Air conditioner pre-trepanning aluminum alloy template assembly

By setting positioning blocks and slots on the pre-drilled aluminum alloy template assembly for air conditioning, and combining them with threaded holes and bolts for fixing, the problem of inaccurate positioning of PVC pipes was solved, achieving the effect of simplifying installation and improving construction efficiency.

CN223459129UActive Publication Date: 2025-10-21CHINA RAILWAY 11TH BUREAU GRP CORP LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422757604.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-13
Publication Date
2025-10-21
Estimated Expiration
2034-11-13

AI Technical Summary

Technical Problem

When using existing pre-drilled aluminum alloy formwork components for air conditioning, PVC pipes are located between the two side formworks. Using only rubber gaskets cannot guarantee that the poured material will not enter the pipes, affecting the construction effect. Furthermore, the two ends of the pipes need to be positioned by metal round pipes, which makes the processing steps cumbersome and affects the construction efficiency.

Method used

An air conditioning pre-drilled aluminum alloy template assembly was designed. It achieves rapid positioning by setting positioning blocks and positioning grooves on the template. The pipes pass through the inside of the template and are fixed by threaded holes and bolts, which simplifies the installation steps and prevents the poured material from entering the pipes.

Benefits of technology

It improves construction efficiency and stability, reduces processing steps, prevents poured materials from entering the pipes, ensures construction results, and allows for adjustment of excess pipes after demolding, thus increasing the tolerance for errors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223459129U_ABST
    Figure CN223459129U_ABST
Patent Text Reader

Abstract

The utility model discloses an air conditioner pre-trepanning aluminum alloy formwork assembly, and relates to the technical field of building, the air conditioner pre-trepanning aluminum alloy formwork assembly comprises a first formwork, the right side of the first formwork is fixedly provided with a positioning block, the right side of the first formwork is provided with a second formwork in an inserted connection mode, the left side of the first formwork is provided with a positioning groove, and the left side of the first formwork is provided with a third formwork in an inserted connection mode; a plurality of first threaded holes are formed in the outer side of the first template, a notch is formed in the inner side of the first template, a rubber pad is arranged on one side of the notch, and two fixing blocks are fixedly installed on the inner side of the first template. According to the air conditioner pre-trepanning aluminum alloy formwork assembly, through the arrangement of the notches, a pipeline can be rapidly positioned, manpower and resources needed for fixing through steel bars are saved, installation is easy, reutilization can be achieved, and through the arrangement of the bolts and the second threaded holes, after the pipeline is positioned, the pipeline can be conveniently fixed. And the pipeline can be further fixed by tightening the bolts, and the situation that construction is affected by displacement of the pipeline is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to building technology field, concretely is a kind of air conditioner pre-perforated aluminium alloy formwork assembly. BACKGROUND

[0002] With the development of science and technology, a large amount of concrete needs to be used in construction engineering, and the high stability, high precision, high efficiency and high recovery rate of the aluminum alloy formwork in the related construction engineering of concrete make it become one of the most commonly used formworks in concrete construction engineering, and with the improvement of people's living standard, the popularization of air conditioner, PVC pipeline used by air conditioner is often pre-buried in housing construction, the following is the assembly that reaches the purpose of PVC pipeline pre-buried by pre-perforating on aluminum alloy formwork.

[0003] Chinese utility model patent publication number: CN 211524083 U discloses: an air conditioner pre-perforated aluminium alloy formwork assembly, the air conditioner pre-perforated aluminium alloy formwork assembly can reliably position air conditioner pre-perforation, and can avoid problems such as slurry leakage, so that the air conditioner reserved hole is well formed, but the air conditioner pre-perforated aluminium alloy formwork assembly, when using, PVC pipeline is located between two side templates, only using rubber gasket cannot guarantee that pouring material will not enter the pipeline, which can easily affect construction effect, and the air conditioner pre-perforated aluminium alloy formwork assembly, when using, the two ends of the pipeline abut against the inner walls of the two side templates, and are positioned by metal round pipes, so that the PVC plate still needs to be measured and cut in advance, and the processing steps are more, which affects construction efficiency. UTILITY MODEL CONTENTS

[0004] The utility model aims at providing an air conditioner pre-perforated aluminium alloy formwork assembly, which can solve the problems in the above background technology that when using, PVC pipeline is located between two side templates, only using rubber gasket cannot guarantee that pouring material will not enter the pipeline, which can easily affect construction effect, and when using, the two ends of the pipeline abut against the inner walls of the two side templates, and are positioned by metal round pipes, so that the PVC plate still needs to be measured and cut in advance, and the processing steps are more, which affects construction efficiency.

