Rapid supporting device for tunnel secondary lining steel mold

By designing a rapid support device for tunnel secondary lining steel molds, the problem of difficulty in installing and reinforcing steel molds in flood drainage tunnels is solved, and the rapid fixation of steel molds and the reduction of construction costs are achieved.

CN222596080UActive Publication Date: 2025-03-11MCC TIANGONG GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420606605.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2025-03-11
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

In mining projects, it is difficult to install and reinforce the secondary lining steel mold of the flood drainage tunnel, and the installation and disassembly of the existing steel pipe support system, which is large in weight, difficult to carry, and is prone to loose and unstable support.

Method used

A quick support device for secondary lining steel molds for tunnels is designed, including a support structure and a formwork structure. The support structure consists of a vertical pole and a horizontal pole, the cross-node connection of the vertical pole and a horizontal pole, and the hydraulic telescopic device is used to lock and extend the length of the vertical pole and a horizontal pole. The formwork structure includes a side template and a top template to fill the inside of the tunnel to fully support the tunnel.

Benefits of technology

It realizes rapid and accurate fixing of steel molds, improves construction quality, reduces construction costs, and has ordinary materials, light weight, easy to disassemble and transport, and can be reused.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222596080U_ABST
    Figure CN222596080U_ABST
Patent Text Reader

Abstract

The utility model discloses a fast supporting device for a tunnel secondary lining steel mould, which can be arranged on a tunnel and used for supporting the tunnel and comprises a supporting structure and a template structure, the supporting structure can be arranged in the tunnel and used for supporting the template structure, and the template structure is arranged on the supporting structure and used for increasing the supporting area of the supporting structure to the tunnel. The supporting structure comprises vertical rods and horizontal rods which are arranged in a tunnel, the number of the vertical rods and the number of the horizontal rods are multiple, all the vertical rods and the horizontal rods are connected through cross nodes, hydraulic telescopic devices are arranged at the bottoms of the vertical rods and the two ends of the horizontal rods, and the formwork structure comprises side formworks and top formworks which are arranged on the supporting structure. The rapid supporting device for the tunnel secondary lining steel mold is common in used materials, light in weight, convenient to disassemble and transport, low in construction cost, capable of accurately and rapidly fixing the steel mold, capable of improving the construction quality, capable of being repeatedly used and capable of reducing the construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel lining, in particular to a quick supporting device for a steel formwork for a tunnel secondary lining. Background Art

[0002] Flood drainage tunnels are often set up in mining projects. However, the clearance section of flood drainage tunnels is smaller than that of conventional tunnels, and the installation and reinforcement of the standardized steel formwork used for the secondary lining is difficult. The common method for steel formwork is to use steel pipe scaffolding as the support system to support the bottom, waist and arch steel formwork. The installation and disassembly of the support scaffolding is troublesome, which affects the construction progress. The steel pipe is heavy and difficult to carry manually. The steel formwork supported by the top support at the end of the steel pipe support system is prone to loosening and unstable support. During the concrete pouring process, a special person should be arranged to correct the top support, which increases the labor cost. In order to solve the above problems, a utility model is provided for a construction method of rapid support and disassembly of steel formwork for secondary lining of tunnels. Utility Model Content

[0003] The utility model aims to provide a quick supporting device for a tunnel secondary lining steel formwork to solve the problems raised in the above-mentioned background technology.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a quick support device for a secondary lining steel formwork of a tunnel, which can be arranged on a tunnel to support the tunnel, comprising:

[0005] A support structure may be disposed in the tunnel to support the template structure.

[0006] The template structure is arranged on the supporting structure and is used to increase the supporting area of ​​the tunnel by the supporting structure.

[0007] Preferably, the support structure comprises vertical rods and horizontal rods arranged in the tunnel for stabilizing the formwork structure.

[0008] Preferably, the number of the vertical rods and the horizontal rods is several so as to share the pressure of supporting the tunnel.

[0009] Preferably, all the vertical rods and the horizontal rods are connected at cross nodes to stabilize the support of the formwork structure.

[0010] Preferably, hydraulic telescopic devices are provided at the bottom of the vertical pole and at both ends of the horizontal pole, so as to lock and extend the length of the vertical pole and the horizontal pole.

[0011] Preferably, the formwork structure comprises a side formwork and a top formwork arranged on the supporting structure, and the formwork structure is arranged at the end points of the vertical rods and the horizontal rods.

[0012] Preferably, there are a plurality of side formworks and top formworks, and all of the side formworks and top formworks are able to fill the inside of the tunnel, thereby being able to fully support the tunnel.

[0013] Compared with the prior art, the beneficial effects of the utility model are: the rapid support device for the steel formwork for the secondary lining of the tunnel is made of ordinary materials, is light in weight, is easy to disassemble and transport, has low construction cost, can accurately and quickly fix the steel formwork, improves construction quality, is reusable, and reduces construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a front schematic diagram of an embodiment of the utility model;

[0015] Figure 2 The utility model is a schematic diagram of a transverse cross-section of an embodiment of the utility model.

