Transition beam structure of tower crane and introduction system
By designing an adjustable tower crane transition beam structure and introduction system, the length of the transition beam is adjusted by using the combination of bolts and nuts, the problem of immutable transition beam structure dimensions in the prior art is solved, and the function of adapting to different types of tower cranes is realized, and production and maintenance costs are reduced.
Patent Information
- Application Number
- CN202420240080.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-01-31
AI Technical Summary
The transition beam structure and introduction system size of the existing tower cranes are unchanged, resulting in the production of transition beam structures and introduction systems of corresponding sizes when installing tower cranes of different models and specifications, which increases production and manufacturing costs and maintenance management costs.
An adjustable tower crane transition beam structure and introduction system are designed. By dividing the transition beam structure into symmetrical first and second transition beams, and adjusting the length between the first and second transition beams through a combination of bolts and nuts to adapt to different types of tower cranes.
The adjustment of the transition beam structure is achieved, and it can adapt to different types of tower cranes, reduce production and manufacturing costs, and improve the convenience of maintenance and management.
Smart Images

Figure CN222630920U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction equipment, in particular to a transition beam structure and an introduction system of a tower crane. Background Art
[0002] The slewing mechanism is installed between the crane and the tower body of the tower crane, so that the tower crane can achieve 360-degree rotation during work, improve the flexibility and operation capacity of the tower crane during work, expand the working range, and thus improve work efficiency. When the slewing mechanism is installed on the tower body, a transition beam structure is installed between the slewing mechanism and the tower body to fix the tower body and the slewing mechanism, and the introduction system (including the introduction beam, introduction trolley and other components) will be fixed on the transition beam structure as a guarantee of the safety and stability of the tower crane.
[0003] However, the current transition beam structure and introduction system dimensions are basically fixed. The same transition beam structure and introduction system can only be used on tower cranes of corresponding dimensions. This means that when installing tower cranes of different models and specifications, only transition beam structures and introduction systems of corresponding dimensions can be produced, which increases production and manufacturing costs. In addition, the maintenance and management costs and difficulty of the transition beam structure and introduction system will also increase. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a transition beam structure and an introduction system for a tower crane, aiming to solve the problem of increased production and manufacturing costs due to the need to produce transition beam structures and introduction systems of corresponding sizes according to the models of tower cranes when different models of tower cranes need to be used.
[0005] In order to solve the above problems, the technical solution adopted by the utility model is: a transition beam structure and an introduction system of a tower crane, including a transition beam structure and an introduction system, the transition beam structure includes a symmetrical first transition beam and a second transition beam, the first transition beam and the second transition beam include a main beam and a connecting part, the connecting part is fixed at both ends of the main beam to form a C-shaped transition beam, the ends of the connecting parts of the first transition beam and the second transition beam are provided with mounting blind holes, and also include bolts matching the mounting blind holes, nuts are threadedly connected to the bolts, the introduction system includes an introduction beam, an introduction trolley, and a pulley assembly, one end of the introduction beam is fixedly installed at the bottom of the transition beam structure, the pulley assembly is fixedly installed at the other end of the introduction beam, a slide groove is opened on the side wall of the introduction beam, and the wheels of the introduction trolley are slidably installed in the slide groove.
[0006] The principles of this solution are:
[0007] The transition beam structure is divided into a symmetrical first transition beam and a second transition beam, the first transition beam and the second transition beam both include a main beam and a connecting portion, and the connecting portion is fixed at both ends of the main beam to form a C-shaped transition beam, bolts are fixedly installed on the connecting portion of the first transition beam and the second transition beam, and nuts are used to fix the bolts together, the first transition beam and the second transition beam are fixed together to form a transition beam structure, the transition beam is installed between the tower body and the slewing mechanism of the tower crane to achieve the fixation of the tower body and the slewing mechanism, and the introduction beam is fixed at the bottom of the transition beam structure, after the standard section of the tower crane or other heavy objects are transferred to the introduction beam through the boom, the standard section or heavy objects are pulled onto the tower body through the introduction trolley; when using different models of tower cranes, the models of the slewing mechanism and the tower body require the use of corresponding different models of transition beam mechanisms and introduction systems, at this time, the size of the transition beam structure is changed by adjusting the length of the bolts between the first transition beam and the second transition beam, thereby achieving the purpose of reducing costs.
