A type of concrete turnout sleeper for passenger and freight railways

By setting pre-embedded components on concrete turnout sleepers, the installation process of T-bolts and elastic clips is simplified, the problem of cleaning pre-embedded sleeves is solved, construction efficiency and load-bearing capacity are improved, the risk of turnout sleeper collision damage is reduced, and the service life is extended.

CN224981981UActive Publication Date: 2026-11-17RAILWAY CONSTR RES INST OF CHINA ACAD OF RAILWAY SCI CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522359480.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-06
Publication Date
2026-11-17
Estimated Expiration
2035-11-06

AI Technical Summary

Technical Problem

In existing passenger and freight railway concrete turnout sleepers, the pre-embedded sleeves are difficult to clean, the pre-embedded iron bases are complicated to install, the construction efficiency is low, and they are prone to collisions and damage.

Method used

Two sets of pre-embedded components are set on the turnout sleeper body. Each set includes two pre-embedded seats facing each other. The pre-embedded seats include a connecting part and an installation part. The inner side of the installation part is provided with a bolt mounting groove, and the top surface is provided with a spring clip mounting groove. The track gauge baffle is eliminated and the installation process is simplified by positioning and installing the T-bolts and spring clips.

Benefits of technology

It completely solves the problem of debris falling in and being difficult to clean, significantly reduces the difficulty of construction and installation, improves efficiency, adapts to T-bolts of different thicknesses and fastener springs of different models, enhances load-bearing capacity, reduces the risk of bumps and damage to turnout sleepers, and extends service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224981981U_ABST
    Figure CN224981981U_ABST
Patent Text Reader

Abstract

This utility model discloses a concrete turnout sleeper for passenger and freight railways, relating to the field of rail transit. It includes a sleeper body with two sets of pre-embedded components. Each pre-embedded component includes two opposing pre-embedded seats. Each pre-embedded seat includes a connecting part for fixing to the inside of the sleeper body and a mounting part located above the connecting part. The inner surface of the mounting part has a bolt mounting groove, and the top surface of the mounting part has a spring clip mounting groove. This utility model provides a concrete turnout sleeper for passenger and freight railways to solve problems in the prior art such as the difficulty in cleaning pre-embedded sleeves on turnout sleepers, the complexity of pre-embedded seat installation, and low construction efficiency. It aims to eliminate the difficulty of cleaning pre-embedded sleeves, expand the functionality and ease of use of pre-embedded components, and reduce the risk of damage to the turnout sleeper.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of rail transit, specifically to a concrete turnout sleeper for a passenger and freight railway. Background Technology

[0002] Passenger-freight railway lines must meet the requirements of fast and comfortable passenger transport while also handling the heavy-load and high-capacity transport of freight trains. The significant differences in axle load, speed, and other parameters between different types of trains place higher demands on the load-bearing capacity and adaptability of the track structure, including the turnout sleepers. For example, the larger axle load of freight trains exerts greater pressure and impact on the turnout sleepers; passenger trains, on the other hand, require the turnout sleepers to provide stable support to ensure a comfortable ride.

[0003] Prestressed concrete turnout sleepers, through the rational design of the prestressing system and concrete structure, can better meet the complex load requirements of passenger and freight railways. In traditional track structures, concrete turnout sleepers are mostly connected to sleeper components via embedded sleeves. These embedded sleeves are prone to debris falling into them during track operation and are difficult to clean. Furthermore, the sleepers are susceptible to damage from falling pieces during transportation, on-site construction, and track operation. In addition, existing technologies have disclosed solutions that replace embedded sleeves with embedded iron bases. However, these existing technologies require the installation of special gauge plates on the embedded iron bases for the positioning and installation of fastener springs and T-bolts, resulting in a complex installation process and low construction efficiency. Utility Model Content

[0004] This utility model provides a concrete turnout sleeper for passenger and freight railways to solve the problems of difficult cleaning of pre-embedded sleeves on turnout sleepers, complex installation process of pre-embedded iron bases, and low construction efficiency in the prior art. It aims to eliminate the problem of cleaning pre-embedded sleeves, expand the functionality and ease of use of pre-embedded parts, and reduce the risk of damage to turnout sleepers.

[0005] This utility model is achieved through the following technical solution:

[0006] A concrete turnout sleeper for a passenger and freight railway line includes a sleeper body, on which two sets of pre-embedded components are provided, each pre-embedded component including two pre-embedded seats facing each other.

[0007] The pre-embedded seat includes a connecting part for fixing inside the turnout sleeper body and a mounting part located above the connecting part. The inner surface of the mounting part is provided with a bolt mounting groove, and the top surface of the mounting part is provided with a spring mounting groove.

