A foundation pit drainage device for building construction projects

By using the sliding pipe and cantilever structure of the foundation pit drainage device, the problem of silt clogging the water suction head was solved, enabling layer-by-layer water pumping from the foundation pit and improving pumping efficiency and construction efficiency.

CN224281336UActive Publication Date: 2026-05-26CHONGQING KANGSHIDE CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHONGQING KANGSHIDE CONSTR ENG CO LTD
Filing Date
2025-06-09
Publication Date
2026-05-26

AI Technical Summary

Technical Problem

In existing technologies, silt easily clogs the suction head during the dewatering process of the foundation pit, resulting in low dewatering efficiency and affecting construction progress and costs.

Method used

A foundation pit drainage device was designed. Through the sliding pipe and cantilever structure, the water suction head can gradually penetrate into the foundation pit. The position of the water suction head is fixed by the connecting rope and the limiting rod to avoid silt blockage and realize the pumping of water layer by layer.

Benefits of technology

This improves pumping efficiency, prevents clogging of the suction head, and ensures construction progress and cost control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224281336U_ABST
    Figure CN224281336U_ABST
Patent Text Reader

Abstract

This utility model relates to the technical field of foundation pit drainage devices, specifically a foundation pit drainage device for building construction projects. It solves the problems mentioned in the background section. The device includes a base plate, a sliding pipe above the base plate, a cantilever rod slidably connected to the sliding pipe, multiple connecting plates connecting the sliding pipe and the base plate, a water pump installed on the top of the base plate, a connecting pipe installed at the pump's suction end, and a suction head installed at one end of the connecting pipe. By pushing the cantilever rod on the sliding pipe, the suction head enters the middle of the foundation pit. An insert plate then enters the slot of the cantilever rod to limit and fix its position. A limiting rod is inserted into a retractor tube to limit the suction head via a connecting rope connected to a winding rod. This allows the suction head to gradually enter different depths in the foundation pit, gradually extracting water. Compared to traditional methods where the suction head is placed directly at the bottom of the foundation pit, this device solves the problem of silt clogging the suction head, thus improving work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of foundation pit drainage devices, specifically a foundation pit drainage device for building construction projects. Background Technology

[0002] In the construction process of building projects, foundation pit excavation is a fundamental and crucial task. As the working space for foundation construction, the quality and construction conditions of the foundation pit have a significant impact on the stability and safety of the entire building project.

[0003] During the foundation pit construction phase, water often accumulates in the pit due to various factors such as groundwater and rainwater. To ensure the smooth progress of subsequent foundation construction and prevent the accumulated water from soaking and softening the foundation soil, thus affecting the bearing capacity, it is necessary to pump out the water from the pit in a timely manner. Currently, the commonly used method is to use a water pump in conjunction with a suction head, placing the suction head at the bottom of the pit to perform the pumping operation.

[0004] However, the actual environment of an excavation pit is quite complex, and in many cases, silt will be present at the bottom. During the pumping process, the silt will be drawn into the suction head along with the water flow, easily causing blockage. Once the suction head is blocked, the pumping efficiency will be greatly reduced, or it may even fail to work properly, resulting in the inability to effectively remove the water accumulated in the excavation pit. This will delay the construction progress and increase construction costs. Utility Model Content

[0005] (a) Technical problems to be solved

[0006] In view of the shortcomings of the prior art, this utility model provides a foundation pit drainage device for building construction projects, which solves the problems mentioned in the background art.

[0007] (II) Technical Solution

[0008] To achieve the above objectives, this utility model provides the following technical solution: a foundation pit drainage device for building construction projects, comprising a base plate, a sliding pipe arranged above the base plate, a cantilever rod slidably connected to the sliding pipe, multiple connecting plates connecting the sliding pipe and the base plate, a water pump installed on the top of the base plate, a connecting pipe installed at the pumping end of the water pump, a suction head installed at one end of the connecting pipe, a winding drum arranged on the top of the sliding pipe, a winding rod rotatably connected inside the winding drum, a connecting rope passing through the cantilever rod connecting the winding rod and the suction head, a turntable installed on one side of the winding rod, a rocking pipe fixedly connected to the side wall of the turntable and communicating with the other side, and a limiting rod for limiting the winding rod inserted into the rocking pipe.

