A prefabricated substation installation foundation structure

By combining precast concrete anchors and vulcanized rubber buffer seats, the construction complexity and seismic resistance of the precast module installation foundation in substations are solved, enabling rapid and stable installation in complex terrain and enhancing the seismic performance and connection stability of the equipment.

CN224955130UActive Publication Date: 2026-11-10TIANJIN ELECTRIC POWER DESIGN INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522477808.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-21
Publication Date
2026-11-10
Estimated Expiration
2035-11-21

AI Technical Summary

Technical Problem

The existing prefabricated module installation foundations for substations are complex to construct, have poor seismic resistance, and are not adaptable to complex terrain, posing safety hazards.

Method used

The system employs a combined structure of precast concrete anchors, anchor rods, vulcanized rubber buffer seats, and a top seat. It is fixed underground by anchor rods and combined with the vibration reduction design of the vulcanized rubber buffer seats to achieve modular installation and seismic performance.

Benefits of technology

The simplified construction process improved the installation adaptability in complex terrain, enhanced seismic resistance and connection stability, prevented the transmission of equipment vibration to the foundation, and ensured the stable operation of the substation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224955130U_ABST
    Figure CN224955130U_ABST
Patent Text Reader

Abstract

This utility model discloses a prefabricated substation cabin installation foundation structure, relating to the field of substation construction technology, including a prefabricated concrete anchor seat, anchor rod, vulcanized rubber buffer seat, and top seat. The anchor seat is fixed underground by the anchor rod and has a notch at its top; the buffer seat has a buffer column that mates with the notch; the top seat is connected to the buffer seat and anchor seat by bolts, and a steel support body is mounted on it. This utility model adopts a modular anchoring method, eliminating the need for overall land leveling and adapting to complex terrain; the vulcanized rubber buffer seat effectively reduces vibration, preventing equipment vibration from causing anchorage failure or affecting equipment operation; the steel support body can be cut and leveled on-site, facilitating construction; after installation, the prefabricated cabin forms a gap with the ground, also providing moisture protection.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to substation construction technical field, concretely is a substation prefabricated cabin installation foundation structure. BACKGROUND

[0002] With the increase of urban construction and suburban complex and poor environment infrastructure projects, the demand for substation construction is growing. At present, the substation more and more uses prefabricated modular cabin structure, and only needs to construct and install foundation to directly assemble prefabricated module. The existing installation foundation usually adopts the way of present foundation, and sets up a water retaining wall around the foundation, and the prefabricated module is planted in the hole on the foundation during installation.

[0003] However, the above installation foundation construction process is time-consuming and laborious, especially in complex terrain area. In addition, in order to ensure stability, the prefabricated module and the installation foundation are usually connected by anchor bolts, but the high frequency vibration in the operation of power equipment can easily cause the anchor bolts to loosen, which has safety hazards. Therefore, there is an urgent need for an installation foundation structure which is simple to construct, has strong adaptability and has anti-seismic performance. SUMMARY

[0004] The utility model aims at at least solves one of the prior art technical problems. For this purpose, one object of the utility model is to provide a substation prefabricated cabin installation foundation structure to solve the problems of complex construction, poor seismic performance, weak adaptability and the like in the prior art. Specifically, the utility model aims to improve the installation flexibility and seismic performance of the prefabricated cabin, simplify the construction process, and enhance the adaptability to complex terrain.

[0005] In order to solve the above problems, the utility model provides a substation prefabricated cabin installation foundation structure, which comprises a concrete prefabricated anchor base, an anchor rod, a vulcanized rubber buffer seat and a top seat. The lower end of the anchor base is coaxially fixed with a circular table, and a plurality of anchor holes are uniformly distributed on the circular table. An anchor rod is arranged in each anchor hole, and the anchor rod is used to anchor the anchor base to the ground. A large notch is arranged at the center of the top surface of the anchor base, and a small notch is arranged around the large notch. A disc is integrally formed on the top of the vulcanized rubber buffer seat, a positioning buffer column is arranged at the center of the bottom surface of the disc, and a connecting buffer column is arranged around the positioning buffer column. The positioning buffer column is embedded in the large notch, and the connecting buffer column is embedded in the small notch. The top seat comprises a connecting disc, a through hole corresponding to the number of connecting buffer columns is arranged on the connecting disc, and a bolt is screwed with a connecting sleeve fixedly inserted at the bottom of the small notch through the through hole and the center hole on the connecting buffer column, so that the top seat, the vulcanized rubber buffer seat and the anchor base are connected as a whole. Preferably, the anchor hole is a stepped hole, and an anchor sleeve is embedded in the stepped hole. The top of the anchor sleeve is provided with a limiting platform, which is embedded in the large diameter part of the stepped hole; the top of the anchor rod is inserted into the inner hole of the anchor sleeve.