[0008] To address the problems of difficult cleaning of pre-embedded sleeves on turnout sleepers and the complex installation process and low construction efficiency of pre-embedded iron seats in existing technologies, this utility model proposes a concrete turnout sleeper for passenger and freight railways. Two sets of pre-embedded components are installed on the sleeper body, each used to install a set of fasteners. Each set of pre-embedded components includes two opposing pre-embedded seats, with corresponding rails, fasteners, elastic clips, and pads installed between the two pre-embedded seats. The pre-embedded seat in this application includes a connecting part and an installation part. The connecting part is pre-embedded inside the turnout sleeper body, while the installation part is exposed on the turnout sleeper body for installing relevant track components. This application features a bolt mounting groove on the inner surface of the mounting section and a spring clip mounting groove on the top surface of the mounting section. In use, a T-bolt is inserted into the bolt mounting groove of the pre-embedded seat for positioning, and the outer side of the spring clip is secured in the spring clip mounting groove. This achieves the positioning and installation of the T-bolt and spring clip. Compared to existing technologies, this application eliminates the need for a gauge baffle to achieve the positioning and installation of the T-bolt and spring clip, significantly reducing the installation difficulty of rail transit, improving construction efficiency, and saving materials. Because this application completely abandons the traditional pre-embedded sleeve approach, it thoroughly solves the problem of debris falling in and being difficult to clean.

[0009] Those skilled in the art should understand that, in this application, the inner and outer sides of all components within the embedded base are defined as the direction of the center line connecting two embedded bases in the same group of embedded components, and vice versa.

[0010] Furthermore, the mounting part includes a base fixed to the top of the connecting part, two platforms located on the base, and the elastic mounting groove located on the top surface of the platform.

[0011] This solution uses two platforms to raise the spring clip mounting slot to a set height, which makes it easier to reserve space for the installation of components such as T-bolts. It also allows for a larger groove depth in the mounting slot, improving the installation stability of the fastener spring clip.

[0012] Furthermore, each platform is provided with a limiting plate extending toward the other platform on its top; the two limiting plates, the two platforms, and the base form the bolt mounting groove around each other.

[0013] In this design, two limiting plates face each other and extend towards each other, but a gap is always maintained between them to facilitate the passage of bolts and other components later. This design uses the two limiting plates to provide a limiting and anti-loosening function for the bolt mounting slot, ensuring that T-bolts can only be inserted from the side, facilitating quick installation.

[0014] Furthermore, the limiting plate is located on the inner side of the platform, and the elastic bar mounting groove is located on the outer side of the platform.

[0015] This design ensures that after the two embedded seats in the same group of embedded components are installed, their respective limiting plates are located inside the two embedded seats, facilitating the rapid installation of T-bolts. Furthermore, the elastic clip mounting groove is located outside the length direction of the turnout sleeper body relative to the limiting plate, which further facilitates the rapid positioning of the outer end of the elastic clip.

[0016] Furthermore, the thickness of the limiting plate gradually decreases from the end closest to the platform to the end furthest from the platform. The thickness of the limiting plate also gradually decreases from the end closest to the spring clip mounting groove to the end furthest from the spring clip mounting groove. This design facilitates the adaptation of T-bolts of different thicknesses, thus expanding the applicability of this application.

[0017] Furthermore, the spring clip mounting groove is arc-shaped, and both ends of the groove penetrate the platform. The arc-shaped groove wall facilitates adaptation to the shape of conventional fastener spring clips. In addition, the axis of the spring clip mounting groove is perpendicular to the length direction of the turnout sleeper body, so the two ends of the groove penetrate the platform, making it easy to adapt to more different types of fastener spring clips.

[0018] Furthermore, the mounting portion also includes two positioning plates fixed to the outer wall of the connecting portion. The two positioning plates are respectively positioned opposite the two platforms, and the bottom surface of the positioning plates is coplanar with the bottom surface of the base. This solution, through two laterally outward-extending positioning plates, facilitates the positioning of the embedded seat inside the mold, thereby ensuring that the mounting portion is exposed outside the concrete structure.

[0019] Furthermore, the turnout sleeper body contains 10 to 18 prestressed steel wires, the diameter of which is 5mm to 10mm. By applying prestress to the steel wires to meet the set requirements, the load-bearing capacity of the turnout sleeper body is enhanced, enabling it to simultaneously withstand high-speed heavy loads, as well as the loads generated when high-speed trains, passenger trains, and freight trains pass by.

[0020] Furthermore, along its length, the top and bottom sides of the turnout sleeper body are chamfered to reduce the risk of impact damage to the sleeper body during transportation, construction, and line operation, thereby improving its durability and extending its service life. The specific type of chamfer is not limited here.

