Construction site integrated standard operation display board
By providing an integrated standard operating exhibition board on the construction site including slip seat, LCD display, exhibition frame and exhibition board, the cumbersome problems of traditional exhibition board handling and assembly are solved, and the effect of rapid construction and multi-information display is achieved.
Patent Information
- Application Number
- CN202421076622.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-16
- Publication Date
- 2025-02-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When building a standardized and safe operation site, traditional display boards are inconvenient to carry, repeated assembly is time-consuming and laborious, and there are many types of display information, which requires carrying and installing multiple display boards, resulting in cumbersome process.
It provides an integrated standard operation display board on the construction site, including a sliding sliding seat, LCD screen, exhibition frame and exhibition board. The information is displayed through the combination of LCD screen and exhibition board, and the built-in construction process diagram of the LCD screen is provided. The display board can be slid and separated from the LCD screen, making it easy to store and transport.
The display board can quickly, standardize and standardize the construction of standardized operations, simplify the storage, transportation, assembly and layout process, reduce the construction time, and facilitate display of multiple types of information, reducing the complexity of on-site layout.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of standardized safety operation equipment, in particular to an integrated standard operation display board at a construction site. Background Art
[0002] Creating a standardized safe work site will help improve the safety control level of power construction sites and standardize the work order of on-site operations. The traditional standardized work site construction is generally divided into three parts: work construction area, work preparation area, and material placement area. Building the above areas requires a lot of tools, such as fences, mesh, mesh support rods, warning lights, display boards, safety technical instructions, etc. Among them, display boards are usually used to display information such as work tickets, operation tickets, and types of guidance cards on site in a certain area, so that employees working in the area can understand the relevant information in a timely manner. For example, Chinese patent CN108831340B, an on-site display board and a method of use, includes a first connecting plate, a second connecting plate vertically fixedly arranged on the upper side of the front end face of the first connecting plate, a third connecting plate hingedly arranged on the left side of the first connecting plate, a fourth connecting plate hingedly arranged on the right side of the first connecting plate, and a fifth connecting plate vertically fixedly arranged on the lower side of the front end face of the first connecting plate, the front end face of the fifth connecting plate is hingedly provided with a movable plate, and the rear end face of the first connecting plate is hingedly provided with a moving component; the third connecting plate, the fourth connecting plate and the movable plate are rotated, the display board is combined through the first connecting plate, the second connecting plate, the third connecting plate, the fourth connecting plate, the fifth connecting plate and the movable plate, and the movement of the display board is achieved by combining the moving components of the display board. The invention is used to solve the problems of inconvenient transportation of display boards, time-consuming and laborious repeated assembly, and inconvenient on-site invoicing during mobile operations. However, since the invention has a single function, its main function is to display relevant information, but a standardized safe operation site usually needs to display many types of information. If more information needs to be displayed, such as operating safety specifications, construction process drawings, etc., when the invention is used at the construction site, if a complete standardized safe operation site is to be built, it is necessary to carry and install multiple display boards, and it is also necessary to separately demarcate areas such as operation construction areas and material customization areas at the construction site, as well as assemble testing instruments, etc., making the series of processes such as storage, transportation, assembly, and layout when building a standardized safe operation site very cumbersome. Utility Model Content
[0003] The utility model provides an integrated standard operation display board for a construction site, aiming to solve the problem of a series of very cumbersome processes such as storage, transportation, assembly and arrangement when building a standardized safety operation site by providing a display board that can quickly, standardly and normatively complete the construction of a standardized operation site.
[0004] The integrated standard operation display board for the construction site provided by the utility model adopts the following technical solutions:
[0005] An integrated standard operation display board at a construction site comprises a sliding seat capable of sliding on the ground, and a liquid crystal display screen vertically arranged above the sliding seat, display frames are arranged on the front and rear sides of the liquid crystal display screen, and a display board is detachably connected to the display frame, and the display frame can be slid toward the left or right side of the liquid crystal display screen and connected to the top of the sliding seat, the sliding direction of the display frame arranged on the front side of the liquid crystal display screen is opposite to the sliding direction of the display frame arranged on the rear side of the liquid crystal display screen, and the display frame arranged on the front side of the liquid crystal display screen and the display frame arranged on the rear side of the liquid crystal display screen are both provided with sliding tripods capable of sliding on the ground on the opposite sides.
