Equipment lifting device in construction process
By designing a equipment lifting device for construction projects, the problems of mechanical and electrical equipment installation difficulties and construction safety hazards are solved at high places, efficient and safe equipment lifting is achieved, and construction efficiency and safety are significantly improved.
Patent Information
- Application Number
- CN202421316849.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-06-11
AI Technical Summary
During the construction process of construction projects, the installation of electromechanical equipment is difficult to install and poor stability due to the large weight of the equipment, high installation height and difficult crane extension, which can easily lead to construction safety accidents, and the forklift cannot convey the equipment to a high place, resulting in lag in construction progress.
Design a equipment lifting device during construction, including base structure, motor structure, groove structure and hanging frame structure, lifting pipes through motor drive ropes, groove structure protects ropes, and hanging frame structure changes rope angle to support pipe lifting.
The device is low overall cost, small in size, reusable, simple in operation, and can be installed with rollers for speed buffering, low operating risk, improves construction efficiency and safety, and significantly saves material transportation time.
Smart Images

Figure CN222593207U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to an equipment lifting device in a construction process. Background Art
[0002] In many construction projects, some electromechanical equipment installed in basements and large public buildings, such as air ducts, ceiling fans, heating water pipes and cables, are heavy and have high installation heights. In addition, it is difficult to extend the crane in basements and other areas, which makes it difficult to install such equipment during construction. In traditional construction, such equipment is mostly lifted to the corresponding installation height by on-site workers using ladders, hangers or forklifts, and then installed in cooperation with other construction personnel. This installation method has high requirements on the quality of related equipment and the workers' own installation experience. During the construction process, the equipment is hoisted by manpower, and the stability of the equipment is poor. It is easy to shake during the installation process, which makes the installation difficult and easy to cause construction safety accidents. When the net height of the space is too high, there are also problems such as the inability of the forklift to transport the equipment to the corresponding installation height. In addition, some co-constructed multi-story buildings do not have building ramps, and large-scale mechanical equipment cannot be driven to the construction area to assist in construction. Construction can only be completed by manpower, which is difficult to construct and easily causes delays in construction progress. This is one of the main problems facing the current high-elevation construction of electromechanical equipment.
[0003] The difficulties and shortcomings faced by traditional equipment installation methods include: high requirements on the construction level of construction workers; for example, the net height of the construction area is high, exceeding the maximum working height of the mechanical equipment, and manpower is still required to install the equipment; and the construction stability is poor, which is prone to safety hazards. Utility Model Content
[0004] The purpose of the utility model is to provide an equipment lifting device during the construction process to solve the problems raised in the above background technology.
[0005] To achieve the above purpose, the utility model provides the following technical solutions: an equipment lifting device during construction, the equipment lifting device is used to hoist the pipeline, comprising:
[0006] A base structure, which is arranged on the ground and used to support the equipment lifting device, and a motor structure is arranged on the base structure;
[0007] The motor structure includes a rope, and the motor structure is used to drive the rope to hoist the pipeline, and a groove structure is provided on the motor structure;
[0008] The groove structure is used to wrap and protect the rope, and a hanger structure is arranged on the groove structure;
[0009] The hanger structure is used to change the angle of the rope and support the rope to hang the pipeline.
[0010] Preferably, the base structure comprises a base arranged on the ground, and the base is provided with fixing bolts and universal wheels.
[0011] Preferably, the number of the fixing bolts and the universal wheels is at least four.
[0012] Preferably, in addition to the rope, the motor structure also includes a motor room bracket arranged on the base, and a hoist and a rope pulley are arranged in the motor room bracket. The rope pulley is used to change the position of the rope, and the rope is arranged on the hoist.
[0013] Preferably, the groove structure includes a cable groove rod arranged on the motor room bracket, the cable groove rod is provided with a fixing card and a control panel, at least two cable grooves are opened in the cable groove rod for wrapping the rope, and the control panel is used to control the hoist.
[0014] Preferably, the number of the cable trough rods is at least two, and the two cable trough rods are sleeved and fixed by the fixing card.