[0021] Compared with the prior art, this utility model has at least the following advantages and beneficial effects:

[0022] 1. This utility model provides a concrete turnout sleeper for passenger and freight railway lines, which completely abandons the traditional approach of pre-embedded sleeves, thus thoroughly solving the problem of debris falling in and being difficult to clean.

[0023] 2. This utility model provides a concrete turnout sleeper for passenger and freight railways, which eliminates the need for gauge baffles to position and install T-bolts and elastic clips, significantly reducing construction and installation difficulty, improving construction efficiency, and saving materials.

[0024] 3. This utility model provides a concrete turnout sleeper for passenger and freight railway lines, which is suitable for T-bolts of different thicknesses and fasteners of different models, and has a wide range of applications.

[0025] 4. This utility model relates to a concrete turnout sleeper for passenger and freight railways. By applying prestress to the steel wires to meet the set requirements, the load-bearing capacity of the turnout sleeper body is enhanced, enabling it to simultaneously withstand high-speed heavy loads, as well as the loads generated when high-speed trains, passenger trains, and freight trains pass by.

[0026] 5. This utility model provides a concrete turnout sleeper for passenger and freight railways, which can reduce the risk of bumps and damage to the sleeper body during transportation, construction, and line operation, and improve its durability and extend its service life. Attached Figure Description

[0027] The accompanying drawings, which are included to provide a further understanding of the embodiments of the present invention and form part of this application, do not constitute a limitation thereof. In the drawings:

[0028] Figure 1 This is a schematic elevation view of a specific embodiment of the present utility model;

[0029] Figure 2 This is a schematic diagram of the end face of a specific embodiment of the present utility model;

[0030] Figure 3 This is a schematic diagram of the pre-embedded seat in a specific embodiment of this utility model;

[0031] Figure 4 This is a schematic diagram of the mounting part in a specific embodiment of the present utility model.

[0032] The attached diagram shows the markings and corresponding component names:

[0033] 1-Forklift sleeper body, 2-Embedded seat;

[0034] 21-Connecting part; 22-Mounting part; 23-Bolt mounting slot; 24-Spring mounting slot;

[0035] 221-Base, 222-Platform, 223-Limiting plate, 224-Positioning plate. Detailed Implementation

[0036] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the embodiments and accompanying drawings. The illustrative embodiments and descriptions of this utility model are only used to explain this utility model and are not intended to limit this utility model. In the description of this application, it should be understood that terms such as "front," "rear," "left," "right," "up," "down," "vertical," "horizontal," "high," "low," "inner," and "outer" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting the scope of protection of this application.

[0037] Example 1:

[0038] like Figures 1 to 4 The concrete turnout sleeper shown is a type of passenger and freight railway turnout sleeper, including a turnout sleeper body 1, on which two sets of pre-embedded components are provided, and the pre-embedded components include two pre-embedded seats 2 facing each other.

[0039] The pre-embedded seat 2 includes a connecting part 21 for fixing inside the turnout sleeper body 1 and an mounting part 22 located above the connecting part 21. The inner surface of the mounting part 22 is provided with a bolt mounting groove 23, and the top surface of the mounting part 22 is provided with a spring mounting groove 24.

[0040] In this embodiment, 10 to 18 prestressed steel wires are provided inside the turnout sleeper body 1. The diameter of the prestressed steel wires is 5 mm to 10 mm, and preferably 12 wires are symmetrically distributed.

[0041] Along the length of the fork pillow body 1, in this embodiment, the top two sides are rounded and the bottom two sides are chamfered.

[0042] In a more preferred embodiment, such as Figure 3 As shown, the connecting part 21 has a fishbone-like or tree-like structure. The connecting part 21 has an overall tapered structure that is wider at the top and narrower at the bottom, and several protruding structures are symmetrically arranged on both sides of the connecting part 21; the protruding structures can also adopt a barbed structure that is wider at the top and narrower at the bottom, which further ensures the consolidation stability of the embedded seat in this application.

[0043] Example 2:

[0044] A concrete turnout sleeper for a passenger and freight railway, based on Example 1, such as... Figures 1 to 4As shown, the mounting part 22 includes a base 221 fixed to the top of the connecting part 21 and two platforms 222 located on the base 221. The elastic bar mounting groove 24 is located on the top surface of the platform 222. In this embodiment, the elastic bar mounting groove 24 is arc-shaped, and both axial ends of the elastic bar mounting groove 24 penetrate the platform 222.

[0045] For the two platforms 222 on the same base 221, the top of each platform 222 is provided with a limiting plate 223 extending toward the other platform 222; the two limiting plates 223, the two platforms 222 and the base 221 surround to form the bolt mounting groove 23.

[0046] The limiting plate 223 is located inside the platform 222, and the elastic bar mounting groove 24 is located outside the platform 222.

