A prefabricated structure for road and bridge repair

By dividing the damaged surface of the road and bridge into multiple prefabricated repair units and using a support nail array and a matching slope design, efficient, precise and durable road and bridge repair is achieved, solving the problems of long on-site construction cycles and difficulties in transporting large-sized irregular surfaces.

CN224982001UActive Publication Date: 2026-11-17SHANDONG XINCHENG ENGINEERING CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522751544.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-25
Publication Date
2026-11-17
Estimated Expiration
2035-12-25

AI Technical Summary

Technical Problem

Existing road and bridge repair technologies involve long on-site construction periods, are greatly affected by outdoor weather, and face difficulties in manufacturing and transporting large, irregular repair surfaces, which increases the construction burden.

Method used

The damaged surface of the road and bridge is divided into multiple prefabricated repair units. Each unit includes a repair block and support nails. The support nail array design is adjusted according to the shape of the pit bottom. There are matching slopes and grouting gaps between the repair units. The pouring channel and the positioning hole realize precise grout injection.

Benefits of technology

The size and weight of individual repair blocks are reduced, facilitating factory prefabrication and on-site installation, reducing construction time and traffic impact, and improving the adaptability and durability of repairs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982001U_ABST
    Figure CN224982001U_ABST
Patent Text Reader

Abstract

A prefabricated structure for road and bridge repair, adapted to the repair pit on a damaged road or bridge surface, includes at least two adjacent prefabricated repair units: a first repair unit and a second repair unit. Each prefabricated repair unit includes a repair block and multiple support pins penetrating the repair block. The support pins are arranged in an array within the repair block, with the tip of each support pin extending beyond the bottom surface of the repair block and contacting the upper surface of the pit to be repaired. After the repair block is supported by the support pins within the pit, its upper surface is flush with or parallel to the normal horizontal plane of the undamaged road or bridge. The space between the bottom surface of the repair block and the upper surface of the pit to be repaired forms a grouting cavity. The adjacent surfaces of the repair blocks in the first and second repair units have a mating slope, which can form a grouting gap. At least one prefabricated repair unit has a grouting channel on its repair block. This invention provides an optimized solution for large-sized, irregular repair surfaces.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of road and bridge construction technology, and specifically relates to a prefabricated structure for road and bridge repair. Background Technology

[0002] In the field of road and bridge construction, road surface or bridge deck repair is a common task. Currently, the most widely used technology is on-site construction, which has the following disadvantages: First, all repair materials are poured or laid on site. Most road and bridge repair materials are applied in multiple layers. Each layer takes time to lay and wait for the poured material to solidify. This results in many operations, a long construction period, and long-term closure for construction, which will affect public transportation. Secondly, outdoor climate conditions are variable, and factors such as temperature and humidity can directly affect the curing quality of repair materials.

[0003] Using prefabricated structures to repair road or bridge surfaces is a novel approach that has been applied in existing technologies. However, there are some shortcomings in its application. For example, large-sized irregular repair surfaces not only make the manufacturing of prefabricated structures difficult, but also require large three-dimensional dimensions and weight when the damaged surface is deep, further increasing the burden of transportation, hoisting and other operations. Utility Model Content

[0004] To address the problems in the background art, this utility model proposes a prefabricated structure for road and bridge repair.

[0005] The technical solution adopted in this utility model is: A prefabricated structure for road and bridge repair, adapted to the pit to be repaired on the damaged surface of the road and bridge, includes at least two adjacent prefabricated repair units: a first repair unit and a second repair unit. Each prefabricated repair unit includes a repair block and a plurality of support nails penetrating the repair block. The plurality of support nails are arranged in an array through the repair block. The tip of each support nail extends out of the bottom surface of the repair block and can contact the upper surface of the pit to be repaired. After the repair block is supported in the pit to be repaired by the plurality of support nails, its upper surface is flush with or parallel to the normal horizontal surface of the undamaged road and bridge. The space between the bottom surface of the repair block and the upper surface of the pit to be repaired constitutes a cavity to be poured. The adjacent surfaces of the repair blocks of the first repair unit and the second repair unit have a mating slope, which can form a grouting gap; At least one prefabricated repair unit has a pouring channel on its repair block.

