Operation and maintenance channel installation structure suitable for color steel tiles of various bone line structures

By designing an operation and maintenance channel installation structure suitable for a variety of bone line structures, and using support beams and clamps arranged side by side and spaced, the problem of unstable bone line structure when installing operation and maintenance channels on color steel tile is solved, stable and convenient installation is achieved, and the efficiency of maintenance and disassembly of solar panels is improved.

CN222614707UActive Publication Date: 2025-03-14天津市瑞利荣达钢结构有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420520328.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2025-03-14
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

When installing operation and maintenance channels on existing color steel tiles, the installation is unstable due to the unstable bone line structure, and the operation and maintenance channels cannot be effectively supported, which affects the convenience of maintenance and disassembly.

Method used

A running and maintenance channel installation structure suitable for a variety of bone line structures is designed, and supports and clamps are arranged side by side and spaced. The clamps are clamped and fixed to the bone line on the color steel tile through clamps. The two ends of the support beam are firmly connected to the upper side of the support part to ensure stable and convenient installation.

Benefits of technology

Through this installation structure, the installation operation and maintenance channels can be effectively and stably, which improves the convenience of maintenance and disassembly of solar panels, avoids damage to solar panels, and utilizes the stiffness and load-bearing capacity of the bone lines to improve installation reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222614707U_ABST
    Figure CN222614707U_ABST
Patent Text Reader

Abstract

The operation and maintenance channel installation structure comprises a plurality of supporting beams, the upper sides of the supporting beams are fixedly connected with an operation and maintenance channel, the bottom of each supporting beam is fixedly connected with a clamping piece, each clamping piece comprises a first clamping plate and a second clamping plate located on the left side of the first clamping plate, and the second clamping plate is fixedly connected with the operation and maintenance channel. A supporting part is horizontally arranged on the top of the first clamping plate rightwards, a clamping groove is formed in the position, located on the lower side of the supporting part, of the upper portion of the left side of the first clamping plate, the upper end of the second clamping plate is clamped in the clamping groove, a clamping opening is formed between the lower portion of the first clamping plate and the lower portion of the second clamping plate, and the clamping piece is clamped and fixed to a corresponding skeleton line on the upper side of the color steel tile through the clamping opening. The two ends of the supporting beams are fixedly connected to the upper sides of the corresponding supporting parts. The color steel tile has the advantages that the operation and maintenance channel is installed on the color steel tile, so that the solar panel is convenient to disassemble, assemble and maintain; the clamping piece is arranged to be an assembly composed of a left part structure and a right part structure, installation is convenient and fast while installation stability is guaranteed, and the clamping piece is particularly suitable for the bone line with the wide upper portion and the narrow lower portion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of installing operation and maintenance channels on color steel tiles, and in particular relates to an operation and maintenance channel installation structure on color steel tiles suitable for various skeleton structures. Background Art

[0002] In order to save energy, people pay more and more attention to the use of solar energy, especially in large-scale color steel plate factories. Solar panels will be laid on the roof of the color steel plate. In order to facilitate the later maintenance and disassembly of solar panels, operation and maintenance channels will be added on the roof. The roof of the color steel plate factory is paved with color steel tiles, and there are multiple convex strips, namely bone lines, side by side on the upper side of the color steel tiles to improve the rigidity and bearing capacity of the color steel tiles. The upper side of the bone line on some color steel tiles is not a wider plane structure, and there will be a wide upper part and a narrow lower part on the entire bone line. If the clamp is overlapped on the bone line, it is likely to cause unstable installation, and the operation and maintenance channel cannot be stably installed. Utility Model Content

[0003] In view of this, the utility model aims to overcome the shortcomings of the above-mentioned problems in the prior art and proposes an operation and maintenance channel installation structure on color steel tiles suitable for various skeleton structures.

[0004] In order to achieve the above object, the technical solution of the utility model is implemented as follows:

[0005] An operation and maintenance channel installation structure suitable for color steel tiles with various skeleton structures includes multiple support beams arranged side by side and at intervals, an operation and maintenance channel is fixedly connected to the upper sides of the multiple support beams, and clamps are fixedly connected at both ends of the bottom of each support beam, the clamps include a first clamping plate and a second clamping plate located on the left side of the first clamping plate, an integrally formed support portion is horizontally provided to the right on the top of the first clamping plate, and a clamping groove is provided on the upper left side of the first clamping plate at the lower side of the support portion, the upper end of the second clamping plate is clamped in the clamping groove of the first clamping plate, and a clamping opening is formed between the lower parts of the first clamping plate and the second clamping plate, the clamping member is clamped and fixed to the corresponding skeleton line on the upper side of the color steel tile through the clamping opening, and the two ends of the support beam are fixedly connected to the upper side of the corresponding support portion.