[0047] The thickness of the limiting plate 223 gradually decreases from the end near the platform 222 to the end away from the platform 222, and the thickness of the limiting plate 223 gradually decreases from the end near the spring bar mounting groove 24 to the end away from the spring bar mounting groove 24.

[0048] In this embodiment, the bolt mounting groove 23 is configured as a dovetail groove, which is convenient for compatibility with existing T-bolts.

[0049] In this embodiment, during specific installation, for the two pre-embedded seats 2 in each group of pre-embedded components, their respective limiting plates 223 are arranged facing each other and towards each other.

[0050] In a more preferred embodiment, the mounting part 22 further includes two positioning plates 224 fixed to the outer wall of the connecting part 21. The two positioning plates 224 are respectively facing the two platforms 222, and the bottom surface of the positioning plates 224 is coplanar with the bottom surface of the base 221.

[0051] Example 3:

[0052] The method for preparing concrete turnout sleepers for passenger and freight railways as described in Example 2 includes the following steps:

[0053] S1. Place the four pre-embedded seats 2 in pairs to form two sets of pre-embedded components and place them in the designated positions inside the turnout sleeper mold.

[0054] S2. Arrange the prestressed steel wires according to the design drawings, and tension the prestressed steel wires according to the design.

[0055] S3. Inject concrete into the turnout sleeper mold so that the concrete surface is at the same height as the top surface of the positioning plate 224;

[0056] S4. Vibrate to compact, allow to set, demold, and cure.

[0057] Example 4:

[0058] The installation method for concrete turnout sleepers on passenger and freight railways as described in Example 2 includes the following steps:

[0059] Insert the T-bolt into the bolt mounting slot 23 from the side;

[0060] Install the mounting plate and rail;

[0061] Install the spring clip so that the T-bolt passes through the spring clip and one end of the spring clip is locked in the spring clip mounting groove 24;

[0062] Screw the matching nut into the top of the T-bolt, rotate the nut, and adjust the spring bar to the set height.

[0063] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of this utility model. It should be understood that the above description is only a specific embodiment of this utility model and is not intended to limit the scope of protection of this utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the scope of protection of this utility model.

[0064] It should be noted that, in this document, terms such as “comprising,” “including,” or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

Claims

1. A concrete switch tie for a mixed passenger and freight railway, comprising a switch tie body (1), characterized in that, Two sets of pre-embedded components are provided on the fork pillow body (1), and the pre-embedded components include two pre-embedded seats (2) facing each other. The pre-embedded seat (2) includes a connecting part (21) for fixing inside the turnout sleeper body (1) and an installation part (22) located above the connecting part (21). The inner surface of the installation part (22) is provided with a bolt mounting groove (23), and the top surface of the installation part (22) is provided with a spring mounting groove (24).

2. A concrete frog for a mixed traffic railway line according to claim 1, characterized in that The mounting part (22) includes a base (221) fixed to the top of the connecting part (21) and two platforms (222) located on the base (221), and the spring bar mounting groove (24) is located on the top surface of the platform (222).

3. A concrete frog for a mixed traffic railway according to claim 2, characterised in that Each platform (222) has a limiting plate (223) extending toward the other platform (222) on its top; the two limiting plates (223), the two platforms (222) and the base (221) surround each other to form the bolt mounting groove (23).

4. A concrete frog for a mixed traffic railway line according to claim 3, characterised in that The limiting plate (223) is located inside the platform (222), and the elastic bar mounting groove (24) is located outside the platform (222).

5. A concrete frog for a mixed traffic railway according to claim 3, wherein The thickness of the limiting plate (223) gradually decreases from the end near the platform (222) to the end away from the platform (222).

6. A concrete frog for a mixed traffic railway line according to claim 1, characterized in that The thickness of the limiting plate (223) gradually decreases from the end near the spring bar mounting groove (24) to the end away from the spring bar mounting groove (24).

7. A concrete frog for a mixed traffic railway line according to claim 2, characterized in that The spring bar mounting groove (24) is arc-shaped, and both ends of the spring bar mounting groove (24) pass through the platform (222).

8. A concrete frog for a mixed traffic railway line according to claim 2, characterized in that The mounting part (22) also includes two positioning plates (224) fixed to the outer wall of the connecting part (21). The two positioning plates (224) are respectively facing the two platforms (222), and the bottom surface of the positioning plate (224) is coplanar with the bottom surface of the base (221).

9. A concrete frog for a mixed traffic railway according to claim 1, characterized in that The fork pillow body (1) has 10 to 18 prestressed steel wires inside, and the diameter of the prestressed steel wires is 5 mm to 10 mm.

10. The concrete frog for a mixed traffic railway line according to claim 1, wherein Along the length direction, the top and bottom sides of the fork pillow body (1) are chamfered.