By designing a pier settlement monitoring device that includes monitoring components, reference components, support components and scale rods, the problem of measurement errors when the pier is settled and tilted at the same time is solved, and more accurate measurement of settlement and tilt angles is achieved.

CN222617900UActive Publication Date: 2025-03-14CHONGQING YUHAI CONSTR SUPERVISION CO LTD

Patent Information

Application Number
CN202420563647.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-21
Publication Date
2025-03-14
Estimated Expiration
2034-03-21

AI Technical Summary

Technical Problem

When the existing bridge pier settlement monitoring device settles and tilts at the same time, the measurement results are prone to errors, affecting the accuracy of the monitoring.

Method used

A bridge pier settlement monitoring device is designed, including a monitoring assembly, a reference assembly, a support assembly and a scale rod. Through the combination of mounting frame, U-frame, protractor, leveler and scale rod, ensure that the scale rod is always perpendicular to the reference plate to avoid measurement errors caused by tilting the bridge pier.

Benefits of technology

The device can accurately measure the pier settlement and inclination at the same time, improving the accuracy and practicality of the monitoring results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222617900U_ABST
    Figure CN222617900U_ABST
Patent Text Reader

Abstract

The bridge pier settlement monitoring device comprises a monitoring assembly, a reference assembly, a supporting assembly and a scale rod, the monitoring assembly comprises a mounting frame and a first sleeve, the mounting frame is arranged on the side wall of a bridge pier in the transverse direction, a U-shaped frame is fixedly arranged at the end, away from the bridge pier, of the mounting frame, and the top of the side wall of the first sleeve is rotationally connected with the side wall of the U-shaped frame; a first water level is fixedly arranged at the top of the first sleeve, the reference assembly comprises a reference plate, the reference plate is transversely arranged above a soil foundation adjacent to a pier, the supporting assembly comprises a telescopic rod and a second sleeve, the telescopic rod is transversely and fixedly arranged under the monitoring assembly, and the second sleeve is rotationally arranged at the end, away from the pier, of the telescopic rod; the scale rod sequentially penetrates through the first sleeve and the second sleeve in a sliding mode, and the bottom wall of the scale rod abuts against the top face of the datum plate. Through the arrangement, errors of measured settlement results caused by inclination of the bridge pier can be avoided, and the accuracy of the measured results is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of engineering monitoring, and in particular relates to a pier settlement monitoring device. Background Art

[0002] A complete bridge is mainly composed of an upper structure, a lower structure and a support system. The lower structure mainly includes piers, abutments and foundations. As a building component supporting the upper structure, the piers transfer dead loads and live loads such as vehicles to the foundation, thereby ensuring the safety and stability of the bridge. However, under the action of load, each layer of soil within a certain depth will produce different degrees of compression deformation, resulting in settlement of the piers. In order to prevent harm caused by settlement and determine the control measures for settlement, it is necessary to monitor and feedback the settlement deformation data of the piers regularly.

[0003] A Chinese patent with publication number CN220062935U discloses a bridge settlement monitoring device, which consists of a mounting base, a mounting plate, a movable slide rail, a mobile monitoring component and a bridge connection component. A mounting groove is provided on the mounting plate in the middle position along its vertical direction, and two groups of movable slide rails are symmetrically arranged on both sides of the mounting groove. The surface of each group of mounting slide rails is fitted with a monitoring scale. Both sides of the mobile monitoring component are slidably arranged on the two groups of movable slide rails. One side of the bridge connection component is connected and fixed to the bridge, and the other side of the bridge connection component is connected to the mobile monitoring component through the mounting groove. The settlement amplitude of the bridge can be observed by comparing the monitoring scales on the mobile monitoring component and the mobile slide rail.

[0004] In actual construction, in addition to settlement, bridge piers may also tilt due to human factors, construction factors or environmental factors. When the above scheme is in use, the mounting plate is set perpendicular to the ground, and the two sides of the mobile monitoring component are slidingly set on two sets of mobile rails. When the bridge pier settles and tilts at the same time, there is an angle between the moving direction of the mobile monitoring component and the length direction of the mobile rail, which makes the measurement results of the above scheme prone to errors. Utility Model Content