[0016] In the figure:

[0017] 1. Vertical pole 2. Horizontal pole 3. Hydraulic telescopic device

[0018] 4. Side formwork 5. Top formwork DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] like Figure 1 As shown, the utility model provides a technical solution: a rapid support device for tunnel secondary lining steel formwork, which can be arranged on the tunnel to support the tunnel, including: a support structure and a template structure, the support structure can be arranged in the tunnel to support the template structure, and the template structure is arranged on the support structure to increase the supporting area of ​​the support structure for the tunnel.

[0021] like Figure 2As shown, the supporting structure includes vertical rods 1 and horizontal rods 2 arranged in the tunnel, the vertical rods 1 are used to support the top template 5, and the top of the tunnel is supported by the top template 5, and the horizontal rods 2 are used to support the side templates 4, and the two sides of the tunnel are supported by the side templates 4 to stabilize the template structure. The number of vertical rods 1 and horizontal rods 2 is several, the number of vertical rods 1 is three, and the number of horizontal rods 2 is two, so as to share the pressure of supporting the tunnel and ensure that the vertical rods 1 and the horizontal rods 2 will not be damaged due to a single pressure. The cross nodes of all vertical rods 1 and horizontal rods 2 are connected, which can The three vertical poles 1 and the two horizontal poles 2 are connected as a whole to increase the stability of the device, which is used to stabilize the support for the formwork structure. Hydraulic telescopic devices 3 are arranged at the bottom of the vertical poles 1 and both ends of the horizontal poles 2. The hydraulic telescopic devices 3 are welded to the bottom of the vertical poles 1 and the end points of both sides of the horizontal poles 2. The hydraulic telescopic devices 3 can be telescoped. The vertical poles 1 and the horizontal poles 2 are installed in the tunnel while the hydraulic telescopic devices 3 are pressed. After installation, the hydraulic telescopic devices 3 pop out, and through the pressure on the tunnel, the connection of the device in the tunnel is stabilized, so that the length of the vertical poles 1 and the horizontal poles 2 can be locked and extended.

[0022] The formwork structure includes a side formwork 4 and a top formwork 5 arranged on a supporting structure. The formwork structure is arranged at the end points of the vertical pole 1 and the horizontal pole 2. The side formwork 4 and the top formwork 5 are pressed against the inner wall of the tunnel through the vertical pole 1 and the horizontal pole 2. The top of the tunnel can be supported by the top formwork 5 through the end point at the top of the vertical pole 1. The two end points of the horizontal pole 2 are used to support the two side formworks 4 to ensure that the side formworks 4 can fit on the inner side of the tunnel wall, thereby supporting the tunnel. There are a certain number of side formworks 4 and top formworks 5, and all of the side formworks 4 and top formworks 5 can fill the inside of the tunnel, thereby ensuring that the tunnel has sufficient supporting force, thereby being able to fully support the tunnel.

[0023] According to the above, in this embodiment, the hydraulic telescopic device 3 is first welded to the bottom of the vertical pole 1 and the two side end points of the horizontal pole 2, and then the top formwork 5 is installed on the top of the tunnel, the hydraulic telescopic device 3 at the bottom of the vertical pole 1 is pressed, and the vertical pole 1 is set at the bottom of the top formwork 5, so as to support the top of the tunnel, and then the side formwork 4 is installed on both sides of the tunnel, the hydraulic telescopic device 3 on both sides of the horizontal pole 2 is pressed, and the horizontal pole 2 is set on the side formwork 4 to support the side wall of the tunnel.

[0024] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A quick support device for a secondary lining steel formwork of a tunnel, which can be arranged on a tunnel to support the tunnel, characterized in that: include: A support structure, which may be disposed in the tunnel and is used to support the formwork structure; The template structure is arranged on the supporting structure and is used to increase the supporting area of ​​the supporting structure for the tunnel.

2. A quick support device for a tunnel secondary lining steel formwork according to claim 1, characterized in that: The support structure includes vertical poles and horizontal poles arranged in the tunnel.

3. A quick support device for a tunnel secondary lining steel formwork according to claim 2, characterized in that: The number of the vertical rods and the horizontal rods is several.

4. A quick support device for a tunnel secondary lining steel formwork according to claim 2, characterized in that: All of the vertical rods and the cross nodes of the horizontal rods are connected.

5. The device for quickly supporting a steel formwork for secondary lining of a tunnel according to claim 2, characterized in that: The bottom of the vertical rod and both ends of the horizontal rod are provided with hydraulic telescopic devices.

6. The device for quickly supporting a steel formwork for secondary lining of a tunnel according to claim 1, characterized in that: The formwork structure comprises a side formwork and a top formwork arranged on the supporting structure.

7. A quick support device for a tunnel secondary lining steel formwork according to claim 6, characterized in that: The number of the side formworks and the top formworks is certain, and all of the side formworks and the top formworks can fill the inside of the tunnel.