[0005] To achieve the above object, the utility model provides the following technical scheme: an air conditioner pre-perforated aluminium alloy formwork assembly, which comprises a formwork one, a positioning block is fixedly installed on the right side of the formwork one, a formwork two is insertedly installed on the right side of the formwork one, a positioning groove is formed on the left side of the formwork one, a formwork three is insertedly installed on the left side of the formwork one, a plurality of screw holes one are arranged on the outer side of the formwork one, a slot is formed on the inner side of the formwork one, a rubber pad is arranged on one side of the slot, two fixed blocks are fixedly installed on the inner side of the formwork one, a screw hole two is formed on the outer side of the fixed block, a bolt is screw-connected in the screw hole two, and a pipeline is insertedly installed in the inner side of the slot.

[0006] Preferably, the right side of the template one, the template two and the template three is provided with a positioning block, the left side of the template one, the template two and the template three is provided with a positioning slot, the positioning block and the positioning slot are insertedly installed, and the template three is in L-shaped structure.

[0007] Preferably, a plurality of the threaded holes one are arranged, and the plurality of threaded holes one are equidistantly distributed on the connecting side of the template one, the template two and the template three.

[0008] Preferably, the notch is in circular structure, and the inner side of the notch is tightly attached to the outer side of the pipeline.

[0009] Preferably, the template one is provided with two same templates, the two templates are opposite to each other, the pipeline penetrates one template one and extends to the inner side of the other template one, and the inner side of the rubber pad is tightly attached to the outer side of the pipeline.

[0010] Preferably, the pipeline is a PVC pipeline, and the length of the pipeline is greater than the distance between the two template ones.

[0011] Preferably, the fixing block, the threaded hole two and the bolt are provided with two same groups, the two groups of the fixing block, the threaded hole two and the bolt are located on the left and right sides of the pipeline, and the length of the bolt is greater than the distance between the fixing block and the pipeline.

[0012] Compared with the prior art, the utility model has the advantages that:

[0013] The pipeline penetrates the two template ones, and the two ends of the pipeline are located on the inner side of the template one, so that the pipeline opening at the two ends does not enter the pouring object, the pouring object is prevented from entering the pipeline to affect the construction effect, the pipeline is quickly positioned through the notch, the pipeline is only inserted into the notch and penetrates the two template ones during operation, the processing step of measuring the pipeline in advance is saved, the operation steps are few, the installation is simple, the processing efficiency is improved, the pipeline is positioned through the bolt inserted into the threaded hole two and fastened, the pipeline is prevented from being displaced during construction to affect the construction effect, the excess pipeline extending out can be cut flat after the formwork is removed, the construction effect can be adjusted, and the fault tolerance is improved. BRIEF DESCRIPTION OF DRAWINGS

[0014] Figure 1 It is a three-dimensional structure schematic view of the utility model;

[0015] Figure 2 It is a three-dimensional structure schematic view of the template one of the utility model;

[0016] Figure 3 It is a schematic view of the installation structure of the template one and the pipeline of the utility model;

[0017] Figure 4 It is the template one and pipeline split structure schematic view of the utility model;

[0018] Figure 5 It is the template two three-dimensional structure schematic view of the utility model;

[0019] Figure 6 It is the template three three-dimensional structure schematic view of the utility model.

[0020] Among them: 1, template one;2, positioning block;3, template two;4, positioning groove;5, template three;6, threaded hole one;7, slot;8, rubber pad;9, fixed block;10, threaded hole two;11, bolt;12, pipeline. Specific implementation

[0021] The technical scheme in the embodiments of the utility model will be described clearly and completely below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.