[0009] Furthermore, the top of the lever is evenly distributed with several limiting grooves, and the top of the slide tube is plugged in with a plate that matches the limiting groove, which is used to prevent the lever from sliding in the slide tube.

[0010] Furthermore, multiple ground stakes are slidably connected to the base plate.

[0011] Furthermore, a handle is provided at one end of the pole.

[0012] (III) Beneficial Effects

[0013] Compared with the prior art, this utility model provides a foundation pit drainage device for building construction projects, which has the following beneficial effects:

[0014] This foundation pit drainage device for building construction projects uses a sliding pipe to push a cantilever rod, allowing the suction head to enter the middle of the foundation pit. A plate then inserts into the slot of the cantilever rod to limit and fix its position. A limiting rod is inserted into the crank pipe to limit the suction head via a connecting rope-connected winding rod. This allows the suction head to gradually enter different depths within the foundation pit, gradually extracting water. Compared to traditional suction heads placed directly at the bottom of the pit, this device solves the problem of silt clogging the suction head, thus improving work efficiency. Attached Figure Description

[0015] Figure 1 This is a three-dimensional structural diagram of the present invention;

[0016] Figure 2 This is a cross-sectional structural diagram of the present invention.

[0017] In the diagram: 1. Base plate; 2. Connecting plate; 3. Sliding tube; 4. Water pump; 5. Connecting pipe; 6. Suction head; 7. Cantilever rod; 8. Rewind drum; 9. Rewinding rod; 10. Connecting rope; 11. Turntable; 12. Shaker tube; 13. Limiting rod; 14. Limiting groove; 15. Insert plate; 16. Ground stake; 17. Handle. Detailed Implementation

[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0019] Please see Figure 1-2 The present invention discloses a foundation pit drainage device for building construction projects, comprising a base plate 1, with multiple evenly distributed insertion holes at the top edge of the base plate 1, and a ground nail 16 inserted into each insertion hole, thereby making the ground nail 16 slidably connected to the insertion hole. By using a tool to strike the ground nail 16, the ground nail 16 is inserted into the ground, thereby fixing the base plate 1 on the ground, so that the device is stable when in use.

[0020] A water pump 4 is installed on the top of the base plate 1. A connecting pipe 5 is installed on the water pump 4's suction end. A suction head 6 is installed on one end of the connecting pipe 5. The side wall of the suction head 6 is a filter screen to block foreign objects from entering the suction head 6, thereby preventing the water pump 4 from becoming clogged.

[0021] A sliding tube 3 is installed above the base plate 1. The sliding tube is horizontally positioned. Multiple connecting plates 2 connect the sliding tube 3 and the base plate 1, forming an installation space between the sliding tube 3 and the base. The water pump 4 is placed in the installation space.

[0022] The slide tube 3 has a lifting rod 7 inserted and can slide. One end of the lifting rod 7 is connected to a handle 17, and a rope hole is opened at the top near the other end. Several limiting grooves 14 are evenly distributed on the top of the lifting rod 7. The top of the slide tube 3 has an insertion hole, and an insertion plate 15 that matches the limiting groove 14 is inserted and connected to the insertion hole to prevent the lifting rod 7 from sliding on the slide tube 3, thereby adjusting the extension length of the lifting rod 7 on the slide tube 3.

[0023] A take-up drum 8 is fixedly connected to the top of the slide tube 3. A take-up rod 9 is rotatably connected inside the take-up drum 8. A connecting rope 10 is connected between the take-up rod 9 and the suction head 6 through a rope hole. A turntable 11 is installed on one side of the take-up rod 9. A rocker tube 12 connected to the other side of the turntable 11 is fixedly connected to the side wall edge of the turntable 11. A limit rod 13 is inserted into the rocker tube 12. When the suction head 6 reaches the suction position, the limit rod 13 is inserted into the rocker tube 12. The limit rod 13 blocks the top of the slide tube 3, so that the rotating rod is no longer rotated by the pull of the suction head 6.

