Vertical elevator rope head weighing device

By designing a vertical elevator rope head weighing device including rope head seat, rope head device, traction device, bracket device and overload alarm device, the problem of insufficient installation and maintenance convenience and impact of weighing accuracy in the prior art is solved, and a higher detection accuracy and a more convenient maintenance process is achieved.

CN222647367UActive Publication Date: 2025-03-21HITACHI ELEVATOR CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420391012.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2025-03-21
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The existing vertical elevator rope head weighing device is not convenient for installation and maintenance, and the weighing accuracy is affected due to uneven tension of the traction wire rope.

Method used

A vertical elevator rope head weighing device including a rope head seat, a rope head device, a traction device, a bracket device and an overload alarm device is designed. By setting a trigger probe and an electrical switch in the rope head seat and a bracket device, precise detection of the load of the elevator car and overload alarm is achieved.

Benefits of technology

The device improves the detection accuracy of weighing, simplifies the installation and maintenance process, and reduces the weighing accuracy error caused by uneven tension of the traction device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222647367U_ABST
    Figure CN222647367U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of elevator weighing alarm devices, and discloses a vertical elevator rope head weighing device which comprises a rope head seat, a rope head device, a traction device, a support device and an overload alarm device. The rope head seat can be fixed on a solid surface; one end of the rope head device is arranged on the first panel of the rope head seat, and the other end of the rope head device is provided with the support device; one end of the traction device is connected with the rope head device; the overload alarm device comprises a trigger probe and an electric switch, the trigger probe is arranged in the middle of a second panel of the rope head seat, and the electric switch is arranged in the middle of the support device and corresponds to the trigger probe; or the trigger probe is arranged in the middle of the support device, and the electrical switch is arranged in the middle of the second panel of the rope head seat and corresponds to the trigger probe; according to the utility model, the problem that the installation and maintenance convenience and the weighing precision of the conventional vertical elevator rope head weighing device cannot be simultaneously considered is effectively solved; the utility model has better versatility.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of elevator weighing alarm devices, and in particular relates to a vertical elevator rope head weighing device. Background Art

[0002] At present, there are two common solutions for vertical elevator rope head weighing devices:

[0003] Reference Figure 4 The first solution is to set up a double-layer rope head plate 71, and install a pressure sensor 72 between the double-layer rope head plates 71 to directly read the weighing data, or install rubber, and convert the rubber compression into the bridge compartment loading weight data. This solution requires the installation of a double-layer rope head plate 71, and the process is relatively complicated. If one piece is missed when installing the rope head or the pressure sensor 72 or the rubber needs to be replaced during maintenance, the cost of engineering rectification is high, and its replacement efficiency is low;

[0004] Reference Figure 5 The second solution is to directly install a flat plate 82 on the pull rod 81 of the rope head device, and then install the weighing switch 83 on the flat plate 82, and the trigger probe 84 is installed on the lower rope head plate 85 corresponding to the weighing switch 83. Although this solution is easy to install and maintain, since the weighing switch 83 is on one side of the rope head device, if the traction wire rope is unevenly stressed, the spring compression amounts on each rope head device will also be different, and there will be uncoordinated deformation, which may easily cause the upper flat plate 82 to appear irregularly tilted, affecting the contact detection of the weighing switch 83 on one side, thereby affecting the accuracy of the rope head weighing.

[0005] From the above, it can be seen that there is currently a lack of a new type of vertical elevator rope end weighing device, which can not only solve the convenience problems of device installation and maintenance, but also reduce the impact of weighing accuracy caused by uneven tension of the traction wire rope.

[0006] Therefore, a new technology is needed to solve the problem of lacking a novel vertical elevator rope end weighing device in the prior art. Utility Model Content

[0007] In order to solve the above problems in the prior art, the utility model provides a novel vertical elevator rope end weighing device, which can not only solve the convenience problems of device installation and maintenance, but also reduce the influence of weighing accuracy caused by uneven tension of traction wire rope; the device improves the detection accuracy of weighing.