[0006] As described above, in a prefabricated structure for road and bridge repair, when the prefabricated repair unit is adjacent to the sidewall of the pit to be repaired, the repair block of the prefabricated repair unit and the sidewall of the pit to be repaired also have a matching slope that can form a grouting gap.

[0007] As described above, in a prefabricated structure for road and bridge repair, the upper surface of the pit to be repaired has an uneven shape, and the lengths of the multiple support nails on the same repair block extending out of the bottom surface of the repair block are different.

[0008] In the prefabricated structure for road and bridge repair described above, among all the support nails on the same repair block, the upper ends of some support nails extend beyond the upper surface of the repair block and are provided with an auxiliary pick-and-place structure, while the upper ends of the remaining support nails are flush with the upper surface of the repair block.

[0009] In the prefabricated structure for road and bridge repair described above, the auxiliary lifting and placing structure is a lifting ring or a lifting hook.

[0010] The prefabricated structure for road and bridge repair described above further includes a third repair unit. Both the second and third repair units have sides adjacent to the sidewall of the pit to be repaired. The first repair unit is adjacent to the second and third repair units.

[0011] As described above, in a prefabricated structure for road and bridge repair, the first repair unit is of a regular shape and does not have an edge adjacent to the sidewall of the pit to be repaired, while the second and third repair units are of irregular shapes and the edges adjacent to the sidewall of the pit to be repaired are non-straight curves or arcs.

[0012] In the prefabricated structure for road and bridge repair described above, at least one prefabricated repair unit has a casting positioning hole.

[0013] In the prefabricated structure for road and bridge repair described above, the pouring positioning hole and the pouring channel are not located on the same prefabricated repair unit.

[0014] As described above, in a prefabricated structure for road and bridge repair, the material of the repair block is the same as the material of the damaged surface of the road and bridge, or the material of the repair block has a higher mechanical strength than the material of the damaged surface of the road and bridge.

[0015] Beneficial effects: This invention effectively reduces the size and weight of individual repair blocks by dividing large, irregular pits into multiple prefabricated repair units, facilitating factory prefabrication, transportation, and on-site installation. Especially for areas with irregular edges, precise matching can be achieved through customized repair units, improving adaptability to complex damaged surfaces. Furthermore, the use of prefabricated structures for on-site assembly significantly reduces on-site wet work time and maintenance waiting time, minimizing the impact on road traffic. It is particularly suitable for commuter roads or bridges that require rapid repair.

[0016] The support nail array design adopted in this utility model can adjust the exposed length according to the actual concave and convex shape of the pit bottom, ensuring that the repair block is stably supported and maintains a uniform gap with the pit bottom, forming a structurally stable cavity to be poured, which is conducive to the uniform filling of subsequent bonding grout.

[0017] The present invention provides adjacent surfaces with matching slopes between the repair units and between the repair units and the pit wall, forming continuous grouting gaps, so that the injected bonding grout can fully fill all joints, enhance the mechanical interlocking and bonding strength of the overall structure, and improve the integrity and durability of the repaired structure.

[0018] The design of the pouring channel and pouring indicator hole in this invention enables precise injection of grout and visual control of filling degree, avoiding insufficient or excessive grouting. Some support nails are equipped with lifting rings and other auxiliary lifting and placing structures to facilitate hoisting and positioning, reduce on-site adjustment time, and further shorten the construction cycle. Attached Figure Description

[0019] Figure 1 This is a schematic diagram illustrating the unit division principle of the prefabricated structure for road and bridge repair according to this utility model.

[0020] Figure 2 This is a schematic diagram of the structural principle of a prefabricated structure for road and bridge repair according to the present invention (with the repair block flush with the road and bridge surface).

[0021] Figure 3 This is a schematic diagram of the structural principle of another prefabricated structure for road and bridge repair according to this utility model (the repair block is flush with the road and bridge surface).

[0022] Figure 4 This is a schematic diagram of the structural principle of a prefabricated structure for road and bridge repair according to the present invention (with the repair block parallel to the road and bridge surface).

