Central heating and ventilation pipeline mounting and laying device

The plug-in structure of multiple bases and HVAC pipe support clamps solves the problems of inconvenience and misalignment during HVAC pipe laying, and enables the rapid and aesthetically pleasing fixing of multiple pipes.

CN224121308UActive Publication Date: 2026-04-14ZHONGHUI ELECTROMECHANICAL TECH
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-18
Publication Date
2026-04-14

AI Technical Summary

Technical Problem

In existing technologies, fixing each HVAC pipe individually during installation is labor-intensive, prone to displacement, and unsightly.

Method used

Multiple bases and HVAC pipe support clamps with adjacent plug-in connections, combined with binding straps and plug-in structures, enable the rapid assembly and fixing of multiple pipes. The support spacing and length can be adjusted by using serrated and barbed meshing, T-blocks and grooves.

Benefits of technology

It enables the regular parallel laying of multiple pipes, which are firmly fixed and not easily shifted, resulting in a good aesthetic effect and reducing the amount of labor required.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224121308U_ABST
    Figure CN224121308U_ABST
Patent Text Reader

Abstract

The utility model provides a central heating and ventilation pipeline installing and laying device which comprises a plurality of bases I and bases II which are adjacently connected in an inserted mode, heating and ventilation pipe supporting clamps and binding belts. A socket is fixedly mounted on one side of the base I, a slot is formed in the middle of the socket, and sawteeth are arranged on the inner wall of the slot; an inserting column is installed on one side of the base II, barbs are arranged on the outer wall of the inserting column, the inserting column is detachably inserted into the inserting groove, and the barbs are meshed with the sawteeth when inserted; the heating and ventilation pipe supporting clamps are installed in the multiple bases I and the multiple bases II in a sliding mode, and the fixing buckles are installed at the two ends of the tops of the outer sides of the heating and ventilation pipe supporting clamps. The binding belt is detachably arranged above the heating and ventilation pipe supporting clamp, the two ends of the binding belt are connected with the buckles through rotating shafts, and the buckles and the fixing buckles are detachably buckled. According to the pipeline fixing structure, multiple pipelines which are laid in parallel are fixed at the same time, the multiple pipelines are fixed through the fixing structure, the pipelines can be arranged regularly, deviation is not prone to occurring, and the attractive effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of HVAC duct installation technology, specifically to a centralized heating HVAC duct installation and laying device. Background Technology

[0002] Heating is a basic necessity for residents and a social service that addresses their fundamental need for warmth during winter. When laying HVAC pipes for residential heating, each pipe is typically fixed to the ground or wall using a mounting structure. However, in reality, several pipes are often laid side-by-side, and fixing each pipe individually to the ground or wall reveals several drawbacks: firstly, each pipe requires drilling and bolting, resulting in a large workload; secondly, it can easily lead to misalignment and is unsightly. Therefore, we propose a centralized heating HVAC pipe installation and laying device. Utility Model Content

[0003] In view of the problems in the prior art, this utility model proposes a centralized heating and ventilation pipe installation and laying device.

[0004] To achieve the above objectives, this utility model provides the following technical solution:

[0005] A centralized heating and ventilation (HVAC) pipe installation and laying device includes multiple adjacently inserted bases I and II, as well as HVAC pipe support clamps and binding straps. A socket is fixedly installed on one side of each base I, with a slot in the middle of the socket and serrations on the inner wall of the slot. A post is installed on one side of each base II, with barbs on the outer wall of the post. The post can be detachably inserted into the slot, with the barbs and serrations engaging during insertion. The HVAC pipe support clamp is slidably installed within the multiple bases I and II, with fixing buckles installed at both ends of the top outer side of the HVAC pipe support clamp. The binding straps are detachably positioned above the HVAC pipe support clamps, with both ends connected to buckles via pivots. The buckles and fixing buckles are detachably fastened together.

[0006] Furthermore, a mounting plate is provided on the outer side of base I and base II, and multiple threaded holes are provided on the mounting plate; T-shaped grooves are provided on both sides of the inner wall of base I and base II, and a limiting groove is provided on the top of the inner wall of base I and base II; a limiting plate is provided at the bottom of the HVAC pipe support clamp, and T-shaped blocks are installed on both sides of the HVAC pipe support clamp; the T-shaped blocks are slidably installed in the T-shaped groove, and the limiting plate is limited in the limiting groove.

[0007] Furthermore, the binding strap has a folded section at its center, and the folded section has an adjustment buckle around its periphery, which adjusts the length of the folded section.

[0008] Furthermore, one end of the buckle is threaded, and the other end of the buckle is fitted with a threaded sleeve corresponding to the threaded position.