[0008] The utility model adopts the following technical solutions:

[0009] A vertical elevator rope weighing device, comprising a rope seat, a rope device, a traction device, a bracket device and an overload alarm device; the rope seat can be fixed on a solid surface; one end of the rope device is arranged on a first panel of the rope seat, and the other end of the rope device is provided with the bracket device; one end of the traction device is connected to the rope device; the overload alarm device comprises a trigger probe and an electrical switch, the trigger probe is arranged at the middle position of the second panel of the rope seat, and the electrical switch is arranged at the middle position of the bracket device and corresponds to the trigger probe;

[0010] Alternatively, the trigger probe is arranged at a middle position of the bracket device, and the electrical switch is arranged at a middle position of the second panel of the rope head seat and corresponds to the trigger probe.

[0011] Furthermore, the solid surface is a solid surface in a machine room or a solid surface at the top of a shaft; and the other end of the traction device can be connected to an elevator car.

[0012] Furthermore, the rope head seat is an I-beam or an H-beam; the I-beam or the H-beam includes the first panel and the second panel, and the first panel and the second panel are connected by a web.

[0013] Furthermore, it also includes a mounting seat; the trigger probe is arranged at the middle position of the mounting seat, and the trigger probe is arranged at the middle position of the second panel through the mounting seat;

[0014] Alternatively, the electrical switch is arranged at a middle position of the mounting seat, and the electrical switch is arranged at a middle position of the second panel through the mounting seat.

[0015] Furthermore, the rope end device includes a first group of elastic telescopic parts and a second group of elastic telescopic parts; the first group of elastic telescopic parts is arranged on the first panel and located on one side of the web; the second group of elastic telescopic parts is arranged on the first panel and located on the other side of the web.

[0016] Furthermore, the first group of elastic and telescopic components and the second group of elastic and telescopic components are symmetrically arranged with the structural center line of the web as the axis of symmetry.

[0017] Furthermore, the traction device includes a first group of traction steel wire ropes and a second group of traction steel wire ropes; the first group of traction steel wire ropes are connected to the first group of elastic telescopic parts in a one-to-one correspondence; the second group of traction steel wire ropes are connected to the second group of elastic telescopic parts in a one-to-one correspondence.

[0018] Furthermore, the bracket device is a "U"-shaped bracket, and the "U"-shaped bracket is provided with a first connecting end and a second connecting end, the first connecting end is connected to the first group of elastic telescopic parts, and the second connecting end is connected to the second group of elastic telescopic parts.

[0019] Furthermore, the electrical switch is provided in the middle of the upper frame plate of the “U”-shaped bracket;

[0020] Alternatively, the trigger probe is provided at the middle position of the upper frame plate of the "U"-shaped bracket.

[0021] Furthermore, the first connecting end and the second connecting end are both "L"-shaped plates.

[0022] Furthermore, after the "U"-shaped bracket is installed, its structural center line is coaxial with the structural center line of the web, and the electrical switch and the trigger probe are both located on the axis.

[0023] Compared with the prior art, the beneficial effects of the utility model are:

[0024] The utility model discloses a vertical elevator rope weighing device, comprising a rope head seat, a rope head device, a traction device, a bracket device and an overload alarm device, wherein the rope head seat can be stably fixed on a solid surface in a machine room or on a solid surface at the top of a shaft, providing a stable and reliable fixing foundation for the utility model; in some preferred embodiments, the rope head seat can be an I-beam or an H-beam; one end of the rope head device is arranged on a first panel of the rope head seat, and the other end of the rope head device is provided with a bracket device; one end of the traction device is connected to the rope head device, and the other end of the traction device can be connected to the elevator car, and the rope head device is towed by the traction device to drive the bracket device to move (up and down); the overload alarm device can be used to prevent the rope head device from moving. The overload alarm device includes a trigger probe and an electrical switch, the trigger probe is arranged in the middle position of the second panel of the rope head seat, the electrical switch is arranged in the middle position of the bracket device and corresponds to the trigger probe; or the trigger probe is arranged in the middle position of the bracket device, the electrical switch is arranged in the middle position of the second panel of the rope head seat and corresponds to the trigger probe; the electrical switch and the trigger probe can determine whether the elevator car is overloaded; when the elevator car is not fully loaded, there is a certain distance between the electrical switch and the trigger probe, and the distance decreases as the load of the elevator car increases. Finally, when the elevator car is fully loaded, the electrical switch contacts the trigger probe and feeds back the elevator car weighing result or overload alarm.

