Air energy heat pump structure convenient to defrost and drain
By designing an air energy heat pump structure including a sprayer, collection frame and treatment tank, the problem of frost accumulation around the heat pump in a low-temperature environment is solved, the rapid melting of frost and reuse of water are achieved, and the working efficiency of the equipment is improved.
Patent Information
- Application Number
- CN202420623593.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-03-28
AI Technical Summary
When the air energy heat pump works in a low-temperature environment, a large amount of frost is easily accumulated around the evaporator, affecting the efficiency of the equipment, and it is difficult for the existing technology to effectively clean external frost.
An air energy heat pump structure is designed, including a heat pump body, a top cover, a collection frame and a treatment tank. A sprayer is provided on the top cover, and the frost is melted through the heating water pipe. The melted water is collected into the treatment water tank through the collection frame. An activated carbon adsorption plate is provided in the treatment water tank for decomposition treatment, and the water is reused for heating.
It realizes the convenient and quick cleaning of the frost around the heat pump, avoids moisture freezing, improves the working efficiency of the equipment, and realizes the reuse of water through the removal of the activated carbon adsorption plate.
Smart Images

Figure CN222651680U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of air energy heat pumps, in particular to an air energy heat pump structure which is convenient for defrosting and draining water. Background Art
[0002] An air energy heat pump is a device that uses the heat in the air for heating or cooling. Its working principle is based on the principle of heat energy exchange in thermodynamics. The main components of an air energy heat pump include a compressor, an evaporator, a condenser, and a throttling device. Its working process is as follows: the refrigerant is in a low-pressure state and enters the evaporator through a diffusion valve. The air outside the evaporator passes through the evaporator, contacts the refrigerant, and exchanges heat. The heat in the air is absorbed and transferred to the refrigerant, causing it to evaporate and convert into a low-temperature, low-pressure gas; the low-temperature, low-pressure gas passes through the evaporator and enters the compressor. Inside the compressor, the gas is compressed into a high-temperature, high-pressure gas; the high-temperature, high-pressure gas leaves the compressor and enters the condenser, where the refrigerant exchanges heat with the water or air in the heating system. The refrigerant in the condenser releases heat, causing it to condense into a high-temperature, high-pressure liquid state; the high-temperature, high-pressure liquid passes through the throttling device, the pressure is reduced, and the temperature also drops, and it re-enters the evaporator for circulation. By continuously circulating this process, the air energy heat pump can extract heat from the low-temperature environment outdoors, transfer it to the heating system through compression and heat exchange, and realize the indoor heating function. In cooling mode, the air energy heat pump will transfer indoor heat to outdoor air through a similar principle to achieve cooling of the indoor space.
[0003] When the air-to-air heat pump works in a low-temperature environment, a large amount of frost will be generated around the evaporator due to the temperature difference between the inside and outside of the evaporator. It needs to be cleaned in time, otherwise it will affect the working efficiency of the evaporator. The existing air-to-air heat pump melts and cleans the frost around the evaporator through the work of the internal structure. The melted water directly falls around the heat pump. It is difficult for the water to evaporate in a low-temperature environment, which makes it easy for water to freeze around the heat pump, affecting the operation. In addition, when the heat pump cannot work, the frost on the outside is difficult to clean. Therefore, an air-to-air heat pump structure that is convenient for defrosting and drainage is needed. Utility Model Content
[0004] The technical problem to be solved by the utility model is to overcome the above technical defects and provide an air energy heat pump structure which is convenient for defrosting and draining water.
[0005] To solve the above technical problems, the technical solution provided by the utility model is: an air-energy heat pump structure for convenient defrosting and drainage, comprising a heat pump body, a top cover, a first collecting frame and a second collecting frame, the top ends of the left and right outer walls of the heat pump body are fixed with connecting grooves, the bottom end of the top cover is provided with a connecting rod extending into the connecting groove, the bottom surface of the top cover is connected with an inclined pipe arranged around the heat pump body, the inclined pipe is evenly connected with a plurality of sprinklers close to the wall of one side of the heat pump body, a heating water pipe is fixedly provided at the center of the top surface of the top cover, a water pump connected to the heating water pipe is provided on the top cover, and a plurality of water supply hoses connected to the inclined pipe are provided on the water pump, the first collecting frame and the second collecting frame are symmetrically arranged close to the outer walls around the heat pump body, the inner walls of the bottom ends of the first collecting frame and the second collecting frame are fixed with a collecting groove, and the bottom ends of the first collecting frame and the second collecting frame are both provided with a treated water tank connected to the collecting groove.
[0006] Compared with the prior art, the utility model has the following advantages: the top cover is installed on the top of the heat pump body, and then hot water is sprayed from multiple sprayers to the frost positions around the heat pump body through the heating water pipe to melt the frost, and the melted water and the hot water after use are collected in the treatment water tank through a set of detachable collection frames, which is convenient for defrosting and drainage.
[0007] As an improvement, a connecting screw rod threadedly connected to the connecting rod is provided through the connecting groove, and the connecting screw rod is convenient for fixing the connecting groove and the connecting rod, thereby fixing the top cover, which is convenient for disassembly when not in use.
