Temporary drainage device for roadbed slope

By adopting detachable assembled support top segments and standard segment groups, the existing rubber groove construction, transportation and installation problems are solved, and the more efficient temporary drainage effect of roadbed slopes and a longer service life are achieved.

CN222557779UActive Publication Date: 2025-03-04CHINA RAILWAY 11TH BUREAU GRP CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420600033.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2025-03-04
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The existing rubber grooves are inefficient in construction, transportation and installation, and have poor adaptability, resulting in damage to the roadbed slope and time-consuming and labor-intensive restoration.

Method used

The top section and standard section group of the support are adopted, and the rainwater guidance and drainage are achieved through detachable assembly and fixed nail connection. The assembly between the top section of the support and standard section group is simple to adapt to roadbed slopes of different lengths.

Benefits of technology

It reduces the amount of manual labor, reduces damage to the roadbed slope, improves construction efficiency and adaptability, and extends the service cycle of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222557779U_ABST
    Figure CN222557779U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of roadbed slope temporary protection, in particular to a roadbed slope temporary drainage device. Comprising a support top section and a standard section set, the support top section is in an open groove shape, one end of the support top section is a large-caliber end, the other end of the support top section is a small-caliber end, the large-caliber end of the support top section is matched with a water diversion opening in the top of a roadbed slope, and the standard section set is arranged on the support top section. The large-caliber end and the small-caliber end of the top section of the support are matched with each other, so that rainwater can be guided to gather towards the small-caliber end; a standard section set is detachably assembled at the small-caliber end of the support top section through a connecting structure, the standard section set is composed of a plurality of standard sections, all the standard sections are detachably connected end to end, and the support top section and the standard section set of the temporary drainage device are detachably installed. Therefore, adaptive length adjustment can be carried out according to different roadbed slopes, the splicing length can be flexibly adjusted, and the adaptability is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of temporary protection of roadbed slopes, in particular to a temporary drainage device for roadbed slopes. Background Art

[0002] The roadbed is a structure that directly supports the track formed by filling or excavation. During the operation of trains on high-speed railways, the roadbed bears the static load of the track and the live load of the train. Therefore, the roadbed is one of the important structures to ensure the safe operation of trains. During the filling period of the roadbed, it is inevitable to encounter rainy weather. In order to prevent rainwater from eroding the slope of the roadbed and affecting the integrity of the slope of the roadbed, it is necessary to set up temporary drainage devices on the slope of the roadbed.

[0003] The traditional temporary drainage device is an integrally formed rubber groove with a "U"-shaped cross-section. The construction method of the temporary drainage device is: first, a groove is manually excavated on the slope of the roadbed, and then the integrally formed rubber groove is directly buried in the groove, thereby guiding rainwater at the top of the slope into the drainage ditch at the foot of the slope through the rubber groove.

[0004] The above-mentioned temporary drainage device requires manual trench excavation during the construction process, which is bound to cause certain damage to the roadbed slope, not only affecting the auxiliary construction of the roadbed, but also the later repair of the roadbed slope also has the problems of large manual labor, time-consuming and labor-intensive, and low installation efficiency. On the other hand, the existing rubber groove is not easy to store during transportation due to its one-piece molding, and the transportation efficiency is low. It is easy to age due to the influence of the use environment, and the recycling cycle is short. In addition, due to its fixed overall structure, it cannot be adjusted for roadbed slopes of different lengths, resulting in poor adaptability. It is necessary to improve it. Utility Model Content

[0005] The utility model aims to solve the technical problems of the existing rubber grooves in the above background, such as the troublesome construction operation, low transportation and installation efficiency and poor adaptability, and proposes a temporary drainage device for the roadbed slope.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] A temporary drainage device for a roadbed slope comprises a support top segment and a standard segment group, characterized in that: the support top segment is in the shape of an open groove, one end of the support top segment is a large-diameter end, and the other end of the support top segment is a small-diameter end, the large-diameter end of the support top segment is adapted to a water inlet at the top of the roadbed slope, and the large-diameter end and the small-diameter end of the support top segment cooperate with each other to guide rainwater to gather toward the small-diameter end; the small-diameter end of the support top segment is detachably assembled with a standard segment group through a connecting structure, the standard segment group is composed of a plurality of standard segments, and each standard segment is detachably connected end to end.