[0006] Preferably, the periphery of the anchor sleeve has several through holes, and the top periphery of the anchor rod has several grooves.

[0007] Preferably, the top of the anchor rod is provided with a connection hole, and the flange bolt is screwed into the connection hole, with the flange face of the flange bolt pressing against the top of the anchor sleeve.

[0008] Preferably, the steel support is welded to the connecting plate, and the steel support is made of I-beams, channel steel, or square steel.

[0009] Preferably, there is a buffer gap between the disc and the top surface of the anchor.

[0010] Preferably, the connecting sleeve has an internal threaded hole, and the bolt is screwed into the internal threaded hole.

[0011] Preferably, the prefabricated substation installation base structure also includes a surrounding panel, which is installed around the bottom perimeter of the prefabricated substation to enclose the installation base structure.

[0012] The advantages of this utility model compared with the prior art are as follows: 1. Simple construction and strong adaptability: The anchor seat is fixed underground by anchor bolts, without the need for overall ground leveling. Multiple points can be selected for installation in complex terrain with uneven surfaces, making it highly adaptable and easy to construct.

[0013] 2. Waterproof and moisture-proof: After installation, the prefabricated cabin forms a gap with the ground, avoiding groundwater erosion and eliminating the need to install a waterproof wall.

[0014] 3. Seismic buffering: The vulcanized rubber buffer seat effectively reduces vibration, preventing the transmission of ground vibration or high-frequency vibration of equipment, and improving the operational stability of the substation.

[0015] 4. Secure connection: The anchor rod and anchor hole are connected by anchor sleeve and anchor adhesive, providing dual protection of mechanical and chemical anchoring and enhancing connection strength. Attached Figure Description

[0016] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0017] Figure 1This is a diagram showing the usage state of the present invention installed under a prefabricated cabin (on a flat ground). Figure 2 This is a diagram showing the usage state of the present invention installed under a prefabricated cabin (uneven ground). Figure 3 This is a three-dimensional structural diagram of the present invention; Figure 4 This is a half-sectional view of the present invention; Figure 5 This is a three-dimensional exploded structure diagram of the present invention; In the diagram: 1. Anchor seat; 11. Frustum; 12. Anchor hole; 13. Large notch; 14. Small notch; 15. Connecting sleeve; 16. Anchoring sleeve; 161. Limiting platform; 162. Adhesive hole; 2. Anchor rod; 21. Groove; 22. Connecting hole; 23. Flange bolt; 3. Buffer seat; 31. Disc; 32. Positioning buffer post; 33. Connecting buffer post; 331. Central perforation; 4. Top seat; 41. Connecting disc; 42. Bolt; 43. Steel support body; 5. Prefabricated cabin; 51. Steel frame; 6. Enclosure. Detailed Implementation

[0018] The embodiments of this application are described in detail below. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain this application, and should not be construed as limiting this application.

[0019] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0020] The present invention will now be described in further detail with reference to the accompanying drawings.

[0021] like Figures 1 to 5As shown, a prefabricated substation installation foundation structure includes a prefabricated concrete anchor seat 1, an anchor rod 2, a vulcanized rubber buffer seat 3, and a top seat 4. The anchor seat 1 is a square or cylindrical structure with a frustum 11 fixed at its lower end. Multiple anchor holes 12 are evenly distributed around the circumference of the frustum 11. The anchor holes 12 are stepped holes, with an anchoring sleeve 16 embedded inside. A limiting platform 161 is provided at the top of the anchoring sleeve 16, and the limiting platform 161 is embedded in the large-diameter portion of the stepped hole. The top of the anchor rod 2 is inserted into the inner hole of the anchoring sleeve 16, with the anchor rod 2 inserted to a depth of not less than 2 meters underground. Adhesive passage holes 162 are distributed on the periphery of the anchoring sleeve 16, and grooves 21 are distributed on the periphery of the top of the anchor rod 2. During construction, anchoring adhesive or rebar adhesive is injected, and the adhesive flows through the adhesive passage holes 162 and fills the grooves 21, enhancing the anchoring strength. The top of the anchor rod 2 is also provided with a connection hole 22, and the flange bolt 23 is screwed into the connection hole 22. Its flange face presses against the top of the anchor sleeve 16 for further tightening.