[0008] As an improvement, a drain pipe connected to the collection trough is fixedly provided at the bottom end of the outer wall of the first collecting frame and the second collecting frame. The drain pipe is connected to the top of the treatment water tank. The drain pipe discharges the hot water and melted frost water collected in the collection trough into the water tank to be treated, and the treatment water tank can reuse them after processing them.
[0009] As an improvement, a plurality of activated carbon adsorption plates are arranged in sequence from top to bottom in the treatment water tank, and a connecting water valve is arranged at the bottom of the treatment water tank. The activated carbon adsorption plates remove impurities from the water entering the treatment water tank. After the treatment, an external water pipe can be used to connect the connecting water valve to the heating water pipe. The water in the heating water pipe is reused for defrosting work. The treatment water tank is made of heat-insulating material to reduce the risk of water condensation.
[0010] As an improvement, the first collection frame and the second collection frame are both provided with a fixing plate close to one end wall, and the fixing plates are provided with fastening bolts through which the threads cooperate. The fastening bolts penetrate a group of fixing plates so that the first collection frame and the second collection frame are tightly connected and closely attached to the outer wall of the heat pump body to collect moisture convected by convection. The provision of the fastening bolts facilitates the installation and disassembly of the first collection frame and the second collection frame.
[0011] As an improvement, a plurality of heating tubes are evenly arranged in the heating water pipe, and the heating tubes can heat the reused water to improve the defrosting efficiency. A closed cover is provided on the heating water pipe to protect it. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is the first stereoscopic diagram of an air energy heat pump structure for convenient defrosting and drainage according to the utility model.
[0013] Figure 2 This is the second stereoscopic diagram of the air energy heat pump structure of the utility model which is convenient for defrosting and draining water.
[0014] Figure 3 It is a sectional stereoscopic diagram of an air energy heat pump structure which is convenient for defrosting and draining water according to the utility model.
[0015] Figure 4 It is a cross-sectional stereoscopic view of a treatment water tank of an air energy heat pump structure which is convenient for defrosting and draining water according to the utility model.
[0016] Figure 5 yes Figure 1 Schematic diagram of the structure of part A.
[0017] Figure 6 yes Figure 2 Schematic diagram of the structure of part B.
[0018] As shown in the figure: 1. Heat pump body; 2. Top cover; 3. First collection frame; 4. Second collection frame; 5. Connecting groove; 6. Connecting rod; 7. Inclined pipe; 8. Sprinkler; 9. Heating water pipe; 10. Water pump; 11. Water supply hose; 12. Collecting groove; 13. Treatment water tank; 14. Connecting screw; 15. Drain pipe; 16. Activated carbon adsorption plate; 17. Connecting water valve; 18. Fixing plate; 19. Fastening bolt; 20. Heating pipe. DETAILED DESCRIPTION
[0019] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0020] Combined with Figure 1-6 As shown, an air energy heat pump structure convenient for defrosting and draining water comprises a heat pump body 1, a top cover 2, a first collection frame 3 and a second collection frame 4. The top ends of the outer walls on both sides of the heat pump body 1 are fixedly provided with connecting grooves 5. The bottom end of the top cover 2 is provided with a connecting rod 6 extending into the connecting groove 5. A connecting screw 14 threadedly connected to the connecting rod 6 is penetrated through the connecting groove 5. The connecting screw 14 is used to fix the connecting groove 5 and the connecting rod 6, thereby fixing the top cover 2.
[0021] The bottom surface of the top cover 2 is connected with an inclined pipe 7 arranged around the heat pump body 1. The inclined pipe 7 is evenly connected to a wall of one side of the heat pump body 1 and is evenly connected with a plurality of sprinklers 8. A heating water pipe 9 is fixedly provided at the center of the top surface of the top cover 2. A water pump 10 connected to the heating water pipe 9 is provided on the top cover 2. A plurality of heating pipes 20 are evenly provided in the heating water pipe 9. A plurality of water delivery hoses 11 are provided on the water pump 10 and are connected with the inclined pipe 7 to connect the external hot water to the heating water pipe 9. The sprinklers 8 evenly spray the hot water to the frosted positions around the heat pump body 1 to melt the frost.
[0022] The first collecting frame 3 and the second collecting frame 4 are symmetrically arranged close to the outer walls of the heat pump body 1. The first collecting frame 3 and the second collecting frame 4 are each provided with a fixing plate 18 close to one end wall of each other, and the fixing plates 18 are provided with fastening bolts 19 that cooperate with threads to penetrate them. The first collecting frame 3 and the second collecting frame 4 are placed close to the left and right sides of the heat pump body 1, and then the fastening bolts 19 are used to penetrate a group of fixing plates 18 to make the first collecting frame 3 and the second collecting frame 4 fit and connect, so that they are close to the outer wall of the heat pump body 1.