[0015] Preferably, the hanger structure includes a hanger arranged on the cable trough rod, and at least two hanger pulleys are connected to the hanger. The rope changes direction through the hanger pulleys to lift the pipeline.
[0016] Compared with the prior art, the beneficial effects of the utility model are: the equipment lifting device in the construction process has a low overall cost, can be manufactured using on-site materials, can be put into use after the equipment load-bearing test, the overall size of the equipment is small, multiple projects can be reused, the equipment is easy to operate, rollers are arranged at the motor for speed buffering, the equipment operation risk is low, the operation safety of relevant personnel is high, the efficiency is significantly improved, the equipment lifting speed is fast, and compared with traditional construction, most of the time for transporting materials to the equipment installation location is saved. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of forward hoisting of an embodiment of the utility model;
[0018] Figure 2 It is a front view schematic diagram of an embodiment of the utility model;
[0019] Figure 3 This is a schematic diagram of the back-mounting of an embodiment of the utility model;
[0020] Figure 4 This is a schematic diagram of the inner side of a motor room bracket according to an embodiment of the utility model;
[0021] Figure 5Schematic diagram of a cable trough rod according to an embodiment of the utility model.
[0022] In the figure:
[0023] 1. Base 2. Motor room bracket 3. Cable trough rod
[0024] 4. Hanger 5. Fixing bolt 6. Universal wheel
[0025] 7. Hoist 8. Rope pulley 9. Fixing card
[0026] 10. Control panel 11. Hanger pulley 12. Rope DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] like Figure 1-3 As shown, the utility model provides a technical solution: an equipment lifting device during construction, the equipment lifting device is used to lift pipes, including: a base structure, which is arranged on the ground to support the equipment lifting device, the base structure can also drive the entire device to move, which is convenient for transportation, increases the convenience of the device, and thus improves the practicality of the device, a motor structure is arranged on the base structure, the motor structure includes a rope 12, the motor structure is used to drive the rope 12 to lift the pipe, the motor structure can drive the rope 12 to release and retract, so as to achieve the lifting of the pipe, a groove structure is arranged on the motor structure, the groove structure is used to wrap and protect the rope 12, the groove structure prevents accidental touching of the rope 12 from causing injury to personnel by wrapping the rope 12, a hanger structure is arranged on the groove structure, the hanger structure is used to change the angle of the rope 12, and supports the rope 12 to lift the pipe, the hanger structure is used to change the connection direction of the rope 12, and is used to extend downward, so as to bundle the pipe for lifting.
[0029] The base structure includes a base 1 arranged on the ground. The frame size of the base 1 is W*D*H, 1000*1000*100mm. A grid is opened on the base 1, which saves materials and reduces the weight of the base 1, and is convenient for moving the device. The grid size is 200*200mm and is evenly arranged. A fixing bolt 5 and a universal wheel 6 are arranged on the base 1. The fixing bolt 5 is welded at the top four corners of the base 1 to fix the fixing bolt 5 on the ground, so that the device can be stabilized. The universal wheel 6 can drive the entire device to move. The number of the fixing bolts 5 and the universal wheel 6 is at least four. The four fixing bolts 5 can effectively fix the base 1. The four universal wheels 6 can not only stably support the base 1, but also drive the base 1 to move.
[0030] like Figure 4 As shown, in addition to the rope 12, the motor structure also includes a motor room bracket 2 arranged on the base 1. The size of the motor room bracket 2 is W*D*H 600*400*550mm. A threading interface and a control panel 10 are reserved on the motor room bracket 2 for connecting the cables. A hoist 7 and a rope pulley 8 are arranged in the motor room bracket 2. The value of the hoist 7 is a voltage level of 380V, a motor power of 1.5kw, and a lifting speed of 1.5m / min. The rope 12 can be driven to be retracted and released by rotation, so as to achieve the effect of lifting the pipeline. The rope pulley 8 is used to change the position of the rope 12, and the rope pulley 8 is used to change the direction of the rope 12. The rope 12 is arranged on the hoist 7. The rope 12 is made of steel wire rope and has the characteristics of strong bearing capacity, thereby ensuring that the rope 12 will not break when lifting the pipeline.