[0008] The connection structure includes a first fixing hole opened on the top segment of the support and a second fixing hole opened on the standard segment. The first fixing holes are arranged in an array on the inner plane of the top segment of the support, and the second fixing holes corresponding to the first fixing holes are arranged in an array on the inner plane of the standard segment. Fixing nails can be inserted into the first fixing holes and the second fixing holes.

[0009] The fixing nail is in the shape of an elongated cylinder, one end of the fixing nail is in the shape of a pointed cone, and a limiting flange is arranged at the other end of the fixing nail, and the diameter of the limiting flange is larger than the first fixing hole and the second fixing hole.

[0010] The cross section of the upper half of the support top segment is trapezoidal, and the cross section of the lower half of the support top segment is rectangular.

[0011] The standard segment is in the shape of a rectangular open slot.

[0012] The connection structure includes a first external assembly slot arranged on both sides of the small-diameter end of the top segment of the support, an internal assembly slot arranged on both sides of one end of the standard segment, and a second external assembly slot opened on both sides of one end of the standard segment. The first external assembly slot and the second external assembly slot have the same structure, and the internal assembly slot is matched with the first external assembly slot and the second external assembly slot for card connection.

[0013] The end surface of the first outer assembly slot is symmetrically provided with limiting convex strips, which are in the shape of long strips.

[0014] A limiting groove is arranged on the end surface of the inner assembly slot at a position corresponding to the limiting convex strip, and the limiting groove is engaged with the limiting convex strip.

[0015] Compared with the prior art, the advantages and positive effects of the utility model are:

[0016] In the utility model, the support top segment and the standard segment group of the temporary drainage device for the roadbed slope are respectively made of aluminum materials, which effectively increases their wear resistance and structural strength, so as to increase the turnover times of the support top segment and the standard segment group; the assembly between the support top segment and the standard segment group is simple, the construction is convenient, and there is no need to manually excavate the embedded trench during the construction process, which reduces the manual labor and damage to the roadbed slope and improves the paving construction efficiency; the support top segment and the standard segment group are detachably installed, so that the length can be adaptively adjusted according to different roadbed slopes, the assembly length can be flexibly adjusted, and the adaptability is strong. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a three-dimensional structural schematic diagram of the top segment of the support in the utility model;

[0018] Figure 2It is a three-dimensional structural schematic diagram of a standard segment in the utility model;

[0019] Figure 3 This is a schematic diagram of the structure of the fixing nail in the utility model;

[0020] Figure 4 This is a schematic diagram of the three-dimensional structure of the utility model after assembly;

[0021] Figure 5 This is a schematic diagram of the structure of the utility model after being applied to a roadbed slope;

[0022] Figure 6 It is a schematic diagram of the structure of the improved top segment of the support in the utility model;

[0023] Figure 7 It is a schematic diagram of the structure of the improved standard segment in the utility model.

[0024] Legend:

[0025] 1. Support top segment; 2. Standard segment group; 3. Roadbed; 4. Water inlet; 5. Standard segment; 6. First fixing hole; 7. Second fixing hole; 8. Fixing nail; 9. Limiting flange; 10. First outer assembly slot; 11. Inner assembly slot; 12. Second outer assembly slot; 13. Limiting convex strip; 14. Limiting groove. DETAILED DESCRIPTION

[0026] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0027] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0028] Embodiment 1:

[0029] See also Figure 1-5 The utility model provides a technical solution: a temporary drainage device for a roadbed slope, comprising a support top segment 1 and a standard segment group 2, the support top segment 1 is in the shape of an open groove, one end of the support top segment 1 is a large-diameter end, the cross-section of the large-diameter end of the support top segment 1 is a trapezoidal, the other end of the support top segment 1 is a small-diameter end, the cross-section of the small-diameter end of the support top segment 1 is a rectangular, the large-diameter end of the support top segment 1 is matched with a water inlet 4 at the top of the roadbed slope, thereby allowing rainwater at the top of the roadbed slope to flow into the support top segment 1 through the water inlet 4.

[0030] The large-diameter end and the small-diameter end of the support top segment 1 cooperate with each other to guide rainwater to gather toward the small-diameter end, thereby introducing rainwater from the support top segment 1 into the standard segment group 2.

[0031] The small-diameter end of the support top segment 1 is detachably assembled with a standard segment group 2 through a connecting structure. The connecting structure includes a first fixing hole 6 opened on the support top segment 1 and a second fixing hole 7 opened on the standard segment 5. The first fixing holes 6 are arranged in an array on the inner plane of the support top segment 1, and the second fixing holes 7 corresponding to the first fixing holes 6 are arranged in an array on the inner plane of the standard segment 5. Fixing nails 8 can be inserted in the first fixing holes 6 and the second fixing holes 7.