[0006] Furthermore, two clamping pieces at the bottom of each support beam are overlapped and fixed on the same bone line.

[0007] Furthermore, a first clamping plate is provided on the left side of the support portion, the clamping groove is located at the connection of the left side of the support portion of the first clamping plate, and the upper end of the second clamping plate is bent rightward to provide a limiting portion, which is clamped in the clamping groove.

[0008] Furthermore, a strip hole is opened on the support portion, and a mounting hole is opened on the support beam at a position corresponding to the strip hole. The support beam is fixed to the clamping member through the cooperation of the first bolt and nut pair, the mounting hole and the strip hole.

[0009] Furthermore, the cross section of the clamp formed between the first clamping plate and the lower portion of the second clamping plate is Y-shaped, trapezoidal, rectangular or triangular, and is consistent with the shape and size of the corresponding bone line cross section.

[0010] Furthermore, a first connecting hole is opened on the upper part of the first clamping plate, and a second connecting hole is opened on the upper part of the second clamping plate corresponding to the first connecting hole. The clamping member is clamped on the corresponding bone line and the first clamping plate and the second clamping plate are fixed together by the cooperation of the second bolt and nut pair with the first connecting hole and the second connecting hole.

[0011] Furthermore, a first abutting portion integrally formed to the right is provided at the bottom of the first clamping plate, and a second abutting portion integrally formed is provided at the bottom of the second clamping plate. The first abutting portion and the second abutting portion abut against the roots of both sides of the corresponding bone line respectively.

[0012] Furthermore, a plurality of protrusions are provided on the upper side of the support portion, the lower left portion of the first clamping plate, the lower right portion of the second clamping plate, the bottom of the first abutting portion, and the bottom of the second abutting portion.

[0013] Furthermore, each support beam is fixedly connected to the operation and maintenance channel through a plurality of drill tail screws.

[0014] Furthermore, a plurality of through grooves are provided on the upper side of the operation and maintenance channel along the width direction, and a plurality of hollow holes are provided in each through groove.

[0015] Compared with the prior art, the utility model has the following advantages:

[0016] The operation and maintenance channel installation structure on the color steel tiles suitable for various skeleton structures described in the utility model installs the operation and maintenance channel on the color steel tiles, which is convenient for disassembly, assembly and maintenance of the solar panels installed on the color steel tiles, without stepping on the solar panels to avoid damage to the solar panels, and because the support beam for installing the operation and maintenance channel is fixed to the skeleton on the color steel tiles through the clamping member, that is, when the staff walks on the operation and maintenance channel, the skeleton is the main stress point, and the stiffness and bearing capacity of the skeleton is utilized, which is more stress-bearing than directly stepping on the color steel tiles; and, the clamping member is arranged on a component composed of left and right structures, which ensures stable installation while making installation convenient, and is particularly suitable for skeletons that are wide at the top and narrow at the bottom. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the accompanying drawings:

[0018] Figure 1 This is a schematic diagram of the installation structure of the operation and maintenance channel on the color steel tile applicable to various skeleton structures according to the embodiment of the utility model;

[0019] Figure 2 This is a schematic diagram of the structure in which the clamping opening of the clamping member according to an embodiment of the utility model is Y-shaped;

[0020] Figure 3 This is a schematic structural diagram of a clamping piece according to an embodiment of the utility model, in which the clamping opening is trapezoidal;

[0021] Figure 4 This is a schematic structural diagram of a clamping piece according to an embodiment of the utility model, in which the clamping opening is rectangular;

[0022] Figure 5 This is a schematic structural diagram of a clamping piece according to an embodiment of the utility model, in which the clamping opening is triangular;

[0023] Figure 6 This is another structural schematic diagram of a clamping piece according to an embodiment of the utility model in which the clamping opening is triangular;

[0024] Figure 7 This is a schematic diagram of the structure of the clamping parts and the support beam installed on the color steel tile according to the embodiment of the utility model.

[0025] Description of reference numerals:

[0026] 1. Color steel tile; 11. Skeleton line; 2. Clamping piece; 21. First clamping plate; 211. Support part; 212. Strip hole; 213. First abutting part; 214. Clamping groove; 22. Second clamping plate; 221. Limiting part; 222. Second abutting part; 23. Clamping mouth; 3. Support beam; 4. Operation and maintenance channel; 41. Through groove; 42. Hollow hole; 5. First bolt and nut pair; 6. Drill tail thread. DETAILED DESCRIPTION

[0027] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0028] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0029] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0030] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.