[0025] The bracket device, trigger probe and electrical switch of the utility model can be installed after the entire elevator main structure is installed. The installation, maintenance and replacement do not require the lifting of the car and counterweight, and the engineering operation is more convenient; the electrical switch is installed in the middle position of the bracket device, and the trigger probe is installed in the middle position of the second panel of the rope head seat (or the trigger probe is installed in the middle position of the bracket device, and the electrical switch is installed in the middle position of the second panel of the rope head seat). This design can effectively reduce the weighing accuracy error caused by the incoordination of the installation position, and can effectively reduce the influence of the uneven tension of the traction device and the inconsistent elastic deformation of the rope head device on the weighing accuracy; the utility model effectively solves the problem that the convenience of installation and maintenance of the rope head weighing device of the vertical elevator and the weighing accuracy cannot be taken into account at the same time; the utility model has better versatility and stronger practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The technology of the utility model is further described in detail below in conjunction with the accompanying drawings and specific embodiments:

[0027] Figure 1 This is a front view of the vertical elevator rope weighing device (where the electrical switch and the trigger probe are kept at a certain distance);

[0028] Figure 2 It is the left view of the vertical elevator rope end weighing device;

[0029] Figure 3 It is a front view of the vertical elevator rope end weighing device (where the electrical switch is in contact with the trigger probe);

[0030] Figure 4 It is a structural schematic diagram of a vertical elevator rope end weighing device of the first solution in the background technology;

[0031] Figure 5 It is a structural schematic diagram of a vertical elevator rope end weighing device of the second solution in the background technology.

[0032] Reference numerals:

[0033] 1-rope head seat; 11-first panel; 12-second panel; 13-web; S-structure centerline; A-one side; B-the other side;

[0034] 2-rope head device; 21-first group of elastic telescopic parts; 22-second group of elastic telescopic parts;

[0035] 3- traction device; 31- first set of traction steel wire ropes; 32- second set of traction steel wire ropes;

[0036] 4-bracket device; 41-"U"-shaped bracket; 411-upper frame plate; 42-first connecting end; 43-second connecting end;

[0037] 5-overload alarm device; 51-trigger probe; 52-electrical switch;

[0038] 6-Mounting seat;

[0039] 71-rope head plate; 72-pressure sensor;

[0040] 81-pull rod; 82-plate; 83-weighing switch; 84-trigger probe; 85-rope head plate;

[0041] 9-Solid face. DETAILED DESCRIPTION

[0042] The following will be combined with the embodiments and drawings to clearly and completely describe the concept, specific structure and technical effects of the utility model, so as to fully understand the purpose, scheme and effect of the utility model. It should be noted that the embodiments and features in the embodiments in this application can be combined with each other without conflict. The same reference numerals used throughout the drawings indicate the same or similar parts.

[0043] It should be noted that, unless otherwise specified, when a feature is referred to as being "fixed" or "connected" to another feature, it can be directly fixed or connected to the other feature, or it can be indirectly fixed or connected to the other feature. In addition, the descriptions of up, down, left, right, etc. used in the present invention are only relative to the relative positional relationship of the components of the present invention in the accompanying drawings.

