Auxiliary equipment for positioning and installing pier body reinforcing steel bars through rollover method
Through the mold turning method, the auxiliary equipment for the pier body steel bar positioning and installation of steel bars is used to achieve accurate layout and overall lifting of steel bars, which solves the problems of poor accuracy, low efficiency and high cost in traditional installation methods, and achieves efficient and accurate steel bar installation.
Patent Information
- Application Number
- CN202420402012.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-03-01
AI Technical Summary
The traditional steel bar installation method requires manual docking, resulting in poor installation accuracy, low efficiency, high cost, and difficult to meet the construction period requirements of large-scale engineering projects.
The mold turning method is used to position and install auxiliary equipment for pier body steel bars, which includes auxiliary plates and steel bar positioning holes opened on the auxiliary plates. Through these positioning holes, the steel bars can be accurately laid out and positioned, and the overall lifting is carried out.
It achieves high accuracy, high efficiency and low cost of steel bar installation, shortens construction period, reduces investment in manual machinery, and ensures accurate control of steel bar spacing.
Smart Images

Figure CN222613958U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bridge engineering, and in particular to an auxiliary device for positioning and installing steel bars of a pier using a turnover mold method. Background Art
[0002] The conventional method is that the steel bars are first processed into semi-finished products in the processing plant and then transported to the construction site. After arriving at the site, the construction workers need to use a crane to lift the steel bars, and then cooperate with manual labor to connect the steel bars one by one to the predetermined placement position for installation; however, this traditional construction method requires manual connection of steel bars one by one, which not only has a large workload, but also slow progress. Especially in large-scale engineering projects, the number and density of steel bars are very large, and this traditional construction method is difficult to meet the construction period requirements; and due to the limitations of manual operation, it is difficult to ensure that each steel bar can be accurately connected to the predetermined position, which makes it difficult to accurately control the steel bar spacing and protective layer thickness within the design range, making the control accuracy of the steel bar spacing and protective layer thickness low, which may not only affect the overall performance of the structure, but also may bring safety hazards; in addition, this construction method requires a large amount of machinery and labor, but the investment cost of mechanical equipment such as cranes, steel bar processing equipment, and transportation vehicles is high, and a large amount of labor is required for coordinated operation, which not only increases the construction cost, but also increases the difficulty of management of the construction site.
[0003] The traditional method in related technologies requires the use of a crane to lift the steel bars, and then manually connect the steel bars one by one to the predetermined placement position for installation. This causes problems such as poor installation accuracy, low efficiency and high cost, and no effective solution has been proposed so far. Summary of the invention
[0004] The main purpose of the present application is to provide an auxiliary device for positioning and installing pier body reinforcement by the overmolding method, so as to solve the problems of poor installation accuracy, low efficiency and high cost.
[0005] In order to achieve the above-mentioned purpose, according to one aspect of the present application, an auxiliary device for positioning and installing pier shaft reinforcement using the overmolding method is provided.
[0006] The auxiliary equipment for positioning and installing steel bars of a pier body by the overmolding method according to the present application comprises: an auxiliary plate and steel bar positioning holes formed on the auxiliary plate.
[0007] Furthermore, the auxiliary plate is formed by splicing a plurality of plates of the same and / or different shapes.
[0008] Furthermore, the steel bar positioning holes are evenly spaced apart and arranged on the outer edge of the auxiliary plate.
[0009] Furthermore, the auxiliary plate is a metal auxiliary plate.
[0010] Furthermore, the auxiliary plate is a steel plate.
[0011] Further, the auxiliary plate includes: a rectangular auxiliary plate, and a triangular auxiliary plate connected to the rectangular auxiliary plate;
[0012] A right-angled side of the triangular auxiliary plate is connected to a long side of the rectangular auxiliary plate, and a right-angled vertex of the triangular auxiliary plate coincides with a vertex of a connected side of the rectangular auxiliary plate.
