A geogrid structure for the junction of old and new roadbeds in highway reconstruction and expansion.
By using high-strength polyester geogrid bodies and stainless steel fasteners in highway reconstruction and expansion projects, the stability and durability issues of traditional geogrids at the junction of old and new roadbeds have been resolved, achieving robust integration and improved safety while reducing construction and maintenance costs.
Patent Information
- Application Number
- CN202522699571.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-19
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-19
AI Technical Summary
Traditional geogrids are difficult to integrate into a solid whole between new and old roadbeds during highway reconstruction and expansion. They have poor stress dispersion effect, limited anchoring methods, weak resistance to slippage, displacement and uneven settlement, and some components are not corrosion resistant enough, making them prone to rust and wear. They are also difficult to construct and have high maintenance costs.
The main body of the grid is made of high-strength polyester material, and it is equipped with stainless steel fixing seats, clamps, connectors and anchors. By penetrating the old and new roadbeds and combining deep anchoring and multi-directional gripping, a solid whole is formed, which disperses stress and prevents slippage and misalignment. The modular structure reduces the difficulty of construction and improves stability and durability.
It achieves a solid integration of the old and new roadbeds, improves the stability of the roadbed connection and traffic safety, reduces construction time and later maintenance costs, avoids cracking at the connection and corrosion of components, and allows for flexible installation to adapt to different working conditions.
Smart Images

Figure CN224982002U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of highway reconstruction and expansion components, and in particular to a geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion. Background Technology
[0002] As a core reinforcing component for the connection between new and old roadbeds in highway reconstruction and expansion projects, geogrids directly affect the road's bearing capacity, traffic safety, and service life. They are a key structure for ensuring the coordinated stress distribution between new and old roadbeds and preventing connection failures. With the large-scale advancement of highway reconstruction and expansion projects, traditional geogrids are widely used in the reinforcement of new and old roadbed connections due to their moderate cost and relatively simple construction.
[0003] Traditional geogrids often fail to create a robust and integrated system between new and old roadbeds. Differences in fill material between new and old roadbeds are common, and some sections face adverse geological conditions such as karst and mining subsidence, resulting in poor stress dispersion. Furthermore, the single anchoring method offers weak resistance to slippage, displacement, and uneven settlement. After long-term operation, existing roads often exhibit transverse cracks and poor interlayer bonding in the base layer. Traditional geogrids lack targeted anchoring designs, making it difficult to suppress crack reflection and often relying on complex external fixing structures, leading to difficult and time-consuming construction. Highway reconstruction and expansion involve various conditions such as cut-fill junctions, steep embankments, and bridge abutment connections. Different road sections have varying width spacing and slope ratios, and the lack of flexible adjustment structures makes it difficult to adapt to different spacing and angle connection conditions. In some sections with high groundwater levels or drainage needs, traditional geogrid components lack sufficient corrosion resistance, making them prone to rust and wear, which not only affects structural stability but also increases subsequent maintenance costs. Utility Model Content
[0004] The purpose of this section is to outline some aspects of embodiments of the present invention and to briefly describe some preferred embodiments. Simplifications or omissions may be made in this section, as well as in the abstract and title of this application, to avoid obscuring the purpose of these documents; however, such simplifications or omissions should not be construed as limiting the scope of the present invention.
[0005] In view of the problems existing in the geogrid structure at the junction of old and new roadbeds in the reconstruction and / or expansion of highways, this utility model is proposed.
[0006] Therefore, the problem to be solved by this utility model is that the new and old roadbeds form a solid whole, the stress dispersion effect is not good, the anchoring method is simple, the anti-slip, anti-dislocation and anti-uneven settlement ability is weak, and some parts are not corrosion resistant enough and are prone to rust and wear.