[0006] Preferably, a first sliding rod capable of sliding on the ground is arranged on the front side of the sliding tripod connected to the display frame arranged on the rear side of the LCD screen, and an exhibition body is arranged between the two; a second sliding rod capable of sliding on the ground is arranged on the front side of the sliding tripod connected to the display board arranged on the front side of the LCD screen, and an exhibition body is arranged between the two; the exhibition body is formed by a plurality of rods hingedly connected using the parallelogram principle.
[0007] Preferably, a retractable warning belt is arranged on the top of the first sliding rod, and one end of the belt body of the retractable warning belt can be pulled out and detachably connected to the second sliding rod.
[0008] Preferably, when one side of the display frame slides out of the side of the sliding seat, a positioning cloth is laid in the area surrounded by the two sliding tripods, the first sliding rod and the second sliding rod, and a safety tool area, a construction tool area and a material area are marked on the positioning cloth.
[0009] Preferably, a storage space is opened at the front end of the sliding seat, a flap is hinged on the upper front end of the sliding seat, the flap can cover the front end of the storage space, and a protruding connecting belt is provided at the rear end of the positioning cloth, and the rear end of the connecting belt can be detachably connected to the inner upper wall of the storage space.
[0010] Preferably, a voltage meter is provided at the front end of the sliding seat, and a temperature meter is provided at the top of the second sliding rod.
[0011] Preferably, a fixing seat is provided on the liquid crystal display screen, an LED display screen is provided on the fixing seat, and the display board is slidably connected to the bottom of the fixing seat.
[0012] Preferably, an intelligent anemometer is arranged on the top of the fixed seat, and an anemometer electrically connected to the intelligent anemometer is arranged on the sliding seat.
[0013] Compared with the prior art, the beneficial technical effects of the utility model are:
[0014] 1. The integrated standard operation display board for the construction site provided by the utility model displays information through the combination of a liquid crystal display screen and a display board. The liquid crystal display screen has built-in information such as construction process drawings for display on the safety standard operation site. Since the liquid crystal display screen can cover multiple types of information, compared with the traditional display board, the utility model does not need to carry display boards separately, which is convenient for transportation. The display frame for detachable installation of the display board can be slid apart relative to the liquid crystal display screen for easy storage. The front and rear sides of the liquid crystal display screen are both provided with display boards. When the utility model is stored, the front and rear display boards limit the liquid crystal display screen to prevent the liquid crystal display screen from being damaged during transportation. The sliding seat for carrying the liquid crystal display screen and the display board is convenient for transportation of the utility model. The sliding tripod arranged on the side of the display board is convenient for supporting the display board that slides out of the sliding seat on one side, which is convenient for assembly. When building a standardized safety operation site, the storage, transportation and assembly of the integrated standard operation display board for the construction site provided by the utility model are very convenient;
[0015] 2. When the integrated standard operation display board for the construction site provided by the utility model is unfolded, the left and right sliding legs and the first sliding rod and the second sliding rod can be used to demarcate the relevant area as the working area of the standardized safety operation site, which is convenient for the layout of the standardized safety operation site;
[0016] 3. The left and right side exhibition bodies and the retractable warning belt of the integrated standard operation display board on the construction site provided by the utility model can directly form a fence structure, so that when personnel are working, there is no need to build a safety fence separately, which is convenient for the layout of the standardized safety operation site;
[0017] 4. The positioning cloth of the integrated standard operation display board of the construction site provided by the utility model is directly arranged in the above-mentioned working area. The positioning cloth is divided into a safety tool area, a construction tool area, and a material area, which shortens the arrangement time of the safety tool area, the construction tool area, and the material area of the standardized safety operation site, and integrates the functions of multiple areas in the working area. Through the analysis of typical dangerous points of various types of operations and the integration of control measures, the preparation time for safety technical disclosure before the operation is reduced;
[0018] 5. The positioning cloth of the integrated standard operation display board on the construction site provided by the utility model can be stored in the storage space, and when the positioning cloth is laid on the ground, the connecting belt is pressed and fixed by the flap, so that the positioning cloth is easy to lay in the working area and is not easy to shift, which reduces the layout time of the standardized safety operation site;
[0019] 6. The integrated standard operation display board provided by the utility model is convenient for checking the voltage and temperature in real time when setting up a standardized safety operation site by setting up a voltage meter at a position near the working area of the sliding seat and setting up a temperature meter at a position near the working area of the second sliding rod;
[0020] 7. The fixing base of the integrated standard operation display board at the construction site provided by the utility model is not only used for the top sliding of the display frame to play a limiting role, but also the LED display screen on the fixing base can display real-time notifications of the standardized safety operation site;
[0021] 8. The intelligent anemometer on the fixed seat of the integrated standard operation display board on the construction site provided by the utility model can test the wind speed. The wind speed related information is displayed on the sliding seat for easy viewing by personnel. There is no need to build a separate wind speed testing device, which shortens the layout time of the standardized construction site. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the utility model when the integrated standard operation display board of the construction site is stored;
[0023] Figure 2 It is a schematic diagram of the layout of the integrated standard operation display board at the construction site of the utility model.