[0032] The fixing nail 8 is in the shape of an elongated cylinder, one end of which is in the shape of a pointed cone, and a limiting flange 9 is provided at the other end of the fixing nail 8. The diameter of the limiting flange 9 is larger than the diameters of the first fixing hole 6 and the second fixing hole 7. The purpose of such a setting is to limit the fixing nail 8 on the first fixing hole 6 and the second fixing hole 7 through the limiting flange 9.

[0033] The standard segment group 2 is composed of a plurality of standard segments (5), the standard segments 5 are in the shape of rectangular open slots, and each standard segment 5 is detachably connected end to end through the second fixing holes 7 and fixing nails 8.

[0034] The assembly method of the temporary drainage device for the roadbed slope is as follows: taking the roadbed 3 with a total length of 210m and a slope ratio of 1:1.5 as an example, first align the large-diameter end of the top segment 1 of the support with the water inlet 4 on the shoulder of the roadbed slope that has been filled, and then insert the fixing nail 8 through the first fixing hole 6 close to the large-diameter end into the roadbed slope, and the fixing nail 8 cooperates with the first fixing hole 6 to achieve the fixation of the top segment 1 of the support on the roadbed slope.

[0035] Next, the first standard segment 5 is mounted on the small-diameter end of the support top segment 1 so that the first fixing hole 6 of the support top segment 1 is aligned with the second fixing hole 7 of the standard segment 5, and the fixing nail 8 is inserted into the roadbed slope through the first fixing hole 6 and the second fixing hole 7. The fixing nail 8 cooperates with the first fixing hole 6 and the second fixing hole 7 to achieve the fixation of the standard segment 5 on the support top segment 1, and at the same time, the standard segment 5 is also fixed on the roadbed slope.

[0036] Then, the second standard segment 5 to be installed is mounted on the first standard segment 5 so that the second fixing hole 7 on the upper part of the second standard segment 5 is aligned with the second fixing hole 7 on the lower part of the first standard segment 5 , and the fixing nail 8 passes through the two overlapping second fixing holes 7 and is inserted into the roadbed slope to fix the second standard segment 5 to the first standard segment 5 .

[0037] Repeat the above steps of installing the standard segment 5 until the standard segment group 2 extends to the drainage ditch at the foot of the roadbed 3, thereby completing the installation of the entire temporary drainage device.

[0038] The configuration of the temporary drainage device for the roadbed slope of this embodiment is as follows: one row is set on each side of the roadbed 3 every 20m along the line defense line, and the length of the single side slope is 5m, so a total of 20 rows of drainage devices need to be set. Taking the traditional construction method as solution one and this embodiment as solution two, the specific indicators of solution one and solution two are compared as shown in the following table:

[0039]

[0040] Embodiment 2:

[0041] See also Figure 6-7 The utility model provides a technical solution: a temporary drainage device for a roadbed slope, comprising a support top segment 1 and a standard segment group 2, the support top segment 1 is in the shape of an open groove, one end of the support top segment 1 is a large-diameter end, the cross-section of the large-diameter end of the support top segment 1 is a trapezoidal, the other end of the support top segment 1 is a small-diameter end, the cross-section of the small-diameter end of the support top segment 1 is a rectangular, the large-diameter end of the support top segment 1 is matched with a water inlet 4 at the top of the roadbed slope, thereby allowing rainwater at the top of the roadbed slope to flow into the support top segment 1 through the water inlet 4.

[0042] The large-diameter end and the small-diameter end of the support top segment 1 cooperate with each other to guide rainwater to gather toward the small-diameter end, thereby introducing rainwater from the support top segment 1 into the standard segment group 2.

[0043] The small-diameter end of the support top segment 1 is detachably assembled with the standard segment group 2 through a connecting structure, and the connecting structure includes a first outer assembly slot 10 arranged on both sides of the small-diameter end of the support top segment 1, an inner assembly slot 11 arranged on both sides of one end of the standard segment 5, and a second outer assembly slot 12 opened on both sides of one end of the standard segment 5. The first outer assembly slot 10 and the second outer assembly slot 12 have the same structure, and the inner assembly slot 11 is matched with the first outer assembly slot 10 and the second outer assembly slot 12 for card connection.