[0023] Figure 5 This is a schematic diagram of the structural principle of another prefabricated structure for road and bridge repair according to this utility model (the case where the repair block is parallel to the road and bridge surface).

[0024] Figure 6 This is a schematic diagram illustrating another unit division principle of the prefabricated structure for road and bridge repair according to this utility model.

[0025] The components represented by the various reference numerals in the diagram are: First repair unit 1, second repair unit 2, third repair unit 3, repair block 4, support nail 5, pit to be repaired 6, cavity to be poured 7, grouting gap 8, pouring channel 9, pouring indicator hole 10. Detailed Implementation

[0026] Example 1 This embodiment provides a prefabricated structure for road and bridge repair, as described in the background art, which is an optimized solution for large-sized irregular repair surfaces.

[0027] The outline shape of a large, irregularly shaped repair surface is as follows: Figure 1 As shown, the corresponding prefabricated repair structure is not convenient to manufacture as a whole because its size or expected weight exceeds the load limit of conventional transport vehicles. The road and bridge repair prefabricated structure to be provided in this embodiment is to adapt to the contour to be repaired.

[0028] As the first design feature of this utility model, the large-sized irregular repair surface is divided into five splicing units: A, B, C, D, and E. Through this division, the shape of the largest repair area, A, is regularized. This regular shape is conducive to the mold making of the prefabricated repair structure, reducing the manufacturing difficulty. At the same time, the size and weight of the prefabricated repair structure corresponding to each splicing unit (A, B, C, D, E) can be controlled. For example, the area of ​​a single prefabricated repair unit does not exceed 3 square meters, and the weight does not exceed 500 kg.

[0029] The following uses cross-sectional views. Figure 2 This invention provides a detailed scheme for the prefabricated structure for road and bridge repair.

[0030] like Figure 2 The prefabricated structure for road and bridge repair shown is adapted to the pit 6 to be repaired on the damaged surface of the road and bridge. It includes at least two adjacent prefabricated repair units. In this embodiment, three repair units are shown, which are the second repair unit 2, the first repair unit 1 and the third repair unit 3 from left to right.

[0031] For ease of understanding, when reading the scheme of this embodiment, the second repair unit 2, the first repair unit 1, and the third repair unit 3 can be corresponded to as follows: Figure 1 The three repair areas B, A, and C, from left to right, are prefabricated repair units. In this application scenario, the second repair unit 2 and the third repair unit 3 both have sides adjacent to the sidewall of the pit 6 to be repaired, and the first repair unit 1 is adjacent to the second repair unit 2 and the third repair unit 3.

[0032] Combination Figure 1 In the scenario, the first repair unit 1 is a regular rectangular shape and does not have an edge adjacent to the sidewall of the pit to be repaired 6. The second repair unit 2 and the third repair unit 3 are irregular shapes and have at least one edge adjacent to the sidewall of the pit to be repaired 6. This edge is a non-straight curve or arc shape.

[0033] like Figure 2As shown, each prefabricated repair unit includes a repair block 4 and multiple support nails 5 penetrating the repair block 4. The multiple support nails 5 are arranged in an array through the repair block 4. The tip of each support nail 5 extends out of the bottom surface of the repair block 4 and can contact the upper surface of the pit 6 to be repaired. After the repair block 4 is supported in the pit 6 to be repaired by the multiple support nails 5, its upper surface is flush with the normal horizontal surface of the undamaged road and bridge. The space between the bottom surface of the repair block 4 and the upper surface of the pit 6 to be repaired forms the pouring cavity 7.

[0034] In actual construction, the internal shape of the pit to be repaired is often irregular, which is related to the degree of damage to the road and bridge and the conditions for manual excavation. Figure 2 As shown, the upper surface of the pit 6 to be repaired in this embodiment has an uneven shape. Therefore, the portions of the multiple support nails 5 extending out of the bottom surface of the same repair block 4 are often of different lengths. This support nail array design can adjust the exposed length according to the actual uneven shape of the pit bottom, ensuring that the repair block is stably supported and maintains a uniform gap with the pit bottom, forming a structurally stable cavity to be poured, which is conducive to the uniform filling of subsequent bonding grout. In this embodiment, the spacing of the support nail array can be controlled at 200-300mm, ensuring that at least 12-25 support nails are set per square meter of repair block, taking into account both support stability and grout filling space.