[0024] In summary, when using the foundation pit drainage device for building construction projects, the device is moved to the edge of the foundation pit, and the ground nails 16 are driven into the ground using a tool to fix the device.

[0025] Pull out the limiting rod 13 from the rocker tube 12 and pull out the insert plate 15 from the slide tube 3. Hold the handle 17 and push the lifting rod 7 on the slide tube 3 so that the suction head 6 enters the middle of the pit. Then insert the insert plate 15 into the insertion hole of the slide tube 3 and insert the insert plate 15 into the limiting groove 14 to prevent the lifting rod 7 from sliding on the slide tube 3.

[0026] Under its own weight, the suction head 6 pulls the connecting rope 10, causing the winding rod 9 to release the connecting rope 10 and positioning the suction head 6 below the water in the pit, preventing the suction head 6 from entering the silt.

[0027] Then, a limiting rod 13 is inserted into the rocker tube 12. The limiting rod 13 is pulled by the connecting rope 10, and the end of the limiting rod 13 is placed on the top of the slide tube 3, thereby preventing the winding rod 9 from rotating and thus fixing the suction head 6.

[0028] Start water pump 4, suction head 6 draws water from the foundation pit, which enters water pump 4 through connecting pipe 5, and water pump 4 discharges water from the foundation pit.

[0029] Once the suction head 6 is exposed from the water in the pit, the limiting rod 13 is pulled out from the crank tube 12. The connecting rope 10 is pulled by the suction head 6, and the winding rod 9 releases the connecting rope 10, allowing the suction head 6 to enter a deeper position in the pit and be placed in the water. Then, the limiting rod 13 is inserted into the crank tube 12 to limit the suction head 6 again. By gradually releasing the suction head 6 downwards in the pit, the water in the pit is extracted layer by layer until the water in the pit is completely extracted.

[0030] After the water in the pit is pumped out, pull out the limiting rod 13 from the crank tube 12, hold the crank tube 12 and rotate it so that the winding rod 9 winds the connecting rope 10. The connecting rope 10 lifts the suction head 6 from the pit, making it easier to remove the suction head 6 from the pit.

[0031] Then remove ground nail 16 and store and move the device.

[0032] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A foundation pit drainage device for building construction projects, comprising a base plate (1), characterized in that: A sliding tube (3) is provided above the base plate (1), a lifting rod (7) is slidably connected to the sliding tube (3), and multiple connecting plates (2) are connected between the sliding tube (3) and the base plate (1). A water pump (4) is installed on the top of the base plate (1), a connecting pipe (5) is installed at the pumping end of the water pump (4), a suction head (6) is installed at one end of the connecting pipe (5), a winding drum (8) is provided on the top of the sliding tube (3), a winding rod (9) is rotatably connected inside the winding drum (8), a connecting rope (10) that passes through the lifting rod (7) is connected between the winding rod (9) and the suction head (6), a turntable (11) is installed on one side of the winding rod (9), a rocking tube (12) that communicates with the other side of the turntable (11) is fixedly connected to the side wall of the turntable (11), and a limiting rod (13) that limits the winding rod (9) is inserted into the rocking tube (12).

2. The foundation pit drainage device for building construction projects according to claim 1, characterized in that: The top of the lifting rod (7) is evenly distributed with several limiting grooves (14), and the top of the sliding tube (3) is connected to a plug plate (15) that matches the limiting grooves (14) to prevent the lifting rod (7) from sliding in the sliding tube (3).

3. A foundation pit drainage device for building construction projects according to claim 1, characterized in that: Multiple ground nails (16) are slidably connected to the base plate (1).

4. A foundation pit drainage device for building construction projects according to claim 1, characterized in that: A handle (17) is provided at one end of the lifting rod (7).