[0022] Embodiment 1

[0023] Please refer to Figures 1-6 , the drawing shows a kind of air conditioning pre-punching aluminum alloy template assembly, including template one 1, positioning block 2 is fixedly installed on the right side of template one 1, template two 3 is insertedly installed on the right side of template one 1, positioning groove 4 is set on the left side of template one 1, template three 5 is insertedly installed on the left side of template one 1, a plurality of threaded hole one 6 are arranged on the outside of template one 1, slot 7 is set on the inside of template one 1, rubber pad 8 is arranged on the side of slot 7, two fixed blocks 9 are fixedly installed on the inside of template one 1, threaded hole two 10 is set on the outside of fixed block 9, bolt 11 is threadedly connected in the inside of threaded hole two 10, pipeline 12 is insertedly installed in the inside of slot 7.

[0024] Please refer to Figures 1-6 , the right side of template one 1, template two 3, template three 5 is provided with positioning block 2, the left side of template one 1, template two 3, template three 5 is provided with positioning groove 4, positioning block 2 and positioning groove 4 are insertedly installed, template three 5 is "L" letter type structure.

[0025] In this embodiment: through the positioning block 2 and the positioning groove 4, when the template one 1, the template two 3 and the template three 5 are installed, the positioning block 2 of the connecting side is inserted into the positioning groove 4, so that the template two 3 is inserted into the template one 1, and the template one 1 is inserted into the template three 5, thereby quickly positioning the template one 1, the template two 3 and the template three 5, facilitating subsequent installation, avoiding displacement between the templates during installation, affecting construction efficiency, and improving practicality.

[0026] Working principle: first, place two template one 1 at the specified position, insert the corresponding template two 3 into the template one 1, and insert the corresponding template one 1 into the template three 5, thereby quickly positioning multiple template one 1, template two 3 and template three 5, after quickly positioning the template one 1, template two 3 and template three 5, so that multiple threaded holes one 6 on the same connecting side overlap, through the fixing screw, the template one 1, template two 3 and template three 5 can be further fixed, after the pipeline 12 is inserted into the template one 1 through the slot 7 and extends to the inside of another template one 1, the bolt 11 is rotated until it cannot be tightened any further, the bottom of the bolt 11 abuts against the pipeline 12, thereby fixing the pipeline 12, after pouring and demolding are completed, the pipeline 12 extending out can be cut flat.

[0027] Embodiment 2

[0028] Please refer to Figures 1-6 , the embodiment further illustrates embodiment 1, and multiple threaded holes one 6 are arranged on the connecting side of the template one 1, the template two 3 and the template three 5.

[0029] In this embodiment: through the multiple threaded holes one 6, after the template one 1, the template two 3 and the template three 5 are quickly positioned, multiple threaded holes one 6 on the same connecting side overlap, and through the fixing screw, the template one 1, the template two 3 and the template three 5 can be further fixed, avoiding loosening and collapse of the template during construction, and improving the overall stability.

[0030] Please refer to Figure 4 , the slot 7 is a "round" structure, and the inside of the slot 7 closely fits the outside of the pipeline 12.

[0031] In this embodiment: through the slot 7, the pipeline 12 can be inserted into the inside of the slot 7, thereby quickly positioning the pipeline 12, facilitating quick installation, reducing the workload of using steel support fixing, reducing cost, making the height uniform, improving the embedding precision, and being reusable, thereby improving practicality.

[0032] Please refer to Figures 1-4, the two templates 1 are opposite to each other, the pipeline 12 penetrates one template 1 and extends to the inner side of the other template 1, and the inner side of the rubber pad 8 is tightly attached to the outer side of the pipeline 12.

[0033] In the embodiment, the pipeline 12 is inserted into the template 1 and extends to the inner side of the other template 1, and the two ends of the pipeline 12 are located on the inner side of the template 1, so that the pouring material cannot enter the pipeline 12 during pouring, thereby eliminating the step of sealing the pipeline 12, reducing the workload, cooperating with the rubber pad 8 on the outer side of the pipeline 12, preventing the pouring material from overflowing from the gap between the slot 7 and the pipeline 12, and improving the practicability.