[0013] Furthermore, the auxiliary plate includes: two mutually perpendicular rectangular auxiliary plates, and a triangular auxiliary plate;
[0014] The two right-angled sides of the triangular auxiliary plate are respectively connected to the two long sides of the two rectangular auxiliary plates, and the right-angled vertex of the triangular auxiliary plate coincides with a vertex of the rectangular auxiliary plate.
[0015] Furthermore, a lifting piece is welded to the top of the auxiliary plate; and an I-beam is welded to the top of the auxiliary plate.
[0016] Furthermore, at least two rows of steel bar positioning holes are evenly arranged on each long side of the rectangular auxiliary plate, and at least one row of steel bar positioning holes is evenly arranged on each short side of the rectangular auxiliary plate.
[0017] Furthermore, the spacings between the two rows of steel bar positioning holes are different.
[0018] In the embodiment of the present application, an auxiliary plate is provided, and steel bar positioning holes are opened around the auxiliary plate. The auxiliary plate and the steel bar positioning holes opened on the auxiliary plate are used to achieve the purpose of accurately arranging the hole spacing and positioning the steel bars on the steel plate, and then hoisting the whole. The technical effect of high installation accuracy, high efficiency and low cost is achieved, and the technical problem of poor installation accuracy, low efficiency and high cost caused by the traditional method of using a crane to lift the steel bars and then manually connecting the steel bars one by one to the predetermined placement position for installation is solved. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:
[0020] Figure 1 is a schematic diagram of the structure according to an embodiment of the present application;
[0021] Figure 2 is a top view according to an embodiment of the present application;
[0022] Figure 3 is a plan view schematically showing an embodiment of the present application;
[0023] Figure 4 It is an installation diagram according to an embodiment of the present application.
[0024] Reference numerals
[0025] 1. Auxiliary plate; 2. Steel bar positioning hole; 3. Rectangular auxiliary plate; 4. Triangular auxiliary plate. DETAILED DESCRIPTION
[0026] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0027] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0028] In this application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the utility model and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0029] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in this utility model can be understood according to specific circumstances.
[0030] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
[0031] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0032] like Figure 1-4 As shown, the present application relates to an auxiliary device for positioning and installing steel bars for a pier body by a mold turning method, the auxiliary device for positioning and installing steel bars for a pier body by a mold turning method comprises: an auxiliary plate 1, steel bar positioning holes 2 opened on the auxiliary plate 1, the auxiliary plate 1 is preferably a metal auxiliary plate 1, so as to have sufficient strength to bear and fix the steel bars installed on the auxiliary plate 1; the steel bar positioning holes 2 are used to accurately position and fix the steel bars, and by pre-setting the positioning holes on the auxiliary plate 1, it can be ensured that the steel bars are accurately placed at the predetermined positions before pouring concrete, and the use of the auxiliary plate 1 with positioning holes can greatly improve the construction efficiency, and the construction personnel only need to insert the steel bars into the corresponding positioning holes to quickly complete the arrangement of the steel bars without measuring and locating the positions of the steel bars one by one, which not only reduces the construction time but also reduces the possibility of errors.
[0033] During the actual installation process, the steel bars of the previous section of the pier have been pre-buried and installed. After the pouring of the pedestal concrete is completed, the formwork of the first section of the pier can be directly supported. Once the concrete pouring of the first section of the pier is completed, the workers can quickly proceed with the installation of the steel bars of the second section of the pier.
[0034] The steel bar installation work of the second section pier is as follows: first, the semi-finished products processed in the steel bar factory are loaded and pulled to the site, and the steel bars are manually threaded according to the position of the steel bar positioning hole 2, and then the steel bars passing through the steel bar positioning hole 2 are connected and fixed with threading. After the steel bar is threaded, the auxiliary plate 1 and the threaded steel bars are hoisted as a whole, and each steel bar is manually adjusted up and down for threading connection. If the steel bar is offset or the threading is offset during hoisting and cannot be connected normally, only the lifting point needs to be adjusted to ensure the center position of the steel bar. That is to say, through this device, the steel bar installation work of the second section pier can be carried out while the concrete of the first section pier is solidified, and the auxiliary plate 1 and the steel bar positioning hole 2 can also be used to accurately position and install the steel bar, so that the steel bar installation of the second section pier can be completed in only one day, which greatly shortens the construction period and saves manpower and material resources; the accurate positioning of this device can directly reduce manual machinery and construction period, and because the position of the steel bar positioning hole 2 is pre-opened, only the steel bar needs to be threaded into the hole, so the spacing of the steel bars can also be effectively guaranteed.