[0024] Figure numerals: 1. sliding seat; 2. LCD screen; 3. exhibition frame; 4. exhibition board; 5. sliding tripod; 6. exhibition body; 7. first sliding rod; 8. second sliding rod; 9. telescopic warning tape; 10. positioning cloth; 11. safety tool area; 12. construction tool area; 13. material area; 14. storage space; 15. flip cover; 16. connecting belt; 17. voltage meter; 18. thermometer; 19. fixing seat; 20. LED screen; 21. smart anemometer; 22. anemometer. DETAILED DESCRIPTION
[0025] The following is combined with Figure 1-2 The utility model is described in further detail.
[0026] The utility model embodiment discloses an integrated standard operation display board for a construction site.
[0027] The integrated standard operation display board at the construction site includes a sliding seat 1 that can slide on the ground, a liquid crystal display screen 2 vertically arranged above the sliding seat 1, and display frames 3 are arranged on the front and rear sides of the liquid crystal display screen 2. The display frame 3 is detachably connected with a display board 4, with the side of the display board 4 facing the human perspective as the front, and the side of the display board 4 facing away from the human perspective as the back, and the left or right direction is determined by the user's perspective of looking directly at the display board 4. The display frame 3 can be slidably connected to the top of the sliding seat 1 toward the left or right side of the liquid crystal display screen 2, and the sliding direction of the display frame 3 arranged on the front side of the liquid crystal display screen 2 is opposite to the sliding direction of the display frame 3 arranged on the rear side of the liquid crystal display screen 2, and the display frame 3 arranged on the front side of the liquid crystal display screen 2 and the display frame 3 arranged on the rear side of the liquid crystal display screen 2 are both provided with sliding tripods 5 that can slide on the ground. The lengths of the sliding seats 1 from left to right are consistent, and the display frame 3 cannot completely slide out of the side of the sliding seat 1. The bottoms of the sliding seat 1, the sliding tripod 5, the first sliding rod 7, and the second sliding rod 8 are all provided with universal wheels and a mechanism for locking the universal wheels. The bottom length of the LCD screen 2 is less than the top length of the sliding seat 1, and the bottom length of the display frame 3 is equal to the top length of the sliding seat 1. The length mentioned in the previous sentence is the distance from the left end to the right end. When the integrated standard operation display board of the construction site of the utility model is pressed Figure 1 When tightened as shown, the sliding foot bracket 5 abuts against the side wall of the sliding seat 1.
