During the concrete mortar pouring process of existing pouring devices, concrete mortar is prone to stick to the inner wall of the pouring pipe, resulting in clogging, wasting resources and affecting pouring efficiency.
An energy-saving pouring device for municipal building concrete is designed, including a casting hose, a threaded ring and a spray head, which can quickly disassemble the spray head, the first connecting pipe, the gooseneck pipe and the second connecting pipe and the casting hose after each use, thereby facilitating the cleaning of concrete mortar on the inner wall.
Through rapid disassembly and cleaning, concrete mortar is prevented from adhering to the inner wall of the device, preventing clogging and waste, and improving pouring efficiency.
Smart Images

Figure CN222576159U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of municipal buildings, in particular to an energy-saving concrete pouring device for municipal buildings. Background Art
[0002] Municipal buildings refer to public buildings built with government funding, generally referring to various administrative buildings and buildings serving the public within the planning area, including government buildings, public entertainment facilities, urban transportation facilities, educational, scientific research and cultural institution buildings, medical and health institution buildings, etc. In the construction process of municipal buildings, pouring devices are needed to pour concrete mortar.
[0003] During the pouring process of concrete mortar, part of the existing pouring device often adheres to the inner wall of the pouring pipe. Most of the pouring pipes are one-piece hoses, and there is no cleaning structure inside, so it is difficult to clean. During long-term use, the residual concrete mortar solidifies and clumps on the inner wall of the pouring pipe, which easily affects the pouring efficiency of the concrete mortar and easily blocks the concrete, resulting in more and more concrete mortar adhering to the inner wall of the pouring pipe, which not only wastes resources but also easily causes blockage, affecting normal pouring use.
[0004] Therefore, we proposed an energy-saving concrete pouring device for municipal buildings. Utility Model Content
[0005] The purpose of the utility model is to provide an energy-saving concrete pouring device for municipal buildings, which can quickly separate the nozzle, the first connecting pipe, the gooseneck pipe, the second connecting pipe and the pouring pipe after each use, so as to facilitate the cleaning of the concrete mortar on the inner wall and avoid the concrete mortar adhering to the inner wall of this pouring device, which may cause blockage in the subsequent pouring of concrete mortar, or affect the efficiency of concrete mortar pouring and waste resources.
[0006] The embodiment of the utility model is achieved as follows:
[0007] The utility model embodiment provides a municipal building concrete energy-saving pouring device, including a pouring hose, a threaded ring and a nozzle, a fixing ring is fixedly installed on the right side of the pouring hose, two second connecting pipes are inserted in the pouring hose, gooseneck pipes are fixedly installed on the right sides of the two second connecting pipes, first connecting pipes are fixedly installed on the right sides of the two gooseneck pipes, and holders are fixedly installed on the top and bottom ends of the first connecting pipes, two slots are arranged on the fixing ring, the two holders are respectively clamped in the two slots, two slides are slidably connected in each of the holders, a spring is fixedly installed between the two slides, pin rods are fixedly installed on the sides of the two slides away from each other, pin grooves are arranged in the fixing ring corresponding to the multiple pin rods, and the multiple pin rods extend into the pin grooves on the sides away from the slides.
[0008] Optionally, a nozzle is fixedly installed on the left side of each of the two second connecting pipes, and the left side of each of the two nozzles extends out of the pouring hose. This design is convenient for the use of this pouring device.
[0009] Optionally, the outer threaded sleeves of the two nozzles are provided with a collar, and the two nozzles can be connected via the collar.
[0010] Optionally, a plurality of levers are fixedly mounted on the outer side of the collar, and the collar can be easily moved by the plurality of levers.
[0011] Optionally, a paddle is fixedly installed on the right side of each of the plurality of skateboards, and the paddle is used to facilitate the sliding of the skateboard.
[0012] Optionally, threaded rings are fixedly installed on the right sides of the two first connecting pipes, and the threaded rings are used to facilitate the connection between the casting device and the concrete equipment.