[0035] After the steel bars of the pier column have been installed in accordance with the design requirements and construction specifications, in order to increase the stability of the pier column and prevent it from tilting or shifting due to wind or other external forces, it is necessary to set cables in four directions (usually east, south, west and north) at the top of the pier column to fix the pier column and disperse external forces. The other end of the cable needs to be fixed to the anchor on the ground, and the anchor must be set securely and reliably to ensure that the cable can play an effective role; in this embodiment, soft steel rope is preferably used as the material of the cable; the soft steel rope has a certain flexibility and strength, which can meet the requirements of force and durability. When the cable is subjected to tension, it must be able to meet the tension standards in the design requirements and construction specifications. If the tension of the cable is insufficient, it may cause it to break or fail, thereby affecting the stability of the pier column. After the cable is installed, it is necessary to use a tensioner to tighten the cable to ensure that it can play an effective role.
[0036] From the above description, it can be seen that in the embodiment of the present application, an auxiliary plate 1 is set and steel bar positioning holes 2 are opened around the auxiliary plate 1. Through the auxiliary plate 1 and the steel bar positioning holes 2 opened on the auxiliary plate 1, the purpose of accurately arranging the hole spacing and positioning the steel bars on the steel plate and then hoisting the whole is achieved, thereby achieving the technical effect of high installation accuracy, high efficiency and low cost, and further solving the technical problems of poor installation accuracy, low efficiency and high cost caused by the traditional method of using a crane to lift the steel bars and then manually connecting the steel bars one by one to the predetermined placement position for installation.
[0037] Preferably, the steel bar positioning holes 2 are evenly spaced apart on the outer edge of the auxiliary plate 1 so that the steel bars can be evenly installed.
[0038] Preferably, the auxiliary plate 1 is formed by splicing a plurality of plates of the same and / or different shapes. By splicing a plurality of plates of the same or different shapes, the space occupied by a single plate and the difficulty of processing can be reduced.
[0039] Preferably, the auxiliary plate 1 is a steel plate, which is processed on the basis of the existing steel plate, and the modification is simple and convenient, and the construction effect is obvious.
[0040] Preferably, the auxiliary plate 1 includes: a rectangular auxiliary plate 3, and a triangular auxiliary plate 4 vertically connected to the rectangular auxiliary plate 3; a right-angled side of the triangular auxiliary plate 4 is connected to a long side of the rectangular auxiliary plate 3, and the right-angled vertex of the triangular auxiliary plate 4 coincides with the vertex of the connected side of the rectangular auxiliary plate 3. When multiple groups of auxiliary plates 1 are required to be spliced, this connection method is used as the minimum connection unit, and then they are spliced in pairs. By using this auxiliary equipment, steel bars can be processed in a centralized place and can be hoisted to the construction site as a whole, which greatly improves construction efficiency. Moreover, traditional pier construction requires additional supporting structures, but the present device does not require additional supporting structures during installation, thereby simplifying the construction process.
[0041] Preferably, the auxiliary plate 1 includes: two mutually perpendicular rectangular auxiliary plates 3, and a triangular auxiliary plate 4; the two right-angled sides of the triangular auxiliary plate 4 are respectively connected to the two long sides of the two rectangular auxiliary plates 3, and the right-angled vertex of the triangular auxiliary plate 4 coincides with a vertex of the rectangular auxiliary plate 3, forming a U-shape.