[0005] The utility model aims to provide a pier settlement monitoring device to solve the problem that when the pier settles, it tilts and the measurement result is prone to errors.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A pier settlement monitoring device comprises a monitoring component, a reference component, a support component and a scale rod, wherein the monitoring component comprises a mounting frame and a first sleeve, the mounting frame is transversely arranged on the side wall of the pier, and a U-shaped frame is fixedly arranged at one end of the mounting frame away from the pier, the top of the side wall of the first sleeve is rotatably connected to the side wall of the U-shaped frame, a first leveler is fixedly arranged on the top of the first sleeve, the reference component comprises a reference plate, the reference plate is transversely arranged above the adjacent soil foundation of the pier, the support component comprises a telescopic rod and a second sleeve, the telescopic rod is transversely fixedly arranged directly below the monitoring component, the second sleeve is rotatably arranged at one end of the telescopic rod away from the pier, the scale rod is slidably penetrated through the first sleeve and the second sleeve in sequence, and the bottom wall of the scale rod abuts against the top surface of the reference plate.

[0008] The principle and effect of this technical solution:

[0009] After the construction of the bridge is completed, a mounting frame is fixed on the side wall of the pier, and a reference plate is set above the adjacent soil foundation of the pier. The bottom end of the graduated rod is passed through the first sleeve and the second sleeve in turn, and abutted against the top surface of the reference plate. The length of the telescopic rod is adjusted to make the graduated rod rotate circumferentially along the top of the first sleeve until the first level indicates that the first sleeve is in a horizontal state. At this time, the graduated rod is perpendicular to the reference plate. The size of the alignment of the top of the first sleeve is recorded for the first time. In the next observation period, the above operation is repeated, and the difference with the first recorded data is compared, which is the specific settlement value of the settlement.

[0010] Through the above-mentioned arrangement, the scale rod is slid through the first sleeve and the second sleeve in sequence, and the length of the telescopic rod is adjusted to ensure that the scale rod remains vertical to the reference plate during each measurement. This can avoid errors in the measured settlement results caused by the inclination of the pier, thereby improving the accuracy of the measurement results of the utility model.

[0011] In the utility model, the monitoring component also includes a mounting plate, which is L-shaped, with side plates of the mounting plate fixedly connected to the side walls of the pier, a top plate of the mounting plate connected to the mounting frame via a first leveling member, and a second leveler fixedly arranged on the top of the mounting frame.

[0012] The principle and effect of this technical solution:

[0013] Before adjusting the length of the telescopic rod to make the first sleeve in a horizontal state, the first leveling member is first adjusted until the second leveler indicates that the mounting frame is in a horizontal state.

[0014] Through the above arrangement, it can be further ensured that the first sleeve is in a horizontal state, thereby improving the accuracy of the measurement result of the utility model.

[0015] In the utility model, a protractor is fixedly arranged on the side wall of the U-shaped frame in the vertical direction, and a reference line is arranged on a side wall of the first sleeve close to the protractor in the vertical direction.

[0016] The principle and effect of this technical solution:

[0017] When the pier tilts, the protractor and the mounting frame tilt with the pier. When the length of the telescopic rod is adjusted to make the first sleeve in a horizontal state, the reference line is perpendicular to the horizontal plane, and the angle between the protractor and the reference line is the inclination angle of the pier.

[0018] Through the above arrangement, the inclination angle of the pier can be measured while measuring the settlement of the pier, thereby improving the practicability of the utility model.

[0019] In the utility model, the reference assembly also includes an embedded plate, which is laterally arranged below the reference plate. The embedded plate and the reference plate are connected via a second leveling member, and a third leveler is fixedly arranged on the top of the reference plate.

[0020] In the utility model, a drill rod is fixedly arranged vertically on the bottom of the embedded plate.

[0021] The principle and effect of this technical solution:

[0022] Insert the drill rod into the soil foundation adjacent to the pier until the embedded plate contacts the top of the soil foundation, and adjust the second leveling member until the third leveler indicates that the reference plate is in a horizontal state.

[0023] When the pier is inclined and the scale rod is perpendicular to the horizontal plane, the contact position between the scale rod and the reference plate changes. The above arrangement ensures that during multiple measurements, the contact position between the scale rod and the reference plate is always located in the same horizontal plane, further improving the accuracy of the measurement results of the utility model.

[0024] In the utility model, the telescopic rod includes a fixed rod and a sleeve rod, one end of the fixed rod is fixedly connected to the side wall of the pier, one end of the sleeve rod is slidably sleeved on the other end of the fixed rod, a fastening bolt is threaded through the side wall of the sleeve rod, one end of the fastening bolt abuts against the fixed rod, and the other end of the sleeve rod is rotatably connected to the second sleeve. Through the above arrangement, the sleeve rod can be prevented from sliding along the fixed rod when the first sleeve is in a horizontal state, which is convenient for monitoring personnel to record data, thereby improving the practicality of the utility model.