[0035] Repair block 4 is prefabricated using molding (or 3D printing for complex shapes). Theoretically, the material of repair block 4 can be the same as the material of the damaged road / bridge surface. However, in actual design, since repair block 4 is a small-batch, customized prefabricated block, its material properties can be designed to be better than the basic material of the road / bridge to be repaired. These material properties include, but are not limited to, various mechanical strengths and weather resistance. Preferably, repair block 4 has at least higher mechanical strengths (hardness, wear resistance, compressive strength, etc.) than the material of the damaged road / bridge surface. For example, compared to ordinary cement mortar used for road / bridge construction, higher-grade cement mortar or specially formulated fiber-reinforced cement mortar, three-dimensional reinforced cement mortar, or composite material mortar can be used when manufacturing repair block 4 to obtain higher mechanical strength, locally enhance the load-bearing capacity and service life of the repair area, and achieve targeted performance improvement.

[0036] The mold for making repair block 4 can be made based on the three-dimensional data of the pit 6 to be repaired collected on site. There are various ways to insert the support nails 5 into repair block 4. For example, multiple support nails 5 can be pre-positioned in the mold, and cement mortar can be directly poured to obtain repair block 4 integrated with the support nails 5. Alternatively, repair block 4 can be made in the mold by pouring or laying, and the support nails 5 can be inserted into repair block 4 before it has solidified or fully solidified. It is easy to understand that the former method is suitable for making repair blocks 4 formed from single-material cement mortar, while the latter method is suitable not only for making repair blocks 4 formed from single-material cement mortar but also for making multi-layered composite repair blocks 4 formed by laying.

[0037] The support nail 5 in this utility model only needs to have the mechanical strength to support the repair block 4. It is preferably made of threaded steel with a diameter of 8mm or more, preferably 10mm or more, cut and ground at the end according to the design length of each support nail 5. This not only ensures mechanical strength, but the surface threads can also play a role in engaging with the repair block 4.

[0038] It should be noted that some existing technologies use screws whose length extending beyond the bottom of the repair block 4 can be adjusted on-site as support components. This on-site adjustment is very labor-intensive and time-consuming, and the bonding strength between the repair block 4 and the support component cannot be guaranteed; it is a relatively traditional processing method. The length of the support nail 5 used in this invention is determined by fixed-point, fixed-length cutting based on the three-dimensional data of the pit 6 to be repaired collected on-site by a 3D scanner. Before data collection, the pit 6 to be repaired has already undergone final trimming and mortar application for shaping. Therefore, the cutting length is precise and the support nail 5 can be completely encased within the material of the repair block 4. Although in rare cases, temporary positioning errors of the repair block 4 may occur during on-site construction due to installation errors or uncontrollable slight changes in pit conditions, these positioning errors are completely controllable. On-site construction can also assist in leveling by fine-tuning the support nail 5 through grinding or by inserting a shim at the lower end of the support nail 5. Therefore, in this embodiment, the cost of using the support nail 5 is lower than that of the adjustable screw support component, but the overall performance is superior.

[0039] in addition, Figure 2 The upper ends of each support nail 5 shown are flush with the upper surface of the repair block 4. They can be made flush during molding, or they can be made with a certain amount of protrusion during manufacturing. They can be cut and polished after manufacturing (before transportation), or they can be cut and polished on-site after the repair block 4 is installed.

[0040] The above-mentioned material selection and methods for manufacturing repair block 4 are general experience for those skilled in the art and are not improvements of this utility model, so they will not be elaborated further.