[0013] Optionally, the two nozzles, the second connecting pipe, the gooseneck pipe, the threaded ring and the first connecting pipe are all arranged as half pipes. This design is beneficial to the use of this casting device.
[0014] The beneficial effects of the embodiments of the utility model include:
[0015] Through the mutual cooperation of the nozzle, the collar, the first connecting pipe, the gooseneck pipe, the threaded ring, the holder, the slide plate, the pin groove, the pin rod, the spring and the second connecting pipe, the nozzle, the first connecting pipe, the gooseneck pipe and the second connecting pipe can be quickly separated from the pouring hose after each use, thereby facilitating the cleaning of the concrete mortar on the inner wall and preventing the concrete mortar from adhering to the inner wall of this pouring device, which may lead to blockage during the subsequent pouring of concrete mortar, or affect the pouring efficiency of the concrete mortar and waste resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 This is a schematic diagram of the overall structure of a municipal building concrete energy-saving pouring device of the utility model;
[0018] Figure 2 This is a cross-sectional view of a municipal building concrete energy-saving pouring device according to the utility model;
[0019] Figure 3 This is a cross-sectional view of a holder in a municipal building concrete energy-saving pouring device of the utility model;
[0020] Figure 4 This utility model is a municipal building concrete energy-saving pouring device Figure 3 A is an enlarged view of the middle image.
[0021] Icons: 1. Pouring hose; 2. Fixing ring; 3. Nozzle; 4. Ring; 5. Lever; 6. First connecting pipe; 7. Gooseneck; 8. Threaded ring; 9. Slot; 10. Holder; 11. Lever; 12. Slide plate; 13. Pin slot; 14. Pin rod; 15. Spring; 16. Second connecting pipe. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Therefore, the following detailed description of the embodiments of the utility model provided in the drawings is not intended to limit the scope of the utility model claimed for protection, but merely represents the selected embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0023] In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "vertical", "horizontal", "inner", "outer", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the utility model product is usually placed when in use, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0024] In addition, the terms "horizontal", "vertical" and the like do not mean that the components are required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0025] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0026] like Figure 1-4 As shown, an embodiment of the utility model provides an energy-saving concrete pouring device for municipal buildings, including a pouring hose 1, a threaded ring 8 and a nozzle 3. A fixing ring 2 is fixedly installed on the right side of the pouring hose 1, and two second connecting pipes 16 are inserted in the pouring hose 1, and gooseneck pipes 7 are fixedly installed on the right sides of the two second connecting pipes 16, and first connecting pipes 6 are fixedly installed on the right sides of the two gooseneck pipes 7. A clamping seat 10 is fixedly installed on the top and bottom ends of the first connecting pipe 6, and two clamping grooves 9 are arranged on the fixing ring 2. The two clamping seats 10 are respectively clamped in the two clamping grooves 9, and two slides 12 are slidably connected in each clamping seat 10, and a spring 15 is fixedly installed between the two slides 12, and pin rods 14 are fixedly installed on the sides of the two slides 12 away from each other, and pin grooves 13 are arranged in the fixing ring 2 corresponding to the multiple pin rods 14, and the multiple pin rods 14 extend into the pin groove 13 on the side away from the slide 12.
[0027] The left sides of the two second connecting pipes 16 are fixedly installed with nozzles 3, and the left sides of the two nozzles 3 extend out of the pouring hose 1. This design is conducive to the use of this pouring device. The outer threaded sleeves of the two nozzles 3 are provided with a ring 4, and the two nozzles 3 can be connected through the ring 4. A plurality of levers 5 are fixedly installed on the outer side of the ring 4, and the ring 4 can be easily moved through the plurality of levers 5. The right sides of the plurality of slides 12 are fixedly installed with paddles 11, and the slides 12 can be driven to slide through the paddles 11. The right sides of the two first connecting pipes 6 are fixedly installed with threaded rings 8, and the threaded rings 8 can be used to connect this pouring device with concrete equipment. The two nozzles 3, the second connecting pipe 16, the gooseneck pipe 7, the threaded ring 8 and the first connecting pipe 6 are all half-pipe settings. This design is conducive to the use of this pouring device.