[0023] A collecting groove 12 is fixedly provided on the inner wall at the bottom end of the first collecting frame 3 and the second collecting frame 4. A treatment water tank 13 communicating with the collecting groove 12 is provided at the bottom end of each of the first collecting frame 3 and the second collecting frame 4. A drainage pipe 15 communicating with the collecting groove 12 is fixedly provided at the bottom end of the outer wall of the first collecting frame 3 and the second collecting frame 4. The drainage pipe 15 is communicated with the top of the treatment water tank 13. The melted frost and the falling hot water enter the collecting groove 12 through the first collecting frame 3 and the second collecting frame 4. The drainage pipe 15 collects the frost and the falling hot water into the collecting groove 12. The hot water and defrosted water are discharged into the treatment water tank 13, in which a plurality of activated carbon adsorption plates 16 located at the bottom of the drain pipe 15 are arranged in sequence from top to bottom, and a connecting water valve 17 is connected at the bottom of the treatment water tank 13. The activated carbon adsorption plates 16 in the treatment water tank 13 remove impurities from the water entering the treatment water tank 13. After the treatment, an external water pipe is used to connect the connecting water valve 17 to the heating water pipe 9, and the reused water is heated by the heating pipe 20, and is continuously used for defrosting after heating.
[0024] When the utility model is implemented, the top cover 2 is first placed on the top surface of the heat pump body 1 so that the connecting rod 6 enters the connecting groove 5, and then the connecting screw 14 is used to fix the connecting groove 5 and the connecting rod 6, so as to fix the top cover 2; the first collection frame 3 and the second collection frame 4 are placed close to the left and right sides of the heat pump body 1, and then the fastening bolts 19 are used to penetrate a set of fixing plates 18 so that the first collection frame 3 and the second collection frame 4 are closely connected and close to the outer wall of the heat pump body 1;
[0025] After completing the installation operation of the device, connect the external hot water to the heating water pipe 9, and the sprayer 8 will evenly spray the hot water to the frost positions around the heat pump body 1 to melt the frost. The melted frost and the fallen hot water will enter the collection tank 12 through the first collection frame 3 and the second collection frame 4. The drain pipe 15 will discharge the hot water and melted frost water collected in the collection tank 12 into the treatment water tank 13. The activated carbon adsorption plate 16 in the treatment water tank 13 will remove impurities from the water entering the treatment water tank 13. After the treatment, the connecting water valve 17 is connected to the heating water pipe 9 using an external water pipe. The water pump 10 extracts the water in the treatment water tank 13 and heats the water through the heating pipe 20. After heating, it will continue to be used for defrosting until the defrosting is completed. The water is stored in the treatment tank and will be extracted and used by the water pump 10 when the next defrosting is needed.
[0026] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. An air energy heat pump structure for convenient defrosting and drainage, comprising a heat pump body (1), a top cover (2), a first collection frame (3) and a second collection frame (4), characterized in that: The top ends of the outer walls of the left and right sides of the heat pump body (1) are fixedly provided with connection grooves (5); the bottom end of the top cover (2) is provided with a connection rod (6) extending into the connection groove (5); the bottom surface of the top cover (2) is connected with an inclined pipe (7) arranged around the heat pump body (1); the inclined pipe (7) is evenly connected with a plurality of sprinklers (8) near the side wall of the heat pump body (1); a heating water pipe (9) is fixedly provided at the center of the top surface of the top cover (2); and a connecting rod (6) is provided on the top cover (2) to connect to the heating water pipe. (9) a water pump (10) connected to the heat pump body (1), the water pump (10) being provided with a plurality of water delivery hoses (11) connected to the inclined pipe (7), the first collection frame (3) and the second collection frame (4) being symmetrically arranged close to the outer walls of the heat pump body (1), the inner walls of the bottom ends of the first collection frame (3) and the second collection frame (4) being fixed with a collection trough (12), and the bottom ends of the first collection frame (3) and the second collection frame (4) being provided with a treated water tank (13) connected to the collection trough (12).
2. The air energy heat pump structure for convenient defrosting and drainage according to claim 1 is characterized in that: The connection groove (5) is provided with a connection screw rod (14) threadedly connected to the connection rod (6).
3. The air energy heat pump structure for convenient defrosting and drainage according to claim 1 is characterized in that: A drainage pipe (15) connected to the collection tank (12) is fixedly provided at the bottom end of the outer wall of the first collection frame (3) and the second collection frame (4), and the drainage pipe (15) is connected to the top end of the treatment water tank (13).
4. The air energy heat pump structure for convenient defrosting and drainage according to claim 3 is characterized in that: A plurality of activated carbon adsorption plates (16) located at the bottom of the drainage pipe (15) are arranged in sequence from top to bottom in the treatment water tank (13), and a connecting water valve (17) is arranged at the bottom of the treatment water tank (13).
5. The air energy heat pump structure for convenient defrosting and drainage according to claim 1 is characterized in that: The first collecting frame (3) and the second collecting frame (4) are both provided with a fixing plate (18) near one end wall, and the fixing plate (18) is provided with a fastening bolt (19) through which a matching thread is threaded.
6. The air energy heat pump structure for convenient defrosting and drainage according to claim 1, characterized in that: A plurality of heating pipes (20) are evenly arranged in the heating water pipe (9).