[0044] Reference Figures 1 to 3 A novel vertical elevator rope weighing device comprises a rope seat 1, a rope device 2, a traction device 3, a bracket device 4 and an overload alarm device 5; the rope seat 1 can be fixed on a solid surface 9; one end of the rope device 2 is arranged on a first panel 11 of the rope seat 1, and the other end of the rope device 2 is provided with the bracket device 4; one end of the traction device 3 is connected to the rope device 2; the overload alarm device 5 comprises a trigger probe 51 and an electrical switch 52, the trigger probe 51 is arranged at the middle position of the second panel 12 of the rope seat 1, and the electrical switch 52 is arranged at the middle position of the bracket device 4 and corresponds to the trigger probe 51;

[0045] Alternatively, the trigger probe 51 is disposed at the middle position of the bracket device 4, and the electrical switch 52 is disposed at the middle position of the second panel 12 of the rope head seat 1 and corresponds to the trigger probe 51 (see Appendix Figures 1 to 3 for this embodiment).

[0046] In one embodiment, the solid surface 9 is a solid surface in a machine room or a solid surface at the top of a shaft; the other end of the traction device 2 can be connected to an elevator car.

[0047] Reference Figures 1 to 3 In one embodiment, the rope head seat 1 is an I-beam or an H-beam; the I-beam or the H-beam includes the first panel 11 and the second panel 12, and the first panel 11 and the second panel 12 are connected by a web 13.

[0048] In one embodiment, it further includes a mounting seat 6; the trigger probe 51 is disposed at the middle position of the mounting seat 6, and the trigger probe 51 is disposed at the middle position of the second panel 12 through the mounting seat 6;

[0049] Or the electrical switch 52 is arranged at the middle position of the mounting base 6, and the electrical switch 52 is arranged at the middle position of the second panel 12 through the mounting base 6 (refer to Figures 1 to 3 ).

[0050] In one embodiment, the mounting seat 6 is a steel folding plate frame.

[0051] Reference Figures 1 to 3 In one embodiment, the rope end device 2 includes a first group of elastic telescopic parts 21 and a second group of elastic telescopic parts 22; the first group of elastic telescopic parts 21 is arranged on the first panel 11 and is located on one side A of the web 13; the second group of elastic telescopic parts 22 is arranged on the first panel 11 and is located on the other side B of the web; the first group of elastic telescopic parts 21 and the second group of elastic telescopic parts 22 each include a plurality of elastic telescopic parts, and the number of elastic telescopic parts is determined according to actual conditions.

[0052] In one embodiment, the elastic telescopic part can be a spring or rubber; when the traction device 3 connected to the rope head device 2 is subjected to force or the force is removed, the expansion and contraction amount of the spring or rubber will change accordingly, thereby driving the support device 4 to move; the elastic telescopic part is not limited to the spring or rubber mentioned in this patent, and can also be other devices that can be elastically deformed.

[0053] Reference Figure 1 In one embodiment, the first group of elastic and telescopic members 21 and the second group of elastic and telescopic members 22 are symmetrically arranged with the structural center line S of the web 13 as the axis of symmetry.

[0054] Reference Figures 1 to 3 In one embodiment, the traction device 3 includes a first group of traction steel ropes 31 and a second group of traction steel ropes 32; the first group of traction steel ropes 31 are connected to the first group of elastic telescopic parts 21 in a one-to-one correspondence; the second group of traction steel ropes 32 are connected to the second group of elastic telescopic parts 22 in a one-to-one correspondence.

[0055] In one embodiment, the first group of traction steel ropes 31 and the second group of traction steel ropes 32 both include a plurality of traction steel ropes, and the number of traction steel ropes is determined according to actual conditions.

[0056] In one embodiment, the first group of traction steel ropes 31 and the second group of traction steel ropes 32 are symmetrically arranged with the structural center line S of the web 13 as the axis of symmetry.

[0057] Reference Figures 1 to 3 In one embodiment, the bracket device 4 is a "U"-shaped bracket 41, and the "U"-shaped bracket 41 is provided with a first connecting end 42 and a second connecting end 43, the first connecting end 41 is connected to the upper pull rod of the first group of elastic telescopic parts 21, and the second connecting end 43 is connected to the upper pull rod of the second group of elastic telescopic parts 22.