[0028] Information is displayed through the combination of the LCD screen 2 and the display board 4. The LCD screen 2 has built-in construction process diagrams and other information for display at the safety standard operation site. Since the LCD screen 2 can cover multiple types of information, compared with the traditional display board 4, the utility model does not need to carry the display board 4 separately, which is convenient for transportation. The display frame 3 used for detachable installation of the display board 4 can be slid apart relative to the LCD screen 2 for easy storage. The front and rear sides of the LCD screen 2 are both provided with display boards 4. When the utility model is stored, the front and rear display boards 4 limit the LCD screen 2 to prevent the LCD screen 2 from being damaged during transportation. The sliding seat 1 for carrying the LCD screen 2 and the display board 4 is convenient for transportation of the utility model. The sliding tripod 5 arranged on the side of the display board 4 is convenient for supporting the display board 4 that slides out of the sliding seat 1 on one side, which is convenient for assembly. When building a standardized safety operation site, the utility model provides a series of processes of storage, transportation and assembly of the integrated standard operation display board for the construction site.
[0029] A first sliding rod 7 that can slide on the ground is arranged on the front side of the sliding stand 5 connected to the display frame 3 arranged on the rear side of the LCD screen 2, and a display body 6 is arranged between the two; a second sliding rod 8 that can slide on the ground is arranged on the front side of the sliding stand 5 connected to the display board 4 arranged on the front side of the LCD screen 2, and a display body 6 is arranged between the two; the display body 6 is formed by a plurality of rods hinged by the parallelogram principle. The length between the sliding stand 5 connected to the display board 4 arranged on the rear side of the LCD screen 2 and the first sliding rod 7 is greater than the length between the sliding stand 5 connected to the display board 4 arranged on the front side of the LCD screen 2 and the second sliding rod 8, and the shortest connecting line between the first sliding rod 7 and the second sliding rod 8 is parallel to the long side of the bottom of the sliding seat 1. A retractable warning tape 9 is arranged on the top of the first sliding rod 7, and one end of the tape body of the retractable warning tape 9 can be pulled out and detachably connected to the second sliding rod 8.
[0030] When the integrated standard operation display board for the construction site provided by the utility model is unfolded, the left and right sliding legs 5 and the first sliding rod 7 and the second sliding rod 8 can be used to demarcate the relevant area as the working area of the standardized safety operation site, which is convenient for the arrangement of the standardized safety operation site. The left and right display bodies 6 and the retractable warning tape 9 can directly form a fence structure, so that when personnel are working, there is no need to build a safety fence separately, which is convenient for the arrangement of the standardized safety operation site.
[0031] When one side of the display frame 3 slides out of the side of the sliding seat 1, a positioning cloth 10 is laid in the area surrounded by the two sliding legs 5, the first sliding rod 7 and the second sliding rod 8, and the positioning cloth 10 is marked with a safety tool area 11, a construction tool area 12, and a material area 13. A storage space 14 is opened at the front end of the sliding seat 1, and a flap 15 is hinged at the upper front end of the sliding seat 1. The flap 15 can cover the front end of the storage space 14. A protruding connecting belt 16 is provided at the rear end of the positioning cloth 10, and the rear end of the connecting belt 16 can be detachably connected to the inner upper wall of the storage space 14. A voltage meter 17 is provided at the front end of the sliding seat 1, and a thermometer 18 is provided at the top of the second sliding rod 8. The LCD screen 2 is provided with a fixed seat 19, and the fixed seat 19 is provided with an LED screen 20. The sliding seat 1 is provided with a mobile power supply for supplying power to the LCD screen 2 and the LED screen 20. The display board 4 is slidably connected to the bottom of the fixed seat 19. The top of the fixed seat 19 is provided with an intelligent anemometer 21, and the sliding seat 1 is provided with an anemometer 22 electrically connected to the intelligent anemometer 21.
[0032] The positioning cloth 10 is directly arranged in the above-mentioned working area. The positioning cloth 10 is divided into a safety tool area 11, a construction tool area 12, and a material area 13, which shortens the arrangement time of the safety tool area 11, the construction tool area 12, and the material area 13 of the standardized safety operation site, and integrates the functions of various areas in the working area. By analyzing the typical dangerous points of various types of operations and integrating the control measures, the preparation time for the safety technical disclosure before the operation is reduced. The positioning cloth 10 can be stored in the storage space 14, and when the positioning cloth 10 is laid on the ground, the connecting belt 16 is pressed and fixed by the flap 15, so that the positioning cloth 10 is easy to lay in the working area and is not easy to shift, which reduces the arrangement time of the standardized safety operation site. A voltage meter 17 is set at the position of the sliding seat 1 near the working area, and a thermometer 18 is set at the second sliding rod 8 near the working area, so as to facilitate the real-time viewing of the voltage and temperature when setting up the standardized safety operation site. The fixed seat 19 is not only used for the top sliding of the display frame 3 to play a limiting role, but also the LED display screen 20 on the fixed seat 19 can display real-time notifications of the standardized safety operation site. The intelligent anemometer 21 on the fixed seat 19 can test the wind speed, and the wind speed related information is displayed on the sliding seat 1 for easy viewing by personnel. There is no need to build a separate wind speed testing device, which shortens the layout time of the standardized construction site.