[0041] Regarding the improvements of this utility model, please refer to the following sections. Figure 2 At least one precast repair unit has a pouring channel 9 on its repair block 4, allowing the precast repair unit to be firmly connected to the pit 6 to be repaired during on-site construction by injecting bonding mortar. The bonding mortar can be, for example, polymer-modified cement mortar with a compressive strength of not less than 40 MPa and an initial flowability of not less than 180 mm. Furthermore, it is preferable to have a pouring indicator hole 10 on at least one precast repair unit to accurately monitor the filling status of the mortar poured into the cavity 7. Figure 2 As shown, in this embodiment, the pouring channel 9 is located on the first repair unit 1 in the middle, and a pouring indicator hole 10 is opened on the second repair unit 2 and the third repair unit 3 on both sides. Multiple pouring indicator holes 10 can also be opened as needed, and they should be at a sufficient distance from the pouring channel 9. For example, at least one pouring indicator hole 10 can be set at the edge away from the channel 9. In this way, grout is poured into the cavity 7 to be poured through the pouring channel 9 on the first repair unit 1 in the middle, and the filling status of the pumped grout can be observed through the pouring indicator holes 10 on the second repair unit 2 and the third repair unit 3 on both sides, which are farther away. When the grout overflows from the pouring indicator hole 10, the grouting can be stopped in time. The existence of the pouring channel 9 and the pouring indicator holes 10 not only realizes the precise injection of grout and the visual control of the filling degree, avoiding insufficient grout or over-pouring, but also increases the contact area between the repair block 4 and the bonding mortar to a certain extent.

[0042] As a preferred design in this embodiment, the adjacent surfaces of the repair blocks 4 of the first repair unit 1 and the second repair unit 2 have a mating slope. Similarly, the adjacent surfaces of the repair blocks 4 of the first repair unit 1 and the third repair unit 3 also have a mating slope. This mating slope can form a grouting gap 8 to accommodate the adhesive grout, so that the repair block 4 is more firmly fixed in the pit to be repaired 6.

[0043] Similarly, when the prefabricated repair unit is adjacent to the sidewall of the pit 6 to be repaired, the repair block 4 of the prefabricated repair unit and the sidewall of the pit 6 to be repaired also have a matching slope that can form a grouting gap 8, such as... Figure 2 The second repair unit 2 and the third repair unit 3 are designed with this fitting slope on the surfaces adjacent to the sidewall of the pit to be repaired 6.

[0044] In this embodiment, the aforementioned slope is formed by creating a single-sided angle of 8-25° between the corresponding surface of the repair block 4 and the vertical plane. This angle is easily selected based on experience during actual construction. If the adjacent surfaces of two adjacent repair blocks 4 are both made with an angle, it is preferable to control the single-sided angle of each repair block 4 to not exceed 15°. In this way, the total slope of the adjacent surfaces of adjacent repair blocks 4 does not exceed 30°, ensuring that the grouting gap width takes into account both the fluidity of the grout and the interlocking strength of the structure. Similarly, if the pit wall itself also has a slope that mates with the repair block 4, it is also preferable to ensure that the total slope of the pit wall and the repair block 4 does not exceed 30°.

[0045] The inclined mating surfaces between repair units and between the repair unit and the pit wall create continuous grouting gaps, allowing the injected bonding grout to fully fill all joints, enhancing the mechanical interlocking and bonding strength of the overall structure, and improving the integrity and durability of the repaired structure.

[0046] Example 2 like Figure 3 As shown, based on Embodiment 1, in order to facilitate the transportation and handling of the prefabricated repair unit, as a preferred design of this embodiment, among all the support nails 5 on the same repair block 4, the upper end of a portion of the support nails 5 extends out of the upper surface of the repair block 4 and is provided with an auxiliary pick-and-place structure.

[0047] Figure 3 The auxiliary lifting and placing structure shown in the diagram is a lifting ring, but it can also be other structures, such as a hook.

[0048] In addition to facilitating transportation and handling, lifting rings or hooks can also handle some temporary situations during on-site construction. For example, if the prefabricated repair block 4 cannot be properly horizontally supported due to errors in the installation of support nails or changes in the conditions of the tunnel, as mentioned earlier, the repair block 4 can be lifted with the help of an auxiliary hanger to cut, grind, or adjust some of the support nails 5 (or to repair the tunnel). It can even directly replace the support nails 5 (for example, if some of the support nails 5 are temporarily cut off) to suspend and position the repair block 4 for on-site construction.