[0007] To solve the above-mentioned technical problems, this utility model provides the following technical solution: a geogrid structure for the junction of old and new roadbeds in highway reconstruction and expansion, comprising: a roadbed component including an old roadbed, with a new roadbed fixed to one side of the old roadbed; and a geogrid component disposed inside the old and new roadbeds, including a geogrid body laid inside the old and new roadbeds, with fasteners provided on the surface of the geogrid body, connectors provided on one side of the fasteners, and anchors provided on one side of the connectors.
[0008] As a preferred embodiment of the geogrid structure at the junction of old and new roadbeds in the reconstruction and expansion of the highway described in this utility model, the fixing component includes a fixing seat set at the top of the geogrid body and a clamping plate set at the bottom of the geogrid body.
[0009] As a preferred embodiment of the geogrid structure at the junction of old and new roadbeds in the reconstruction and expansion of the highway described in this utility model, the clamping plate is located at the bottom of the fixing seat, the top of the fixing seat is through an anchor rod, the bottom of the anchor rod passes through the clamping plate, and the bottom of the anchor rod is located inside the old roadbed.
[0010] As a preferred embodiment of the geogrid structure at the junction of the old and new roadbeds in the reconstruction and expansion of the highway described in this utility model, the fixing seat has an insertion hole on one side, a bolt passes through the bottom of the fixing seat, and a nut is threaded onto the top of the bolt.
[0011] As a preferred embodiment of the geogrid structure at the junction of old and new roadbeds in the reconstruction and expansion of the highway described in this utility model, the connector includes a connecting rod disposed in the inner cavity of the insertion hole, and an adjustment hole is provided on one side of the connecting rod, the size of which is adapted to the size of the bolt.
[0012] As a preferred embodiment of the geogrid structure at the junction of the old and new roadbeds in the reconstruction and expansion of the expressway described in this utility model, the number of adjustment holes is four, the distance between two adjacent adjustment holes is the same, and the bolt passes through the inner cavity of the adjustment hole.
[0013] As a preferred embodiment of the geogrid structure at the junction of old and new roadbeds in the reconstruction and expansion of the highway described in this utility model, wherein: the outer ring of the connecting rod is movably fitted with a collar, the bottom of the collar is fixed with a ground-inserting cone, and the surface of the ground-inserting cone is fixed with anti-detachment thorns.
[0014] As a preferred embodiment of the geogrid structure at the junction of the old and new roadbeds in the reconstruction and expansion of the highway described in this utility model, the anchor includes a rotating plate rotatably connected to one end of a connecting rod, a fixing block is fixed to the bottom of the rotating plate, and an anchoring claw is fixed to one side of the fixing block.
[0015] As a preferred embodiment of the geogrid structure at the junction of old and new roadbeds in the reconstruction and expansion of the highway described in this utility model, wherein: a fixing rod is fixed to the surface of the fixing block, a vertical plate is rotatably sleeved on the surface of the fixing rod, and a barb is fixed to one side of the vertical plate.
[0016] As a preferred embodiment of the geogrid structure at the junction of old and new roadbeds in the reconstruction and expansion of the expressway described in this utility model, the main body of the geogrid is made of high-strength polyester material, and the fixing base, clamp, connector and anchor are all made of stainless steel.
[0017] The beneficial effects of this utility model are as follows: By setting up a grid assembly and matching fasteners, connectors, and anchors, and utilizing the grid body's distribution pattern throughout the new and old roadbeds and the excellent tensile strength of the high-strength polyester material, the new and old roadbeds form a solid whole and effectively disperse stress. Simultaneously, the clamping and fixing of the fixing seat and the clamping plate, the deep anchoring of the anchor rod, and the multi-directional gripping action of the anchor claw and barb rod effectively prevent slippage, misalignment, and uneven settlement at the joint. No complex external fixing structure is required, greatly improving the stability of the roadbed joint and traffic safety. Furthermore, the multiple sets of adjustment holes in the connectors allow for flexible adaptation during installation. The use of stainless steel for all components ensures durability. The modular structure reduces construction difficulty, avoids cracking at the joints and corrosion of components, and significantly saves construction time and subsequent maintenance costs. Attached Figure Description
[0018] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0019] Figure 1 Structural diagram of geogrid structure at the junction of old and new roadbeds in the reconstruction and expansion of a highway.