[0025] In the utility model, the monitoring component, the reference component and the supporting component are respectively arranged in two groups and are arranged on two adjacent side walls of the pier. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is the axonometric drawing of the overall structure of the utility model;

[0027] Figure 2 Decomposition of some parts of the utility model Figure 1 ;

[0028] Figure 3Decomposition of some parts of the utility model Figure 2 ;

[0029] Figure 4 Decomposition of some parts of the utility model Figure 3 . DETAILED DESCRIPTION

[0030] The utility model is further described in detail below in conjunction with the accompanying drawings and implementation methods: the figure numbers in the drawings of the specification include: 10, monitoring component; 11, mounting frame; 111, U-shaped frame; 112, protractor; 12, first sleeve; 121, first level; 122, reference line; 13, mounting plate; 131, expansion bolt; 132, first leveling member; 133, second level; 20, reference assembly; 21, reference plate; 22, embedded plate; 221, second leveling member; 222, third level; 223, drill rod; 30, support assembly; 31, telescopic rod; 311, fixing rod; 312, sleeve rod; 313, fastening bolt; 32, second sleeve; 40, scale rod.

[0031] Example:

[0032] As attached Figure 1-4 As shown, the utility model discloses a pier settlement monitoring device, including a monitoring component 10, a reference component 20, a support component 30 and a scale rod 40. The monitoring component 10 includes a mounting frame 11 and a first sleeve 12. The mounting frame 11 is transversely arranged on the side wall of the pier, and a U-shaped frame 111 is fixedly arranged at one end of the mounting frame 11 away from the pier. The top of the side wall of the first sleeve 12 is rotatably connected to the side wall of the U-shaped frame 111. A first leveler 121 is fixedly arranged on the top of the first sleeve 12. The reference component 20 includes a reference plate 21, which is transversely arranged above the adjacent soil foundation of the pier. The support component 30 includes a telescopic rod 31 and a second sleeve 32. The telescopic rod 31 is transversely fixedly arranged directly below the monitoring component 10, and the second sleeve 32 is rotatably arranged at one end of the telescopic rod 31 away from the pier. The scale rod 40 is slidably penetrated in the first sleeve 12 and the second sleeve 32 in sequence, and the bottom wall of the scale rod 40 abuts against the top surface of the reference plate 21.

[0033] In this embodiment, the monitoring component 10 also includes a mounting plate 13, which is L-shaped. The side plates of the mounting plate 13 are fixedly connected to the side walls of the pier via expansion bolts 131, and the top plate of the mounting plate 13 is connected to the mounting frame 11 via a first leveling member 132. A second leveler 133 is fixedly provided on the top of the mounting frame 11.

[0034] In this embodiment, a protractor 112 is fixedly disposed vertically on a side wall of the U-shaped frame 111 , and a reference line 122 is vertically disposed on a side wall of the first sleeve 12 close to the protractor 112 .

[0035] In this embodiment, the reference assembly 20 also includes an embedded plate 22, which is laterally arranged below the reference plate 21. The embedded plate 22 is connected to the reference plate 21 through a second leveling member 221. A third leveler 222 is fixedly arranged on the top of the reference plate 21. The first leveling member 132 and the second leveling member 221 are respectively arranged with at least three ball head bolts.

[0036] In this embodiment, a drill rod 223 is vertically fixedly disposed at the bottom of the embedded plate 22 .

[0037] In this embodiment, the telescopic rod 31 includes a fixed rod 311 and a sleeve rod 312. One end of the fixed rod 311 is fixedly connected to the side wall of the pier, and one end of the sleeve rod 312 is slidably sleeved on the other end of the fixed rod 311. A fastening bolt 313 is threaded through the side wall of the sleeve rod 312. One end of the fastening bolt 313 abuts against the fixed rod 311, and the other end of the sleeve rod 312 is rotatably connected to the second sleeve 32.

[0038] In this embodiment, the monitoring assembly 10, the reference assembly 20 and the support assembly 30 are respectively arranged in two groups and are disposed on two adjacent side walls of the pier.