[0022] Anchor seat 1 has a large recess 13 at the center of its top surface, surrounded by a ring of smaller recesses 14. A connecting sleeve 15 is embedded in the bottom of each smaller recess 14, and the connecting sleeve 15 has an internal threaded hole. A positioning buffer post 32 is positioned at the center of the bottom surface of the disc 31 of buffer seat 3, surrounded by a ring of connecting buffer posts 33. The positioning buffer post 32 is embedded in the large recess 13, and the connecting buffer post 33 is embedded in the smaller recesses 14. A 2mm buffer gap is left between the disc 31 and the top surface of anchor seat 1. A steel support body 43 (such as an I-beam, channel steel, or square steel) is welded to the connecting disc 41 of top seat 4. The connecting disc 41 has a through hole, through which bolts 42 pass and through the central through hole 331 of the connecting buffer post 33, and are screwed into the internal threaded hole of the connecting sleeve 15, thus connecting top seat 4, buffer seat 3, and anchor seat 1 into a single unit.

[0023] During construction, holes are drilled at the installation points of the prefabricated cabin, and anchor bolts 2 are inserted to fix the anchor seats 1. Depending on the terrain, steel support bodies 43 of different lengths are selected, or a laser level is used to level the surface, and any excess material is cut off. The prefabricated cabin 5 is placed on the steel support body 43, and the bottom steel frame 51 of the prefabricated cabin 5 is welded and fixed to the steel support body 43. Finally, the surrounding panels 6 are installed around the bottom perimeter of the prefabricated cabin 5 to enclose the installation foundation structure.

[0024] This utility model is based on three major technical principles: modular anchoring, buffering and shock absorption, and adjustable support, to achieve rapid and stable installation of prefabricated substation modules in complex terrain. Specifically: I. Modular Anchoring and Installation Process 1. Site Preparation and Anchoring: First, drill holes at the planned installation locations according to the size and weight of the prefabricated pod. Place the prefabricated concrete anchor (1) above the hole, with its lower truncated cone (11) in contact with the ground. Then, pass the anchor rod (2) through the anchor hole (12) on the truncated cone (11) and hammer or press it into the ground to a predetermined depth (not less than 2 meters), thereby firmly anchoring the individual anchor (1) to the foundation. This process can be carried out independently at multiple locations without the need for large-scale land leveling, making it particularly suitable for complex terrain with uneven surfaces.

[0025] 2. Buffering and Connection: After the anchor (1) is fixed, align and embed the positioning buffer post (32) and connecting buffer post (33) of the vulcanized rubber buffer seat (3) into the large recess (13) and small recess (14) on the top surface of the anchor (1), respectively. Then, cover the connecting plate (41) of the top seat (4) onto the disc (31) of the buffer seat (3), so that the through hole on the connecting plate (41) is aligned with the central through hole (331) of the connecting buffer post (33) and the connecting sleeve (15) at the bottom of the small recess (14). Finally, pass the bolt (42) through the through hole and the central through hole (331), screw it into the internal thread hole of the connecting sleeve (15) and tighten it. At this point, the top seat (4), the buffer seat (3) and the anchor (1) are connected into an integral installation base unit with shock absorption function.

[0026] II. Working Principle of Shock Absorption and Buffering The electrical equipment in the substation will generate high-frequency vibrations during operation. The core vibration reduction mechanism of this utility model lies in the elastic deformation of the vulcanized rubber buffer seat (3): Vibration absorption: When vibration is transmitted from the prefabricated cabin (5) to the buffer seat (3) through the top seat (4), the positioning buffer column (32) and connecting buffer column (33) made of vulcanized rubber will undergo elastic deformation. This deformation can effectively absorb and dissipate most of the vibration energy.

[0027] Two-way vibration isolation: This design achieves two-way vibration isolation. On the one hand, it prevents equipment vibration from propagating to the ground through the installation foundation, avoiding the risk of anchor bolts (2) loosening due to long-term vibration (i.e., "anchoring" risk); on the other hand, it can also reduce the transmission of ground vibration (such as vibration caused by nearby vehicles passing by) to the precision electrical equipment in the cabin, ensuring the stable operation of the equipment.

[0028] Buffer gap: The small buffer gap designed between the disc (31) and the top surface of the anchor (1) ensures that the buffer seat has enough deformation space when under pressure, avoids rigid contact, and further optimizes the shock absorption effect.

[0029] III. Leveling and Final Installation 1. Leveling treatment: After all the installation base units are installed in place, a laser level is used for measurement. Taking the top surface of the lowest steel support (43) as the reference, for other steel supports (43) at higher positions, the excess part is cut off by cutting or gas welding to ensure that the top surfaces of all steel supports (43) are on the same horizontal plane.