[0008] The beneficial effects of this program are:
[0009] The first transition beam and the second transition beam are fixed together by bolts and nuts to form a transition beam structure. The length between the first transition beam and the second transition beam can be adjusted according to different types of tower cranes, so that the transition beam structure can adapt to different types of tower cranes, thereby reducing production costs.
[0010] Furthermore, a through groove is provided in the connection part, and the through groove horizontally penetrates the connection part. During installation, the staff can hold the first transition beam and the second transition beam through the grass, which is convenient for maintaining the stability of the first transition beam and the second transition beam and facilitating installation.
[0011] Furthermore, a support rod is fixedly installed between the main beam and the connecting part. The installation of the support rod can enhance the stability between the main beam and the connecting part.
[0012] Furthermore, a protective layer is provided on the outer wall of the transition beam structure and the introduction system. Since the working environment of the tower crane is relatively harsh, the transition beam structure and the introduction beam are susceptible to corrosion and wear, which can easily lead to a decrease in safety performance and cause safety accidents. The provision of the protective layer can extend the service life of the transition beam structure and the introduction system.
[0013] Furthermore, a washer is provided between every two nuts on the bolt. The provision of the washer can enhance the tightness of the connection between the bolt and the nut, prevent loosening, reduce wear between the bolt and the nut, and increase the contact area between the bolt and the nut, thereby improving stability.
[0014] Furthermore, the introduction beam includes two beams, the two beams are arranged in parallel, and a connecting rod is fixedly installed between the two beams fixedly installed at the bottom of the transition beam structure. The setting of the connecting rod fixes the distance and position between the two beams to ensure the stability of the introduction beam. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The utility model provides a transition beam structure of a tower crane and an overall structural schematic diagram of the introduction system;
[0016] Figure 2 A schematic diagram of a transition beam structure of a tower crane and a transition beam structure of an introduction system provided by the utility model;
[0017] Figure 3 A schematic diagram of a transition beam structure of a tower crane and an introduction system of the introduction system provided by the utility model;
[0018] Figure 4 The utility model provides a transition beam structure of a tower crane and a schematic diagram of a transition beam structure of an introduction system.
[0019] The figure marks in the drawings of the specification include: a first transition beam 101, a second transition beam 102, a main beam 103, a connecting part 104, a support rod 105, a bolt 106, a nut 107, a gasket 108, a through groove 109, an introduction system 201, an introduction beam 202, an introduction trolley 203, a pulley assembly 204, a slide groove 205, and a pin shaft 301. DETAILED DESCRIPTION
[0020] The following is further described in detail through specific implementation methods:
[0021] like Figure 1-3As shown, the specific structure of a transition beam structure and an introduction system of a tower crane is as follows: it includes a transition beam structure and an introduction system 201, the transition beam structure includes a first transition beam 101 and a second transition beam 102, the first transition beam 101 and the second transition beam 102 are symmetrically arranged, the first transition beam 101 and the second transition beam 102 both include a main beam 103 and a connecting portion 104, the connecting portion 104 is fixedly installed at both ends of the main beam 103 by welding or integral molding, so that the first transition beam 101 and the second transition beam 102 form a C-shaped transition beam, and a connecting portion 104 is provided at the end of the first transition beam 101 and the second transition beam 102. The mounting blind hole also includes a bolt 106 that cooperates with the mounting blind hole. The bolt 106 can be fixedly installed in the mounting blind hole by interference fit between the bolt 106 and the mounting blind hole or by integral molding. A nut 107 is threadedly connected to the bolt 106, and a washer is arranged between every two nuts 107. A through groove 109 that horizontally penetrates the connecting portion 104 is opened on the connecting portion 104 of the first transition beam 101 and the second transition beam 102, and a support rod 105 is fixedly installed between the main beam 103 and the connecting portion 104 by welding or integral molding. The installation of the support rod 105 can improve the stability of the transition beam structure.