[0039] The specific implementation process is as follows:

[0040] After the construction of the bridge is completed, the mounting frame 11 is fixedly installed on the side wall of the pier, and a reference plate 21 is set above the adjacent soil foundation of the pier. The bottom end of the graduated rod 40 is passed through the first sleeve 12 and the second sleeve 32 in sequence, and abuts against the top surface of the reference plate 21. The length of the telescopic rod 31 is adjusted to make the graduated rod 40 rotate circumferentially along the top of the first sleeve 12 until the first level 121 indicates that the first sleeve 12 is in a horizontal state. At this time, the graduated rod 40 is perpendicular to the reference plate 21. The size of the top alignment of the first sleeve 12 is recorded for the first time. When the next observation period comes, the above operation is repeated, and the difference with the first recorded data is compared, which is the specific settlement value of the settlement.

[0041] Before adjusting the length of the telescopic rod 31 to make the first sleeve 12 in a horizontal state, the first leveling member 132 is first adjusted until the second leveler 133 indicates that the mounting frame 11 is in a horizontal state.

[0042] When the pier is tilted, the protractor 112 and the mounting frame 11 are tilted along with the pier. When the length of the telescopic rod 31 is adjusted to make the first sleeve 12 in a horizontal state, the reference line 122 is perpendicular to the horizontal plane, and the angle between the protractor 112 and the reference line 122 is the tilt angle of the pier.

[0043] Insert the drill rod 223 into the soil foundation adjacent to the pier until the embedded plate 22 contacts the top of the soil foundation, and adjust the second leveling member 221 until the third leveler 222 indicates that the reference plate 21 is in a horizontal state.

[0044] The above is only an embodiment of the utility model, and the common knowledge such as the known specific technical scheme or characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the technical scheme of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A pier settlement monitoring device, characterized in that: include: A monitoring assembly, the monitoring assembly comprising a mounting frame and a first sleeve, the mounting frame being arranged transversely on the side wall of the pier, and a U-shaped frame being fixedly arranged at one end of the mounting frame away from the pier, the top of the side wall of the first sleeve being rotatably connected to the side wall of the U-shaped frame, and a first leveler being fixedly arranged on the top of the first sleeve; A reference assembly, the reference assembly comprising a reference plate, the reference plate being arranged laterally above a soil foundation adjacent to the pier; A support assembly, the support assembly comprising a telescopic rod and a second sleeve, the telescopic rod being fixedly arranged in a transverse direction directly below the monitoring assembly, and the second sleeve being rotatably arranged at an end of the telescopic rod away from the pier; The scale rod is slidably inserted into the first sleeve and the second sleeve in sequence, and the bottom wall of the scale rod abuts against the top surface of the reference plate.

2. The pier settlement monitoring device according to claim 1, characterized in that: The monitoring assembly also includes a mounting plate, which is L-shaped, with side plates of the mounting plate fixedly connected to the side walls of the pier, a top plate of the mounting plate connected to the mounting frame via a first leveling member, and a second leveler fixedly arranged on the top of the mounting frame.

3. The pier settlement monitoring device according to claim 2, characterized in that: A protractor is fixedly arranged on the side wall of the U-shaped frame in the vertical direction, and a reference line is arranged on a side wall of the first sleeve close to the protractor in the vertical direction.

4. The pier settlement monitoring device according to claim 3, characterized in that: The reference assembly also includes an embedded plate, which is laterally arranged below the reference plate. The embedded plate and the reference plate are connected via a second leveling member, and a third leveler is fixedly arranged on the top of the reference plate.

5. The pier settlement monitoring device according to claim 4, characterized in that: A drill rod is fixedly arranged vertically on the bottom of the embedded plate.

6. The pier settlement monitoring device according to claim 5, characterized in that: The telescopic rod includes a fixed rod and a sleeve rod, one end of the fixed rod is fixedly connected to the side wall of the pier, one end of the sleeve rod is slidably sleeved on the other end of the fixed rod, a fastening bolt is threaded through the side wall of the sleeve rod, one end of the fastening bolt abuts against the fixed rod, and the other end of the sleeve rod is rotatably connected to the second sleeve.

7. The pier settlement monitoring device according to claim 6, characterized in that: The monitoring component, the reference component and the supporting component are respectively arranged in two groups and are arranged on two adjacent side walls of the pier.

Citation Information

Patent Citations

  • Bridge settlement monitoring device

    CN220062935U

Cited By

  • Bridge pier settlement dynamic monitoring device based on shield pile grinding construction

    CN121025309A