[0020] Figure 2 A structural diagram of a geogrid assembly for the junction of old and new roadbeds in the reconstruction and expansion of a highway.
[0021] Figure 3 A bottom view of the geogrid assembly at the junction of the old and new roadbeds in the reconstruction and expansion of a highway.
[0022] Figure 4 A cross-sectional view of the geogrid structure at the junction of the old and new roadbeds in the reconstruction and expansion of a highway.
[0023] Figure 5 An exploded view of the connecting rods and fixing seats of the geogrid structure at the junction of the old and new roadbeds in the reconstruction and expansion of a highway.
[0024] In the diagram: 1. Roadbed assembly; 11. Old roadbed; 12. New roadbed; 2. Grating assembly; 21. Grating body; 22. Anchor; 221. Rotating plate; 222. Fixing block; 223. Fixing rod; 224. Vertical plate; 225. Anchor claw; 226. Barbed rod; 23. Fixing component; 231. Fixing seat; 232. Bolt; 233. Nut; 234. Anchor rod; 235. Clamping plate; 236. Insertion hole; 24. Connector; 241. Connecting rod; 242. Adjustment hole; 243. Collar; 244. Anti-spiking device; 245. Ground cone. Detailed Implementation
[0025] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings.
[0026] Many specific details are set forth in the following description in order to provide a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Those skilled in the art can make similar extensions without departing from the spirit of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0027] Secondly, the term "an embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The phrase "in one embodiment" appearing in different places in this specification does not necessarily refer to the same embodiment, nor is it a single or selective embodiment that excludes other embodiments.
[0028] Example 1, referring to Figure 1 and Figure 2 This is the first embodiment of the present invention. This embodiment provides a geogrid structure for the connection between the old and new roadbeds in the reconstruction and expansion of a highway. The geogrid structure for the connection between the old and new roadbeds in the reconstruction and expansion of a highway includes a roadbed component 1 and a geogrid component 2. By setting the roadbed component 1 and the geogrid component 2, it is possible to effectively prevent slippage, misalignment and uneven settlement at the connection. It does not require a complex external fixing structure, which greatly improves the stability of the roadbed connection and traffic safety. Moreover, it can be flexibly adapted during installation, avoiding cracking at the connection and corrosion and wear of components, which greatly saves construction time and later maintenance costs.
[0029] Specifically, the roadbed component 1 includes an old roadbed 11, with a new roadbed 12 fixed to one side of the old roadbed 11.
[0030] Specifically, the grid assembly 2 is installed inside the old roadbed 11 and the new roadbed 12, including the grid body 21 laid inside the old roadbed 11 and the new roadbed 12. The surface of the grid body 21 is provided with a fastener 23, a connector 24 is provided on one side of the fastener 23, and an anchor 22 is provided on one side of the connector 24.
[0031] The roadbed component 1 serves as the installation base for the grid component 2. The old roadbed 11 provides stable support, and the new roadbed 12 reserves paving space. The two work together to ensure the through-laying of the grid body 21. The grid component 2 connects to form an overall stress system, avoiding stress concentration caused by the independent bearing of a single roadbed, and laying a solid foundation for the coordinated stress of the new and old roadbeds.
[0032] Example 2, refer to Figures 2-5 This is the second embodiment of the present invention, which is based on the previous embodiment.
[0033] Specifically, it also includes a fixing seat 231 disposed on the top of the grille body 21 and a clamping plate 235 disposed on the bottom of the grille body 21.
[0034] Specifically, the clamp 235 is located at the bottom of the fixing seat 231, the top of the fixing seat 231 is through the anchor rod 234, the bottom of the anchor rod 234 passes through the clamp 235, and the bottom of the anchor rod 234 is located inside the old roadbed 11.