[0033] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.
Claims
1. The integrated standard operation display board at the construction site is characterized by: The invention comprises a sliding seat (1) capable of sliding on the ground, and a liquid crystal display screen (2) vertically arranged above the sliding seat (1); the front and rear sides of the liquid crystal display screen (2) are both provided with an exhibition frame (3); a display board (4) is detachably connected inside the exhibition frame (3); the exhibition frame (3) can be slid toward the left or right side of the liquid crystal display screen (2) and connected to the top of the sliding seat (1); the sliding direction of the exhibition frame (3) arranged on the front side of the liquid crystal display screen (2) is opposite to the sliding direction of the exhibition frame (3) arranged on the rear side of the liquid crystal display screen (2); and the exhibition frame (3) arranged on the front side of the liquid crystal display screen (2) and the exhibition frame (3) arranged on the rear side of the liquid crystal display screen (2) are both provided with a sliding tripod (5) capable of sliding on the ground on the opposite sides.
2. The integrated standard operation display board for construction sites according to claim 1 is characterized in that: A first sliding rod (7) that can slide on the ground is arranged at the front side of a sliding footstand (5) connected to an exhibition frame (3) arranged at the rear side of the liquid crystal display screen (2), and an exhibition body (6) is arranged between the two; A second sliding rod (8) that can slide on the ground is arranged on the front side of a sliding footstand (5) connected to a display board (4) arranged on the front side of the liquid crystal display screen (2), and an exhibition body (6) is arranged between the two; The display body (6) is formed by hingedly connecting a plurality of rods using the parallelogram principle.
3. The integrated standard operation display board for construction sites according to claim 2 is characterized in that: A retractable warning belt (9) that can be rolled up is arranged on the top of the first sliding rod (7); one end of the belt body of the retractable warning belt (9) can be pulled out and is detachably connected to the second sliding rod (8).
4. The integrated standard operation display board for construction sites according to claim 3 is characterized in that: When one side of the display frame (3) slides out of the side of the sliding seat (1), a positioning cloth (10) is laid in the area surrounded by the two sliding legs (5), the first sliding rod (7) and the second sliding rod (8), and the positioning cloth (10) is provided with a safety tool area (11), a construction tool area (12) and a material area (13).
5. The integrated standard operation display board for construction sites according to claim 4 is characterized in that: The front end of the sliding seat (1) is provided with a storage space (14); the upper part of the front end of the sliding seat (1) is hinged with a flap (15); the flap (15) can cover the front end of the storage space (14); the rear end of the positioning cloth (10) is provided with a protruding connection belt (16); the rear end of the connection belt (16) is detachably connected to the inner upper wall of the storage space (14).
6. The integrated standard operation display board for construction sites according to claim 5 is characterized in that: A voltage meter (17) is provided at the front end of the sliding seat (1), and a temperature measuring instrument (18) is provided at the top of the second sliding rod (8).
7. The integrated standard operation display board for construction sites according to claim 1 is characterized in that: A fixing seat (19) is arranged on the liquid crystal display screen (2), an LED display screen (20) is arranged on the fixing seat (19), and the display board (4) is slidably connected to the bottom of the fixing seat (19).
8. The integrated standard operation display board for construction sites according to claim 7 is characterized in that: An intelligent anemometer (21) is arranged on the top of the fixed seat (19), and an anemometer (22) electrically connected to the intelligent anemometer (21) is arranged on the sliding seat (1).