displaying and fixing project data is arranged on the upper end of the progress board 300.

[0033] The constructed part of the lamp can be green, and the unconstructed part can be red for distinction, and the colors can be controlled by the central control unit.

[0034] The lower end of the rain cover 200 is installed on the upper end of the display stand 100 for support through the mounting foot 210, and the lower end of the mounting foot 210 is fixed to the upper surface of the display stand 100 by screws. The rain cover 200 is composed of two sections of sliding splicing, and the inner shell is slidably installed in the inner cavity of the outer shell. The display stand 100 is composed of two symmetrical plate bodies, and one side is connected and fixed by a hinge, and the outer side of the display stand 100 is fixed by a locking part 140.

[0035] The locking portion 140 includes a locking frame 141 rotatably mounted on the outside of the display frame 100 for fixing and a snap-fitting head 143 fixedly mounted on the end of the locking frame 141 for snapping. The locking frame 141 is movably mounted on the upper end of a first positioning foot 142 mounted on the side of the display frame 100 on one side through a mounting shaft, and a second positioning foot 144 for fixing the snap-fitting head 143 is fixedly mounted on the outer side of the display frame 100 on the other side. A U-shaped frame fixedly arranged on one side of the second positioning foot 144 matches the snap-fitting head 143 for snapping and fastening.

[0036] When the display rack 100 needs to be transported after the project is completed, the hinged display rack 100 can be rotated and buckled, and the locking frame 141 and the locking head 143 movably installed on the upper end are buckled on the upper end of the second positioning foot 144, thereby temporarily locking the two groups of display racks 100 to protect the display materials inside, so as to prevent the materials from being scattered during the movement of the display rack 100, or the device installed on the upper end from being damaged by collision. The rainproof cover 200 can be slid for storage, and the overall volume is reduced, which is convenient for transportation and transfer, and can be moved to the destination and unfolded.

[0037] The information rack 400 is arranged in two groups, which are respectively used to be fixed on the upper and lower sides of the display information, and are slidably installed inside the slide groove 130 opened on the surface of the display rack 100, so as to facilitate the display of the display information to be laid flat and prevent the information from being folded or dropped.

[0038] A transparent slot 110 for distinguishing project panels is arranged on one side of the progress light 310 , which can be used to place project information and distinguish the progress of the progress light 310 at the lower end and the information items inside the information rack 400 .

[0039] The document rack 400 includes a clamping bar 410 arranged outside the display rack 100 for clamping and fixing documents. Sliders 420 for determining the position of the clamping bar 410 are fixedly installed on both sides of the clamping bar 410. An insert block on one side of the slider 420 is slidably installed inside a moving part 460 installed inside the slide groove 130, and is movably connected by a spring. A screw hole is provided on one side of the slider 420, and the slider 420 and the moving part 460 can be fastened by screws. When the clamping bar 410 is used to clamp the document, the relative distance between the clamping bars 410 on both sides can be adjusted by moving the position of the slider 420, so as to facilitate the clamping and fixing of documents of different sizes, and make it more flexible to use. If there is no need to adjust again after moving to the position, the slider 420 and the moving part 460 can be fastened by screws to prevent the slider 420 from shifting.

[0040] A socket 430 for fixing the material is provided at the upper end of the clamping strip 410, and a positioning pin 440 can be inserted inside the socket 430 to fix the material. An insert plate 120 for use with the positioning pin 440 can be installed on the inner side of the display rack 100. The insert plate 120 can be supported by a cork board, sponge, rubber or other material. Reinforcing ribs 450 for supporting the clamping strip 410 are arranged at intervals inside the clamping strip 410. When using the clamping strip 410 to clamp the material, if there is a concern that the material may slip, the positioning pin 440 can be used to fix the material through the socket 430. The insert plate 120 made of soft material can facilitate the insertion and positioning of the positioning pin 440.

[0041] A support portion 500 for supporting and lifting the display stand 100 is provided at the lower end of the display stand 100. The support portion 500 includes a support screw 530 for supporting the display stand 100. A fixed support leg 540 for maintaining stability is fixedly installed at the lower end of the support screw 530. A bevel gear sleeve 550 for adjusting the height of the support screw 530 is movably installed in the inner cavity of the lower end of the display stand 100. A thread groove is provided in the middle of the bevel gear sleeve 550, which is threadedly connected with the support screw 530. A transmission gear 560 for driving the bevel gear sleeve 550 to rotate is meshedly installed on one side of the bevel gear sleeve 550. A worm gear 570 is coaxially fixedly installed on one side of the transmission gear 560, and the worm 580 installed on one side of the worm gear 570 sleeve rod drives it.

[0042] When the display stand 100 needs to be transported, the handle at the upper end can be turned after the display stand 100 is folded, and the worm 580 can be driven to rotate by the handle, thereby driving the worm wheel 570 to rotate, and the transmission gear 560 installed on one side can be fixedly driven to rotate, and the bevel gear sleeve 550 can be driven to rotate, thereby driving the support screw 530 installed with the internal thread to rise and fall, and the fixed support leg 540 installed at the lower end can be raised, so that the overall volume of the display stand 100 is reduced, which is convenient for transportation, and the height of the display stand 100 can be adjusted conveniently, and it is more flexible to use.