[0049] In this embodiment, apart from the support nail 5 with the lifting ring, the upper ends of the remaining support nails 5 are flush with the upper surface of the repair block 4, and can be cut and polished before transportation. The support nail 5 with the lifting ring can also be removed by cutting and polishing after the on-site construction is completed.

[0050] Example 3 This implementation example Figure 4As shown, the difference from Embodiment 1 is that when the repair block 4 is supported in the pit to be repaired 6 by multiple support nails 5, its upper surface is parallel to the normal horizontal plane of the road and bridge that is not damaged. In this case, the upper surface of the repair block 4 is not used as the final road surface or bridge surface. Instead, after the repair block 4 is installed and a layer of surface material is applied to the surface of the repair block 4, it becomes flush with the normal horizontal plane of the road and bridge that is not damaged.

[0051] Apart from the difference mentioned above regarding whether the upper surface of the repair block 4 is "flush" or "parallel" to the normal horizontal plane of the undamaged road and bridge, this embodiment is no different from Embodiment 1. The description of Embodiment 1 can be referenced, and will not be elaborated further.

[0052] The solution in this embodiment can achieve a better seamless fit between the repaired area and the road and bridge surface by applying a final surface material. If there are exposed metal marks left after the support nail 5 and the upper surface of the repair block 4 are cut flush, they can also be covered without special repair.

[0053] Another excellent technical effect of this embodiment is that, when dealing with the possible unintentional positioning error of the repair block 4 mentioned in Embodiment 1, it is not even necessary to take any leveling operation listed in Embodiment 1, because the road surface or bridge deck material laid last itself acts as a leveling layer.

[0054] Example 4 This implementation example Figure 5 As shown, the difference from Embodiment 2 is that when the repair block 4 is supported in the pit to be repaired 6 by multiple support nails 5, its upper surface is parallel to the normal horizontal plane of the road and bridge that is not damaged. In this case, the upper surface of the repair block 4 is not used as the final road surface or bridge surface. Instead, after the repair block 4 is installed and a layer of surface material is applied to the surface of the repair block 4, it becomes flush with the normal horizontal plane of the road and bridge that is not damaged.

[0055] Apart from the difference mentioned above regarding whether the upper surface of the repair block 4 is "flush" or "parallel" to the normal horizontal plane of the undamaged road and bridge, this embodiment is no different from embodiment 2. The description of embodiment 2 can be referenced and will not be elaborated further.

[0056] The solution in this embodiment also achieves a better seamless fit between the repaired area and the road / bridge surface through the final application of surface material. If there are exposed metal marks left after the support nail 5 is cut flush with the upper surface of the repair block 4, these can be covered without special repair. Furthermore, in case of potential positioning errors in the repair block 4, no additional leveling operation is required; the final laid road or bridge surface material itself acts as a leveling layer.

[0057] Example 5 like Figure 6As shown, this embodiment provides another way of dividing the irregular repair surface described in the previous embodiments.

[0058] In this embodiment, the irregular repair surface first resembles... Figure 1 It was thus divided into five splicing units: A, B, C, D, and E. Based on this, to further control the size and weight of the prefabricated repair structure corresponding to each splicing unit, the larger units A and D were further subdivided, such as... Figure 6 As shown, unit A is further divided into two splicing units, A1 and A2, and unit D is further divided into two splicing units, D1 and D2.

[0059] In summary, the embodiments of this utility model effectively reduce the size and weight of individual repair blocks by dividing large, irregular pits into multiple prefabricated repair units. This facilitates factory prefabrication, transportation, and on-site installation. Especially for areas with irregular edges, customized repair units can achieve precise matching, improving adaptability to complex damaged surfaces. Furthermore, the use of prefabricated structures for on-site assembly significantly reduces on-site wet work time and maintenance waiting time, minimizing impact on road traffic. This is particularly suitable for commuter roads or bridges requiring rapid repair. The support nail array design used in each embodiment allows for adjustment of the exposed length according to the actual unevenness of the pit bottom, ensuring stable support of the repair block and maintaining a uniform gap with the pit bottom, forming a structurally stable cavity for pouring, which is beneficial for the uniform filling of subsequent bonding grout. Each embodiment has adjacent surfaces with a mating slope between repair units and between the repair unit and the pit wall, forming continuous grouting joints. This allows the injected bonding grout to fully fill all joints, enhancing the mechanical interlocking and bonding strength of the overall structure, and improving the integrity and durability of the repaired surface. The design of the pouring channels and pouring indicator holes in each embodiment enables precise injection of grout and visual control of filling degree, avoiding insufficient or excessive grouting. In the preferred embodiment, some support nails are equipped with lifting rings and other auxiliary lifting and placing structures, which facilitates hoisting and positioning, reduces on-site adjustment time, and further shortens the construction cycle.

