Temporary steel structure sedimentation tank for water collecting well

By designing a temporary steel structure sedimentation tank for water collection wells, using the combination of I-steel and side limit displacement steel plates, the blockage and cleaning difficulties caused by mud in the water collection well during construction are solved, and the separation of mud and sewage and the stable operation of the water collection wells are achieved.

CN222595120UActive Publication Date: 2025-03-11CHINA CONSTR EIGHTH ENG BUREAU TECH CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420568663.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2025-03-11
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

During the construction process, the mud in the water collection well is prone to blockage and silt of drain pipes, difficulty in cleaning, and affect construction efficiency and progress.

Method used

A temporary steel structure sedimentation tank for water collection wells is designed, and the embedded parts of the water collection wells are connected through two sets of I-shaped steels, and the steel sedimentation tank is installed, and the drainage pipe and side limit displacement steel plate are installed to achieve separation of mud and sewage and stable installation.

Benefits of technology

Through the design of this sedimentation tank, mud is avoided from mixing into the water collection well, simplifying the cleaning process, improving construction efficiency, and preventing water collection wells from being blocked.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222595120U_ABST
    Figure CN222595120U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary steel structure sedimentation tank for a water-collecting well, which belongs to the technical direction of construction drainage and comprises the water-collecting well, an embedded part is arranged in the water-collecting well, two groups of second I-shaped steel are fixedly mounted on the embedded part, and two ends of the two groups of second I-shaped steel are connected with the embedded part arranged in the water-collecting well. First I-shaped steel is fixedly welded to one sides of the two sets of second I-shaped steel, a steel water-collecting well sedimentation tank is detachably installed at the top end of the interior of the water-collecting well, and the two sets of I-shaped steel and the water-collecting well are used in cooperation, so that the two sets of I-shaped steel can be connected with embedded parts in the water-collecting well; installation operation can be completed only by hoisting and placing the steel water-collecting well sedimentation tank, installation is convenient and fast, follow-up maintenance is facilitated, through cooperative use of the steel water-collecting well sedimentation tank and the drainage pipe, mud can be prevented from being mixed into the water-collecting well, daily cleaning is facilitated, the water-collecting well is prevented from being blocked, and construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical direction of construction drainage, and specifically relates to a temporary steel structure sedimentation tank for a water collection well. Background Art

[0002] During the basement construction phase, a drainage ditch is generally set up at the entrance of the basement. The rainwater and sewage flowing into the drainage ditch are diverted to the collection well to collect all the leakage water. The collection well is located at the lowest point of the building facilities. When the water level reaches a certain height, a water pump is used to pump out the water and discharge it into the tail water.

[0003] In the existing technology, mud and water are often directly discharged into the water collection well during the construction process. The sludge will cause mud blockage and siltation in the drainage pipe, which is difficult to clean. The drainage efficiency is low and it has a certain impact on the construction progress. It cannot solve the problem of difficulty in cleaning sludge in deep water collection wells during the construction period. Utility Model Content

[0004] The utility model aims to provide a temporary steel structure sedimentation tank for a water collection well in view of the existing device, so as to solve the problems raised in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the utility model provides the following technical solutions: a temporary steel structure sedimentation tank for a water collecting well, comprising a water collecting well, wherein an embedded part is arranged inside the water collecting well, and two groups of second I-beams are fixedly installed on the embedded part, and both ends of the two groups of second I-beams are connected to the embedded parts built into the water collecting well, and a first I-beam is welded and fixed to one side of the two groups of second I-beams, and a steel water collecting well sedimentation tank is detachably installed on the inner top of the water collecting well.

[0006] The utility model further illustrates that side displacement limiting steel plates are fixedly installed at both ends of the first I-beam.

[0007] The utility model further illustrates that a drainage pipe is arranged on the top of one side of the steel water collecting well sedimentation tank, and sediment is placed on the inner bottom of the steel water collecting well sedimentation tank.

[0008] The utility model further describes that an angle iron is fixedly installed at the top wellhead position of the water collection well.

[0009] The utility model further describes that a protective plate is detachably installed on the external top of the steel water collection well sedimentation tank.

[0010] The utility model further illustrates that the water collection well is arranged on the ground of the construction site.

[0011] Compared with the prior art, the beneficial effects achieved by the utility model are as follows: the utility model, through the coordinated use of two groups of I-beams and a water collection well, can connect the two groups of I-beams with the embedded parts in the water collection well, and the installation operation can be completed by only hoisting and placing the steel water collection well sedimentation tank. The installation is convenient and quick, and it is convenient for subsequent maintenance. The coordinated use of the side limit displacement steel plate can prevent the steel water collection well sedimentation tank from being displaced during use, thereby improving the stability of the steel water collection well sedimentation tank. The coordinated use of the steel water collection well sedimentation tank and the drainage pipe can prevent mud from mixing into the water collection well, separate the mud from the sewage, facilitate daily cleaning, prevent the water collection well from being blocked, and improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0014] Figure 2 It is an enlarged schematic diagram of the steel water collection well sedimentation tank structure of the utility model.