[0030] 2. Cabin fixing: The prefabricated cabin (5) is hoisted onto the leveled steel support bodies (43). Since the bottom of the prefabricated cabin (5) is a metal steel frame (51), it can be directly welded and fixed to the top surface of each steel support body (43), and the connection is firm and reliable.

[0031] 3. Sealing and Moisture Prevention: Finally, a surrounding panel (6) is installed around the bottom of the prefabricated cabin (5). The surrounding panel (6) encloses the entire installation base structure, creating an airflow gap between the bottom of the prefabricated cabin (5) and the ground. This gap effectively isolates the ground water and moisture from erosion, providing waterproofing and moisture prevention, eliminating the need for building a retaining wall in traditional construction.

[0032] In summary, this utility model, through the above-described working principle and installation steps, achieves the comprehensive objectives of simplifying construction, enhancing adaptability, improving seismic resistance, and ensuring long-term stability.

[0033] The present invention and its embodiments have been described above. This description is not restrictive, and the accompanying drawings are only one embodiment of the present invention; the actual structure is not limited thereto. In conclusion, if those skilled in the art are inspired by this description and design similar structures and embodiments without departing from the inventive spirit of the present invention, such designs should fall within the protection scope of the present invention.

Claims

1. A prefabricated substation installation foundation structure, characterized in that: It includes a precast concrete anchor (1), an anchor (2), a vulcanized rubber buffer seat (3), and a top seat (4); The lower end of the anchor seat (1) is coaxially fixed with a frustum (11), and a plurality of anchor holes (12) are evenly distributed around the circumference of the frustum (11). Each anchor hole (12) is provided with an anchor rod (2), which is used to anchor the anchor seat (1) to the ground. The anchor (1) has a large notch (13) at the center of its top surface and a ring of small notches (14) around the large notch (13). The top of the vulcanized rubber buffer seat (3) has a disc (31) integrally formed, and a positioning buffer post (32) is provided at the center of the bottom surface of the disc (31). A ring of connecting buffer posts (33) is provided around the positioning buffer post (32). The positioning buffer post (32) is embedded in the large recess (13), and the connecting buffer post (33) is correspondingly embedded in the small recess (14). The top seat (4) includes a connecting plate (41), and the connecting plate (41) is provided with through holes corresponding to the number of connecting buffer columns (33). The bolt (42) passes through the through holes and the central through hole (331) on the connecting buffer column (33) and is threadedly connected to the connecting sleeve (15) fixedly inserted into the bottom of the small notch (14), so that the top seat (4), the vulcanized rubber buffer seat (3) and the anchor seat (1) are buffered and fixedly connected as a whole. A steel support body (43) is also fixed on the top seat (4), which is used to support the prefabricated cabin (5).

2. The substation prefabricated module installation foundation structure as described in claim 1, characterized in that: The anchor hole (12) is a stepped hole, and an anchor sleeve (16) is embedded in the stepped hole. A limiting platform (161) is provided at the top of the anchor sleeve (16), and the limiting platform (161) is embedded in the large diameter part of the stepped hole. The top of the anchor rod (2) is inserted into the inner hole of the anchor sleeve (16).

3. The substation prefabricated module installation foundation structure as described in claim 2, characterized in that: The anchor sleeve (16) has several glue holes (162) distributed on its peripheral wall, and the top peripheral wall of the anchor rod (2) has several grooves (21).

4. The substation prefabricated module installation foundation structure as described in claim 2 or 3, characterized in that: The top end of the anchor rod (2) is provided with a connecting hole (22), and the flange bolt (23) is screwed into the connecting hole (22). The flange face of the flange bolt (23) presses against the top end of the anchor sleeve (16).

5. The substation prefabricated module installation foundation structure as described in claim 1, characterized in that: The steel support body (43) is welded to the connecting plate (41), and the steel support body (43) is made of I-beams, channel steel or square steel.

6. The substation prefabricated module installation foundation structure as described in claim 1, characterized in that: There is a buffer gap between the disk (31) and the top surface of the anchor (1).

7. The substation prefabricated module installation foundation structure as described in claim 1, characterized in that: The connecting sleeve (15) has an internal threaded hole, and the bolt (42) is screwed into the internal threaded hole.

8. The substation prefabricated module installation foundation structure as described in claim 1, characterized in that: It also includes a enclosure panel (6) for installation around the bottom perimeter of the prefabricated cabin (5) to surround the mounting base structure.