[0022] The introduction system 201 includes an introduction beam 202, which includes two beams. The two beams are arranged in parallel, and a connecting rod is fixedly installed between the two beams by welding or integral molding. The installation of the connecting rod fixes the two beams of the introduction beam 202 together to ensure the stability of the introduction beam 202. One end of the introduction beam 202 is fixedly installed at the bottom of the transition beam structure by bolts 106 or snap-fitting. A pulley assembly 204 is fixedly installed at the other end of the introduction beam 202, and a slide groove 205 is opened on the side walls of the two beams. The wheels of the introduction trolley 203 are slidably installed in the slide groove 205.
[0023] A protective layer is also provided on the outer wall of the transition beam structure and the introduction system 201. The protective layer may be a coating made of an anti-corrosion material sprayed on the outer wall of the transition beam structure and the introduction system 201, etc.
[0024] The specific implementation process is as follows:
[0025] When installing the transition beam structure and the introduction system 201 on the tower body to realize the installation of the tower body and the slewing mechanism, the staff first adjusts the length of the bolts 106 between the first transition beam 101 and the second transition beam 102 according to the model, specification and other data of the tower body to adjust the transition beam structure to the corresponding size, and first fixes one end of the introduction beam 202 of the introduction system 201 on the bottom of the transition beam structure, and then installs the transition beam structure and the introduction system 201 on the tower body. Figure 4As shown, the transition beam structure can be fixed on the tower body by bolts 106 or by means of pins 301, open shafts, etc. When the transition beam structure and the introduction system 201 are installed on the tower body, the through slot 109 can be held by hand and the stability of the transition beam structure can be maintained; when in use, the standard section or other heavy objects are pulled onto the introduction beam 202 by the boom of the tower crane, and the movement of the introduction trolley 203 drives the object to move on the introduction beam 202, thereby transferring the standard section or other heavy objects to the tower body to complete the transfer of the object.
[0026] The transition beam structure in this application can challenge the size according to the model, specifications, etc. of the tower crane, and can reduce the production cost to a certain extent.
[0027] The above is only an embodiment of the utility model, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A transition beam structure and introduction system of a tower crane, comprising a transition beam structure and an introduction system, characterized in that: The transition beam structure includes a symmetrical first transition beam and a second transition beam. The first transition beam and the second transition beam include a main beam and a connecting portion. The connecting portion is fixed at both ends of the main beam to form a C-shaped transition beam. The ends of the connecting portions of the first transition beam and the second transition beam are provided with mounting blind holes, and also include bolts matching the mounting blind holes, and nuts are threadedly connected to the bolts. The introduction system includes an introduction beam, an introduction trolley, and a pulley assembly. One end of the introduction beam is fixedly installed at the bottom of the transition beam structure, and the pulley assembly is fixedly installed at the other end of the introduction beam. A slide groove is opened on the side wall of the introduction beam, and the wheels of the introduction trolley are slidably installed in the slide groove.
2. The transition beam structure and introduction system of a tower crane according to claim 1, characterized in that: A through groove is provided in the connecting portion, and the through groove horizontally penetrates the connecting portion.
3. The transition beam structure and introduction system of a tower crane according to claim 1, characterized in that: A support rod is fixedly installed between the main beam and the connecting part.
4. The transition beam structure and introduction system of a tower crane according to claim 3, characterized in that: A protective layer is arranged on the transition beam structure and the outer wall of the introduction system.
5. The transition beam structure and introduction system of a tower crane according to claim 4, characterized in that: A washer is arranged between every two nuts on the bolt.
6. The transition beam structure and introduction system of a tower crane according to claim 5, characterized in that: The introduced cross beam comprises two cross beams, the two cross beams are arranged in parallel, and a connecting rod is fixedly installed between the two cross beams fixedly installed at the bottom of the transition beam structure.