[0042] Preferably, a lifting piece is welded on the top of the auxiliary plate 1, and the lifting piece can be selected as a short angle iron, which is convenient for accurate positioning when the steel bars are hoisted and placed as a whole; an I-beam is welded on the top of the auxiliary plate 1, which can increase the rigidity and bearing capacity of the steel plate.
[0043] Preferably, at least two rows of steel bar positioning holes 2 are evenly arranged on each long side of the rectangular auxiliary plate 3, and at least one row of steel bar positioning holes 2 is evenly arranged on each short side of the rectangular auxiliary plate 3; the position and spacing of the steel bars are crucial to the overall strength and stability of the structure. By opening different numbers of positioning holes on each long side and short side, it is possible to adapt to the arrangement of steel bars of different specifications and requirements, so that the auxiliary plate 1 has higher versatility and flexibility, and can adapt to various construction scenes and needs; two or more rows of steel bar positioning holes 2 can arrange more steel bars in a limited space, thereby increasing the density of the steel bars and improving the overall strength and bearing capacity of the concrete structure.
[0044] Preferably, the spacing between the two rows of steel bar positioning holes 2 is different. By setting up multiple rows of steel bar positioning holes 2, it is possible to adapt to the requirements of steel bar arrangement with different spacings. The same auxiliary plate 1 can be used for steel bar arrangement of various specifications and requirements, thereby improving the versatility and use efficiency of the auxiliary plate 1. In actual construction, it may be necessary to adjust the position and quantity of the steel bars according to specific circumstances. Multiple rows of steel bar positioning holes 2 provide construction personnel with greater flexibility. Construction personnel can choose which positioning holes to use as needed to achieve the best construction effect.
[0045] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A pier body reinforcement positioning and installation auxiliary equipment using the overmolding method, characterized in that: include: An auxiliary plate, with steel bar positioning holes provided on the auxiliary plate; The steel bar positioning holes are evenly spaced and arranged on the outer edge of the auxiliary plate; The auxiliary plate comprises: a rectangular auxiliary plate, and a triangular auxiliary plate connected to the rectangular auxiliary plate; A right-angled side of the triangular auxiliary plate is connected to a long side of the rectangular auxiliary plate, and a right-angled vertex of the triangular auxiliary plate coincides with a vertex of a connected side of the rectangular auxiliary plate; A lifting piece is welded on the top of the auxiliary plate; and an I-beam is welded on the top of the auxiliary plate.
2. The auxiliary equipment for positioning and installing steel bars of pier shaft by the overmolding method according to claim 1 is characterized in that: The auxiliary plate is formed by splicing a plurality of plates of the same and / or different shapes.
3. The auxiliary equipment for positioning and installing steel bars of pier shaft by the overmolding method according to claim 1 is characterized in that: The auxiliary plate is a metal auxiliary plate.
4. The auxiliary equipment for positioning and installing pier reinforcement bars by the overmolding method according to claim 1 is characterized in that: The auxiliary plate is a steel plate.
5. The auxiliary equipment for positioning and installing steel bars of pier shaft by the overmolding method according to claim 1 is characterized in that: The auxiliary plates include: two mutually perpendicular rectangular auxiliary plates, and a triangular auxiliary plate; The two right-angled sides of the triangular auxiliary plate are respectively connected to the two long sides of the two rectangular auxiliary plates, and the right-angled vertex of the triangular auxiliary plate coincides with a vertex of the rectangular auxiliary plate.
6. The auxiliary equipment for positioning and installing steel bars of pier shaft by the overmolding method according to claim 1 is characterized in that: At least two rows of steel bar positioning holes are evenly arranged on each long side of the rectangular auxiliary plate, and at least one row of steel bar positioning holes is evenly arranged on each short side of the rectangular auxiliary plate.
7. The auxiliary equipment for positioning and installing steel bars of pier shaft by the overmolding method according to claim 6 is characterized in that: The spacings between the two rows of steel bar positioning holes are different.