[0009] Furthermore, two threaded holes are provided on the front of the plug, and a threaded hole is provided on the socket at the same position as the threaded holes; threaded pins are inserted into the threaded holes to connect the plug and the socket into one piece.

[0010] Compared with existing technologies, the advantages of this utility model are: this novel HVAC pipe support clamp can be arranged in a single straight line for single-pipe installation, or multiple clamps can be quickly plugged in and assembled into multiple sets of parallel pipes for laying. This allows for the simultaneous fixing of multiple parallel pipes, and the fixing structure ensures a regular pipe arrangement, preventing displacement and creating an aesthetically pleasing appearance. The HVAC pipe support clamp is slidably mounted on the base, and the support spacing can be adjusted according to the load. Attached Figure Description

[0011] The present invention will be further described below with reference to the accompanying drawings.

[0012] Figure 1 This is a schematic diagram of the overall structure of this utility model;

[0013] Figure 2 This is a schematic diagram of the installation structure of the HVAC pipe support clamp of this utility model;

[0014] Figure 3 This is a schematic diagram of the connection structure between the plug and the socket of this utility model;

[0015] Figure 4 This is a schematic diagram of the socket structure of this utility model;

[0016] Figure 5 This is a partial structural diagram of the insert post of this utility model;

[0017] Figure 6 This is a schematic diagram of the binding strap structure of this utility model;

[0018] Figure 7 This is a schematic diagram of the base I structure of this utility model;

[0019] Figure 8 This is a schematic diagram showing multiple bases connected in a row during a specific implementation of this utility model.

[0020] The diagram shows the following: 1. Base I; 2. Base II; 3. HVAC pipe support clamp; 4. Binding strap; 11. Socket; 110. Slot; 111. Serrated edge; 21. Insert post; 211. Barb; 31. Limiting plate; 32. T-block; 33. Fixing buckle; 4. Binding strap; 41. Buckle; 42. Adjusting buckle; 411. Thread; 412. Threaded sleeve. Detailed Implementation

[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0022] Example 1

[0023] like Figure 1-8 As shown, this embodiment provides a centralized heating and ventilation pipe installation and laying device, including multiple adjacently inserted bases I 1 and II 2, as well as heating and ventilation pipe support clamps 3 and binding straps 4.

[0024] Base I 1 and base II 2 have the same structure. Both base I 1 and base II 2 have a mounting plate 101 on their outer side. The mounting plate 101 has multiple threaded holes 102. The only difference is that when multiple bases I 1 and base II 2 are connected, the mounting plates 101 of the outermost bases I 1 and base II 2 are located on different left and right sides. The threaded holes 102 are used for installation and fixation to external walls or ground foundations.

[0025] Both sides of the inner walls of base I1 and base II2 are provided with T-shaped grooves 103, and the top of the inner walls of base I1 and base II2 are provided with limiting grooves 104. The bottom of the HVAC pipe support clamp 3 is provided with a limiting plate 31, and T-shaped blocks 32 are installed on both sides of the HVAC pipe support clamp 3. The T-shaped blocks 32 are slidably installed in the T-shaped grooves 103, and the limiting plate 31 is limited in the limiting grooves 104. By the sliding cooperation of the T-shaped blocks 32 and the T-shaped grooves 103, and the limiting of the limiting grooves 104 and the limiting plate 31, the arrangement spacing of the HVAC pipe support clamp 3 can be adjusted to meet the load requirements of different positions.

[0026] A socket 11 is fixedly installed on one side of base I 1, and a slot 110 is opened in the middle of the socket 11. The inner wall of the slot 110 is provided with serrations 111. A plug 21 is installed on one side of base II 2. The outer wall of the plug 21 is provided with barbs 211. The plug 21 can be detachably inserted into the slot 110. The barbs 211 and the serrations 111 engage when inserted. The HVAC pipe support clamp 3 is slidably installed in the plurality of bases I 1 and base II 2. The outer top ends of the HVAC pipe support clamp 3 are equipped with fixing buckles 33. The binding strap 4 is detachably set above the HVAC pipe support clamp 3. The two ends of the binding strap 4 are connected to buckles 41 through a pivot. The buckles 41 and the fixing buckles 33 are detachably fastened together.

[0027] During installation, when multiple pipes need to be laid in parallel, the inserts 21 of adjacent base II 2 are inserted into the slots 110 of the sockets 11 of base I1; the serrations 111 and barbs 211 engage when inserted; the pipes are placed in the arc-shaped support area of ​​the corresponding HVAC pipe support clamp 3, and connected by the buckles 41 and fixing buckles 33 of the binding strap 4, and the length of the binding strap 4 is adjusted for binding and fixing. This allows for the parallel laying of multiple sets of pipes in any combination.