[0015] In the figure: 1. Steel water collection well sedimentation tank; 2. First I-beam; 3. Second I-beam; 4. Lateral displacement limit steel plate; 5. Drain pipe; 6. Angle iron; 7. Protective plate; 8. Water collection well; 9. Sediment. DETAILED DESCRIPTION

[0016] The following is a further non-limiting detailed description of the technical solution of the utility model in conjunction with the preferred embodiments and the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0017] See also Figure 1-2 The utility model provides a technical solution: a temporary steel structure sedimentation tank for a water collection well, including a water collection well 8, which is arranged on the ground of a construction site, and an angle iron 6 is fixedly installed at the wellhead position of the top of the water collection well 8, and the angle iron 6 plays a role of matching and fixing, and a steel water collection well sedimentation tank 1 is detachably installed at the top of the inner top of the water collection well 8, which is used to collect water and mud generated during the construction stage, and the gap between the steel water collection well sedimentation tank 1 and the angle iron 6 is sealed with structural adhesive;

[0018] The interior of the water collecting well 8 is provided with embedded parts (not shown in the figure), and two groups of second I-beams 3 are fixedly installed on the embedded parts. The two ends of the two groups of second I-beams 3 are connected to the embedded parts built into the water collecting well 8, and play a role in cooperating with the fixing of the steel water collecting well sedimentation tank 1. The first I-beam 2 is welded and fixed on one side of the two groups of second I-beams 3, and plays a role in supporting the steel water collecting well sedimentation tank 1. The two ends of the first I-beam 2 are fixedly installed with side limit displacement steel plates 4, which are used to prevent the steel water collecting well sedimentation tank 1 from displacement;

[0019] A drainage pipe 5 is arranged on the top of one side of the steel water collecting well sedimentation tank 1 for discharging the precipitated sewage into the water collecting well 8. Sediment 9 is placed on the inner bottom of the steel water collecting well sedimentation tank 1 to facilitate centralized cleaning by construction personnel and prevent mud from mixing into the water collecting well 8 and affecting normal use. A protective plate 7 is detachably installed on the outer top of the steel water collecting well sedimentation tank 1 to play a protective role.

[0020] In this embodiment:

[0021] During the construction of the basement, a lot of water and mud will be generated on the ground of the basement. If it is directly discharged into the water collection well 8, it is easy to get clogged and difficult to clean. The construction personnel first install the side limit displacement steel plate 4 at both ends of the first I-beam 2, and then fix the two sets of second I-beams 3 on the embedded parts inside the water collection well 8. After the installation is completed, the steel water collection well sedimentation tank 1 is hoisted into the water collection well 8 using hoisting equipment and placed on the first I-beam 2. At this time, the bottom of the steel water collection well sedimentation tank 1 is fixed, and then the construction personnel use structural glue to inject it into the gap between the angle iron 6 and the steel water collection well sedimentation tank 1. The top of the steel water collection well sedimentation tank 1 can be fixed. After the steel water collection well sedimentation tank 1 is installed, the construction personnel install the protective plate 7 on the top of the steel water collection well sedimentation tank 1 to protect it from foreign objects falling into the steel water collection well sedimentation tank 1. During the construction process, the construction personnel can directly shovel mud and water into the steel water collection well sedimentation tank 1. The mud and foreign objects will settle at the bottom of the steel water collection well sedimentation tank 1. After the sewage generated by the separation reaches a certain liquid level, it will be discharged from the drainage pipe 5 into the water collection well 8 below for centralized collection. The construction personnel only need to clean the sludge in the steel water collection well sedimentation tank 1 regularly.

[0022] By using two groups of I-beams in conjunction with the water collection well 8, the two groups of I-beams can be connected to the embedded parts in the water collection well 8. The installation operation can be completed by simply hoisting and placing the steel water collection well sedimentation tank 1. The installation is convenient and quick, and it is convenient for subsequent maintenance. By using the side limit displacement steel plate 4, the steel water collection well sedimentation tank 1 can be prevented from being displaced during use, thereby improving the stability of the steel water collection well sedimentation tank 1. By using the steel water collection well sedimentation tank 1 in conjunction with the drainage pipe 5, mud can be prevented from mixing into the water collection well 8, and the mud can be separated from the sewage, which is convenient for daily cleaning, prevents the water collection well 8 from being blocked, and improves construction efficiency.

[0023] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0024] Finally, it should be pointed out that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit them. Although the utility model is described in detail with reference to the above embodiments, a person skilled in the art should understand that the technical solutions described in the above embodiments can still be modified, or some of the technical features can be replaced by equivalents, and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the utility model.

Claims

1. A temporary steel structure sedimentation tank for a water collection well, comprising a water collection well (8), characterized in that: The water collecting well (8) is provided with embedded parts inside, and two groups of second I-beams (3) are fixedly installed on the embedded parts, and the two ends of the two groups of second I-beams (3) are connected to the embedded parts inside the water collecting well (8), and the first I-beams (2) are welded and fixed on one side of the two groups of second I-beams (3), and a steel water collecting well sedimentation tank (1) is detachably installed at the top of the inner part of the water collecting well (8).

2. A temporary steel structure sedimentation tank for a water collection well according to claim 1, characterized in that: Lateral displacement limiting steel plates (4) are fixedly mounted on both ends of the first I-beam (2).

3. A temporary steel structure sedimentation tank for a water collection well according to claim 2, characterized in that: A drainage pipe (5) is arranged at the top of one side of the steel water collection well sedimentation tank (1), and sediment (9) is placed at the inner bottom of the steel water collection well sedimentation tank (1).

4. A temporary steel structure sedimentation tank for a water collection well according to claim 3, characterized in that: An angle iron (6) is fixedly installed at the top wellhead position of the water collection well (8).

5. A temporary steel structure sedimentation tank for a water collection well according to claim 4, characterized in that: A protective plate (7) is detachably mounted on the outer top of the steel water collection well sedimentation tank (1).

6. A temporary steel structure sedimentation tank for a water collection well according to claim 5, characterized in that: The water collection well (8) is arranged on the ground of the construction site.