[0035] The side of the clamping plate 235 that fits into the main body of the grille 21 has an anti-slip texture, which greatly enhances the clamping friction and prevents the grille from slipping. The plate has sufficient strength and fits tightly with the fixing seat 231, so that the main body of the grille 21 is not damaged when clamped.
[0036] Specifically, a socket 236 is provided on one side of the fixing base 231, a bolt 232 passes through the bottom of the fixing base 231, and a nut 233 is threaded on the top of the bolt 232.
[0037] The top of the fixing seat 231 has a through hole that is compatible with the anchor rod 234. It has high load-bearing strength, and the bottom is precisely aligned with the clamping plate 235. The clamping surface is flat, ensuring that the grid body 21 is clamped stably without loosening.
[0038] The anchor rod 234 has a tapered tip design, which makes it easy to penetrate deep soil and hard soil layers without the need for additional drilling equipment. The rod body is threaded to enhance the soil's gripping force. The length is suitable for the anchoring requirements of old roadbed 11, and the high pull-out force ensures rigid fixation.
[0039] Specifically, the connector 24 includes a connecting rod 241 disposed in the inner cavity of the insertion hole 236, and an adjustment hole 242 is provided on one side of the connecting rod 241, the size of which is adapted to the size of the bolt 232.
[0040] Specifically, there are four adjustment holes 242, and the distance between any two adjacent adjustment holes 242 is the same. The bolt 232 passes through the inner cavity of the adjustment hole 242.
[0041] Specifically, the outer ring of the connecting rod 241 is movably fitted with a collar 243, the bottom of the collar 243 is fixed with a grounding cone 245, and the surface of the grounding cone 245 is fixed with an anti-detachment puncture 244.
[0042] The adjusting hole 242 of the connector 24 is adapted to different connection conditions. The ground cone 245 and the anti-detachment spike 244 enhance the soil interlocking force. The efficient connection fixing part 23 and the anchor 22 form a stable force transmission path. The installation is convenient and does not require complicated equipment.
[0043] The anti-detachment spike 244 adopts a barbed integrated design, which is sharp and has a reasonable tilt angle. After being inserted into the soil, it has a large reverse resistance, effectively preventing the ground-inserting cone 245 from loosening and falling out. The distribution density is uniform, which enhances the interlocking force with the soil.
[0044] Specifically, the anchor 22 includes a rotating plate 221 rotatably connected to one end of the connecting rod 241, a fixing block 222 fixed to the bottom of the rotating plate 221, and an anchoring claw 225 fixed to one side of the fixing block 222.
[0045] The rotating plate 221 can rotate 360° flexibly, and can accurately adjust the anchoring direction to adapt to different roadbed depths and soil layers. The rotating connection is smooth and without jamming, and it is not easy to deform or break under stress, providing a stable adjustment guarantee for the multi-directional anchoring of the anchor 22.
[0046] The fixing block 222 adopts an integrated structural design and is closely connected with the rotating plate 221 and the fixing rod 223. It has high load-bearing strength and can effectively transmit the force of the anchoring claw 225 and the barbed rod 226, ensuring accurate installation and positioning of each related component and avoiding force deviation.
[0047] The Anchor Claw 225 features a multi-claw design with sharp tips that allow it to penetrate deep soil and gravel layers. The claw surfaces have anti-slip textures to increase the contact area and gripping force with the soil. The longitudinal gripping force is uniform, effectively resisting roadbed uplift.
[0048] Specifically, a fixing rod 223 is fixed to the surface of the fixing block 222, a vertical plate 224 is rotatably sleeved on the surface of the fixing rod 223, and a barb rod 226 is fixed to one side of the vertical plate 224.