[0031] As shown in the figure, the operation and maintenance channel installation structure on the color steel tile with various skeleton structure is suitable for comprising a plurality of support beams 3 arranged side by side and at intervals, the upper sides of the plurality of support beams 3 are commonly fixedly connected with the operation and maintenance channel 4, and the two ends of the bottom of each support beam 3 are fixedly connected with a clamping member 2, the clamping member 2 comprises a first clamping plate 21 and a second clamping plate 22 located on the left side of the first clamping plate 21, an integrally formed support portion 211 is horizontally provided to the right on the top of the first clamping plate 21, and a clamping groove 214 is provided on the upper left side of the first clamping plate 21 at the lower side of the support portion 211, the upper end of the second clamping plate 22 is clamped in the clamping groove 214 of the first clamping plate 21, and a clamping opening 23 is formed between the lower parts of the first clamping plate 21 and the second clamping plate 22, the clamping member 2 is clamped and fixed on the corresponding skeleton line 11 on the upper side of the color steel tile 1 through the clamping opening 23, and the two ends of the support beam 3 are fixedly connected to the upper side of the corresponding support portion 211. In this embodiment, the operation and maintenance channel 4 is installed on the color steel tile 1, which is convenient for disassembly, assembly and maintenance of the solar panel installed on the color steel tile 1, without stepping on the solar panel to avoid damage to the solar panel, and because the support beam 3 on which the operation and maintenance channel 4 is installed is fixed to the skeleton line 11 on the color steel tile 1 through the clamp 2, that is, when the staff walks on the operation and maintenance channel 4, the skeleton line 11 is the main force-bearing point, and the rigidity and bearing capacity of the skeleton line 11 are used, which is more reliable than directly stepping on the color steel tile 1. If the operation and maintenance channel 4 is directly laid and fixed on the color steel tile 1, since the color steel tile 1 and the operation and maintenance channel 4 are both thin, the installation will be unstable and the bearing capacity will be poor. Therefore, the operation and maintenance channel is supported and fixed by the support beam 3 with greater rigidity, which can effectively improve the reliability of the operation and maintenance channel 4. In this embodiment, the clamp 2 is set as a component composed of left and right parts, which ensures stable installation and convenient installation, and is particularly suitable for the skeleton line 11 that is wide at the top and narrow at the bottom.

[0032] The two clamps 2 at the bottom of each support beam 3 are overlapped and fixed on the same bone line 11, ensuring that the support beam 3 is parallel to the bone line 11. On the one hand, it is convenient for installation and the installation is regular, which is suitable for installing operation and maintenance channels 4 of different widths and convenient for adjusting the distance between the two clamps 2. On the other hand, it also effectively utilizes the stiffness and bearing capacity of the bone line 11 to ensure the stability of the operation and maintenance channel 4 installed on the color steel tile 1.

[0033] The left side of the support portion 211 protrudes to the left to form the first clamping plate 21, the clamping groove 214 is located at the connection of the left side of the support portion 211 of the first clamping plate 21, and the upper end of the second clamping plate 22 is bent rightward to form a limiting portion 221, which is clamped in the clamping groove 214. In this embodiment, the limiting portion 221 at the upper end of the second clamping plate 22 can be further limited by the portion of the support portion 211 protruding to the left, so as to prevent the second clamping plate 22 from accidentally slipping off the clamping groove 214 during later use.

[0034] A strip hole 212 is provided on the support portion 211 , and a mounting hole is provided on the support beam 3 at a position corresponding to the strip hole 212 . The support beam 3 is fixed to the clamp 2 through cooperation of the first bolt and nut pair 5 , the mounting hole and the strip hole 212 .

[0035] like Figures 2 to 6 As shown, the cross section of the clamping opening 23 formed between the first clamping plate 21 and the lower part of the second clamping plate 22 is Y-shaped, trapezoidal, rectangular or triangular, and is consistent with the cross-sectional shape and size of the corresponding bone line 11. In this embodiment, according to the structure of the bone line 11, a clamping member 2 with a corresponding structure is selected for installation.

[0036] Two first connecting holes are opened on the upper part of the first clamping plate 21, and a second connecting hole is opened on the upper part of the second clamping plate 22 corresponding to the first connecting hole. The clamping member 2 is clamped on the corresponding bone wire 11 and fixed together by a second bolt and nut pair (not shown) cooperating with the first connecting hole and the second connecting hole.

[0037] An integrally formed first abutting portion 213 is provided at the bottom of the first clamping plate 21 to the right, and an integrally formed second abutting portion 222 is provided at the bottom of the second clamping plate 22. The first abutting portion 213 and the second abutting portion 222 respectively abut against the roots of both sides of the corresponding bone line 11. In this embodiment, the first abutting portion 213 and the second abutting portion 222 are provided so that the clamping member 2 abuts against the color steel tile 1 while clamping the bone line 11, thereby increasing the installation stability of the clamping member 2.