[0043] Stabilizing piles 520 for positioning the fixed legs 540 are movably inserted on both sides of the fixed legs 540 and can be inserted into the soil for stabilization, so as to facilitate the placement and fixation of the display rack 100 under different conditions.

[0044] The upper end of the support screw 530 is sleeved with a support sleeve rod 510 for supporting and stabilizing the support screw 530 , and is used to support the support screw 530 , so that the support screw 530 is further stabilized to prevent shaking and collapse.

[0045] An adjusting rod is movably installed at the end of the worm 580 through a connecting rod, and the end of the adjusting rod is embedded in the middle of the display racks 100 on both sides. After the display racks 100 are unfolded, the handle is hidden inside the display racks 100 for protection to avoid misoperation by personnel, and the protection is more comprehensive.

[0046] The working principle of a construction cost progress management device: when the display rack 100 needs to be transported at the end of the project, the hinged display rack 100 can be rotated and buckled, and the locking rack 141 and the locking head 143 movably installed on the upper end are buckled on the upper end of the second positioning foot 144, thereby temporarily locking the two groups of display racks 100 to protect the display materials inside, so as to avoid the materials from being scattered during the movement of the display rack 100, or the device installed on the upper end from being bumped and damaged. The rainproof cover 200 can be slid for storage, and the overall volume is reduced, which is convenient for handling and transfer, and can be transferred to the destination and unfolded.

[0047] It is understood that the present invention is described by some embodiments, and those skilled in the art are aware that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.

Claims

1. A construction cost progress management device, characterized in that: include A display stand is used to display the progress of the project, and a rain cover is installed on the upper end of the display stand. A progress board is arranged on the outside of the display stand, a progress light is arranged on the upper end of the progress board, and a document rack is arranged on the upper end of the progress board.

2. The construction cost progress management device according to claim 1, characterized in that: The document racks are arranged in two groups and are slidably installed inside the slide grooves opened on the surface of the display rack.

3. The construction cost progress management device according to claim 2 is characterized in that: A transparent slot is arranged on one side of the progress light for distinguishing the progress of the progress light at the lower end and the data items inside the data rack.

4. The construction cost progress management device according to claim 3 is characterized in that: The lower end of the rainproof cover is mounted on the upper end of the display frame through mounting feet for support, and the lower end of the mounting feet is fixed to the upper surface of the display frame through screws.

5. The construction cost progress management device according to claim 4 is characterized in that: The rain cover is composed of two sections of slidingly spliced ​​structures, the inner shell is slidably installed in the inner cavity of the outer shell, the display frame is composed of two symmetrical plate sections, and one side is connected and fixed by a hinge, and the outer side of the display frame is fixed by a locking part.

6. The construction cost progress management device according to claim 5 is characterized in that: The locking part includes a locking frame rotatably mounted on the outside of the display frame and a snap-fit ​​head fixedly mounted on the end of the locking frame. The locking frame is movably mounted on the upper end of a first positioning foot mounted on the side of the display frame on one side through a mounting shaft, and a second positioning foot is fixedly mounted on the outer side of the display frame on the other side. A U-shaped frame fixedly arranged on one side of the second positioning foot matches the snap-fit ​​head for buckling and fastening.

7. The construction cost progress management device according to claim 6 is characterized in that: The document rack includes a clamping bar arranged outside the display rack, sliders are fixedly installed on both sides of the clamping bar, an insert block on one side of the slider is slidably installed inside a moving part installed inside a slide groove, and is movably connected by a spring, a screw hole is opened on one side of the slider, and the slider and the moving part can be fastened by screws.

8. The construction cost progress management device according to claim 7 is characterized in that: The upper end of the clamping strip is provided with a plug hole, and a positioning nail can be inserted into the plug hole to fix the data. The inner side of the display frame can be embedded with a plug-in plate, and reinforcing ribs are arranged at intervals inside the clamping strip.

9. The construction cost progress management device according to claim 8, characterized in that: A support portion is provided at the lower end of the display rack, and the support portion includes a support screw, a fixed support leg is fixedly installed at the lower end of the support screw, and stabilizing piles are movably inserted on both sides of the fixed support leg, and a support sleeve rod is sleeved on the upper end of the support screw.

10. The construction cost progress management device according to claim 9, characterized in that: A bevel gear sleeve is movably installed in the inner cavity at the lower end of the display stand, a thread groove is opened in the middle of the bevel gear sleeve, which is threadedly connected to the support screw, a transmission gear is meshingly installed on one side of the bevel gear sleeve, a worm wheel is coaxially fixedly installed on one side of the transmission gear, and a worm installed on one side of the worm gear sleeve rod is driven.