[0049] The fixed rod 223 serves as the stable rotation axis of the vertical plate 224. The rod body is rigid and resistant to bending. Its smooth surface facilitates the flexible rotation of the vertical plate 224. The two ends are tightly connected without gaps, which can stably bear the lateral force and ensure the stability of the lateral anti-detachment structure.
[0050] The vertical plate 224 can be adjusted from 0° to 90°, and the insertion angle of the barb 226 can be adjusted according to the density of the roadbed soil. The plate has uniform thickness, sufficient strength, and a firm connection that is not easy to bend, ensuring a long-lasting lateral anti-detachment effect.
[0051] Specifically, the main body 21 of the grille is made of high-strength polyester material, while the fixing base 231, clamping plate 235, connector 24 and anchor 22 are all made of stainless steel.
[0052] The fastener 23 clamps the grid body 21 through the fastener 231 and the clamping plate 235, and works with the anchor rod 234 to achieve deep anchoring to achieve rigid fixation between the grid body 21 and the old roadbed 11. The stainless steel material is rust-proof and deformation-resistant, and the various components work together to ensure connection reliability and enhance the stability of the roadbed connection.
[0053] The main body of the grid 21 is made of high-strength polyester material, which has excellent tensile and creep resistance. It can effectively disperse the concentrated stress at the joint, suppress uneven settlement and cracking. The material is durable and flexible in laying, and can be seamlessly adapted to the fastener 23, providing core force support for the integrated connection of new and old roadbeds.
[0054] The 22 anchor design completely prevents roadbed slippage and uplift. The angle is adjustable to adapt to different roadbed conditions. The stainless steel material is durable and corrosion-resistant, with a stable structure and easy installation, which greatly reduces the later maintenance cost.
[0055] When using it, clean the old roadbed 11 connection surface and the new roadbed 12 pre-laid area, remove debris, loose soil and protruding stones, ensure that the roadbed surface is flat and the compaction meets the construction requirements, confirm that the grid body 21 is undamaged, the high-strength polyester material is not aged, the stainless steel parts of the fixing seat 231, clamp 235, connector 24, and anchor 22 are free from rust and deformation, and the anchor rod 234, bolt 232, and nut 233 fasteners are complete.
[0056] Lay the main body of the grid 21 along the connection direction between the old and new roadbeds, ensuring that the main body of the grid 21 penetrates the preset area of the old roadbed 11 and the new roadbed 12. Keep the main body of the grid flat during the laying process, and its coverage area must completely cover the stress concentration area at the connection.
[0057] Fixing seats 231 are placed on the surface of the grid body 21 according to the design spacing, and clamping plates 235 are placed at the bottom of the grid body 21 to ensure that the fixing seats 231 and clamping plates 235 are precisely aligned and clamp the grid body 21. Anchor rods 234 are inserted through the top of the fixing seats 231, through the clamping plates 235 and into the deep soil inside the old roadbed 11 to ensure that the anchoring depth of the anchor rods 234 meets the design requirements and achieves deep fixation between the grid body and the old roadbed.
[0058] Insert the ground-inserting cone 245 into the new roadbed 12 from one side of the fixing seat 231, so that the collar 243 at the top of the ground-inserting cone 245 is concentric with the insertion hole 236 on the surface of the fixing seat 231. Use the anti-detachment puncture 244 on the surface of the ground-inserting cone 245 to enhance the bonding force between the connector 24 and the roadbed soil and prevent the connector 24 from loosening. Then insert the connecting rod 241 into the insertion hole 236 from inside the collar 243. Select the corresponding adjustment hole 242 on the connecting rod 241 according to the actual spacing and angle of the connection between the old roadbed 11 and the new roadbed 12.
[0059] Insert bolt 232 from the bottom of the mounting base 231, so that bolt 232 passes through the adjustment hole 242 on the connecting rod 241 and extends to the top of the mounting base 231. Then screw in nut 233 and tighten it. The connection between the connecting rod 241 and the mounting base 231 is achieved by the locking force of bolt 232 and nut 233. The flexible selection of multiple sets of adjustment holes 242 can adapt to the installation requirements of different connection conditions.