[0044] A limiting convex strip 13 is symmetrically arranged on the end surface of the first outer assembly slot 10, and the limiting convex strip 13 is in the shape of an elongated strip. A limiting groove 14 is arranged on the end surface of the inner assembly slot 11 at a position corresponding to the limiting convex strip 13, and the limiting groove 14 is engaged with the limiting convex strip 13.

[0045] The assembly method of the temporary drainage device for the roadbed slope is as follows: taking the roadbed 3 with a total length of 210m and a slope ratio of 1:1.5 as an example, first align the large-diameter end of the support top segment 1 with the water inlet 4 on the shoulder of the roadbed slope that has been filled, and by setting the support top segment 1 on the top and the first standard segment 5 on the bottom, the first outer assembly groove 10 of the support top segment 1 corresponds to the inner assembly groove 11 of the standard segment 5 and cooperates to slide up and down, so that the support top segment 1 is mounted on the standard segment 5. In this process, the limiting convex strip 13 and the limiting groove 14 are engaged with each other, so that an axial limit is formed between the support top segment 1 and the standard segment 5.

[0046] Then the second standard segment 5 to be installed is set at the bottom, and the first standard segment 5 is set at the top. The second outer assembly slot 12 of the first standard segment 5 corresponds to the inner assembly slot 11 of the first standard segment 5 and cooperates to slide up and down so that the second standard segment 5 is mounted on the first standard segment 5. In this process, the limiting convex strip 13 and the limiting groove 14 are engaged with each other, so that axial limitation is formed between the first standard segment 5 and the second standard segment 5.

[0047] Repeat the above steps of installing the standard segment 5 until the standard segment group 2 extends to the drainage ditch at the foot of the roadbed 3, thereby completing the installation of the entire temporary drainage device.

Claims

1. A temporary drainage device for a roadbed slope, comprising a support top segment (1) and a standard segment group (2), characterized in that: The support top segment (1) is in the shape of an open groove, one end of the support top segment (1) is a large-diameter end, and the other end of the support top segment (1) is a small-diameter end. The large-diameter end of the support top segment (1) is compatible with the water inlet (4) at the top of the roadbed slope. The large-diameter end and the small-diameter end of the support top segment (1) cooperate with each other to guide rainwater to gather at the small-diameter end. The small-diameter end of the support top segment (1) is detachably assembled with a standard segment group (2) through a connecting structure. The standard segment group (2) is composed of a plurality of standard segments (5), and each standard segment (5) is detachably connected end to end. The connecting structure comprises a first outer assembly slot arranged on both sides of the small-diameter end of the support top segment (1). (10), an inner assembly slot (11) arranged on both sides of one end of the standard segment (5) and a second outer assembly slot (12) opened on both sides of one end of the standard segment (5), the first outer assembly slot (10) and the second outer assembly slot (12) having the same structure, the inner assembly slot (11) being engaged with the first outer assembly slot (10) and the second outer assembly slot (12); a limiting convex strip (13) being symmetrically arranged on the end surface of the first outer assembly slot (10), the limiting convex strip (13) being in the shape of a long strip; a limiting groove (14) being arranged on the end surface of the inner assembly slot (11) at a position corresponding to the limiting convex strip (13), the limiting groove (14) being engaged with the limiting convex strip (13) by being engaged.

2. A temporary drainage device for roadbed slope according to claim 1, characterized in that: The connection structure further comprises a first fixing hole (6) formed on the support top segment (1) and a second fixing hole (7) formed on the standard segment (5); the first fixing holes (6) are arranged in an array on the inner plane of the support top segment (1); the second fixing holes (7) corresponding to the first fixing holes (6) are arranged in an array on the inner plane of the standard segment (5); and fixing nails (8) can be inserted into the first fixing holes (6) and the second fixing holes (7).

3. A temporary drainage device for roadbed slope according to claim 2, characterized in that: The fixing nail (8) is in the shape of an elongated cylinder, one end of the fixing nail (8) is in the shape of a pointed cone, and a limiting flange (9) is provided at the other end of the fixing nail (8), wherein the diameter of the limiting flange (9) is larger than that of the first fixing hole (6) and the second fixing hole (7).

4. A temporary drainage device for roadbed slope according to claim 1, characterized in that: The cross section of the upper part of the support top segment (1) is a trapezoid, and the cross section of the lower part of the support top segment (1) is a rectangle.

5. A temporary drainage device for roadbed slope according to claim 1, characterized in that: The standard segment (5) is in the shape of a rectangular open slot.