[0034] Please refer to Figures 1-4 , the pipeline 12 is a PVC pipeline, and the length of the pipeline 12 is greater than the distance between the two templates 1.

[0035] In the embodiment, the PVC pipeline 12 is provided, and when the pipeline 12 is installed, the length of the pipeline 12 is greater than the distance between the two templates 1, so that the steps of measuring and cutting the pipeline 12 in advance can be omitted, and after the formwork is removed, the excess part of the pipeline 12 can be cut and adjusted according to the actual situation, so as to prevent pouring errors and affect the construction results, and improve the fault tolerance.

[0036] Please refer to Figures 1-4 , the two groups of fixing blocks 9, threaded holes 10 and bolts 11 are located on the left and right sides of the pipeline 12, and the length of the bolt 11 is greater than the distance between the fixing block 9 and the pipeline 12.

[0037] In the embodiment, the bolt 11 is provided, and after the pipeline 12 is inserted into the slot 7 for rapid positioning, the bolt 11 is inserted into the threaded hole 10, and the bolt 11 is rotated until it cannot be tightened any more, so that the bottom of the bolt 11 abuts against the pipeline 12, thereby further fixing the pipeline 12, preventing the pipeline 12 from being displaced during pouring, and the left and right two bolts 11 are further improved the stability of the pipeline 12.

[0038] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "include" or "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus comprising a series of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.

[0039] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An air conditioning pre-punched aluminium alloy formwork assembly comprising a formwork panel (1) characterised in that: The right side of the template one (1) is fixedly installed with a positioning block (2), the right side of the template one (1) is insertedly installed with a template two (3), the left side of the template one (1) is provided with a positioning groove (4), the left side of the template one (1) is insertedly installed with a template three (5), the outer side of the template one (1) is provided with a threaded hole one (6), the inner side of the template one (1) is provided with a notch (7), one side of the notch (7) is provided with a rubber pad (8), the inner side of the template one (1) is fixedly installed with two fixed blocks (9), the outer side of the fixed block (9) is provided with a threaded hole two (10), the inner side of the threaded hole two (10) is threadedly connected with a bolt (11), the inner side of the notch (7) is insertedly installed with a pipeline (12).

2. The air conditioning pre-punched aluminum alloy template assembly of claim 1, wherein: The right side of the template one (1), the template two (3) and the template three (5) is provided with a positioning block (2), the left side of the template one (1), the template two (3) and the template three (5) is provided with a positioning groove (4), the positioning block (2) and the positioning groove (4) are insertedly installed, the template three (5) is in "L" type structure.

3. The air conditioning pre-punched aluminum alloy template assembly of claim 1, wherein: The threaded hole one (6) is provided with a plurality of threaded hole ones (6), a plurality of threaded hole ones (6) are equidistantly distributed on the connecting side of the template one (1), the template two (3) and the template three (5).

4. The air conditioning pre-punched aluminum alloy template assembly of claim 1, wherein: The notch (7) is in "circle" type structure, the inner side of the notch (7) is closely combined with the outer side of the pipeline (12).

5. The air conditioning pre-punched aluminum alloy template assembly of claim 1, wherein: The template one (1) is provided with two same templates, two template ones (1) are opposite to each other, the pipeline (12) penetrates one template one (1) and extends to the inner side of the other template one (1), the inner side of the rubber pad (8) is closely combined with the outer side of the pipeline (12).

6. The air conditioning pre-punched aluminum alloy template assembly of claim 1, wherein: The pipeline (12) is a PVC pipeline, the length of the pipeline (12) is greater than the distance between the two template ones (1).

7. The air conditioning pre-punched aluminum alloy template assembly of claim 1, wherein: The fixed block (9), the threaded hole two (10) and the bolt (11) are provided with two groups, two groups of fixed blocks (9), threaded hole two (10) and bolts (11) are located on the left and right sides of the pipeline (12), the length of the bolt (11) is greater than the distance between the fixed block (9) and the pipeline (12).

Citation Information

Patent Citations

  • Pre-perforated aluminum alloy template assembly of air conditioner

    CN211524083U