[0028] It should be noted that the utility model is an energy-saving concrete pouring device for municipal buildings. When cleaning is required, the collar 4 can be rotated counterclockwise to disengage the collar 4 from the nozzle 3, and then the two paddles 11 on each holder 10 can be moved toward one side close to each other, so that the multiple pins 14 can be retracted into the holder 10. At this time, the holder 10 loses its limit, and then the two threaded rings 8 are pulled to the right, so that the nozzle 3, the first connecting pipe 6, the gooseneck pipe 7 and the second connecting pipe 16 can be pulled out of the pouring hose 1, and then the two threaded rings 8 can be pulled out, so that the nozzle 3, the first connecting pipe 6, the gooseneck pipe 7 and the second connecting pipe 16 can be pulled out of the pouring hose 1. 6. The gooseneck tube 7 and the second connecting tube 16 are separated, which is convenient for cleaning the concrete mortar on the inner wall. This municipal building concrete energy-saving pouring device is easy to use. Through the above components, the nozzle 3, the first connecting tube 6, the gooseneck tube 7 and the second connecting tube 16 can be quickly separated from the pouring hose 1 after each use, so as to facilitate the cleaning of the concrete mortar on the inner wall and avoid the concrete mortar adhering to the inner wall of this pouring device, which may cause blockage during the subsequent pouring of concrete mortar, or affect the pouring efficiency of concrete mortar and waste resources.
[0029] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A municipal building concrete energy-saving pouring device, characterized in that: The invention comprises a pouring hose (1), a threaded ring (8) and a nozzle (3), wherein a fixing ring (2) is fixedly installed on the right side of the pouring hose (1), two second connecting pipes (16) are inserted into the pouring hose (1), gooseneck pipes (7) are fixedly installed on the right side of the two second connecting pipes (16), first connecting pipes (6) are fixedly installed on the right side of the two gooseneck pipes (7), and a clamping seat (10) is fixedly installed on the top and bottom ends of the first connecting pipe (6), and two fixing rings (2) are arranged on the fixing ring (2). A card slot (9), the two card seats (10) are respectively carded in the two card slots (9), each card seat (10) is slidably connected with two slide plates (12), a spring (15) is fixedly installed between the two slide plates (12), a pin rod (14) is fixedly installed on the side of the two slide plates (12) away from each other, and pin slots (13) are arranged in the fixing ring (2) corresponding to the multiple pin rods (14), and the multiple pin rods (14) extend into the pin slots (13) on the side away from the slide plates (12).
2. The energy-saving concrete pouring device for municipal buildings according to claim 1 is characterized in that: The left sides of the two second connecting pipes (16) are both fixedly mounted with nozzles (3), and the left sides of the two nozzles (3) extend out of the pouring hose (1).
3. The energy-saving concrete pouring device for municipal buildings according to claim 1 is characterized in that: The outer threads of the two spray heads (3) are provided with collars (4).
4. The energy-saving concrete pouring device for municipal buildings according to claim 3 is characterized in that: A plurality of levers (5) are fixedly mounted on the outer side of the collar (4).
5. The energy-saving concrete pouring device for municipal buildings according to claim 1 is characterized in that: A paddle (11) is fixedly mounted on the right side of each of the plurality of slide plates (12).
6. The energy-saving concrete pouring device for municipal buildings according to claim 1 is characterized by: A threaded ring (8) is fixedly mounted on the right side of each of the two first connecting pipes (6).
7. The energy-saving concrete pouring device for municipal buildings according to claim 1 is characterized by: The two spray heads (3), the second connecting pipe (16), the gooseneck pipe (7), the threaded ring (8) and the first connecting pipe (6) are all arranged in a half-pipe configuration.