[0038] A plurality of protrusions are provided on the upper side of the support portion 211, the lower left side of the first clamping plate 21, the lower right side of the second clamping plate 22, the bottom of the first abutting portion 213 and the bottom of the second abutting portion 222. The protrusions are provided to increase the friction with the corresponding support beam 3, skeleton wire 11 or color steel tile 1, so as to achieve better stable installation.

[0039] Each support beam 3 is fixedly connected to the operation and maintenance channel 4 via a plurality of drill threads 6 .

[0040] A plurality of through grooves 41 are provided on the upper side of the operation and maintenance channel 4 along the width direction, and a plurality of hollow holes 42 are provided in each through groove 41 for facilitating drainage.

[0041] The working process of this embodiment is as follows:

[0042] According to the structure of the bone wire 11, a corresponding clamping member 2 is selected for installation. For example, if the bone wire 11 is a rectangular structure, a clamping member 2 with a rectangular clamping opening 23 is selected.

[0043] During installation, first, the first clamping plate 21 and the second clamping plate 22 of the clamping member 2 are respectively located on both sides of the bone line 11, and are clamped together by the limiting portion 221 and the clamping groove 214, and then the first clamping plate 21 and the second clamping plate 22 are fixed together by the second bolt and nut pair; then the support beam 3 is fixed to the upper side of the support portion 211 by the first bolt and nut pair 5, and finally the operation and maintenance channel 4 is fixed to the support beam 3 by the drill thread 6.

[0044] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. The operation and maintenance channel installation structure is applicable to the color steel tiles with various skeleton structures, and is characterized by: It includes multiple support beams arranged side by side and at intervals, and an operation and maintenance channel is fixedly connected to the upper sides of the multiple support beams, and clamping members are fixedly connected at both ends of the bottom of each support beam, and the clamping members include a first clamping plate and a second clamping plate located on the left side of the first clamping plate, an integrally formed support portion is horizontally provided to the right on the top of the first clamping plate, and a clamping groove is opened on the upper left side of the first clamping plate at the lower side of the support portion, the upper end of the second clamping plate is clamped in the clamping groove of the first clamping plate, and a clamping opening is formed between the lower parts of the first clamping plate and the second clamping plate, the clamping member is clamped and fixed to the corresponding bone line on the upper side of the color steel tile through the clamping opening, and the two ends of the support beam are fixed to the corresponding upper sides of the support portions.

2. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 1 is characterized in that: The two clamping pieces at the bottom of each support beam are overlapped and fixed on the same bone line.

3. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 1 is characterized in that: A first clamping plate is provided on the left side of the support part, the clamping groove is located at the connection of the left side of the support part of the first clamping plate, and a limiting part is bent rightward on the upper end of the second clamping plate, which is clamped in the clamping groove.

4. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 1 is characterized in that: A strip hole is opened on the support part, and a mounting hole is opened on the support beam at a position corresponding to the strip hole. The support beam is fixed on the clamping member through the cooperation of the first bolt and nut pair, the mounting hole and the strip hole.

5. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 1 is characterized in that: The cross section of the clamp formed between the first clamping plate and the lower part of the second clamping plate is Y-shaped, trapezoidal, rectangular or triangular, and is consistent with the shape and size of the corresponding bone line cross section.

6. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 1 is characterized in that: A first connecting hole is opened on the upper part of the first clamping plate, and a second connecting hole is opened on the upper part of the second clamping plate corresponding to the first connecting hole. The clamping member is clamped on the corresponding bone line and the first clamping plate and the second clamping plate are fixed together by the cooperation of the second bolt and nut pair with the first connecting hole and the second connecting hole.

7. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 1 is characterized in that: An integrally formed first abutting portion is provided at the bottom right of the first clamping plate, and an integrally formed second abutting portion is provided at the bottom of the second clamping plate. The first abutting portion and the second abutting portion abut against the roots of both sides of the corresponding bone line respectively.

8. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 7 is characterized in that: A plurality of protrusions are provided on the upper side of the support portion, the lower left portion of the first clamping plate, the lower right portion of the second clamping plate, the bottom of the first abutting portion and the bottom of the second abutting portion.

9. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 1 is characterized in that: Each support beam is fixedly connected to the operation and maintenance channel through multiple drill threads.

10. The operation and maintenance channel installation structure on the color steel tile applicable to various skeleton structures according to claim 1 is characterized in that: A plurality of through slots are provided along the width direction on the upper side of the operation and maintenance channel, and a plurality of hollow holes are provided in each through slot.