[0058] In one embodiment, the electrical switch 52 is disposed in the middle of the upper frame plate 411 of the “U”-shaped bracket 41;

[0059] Alternatively, the trigger probe 51 is disposed in the middle of the upper frame plate 411 of the "U"-shaped bracket 41 (see Figure 1 ).

[0060] Reference Figures 1 to 3 In one embodiment, the first connection end 42 and the second connection end 43 are both "L"-shaped plates.

[0061] Reference Figure 1 In one embodiment, after the "U"-shaped bracket 41 is installed, its structural center line is coaxial with the structural center line S of the web 13, and the electrical switch 52 and the trigger probe 51 are both located on the axis.

[0062] For other contents of the vertical elevator rope end weighing device described in the utility model, please refer to the prior art and will not be repeated here.

[0063] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Therefore, any modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A vertical elevator rope weighing device, characterized in that: It includes a rope end seat, a rope end device, a traction device, a support device and an overload alarm device; the rope end seat can be fixed on a solid surface; one end of the rope end device is arranged on the first panel of the rope end seat, and the other end of the rope end device is provided with the support device; one end of the traction device is connected to the rope end device; the overload alarm device includes a trigger probe and an electrical switch, the trigger probe is arranged at the middle position of the second panel of the rope end seat, and the electrical switch is arranged at the middle position of the support device and corresponds to the trigger probe; Or the trigger probe is arranged at a middle position of the bracket device, and the electrical switch is arranged at a middle position of the second panel of the rope head seat and corresponds to the trigger probe.

2. The vertical elevator rope end weighing device according to claim 1 is characterized in that: The rope head seat is an I-beam or an H-beam; the I-beam or the H-beam includes the first panel and the second panel, and the first panel and the second panel are connected by a web.

3. The vertical elevator rope end weighing device according to claim 2 is characterized in that: It also includes a mounting seat; the trigger probe is arranged at the middle position of the mounting seat, and the trigger probe is arranged at the middle position of the second panel through the mounting seat; Alternatively, the electrical switch is arranged at a middle position of the mounting seat, and the electrical switch is arranged at a middle position of the second panel through the mounting seat.

4. The vertical elevator rope end weighing device according to claim 2, characterized in that: The rope head device includes a first group of elastic and telescopic parts and a second group of elastic and telescopic parts; the first group of elastic and telescopic parts is arranged on the first panel and located on one side of the web; the second group of elastic and telescopic parts is arranged on the first panel and located on the other side of the web.

5. The vertical elevator rope end weighing device according to claim 4 is characterized in that: The first group of elastic expansion members and the second group of elastic expansion members are symmetrically arranged with the structural center line of the web as the axis of symmetry.

6. The vertical elevator rope end weighing device according to claim 4, characterized in that: The traction device includes a first group of traction steel wire ropes and a second group of traction steel wire ropes; the first group of traction steel wire ropes are connected to the first group of elastic telescopic parts in a one-to-one correspondence; the second group of traction steel wire ropes are connected to the second group of elastic telescopic parts in a one-to-one correspondence.

7. The vertical elevator rope end weighing device according to claim 4, characterized in that: The bracket device is a "U"-shaped bracket, and the "U"-shaped bracket is provided with a first connecting end and a second connecting end, the first connecting end is connected to the first group of elastic telescopic parts, and the second connecting end is connected to the second group of elastic telescopic parts.

8. The vertical elevator rope end weighing device according to claim 7, characterized in that: The electrical switch is provided in the middle of the upper frame plate of the "U"-shaped bracket; Alternatively, the trigger probe is provided at the middle position of the upper frame plate of the "U"-shaped bracket.

9. The vertical elevator rope end weighing device according to claim 7, characterized in that: The first connecting end and the second connecting end are both "L"-shaped plates.

10. The vertical elevator rope end weighing device according to claim 7, characterized in that: After the "U"-shaped bracket is installed, its structural center line is coaxial with the structural center line of the web, and the electrical switch and the trigger probe are both located on the axis.