[0060] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present utility model should be included within the protection scope of the present utility model.

Claims

1. A prefabricated structure for road and bridge repair, adapted to the pit (6) to be repaired on the damaged surface of a road or bridge, characterized in that, It includes at least two adjacent prefabricated repair units: a first repair unit (1) and a second repair unit (2). Each prefabricated repair unit includes a repair block (4) and a plurality of support nails (5) penetrating the repair block (4). The plurality of support nails (5) are arranged in an array through the repair block (4). The tip of each support nail (5) extends out of the bottom surface of the repair block (4) and can contact the upper surface of the pit to be repaired (6). After the repair block (4) is supported in the pit to be repaired (6) by the plurality of support nails (5), its upper surface is flush or parallel to the normal horizontal plane of the road and bridge that is not damaged. The space between the bottom surface of the repair block (4) and the upper surface of the pit to be repaired (6) constitutes the cavity to be poured (7). The adjacent surfaces of the repair blocks (4) of the first repair unit (1) and the second repair unit (2) have a fitting slope, which can form a grouting gap (8). At least one prefabricated repair unit has a pouring channel (9) on its repair block (4).

2. The prefabricated structure for road and bridge repair according to claim 1, characterized in that, When the prefabricated repair unit is adjacent to the side wall of the pit (6) to be repaired, the repair block (4) of the prefabricated repair unit and the side wall of the pit (6) to be repaired also have a matching slope that can form a grouting gap (8).

3. The prefabricated structure for road and bridge repair according to claim 1, characterized in that, The upper surface of the pit to be repaired (6) has an uneven shape, and the lengths of the multiple support nails (5) on the same repair block (4) extending out of the bottom surface of the repair block (4) are different.

4. The prefabricated structure for road and bridge repair according to claim 1, characterized in that, Among all the support pins (5) on the same repair block (4), the upper ends of some support pins (5) extend out of the upper surface of the repair block (4) and are provided with an auxiliary picking and placing structure, while the upper ends of the remaining support pins (5) are flush with the upper surface of the repair block (4).

5. A prefabricated structure for road and bridge repair according to claim 4, characterized in that, The auxiliary pick-and-place structure is a lifting ring or a lifting hook.

6. A prefabricated structure for road and bridge repair according to claim 1, characterized in that, It also includes a third repair unit (3), both the second repair unit (2) and the third repair unit (3) have sides adjacent to the sidewall of the pit (6) to be repaired, and the first repair unit (1) is adjacent to the second repair unit (2) and the third repair unit (3).

7. A prefabricated structure for road and bridge repair according to claim 6, characterized in that, The first repair unit (1) is a regular shape and does not have an edge adjacent to the sidewall of the pit to be repaired (6). The second repair unit (2) and the third repair unit (3) are irregular shapes and their edges adjacent to the sidewall of the pit to be repaired (6) are non-straight curves or arcs.

8. A prefabricated structure for road and bridge repair according to any one of claims 1-7, characterized in that, At least one prefabricated repair unit has a casting positioning hole (10).

9. A prefabricated structure for road and bridge repair according to claim 8, characterized in that, The casting indicator hole (10) and the casting channel (9) are not located on the same prefabricated repair unit.

10. A prefabricated structure for road and bridge repair according to any one of claims 1-7, characterized in that, The material of the repair block (4) is the same as the material of the damaged surface of the road or bridge, or the material of the repair block (4) has a higher mechanical strength than the material of the damaged surface of the road or bridge.