[0031] like Figure 5 As shown, the groove structure includes a cable groove rod 3 arranged on the motor room bracket 2, the cable groove rod 3 is used to support the hanger 4, and the size of the cable groove rod 3 is W*D*H 2*240*150*1000mm, the number of cable trough rods 3 is at least two, the two cable trough rods 3 are fixed by the fixing card 9 in a socketed manner, the two cable trough rods 3 are connected in an up and down socketed manner, the size of the upper cable trough rod 3 is slightly larger than the lower cable trough rod 3, the upper cable trough rod 3 is manually moved on the lower cable trough rod 3 to adjust the height of the entire cable trough rod 3, the cable trough rod 3 is provided with a fixing card 9 and a control panel 10, at least two cable troughs are opened in the cable trough rod 3, the size of the cable trough is 50*150mm, which is used to wrap the rope 12, the fixing card 9 is used to fix the cable trough rod 3 after the height of the cable trough rod 3 is adjusted, the fixing card 9 also includes a fixing plate arranged on the cable trough rod 3 for fixing the cable trough rod 3, the fixing plates are respectively arranged at the top and tail of the cable trough rod 3, and the control panel 10 is used to control the hoist 7, thereby adjusting the working state of the hoist 7.
[0032] The hanger structure includes a hanger 4 arranged on the cable trough rod 3, the hanger 4 is a V-shaped hanger 4, the size of the hanger 4 is W*D*H1000 / 240*750*100mm, and at least two hanger pulleys 11 are connected to the hanger 4. The hanger pulleys 11 are arranged below the two end points of the V-shaped hanger 4 to change the direction of the rope 12. The rope 12 changes direction through the hanger pulley 11 to hoist the pipeline.
[0033] As shown above, in this embodiment, the universal wheel 6 can be used to drive the device to move in front of the pipeline, and then the hoist 7 is started through the control panel 10, the rope 12 is released through the hoist 7, and the rope 12 and the rope loop tied to the pipeline are hooked.
[0034] According to the above, in this embodiment, the height of the cable trough rod 3 is adjusted according to the required hoisting height, and finally fixed by the fixing card 9.
[0035] According to the above, in this embodiment, the hoist 7 is started again to recover the rope 12, and the rope 12 is recovered and moved through the hanger pulley 11 of the hanger 4, so as to hoist the pipeline.
[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An equipment lifting device in a construction process, the equipment lifting device is used to lift a pipeline, characterized in that: include: A base structure, which is arranged on the ground and used to support the equipment lifting device, and a motor structure is arranged on the base structure; The motor structure includes a rope, and the motor structure is used to drive the rope to hoist the pipeline, and a groove structure is provided on the motor structure; The groove structure is used to wrap and protect the rope, and a hanger structure is arranged on the groove structure; The hanger structure is used to change the angle of the rope and support the rope to hang the pipeline.
2. The equipment lifting device during construction according to claim 1, characterized in that: The base structure comprises a base arranged on the ground, and a fixing bolt and a universal wheel are arranged on the base.
3. The equipment lifting device during construction according to claim 2, characterized in that: The number of the fixing bolts and the universal wheels is at least four.
4. The equipment lifting device during construction according to claim 2, characterized in that: In addition to the rope, the motor structure also includes a motor room bracket arranged on the base, and a hoist and a rope pulley are arranged in the motor room bracket. The rope pulley is used to change the position of the rope, and the rope is arranged on the hoist.
5. The equipment lifting device during construction according to claim 4, characterized in that: The groove structure includes a cable groove rod arranged on the motor room bracket, a fixing card and a control panel are arranged on the cable groove rod, at least two cable grooves are opened in the cable groove rod for wrapping the rope, and the control panel is used to control the hoist.
6. The equipment lifting device during construction according to claim 5, characterized in that: The number of the cable trough rods is at least two, and the two cable trough rods are sleeved and fixed by the fixing card.
7. The equipment lifting device during construction according to claim 5, characterized in that: The hanger structure comprises a hanger arranged on the cable trough rod, the hanger is connected with at least two hanger pulleys, and the rope changes direction through the hanger pulleys to hang the pipeline.