[0028] Example 2

[0029] This embodiment provides a centralized heating and ventilation pipe installation and laying device, whose structure is basically the same as that of Embodiment 1. The difference is that, based on Embodiment 1, this embodiment further discloses that the binding strap 4 has a folded section at its center, and the folded section is surrounded by an adjusting buckle 42. The adjusting buckle 42 adjusts the length of the folded section. The adjusting buckle 42 can realize the quick adjustment of the length of the binding strap 4, which facilitates the binding and fixing of the pipe.

[0030] Example 3

[0031] This embodiment provides a centralized heating and ventilation pipe installation and laying device, whose structure is basically the same as that of Embodiment 1. The difference is that, based on Embodiment 1, this embodiment further discloses that one end of the buckle 41 has a thread 411 on its outer periphery, and the other end of the buckle 41 is fitted with a threaded sleeve 412 corresponding to the thread 411. The buckle 41 is opened and closed by rotating the threaded sleeve 412 and the corresponding thread 411, thereby detachably engaging with the fixing buckle 33.

[0032] Example 4

[0033] This embodiment provides a centralized heating and ventilation pipe installation and laying device, whose structure is basically the same as that of Embodiment 1. The difference is that, based on Embodiment 1, this embodiment further discloses that the insert 21 has two threaded holes 212 on its front side, and the socket 11 has a threaded hole 3 at the position corresponding to the threaded holes 212. Threaded nails 213 are inserted into the threaded holes 212 and 3 to connect the insert 21 and the socket 11 into one unit. After the insert 21 is inserted into the slot 110 of the socket 11, it is further fixed longitudinally by the threaded nails 213 to prevent loosening.

[0034] The above description is merely an illustrative example of the structure of this utility model. Those skilled in the art can make various modifications or additions to the specific embodiments described, or use similar methods to replace them, as long as they do not deviate from the structure of this utility model or exceed the scope defined in the claims, all of which should fall within the protection scope of this utility model.

Claims

1. A centralized heating and ventilation pipe installation and laying device, comprising multiple adjacently inserted bases I (1) and II (2), and heating and ventilation pipe support clamps (3) and binding straps (4); characterized in that, A socket (11) is fixedly installed on one side of the base I (1), and a slot (110) is opened in the middle of the socket (11). The inner wall of the slot (110) is provided with serrations (111). A plug (21) is installed on one side of the base II (2). The outer wall of the plug (21) is provided with barbs (211). The plug (21) can be detachably inserted into the slot (110). The barbs (211) and the serrations (111) mesh when inserted. The HVAC pipe support clamp (3) is slidably installed in the multiple bases I (1) and base II (2). The outer top ends of the HVAC pipe support clamp (3) are equipped with fixing buckles (33). The binding strap (4) is detachably set above the HVAC pipe support clamp (3). The two ends of the binding strap (4) are connected to buckles (41) through a pivot. The buckles (41) and the fixing buckles (33) can be detachably fastened.

2. The centralized heating and ventilation pipe installation and laying device according to claim 1, characterized in that, A mounting plate (101) is provided on the outer side of the base I (1) and the base II (2), and a plurality of threaded holes (102) are provided on the mounting plate (101); T-shaped grooves (103) are provided on both sides of the inner wall of the base I (1) and the base II (2), and a limiting groove (104) is provided on the top of the inner wall of the base I (1) and the base II (2); a limiting plate (31) is provided at the bottom of the HVAC pipe support clamp (3), and T-shaped blocks (32) are installed on both sides of the HVAC pipe support clamp (3); the T-shaped blocks (32) are slidably installed in the T-shaped groove (103), and the limiting plate (31) is limited in the limiting groove (104).

3. The centralized heating and ventilation pipe installation and laying device according to claim 1, characterized in that, The binding strap (4) has a folded section at its center, and an adjustment buckle (42) is provided around the folded section. The adjustment buckle (42) adjusts the length of the folded section.

4. The centralized heating and ventilation pipe installation and laying device according to claim 1, characterized in that, One end of the buckle (41) is provided with a thread (411), and the other end of the buckle (41) is fitted with a threaded sleeve (412) corresponding to the position of the thread (411).

5. A centralized heating and ventilation pipe installation and laying device according to claim 1, characterized in that, Two threaded holes (212) are opened on the front of the plug (21), and a threaded hole (3) is opened on the socket (11) at the position corresponding to the threaded holes (212); threaded nails (213) are inserted into the threaded holes (212) and the threaded holes (3) to connect the plug (21) and the socket (11) into one piece.