[0060] Rotate the rotating plate 221 to one end of the connecting rod 241, adjust the angle of the rotating plate 221 so that the anchoring claw 225 on one side of the fixing block 222 faces the deep soil of the roadbed, forcefully insert the anchoring claw 225 into the soil to achieve the initial gripping of the anchor. With the fixing rod 223 as the axis, rotate the vertical plate 224 to the preset angle so that the barb 226 on one side of the vertical plate 224 is inserted laterally into the surrounding soil. Through the deep gripping of the anchoring claw 225 and the lateral anti-dislodgement of the barb 226, a multi-directional anchoring system is formed to prevent slippage and misalignment at the joint. After the connection is completed, the grid structure is buried inside the old roadbed 11 and the new roadbed 12 to achieve installation.
[0061] It should be noted that the above embodiments are only used to illustrate the technical solution of this utility model and are not intended to limit it. Although this utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solution of this utility model without departing from the spirit and scope of the technical solution of this utility model, and all such modifications or substitutions should be covered within the scope of the claims of this utility model.
Claims
1. A geogrid structure for the junction of old and new roadbeds in highway reconstruction and expansion, characterized in that: include, A roadbed assembly (1) includes an old roadbed (11), to which a new roadbed (12) is fixed, and, The grid assembly (2) is installed inside the old roadbed (11) and the new roadbed (12), including a grid body (21) laid inside the old roadbed (11) and the new roadbed (12). The surface of the grid body (21) is provided with a fastener (23), a connector (24) is provided on one side of the fastener (23), and an anchor (22) is provided on one side of the connector (24).
2. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 1, characterized in that: The fastener (23) includes a fixing seat (231) disposed on the top of the grid body (21) and a clamping plate (235) disposed on the bottom of the grid body (21).
3. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 2, characterized in that: The clamp (235) is located at the bottom of the fixing seat (231), and the top of the fixing seat (231) is through which the anchor rod (234) passes. The bottom of the anchor rod (234) passes through the clamp (235), and the bottom of the anchor rod (234) is located inside the old roadbed (11).
4. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 3, characterized in that: The fixing base (231) has an insertion hole (236) on one side, and a bolt (232) passes through the bottom of the fixing base (231). A nut (233) is threaded onto the top of the bolt (232).
5. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 4, characterized in that: The connector (24) includes a connecting rod (241) disposed in the inner cavity of the insertion hole (236). An adjustment hole (242) is provided on one side of the connecting rod (241), and the size of the adjustment hole (242) is adapted to the size of the bolt (232).
6. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 5, characterized in that: The number of adjustment holes (242) is four, and the distance between two adjacent adjustment holes (242) is the same. The bolt (232) passes through the inner cavity of the adjustment hole (242).
7. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 6, characterized in that: The outer ring of the connecting rod (241) is movably fitted with a collar (243), and a ground-inserting cone (245) is fixed at the bottom of the collar (243). The surface of the ground-inserting cone (245) is fixed with an anti-detachment puncture (244).
8. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 7, characterized in that: The anchor (22) includes a rotating plate (221) rotatably connected to one end of the connecting rod (241), a fixing block (222) is fixed at the bottom of the rotating plate (221), and an anchoring claw (225) is fixed on one side of the fixing block (222).
9. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 8, characterized in that: A fixing rod (223) is fixed to the surface of the fixing block (222), and a vertical plate (224) is rotatably sleeved on the surface of the fixing rod (223). A barb rod (226) is fixed to one side of the vertical plate (224).
10. The geogrid structure at the junction of old and new roadbeds in highway reconstruction and expansion as described in claim 9, characterized in that: The main body (21) of the grid is made of high-strength polyester material, and the fixing seat (231), clamp (235), connector (24) and anchor (22) are all made of stainless steel.
